Loading...
HomeMy WebLinkAbout_ALL Volume 2 Conformed Set 90F/SF/SF/SF/SF/SF/SF/SF/S F/SF/S F/SF/S F/SF/SF/SF/SF/SF/SF/SF/SF/SF/SF/SF/SF/S F/S F/S 123 5 891011121314151617181920 6.18.1 L M N P Q O R S T Q.1 Q.6 R.3 20.2 02 0205 0508 08 R.5 20.3 R.4 Office-Students 402 Office-Students 404 Office-Students 416 Hybrid Lab - Unassigned 418 Emeritus Suite 410 Faculty Office 405 Faculty Office 407 Faculty Office 409 Faculty Office 411 Faculty Office 413 Faculty Office 415 Faculty Office 417 Office-Lecturer 419 Faculty Office 421 Med. Conference 423 Touch-Down / Hoteling Workspace 401 Egress Stair W 40001 Egress Stair N 40002 Elev P.4 40070 M.Eng Fab Area 425 Hybrid Lab - Soft Systems 442 619 SF Office-Students 446 Faculty Office 443 Faculty Office 451 Faculty Service Center 440 Shared Student Office 406 Shaft SH401 Shaft SH402 Exhibition 40040A Shaft SH404 Shaft SH203 Shaft SH407 Service Corridor 40024 West Corridor 40040 Shaft SH408 Shaft SH409 Elec 40060 Open Stair NE 40003 Dry / Computational Lab 414 Research Conference 431 Office-Students 441 Informal Collaboration 437 M.Eng Study Area 429 NE Corridor 40041 Unisex 40020 M.Eng Study Area 429A M.Eng Study Area 429B V10 FCU V10 FCU V08 FCU V08 FCU V02 FCU V02 FCU V02 FCU V02 FCU V02 FCU V02 FCU V02 FCU V02 FCU V02 FCU V02 FCU V04 FCU V03 FCU V03 FCU V03 FCU V10 FCU V10 FCU V10 FCU V10 FCU V08 FCU H08 FCU H02 FCU H02 FCU H04 FCU H03 FCU V08 FCU V04 FCU V10 FCUV08 FCU V08 FCU V08 FCU HR08 FCU 4-9 VAVS 4-7 VAVR 4-7 VAVS DUCT SHAFT 12 14X10 SAD DN DUCT SHAFT 11 14X10 SAD UP/DN 4-2 VAVR 4-4 VAVR 4-6 VAVR 4-6 VAVS 4-8 VAVS 30 ZRT 80 ZRT 4-1 VAVS 4-1 VAVR 4-2 VAVS 4-11 VAVS 4-9 VAVR 4-10 VAVS 4-8 VAVR 50 ZRT 80 ZRT TYP. OF 9 CD 220 CFM 4-17 VAVS CR 300 CFM CD 300 CFM CD 380 CFM CR 380 CFM CD 240 CFM CR 240 CFM CD 140 CFM CR 140 CFM CD 240 CFM CR 240 CFM CR 160 CFM CD 160 CFM CR 200 CFM CD 280 CFM CR 280 CFM CD 220 CFM 35X20 TEX UP 28X20 TEX DN CD 310 CFM4-12 VAVS 4-10 VAVR V04 FCU HR06 FCU 20"x12"TRANSFER TG 16"x16" TYP (4) 75 ZRT 75 ZRT EG 450 CFM 4-1 VAVE 4-2 VAVE EG 450 CFM 4-5 VAVR 36' FT-A 12 FT-A 20' FT-A 5' FT-A (2) 4" TAP W/CAP 4-6 VAVE (2) 4" TAP W/CAP 80 ZRT (3) 4" TAP W/CAP H06 FCU 4-16 VAVS Faculty Office 449 Sm. Conference 447 Telecom 428 4-4 VAVS 4-3 VAVE 4-4 VAVE 100 ZRT 50 ZRT 4-13 VAVS 4-15 VAVS CR 440 CFM 4-7 VAVE DUCT SHAFT 3 16X12 RAD UP/DN 20X12 SAD UP/DN DUCT SHAFT 10 26X20 EAD UP/DN 20X20 RAD UP/DN DUCT SHAFT 8 20X16 EAD UP/DN 20X18 FUTURE DUCT UP/DN 20X16 RAD UP/DN 20X35 SAD UP/DN DUCT SHAFT 9 55X18 SAN UP/DN 22X18 RAD UP/DN 24X18 EAD UP/DN DUCT SHAFT 15 20X16 EAD UP/DN 12X12 RAD UP/DN 20X30 SAD UP/DN DUCT SHAFT 14 34X24 SAD UP 26X24 SAD DN 26X24 RAD UP/DN DUCT SHAFT 13 24X18 SAD UP/DN 20X18 RAD UP/DN DUCT SHAFT 2 24x10 SAD UP JOG OVER 24x10 SAD DN DUCT SHAFT 10 40X20 SAD UP 34X20 SAD DN 12"x6"SA OFSET DUCTWORK IN SHAFT TO COORDINATE WITH ROOF PENETRATION LOCATION MATCHLINE SEE /1 M-2004B MATCHLINE SEE /1 M-2004B CD 180 CFM 4-24 VAVS H04 FCU H02 FCU 12"x5"SA 90 ZRT Machine Shop / Support 442A 244 SF Hood Lab 442B 275 SF CR 270 CFM 14"x8"EA CR 340 CFM 24"x10"EA 12"x6"EA 4-17 VAVE 4-18 VAVE 14"x6"EA14"x6"SA 12"x6"SA CD 270 CFM CD 375 CFM CD 340 CFM 14"x10"SA 24"x8"SA 4-26 VAVS 12"x8"SA 14"x8"SAHR02 FCU HR02 FCU CR 310 CFM 4-3 VAVR 4-5 VAVS CR 160 CFM CD 160 CFM 4-3 VAVS CD 200 CFM 14"x6"SA 12"x5"SA 14"x8"RA14"x6"RA 14"x8"SA 16"x6"SA 12"x5"SA 16"x6"RA 12"x5"SA18"x8"SA CR CR 12"x5"RA 12"x6"SA 12"x5"SA 12"x5"RA 12"x5"SA 12"x5"RA 12"x5"RA 12"x5"SA 12"x5"SA 12"x5"SA 7 FT-C 90 ZRT CR 20"x8"SA 12"x5"SA12"x6"RA 12"x6"SA CR 16"x8"RA 18"x10"EA 14"x8"EA 14"x8"EA 14"x6"SA 12"x5"SA 14"x6"SA 12"x5"RA WG 400 CFM CD 375 CFM 4-1 LVAV11"øEA4-3 LVAV4-3 HC CR 220 CFM 4-2 LVAV 6"øEA BMS CONTROL PANEL COORDINATE EXACT LOCATION WITH IT 120 ZRT 6"øEA FINTUBE TO BE MOUNTED AGAINST UNDERSIDE OF LANDING FINTUBE TO BE MOUNTED AGAINST UNDERSIDE OF LANDING 20"x6"EA 30"x8"EA 20"x10"EA12"x5"RA Sheet Title Approved Checked Drawn Job Number Date Sheet Information Revisions MEP FP ME Engineers 29 West 38th Street, 5th Floor New York, NY 10018 t 212.447.6770 f 212.447.6615 STRUCTURAL ENGINEER/ SUSTAINABILITY CONSULTANT Thornton Tomasetti 51 Madison Ave. New York, N.Y. 10010 t 917.661.7800 f 917.661.7801 LIGHTING CONSULTANT Lumen Architecture 214 W 29th Street Suite 1005 New York, NY 10001 t 212.564.6469 f 917.591.2524 LANDSCAPE ARCHITECT Trowbridge Wolf Michaels 1001 West Seneca Street Suite 101Ithaca, NY 14850 t 607.277.1400 f 000.000.0000 162345 A E B C D 162345 A E B C D Copyright © 2013 Perkins+Will 227 West 29th Street, 7th Flr. New York, NY 10001 t: 212 505-5955 f: 212 505-1648 CIVIL ENGINEER TG Miller PC 203 North Aurora Street Ithaca, NY 14850 t 607.272.6477 f 607.273.6322 AV / ACOUSTICS The Sextant Group 244 Madison Avenue Suite 311 New York NY 10016 t 877.684.2311 f 412.323.8538 CODE CONSULTANT Code Consultants Professional Engineers, PC 215 West 40th Street 15th Floor New York, NY 10018 t 212.216.9596 f 212.216.9619 C:\Users\edgar.avila\Documents\Upson Hall_MECH_PLUMB_FP_Josue.Avila.rvtM-2004A MECHANICAL CONSTRUCTION PLAN - LEVEL 04 PART A MEE MEE 031549.000 11/07/2014 MEE Upson Hall Renovation 124 Hoy Rd, Ithaca, NY 14850 Cornell University 215 Park Avenue South 4th Floor New York, NY 10003 t 212.251.7000 f 212.251.7111 www.perkinswill.com GENERAL NOTES 1. SEE PHASING NOTES ON LEGEND SHEETS 2. CONDENSATE DRAIN PIPE SHALL BE PITCHED AT 1/8" PER FOOT. 3. DRAWINGS ARE DIAGRAMMATIC IN NATURE, AND ARE PROVIDED TO CONVEY THE DESIGN INTENT. REGARDLESS OF HOW INDICATED, ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH ALL MANUFACTURER'S RECOMMENDATIONS AND AS REQUIRED TO PROVIDE NEC, SERVICE AND MAINTENANCE CLEARANCES. PROVIDE ADDITIONAL OFFSETS AND FITTINGS AS REQUIRED FOR DUCTWORK AND PIPING. 4. REFER TO SPECS FOR INSULATION REQUIREMENTS ON DUCTWORK AND PIPING. ALL CONCEALED DUCTWORK AND PIPING SHALL BE INSULATED PER ENERGY CODE. 5. ALL EXPOSED DUCTWORK SHALL BE PAINTED AS PER ARCHITECT SPECIFICATION AND NOT INSULATED. ALL CONCEALED DUCTWORK SHALL BE INSULATED AS PER SPECIFICATIONS. 6. ALL VAV BOX AND FAN COIL HOUSING SHALL BE LINED AS PER ACOUSTICAL ENGINEERS REPORT. 7. BRANCH DUCT SIZES TO AIR DEVICES ARE EQUAL TO AIR DEVICE NECK SIZE, UNLESS NOTED OTHERWISE. 8. PROVIDE AN ACCESSIBLE, MANUAL VOLUME DAMPER AT EVERY BRANCH DUCT AND FOR EVERY INLET/OUTLET. PROVIDE MANUAL VOLUME DAMPER UPSTREAM OF ALL ZONE REGISTER TERMINALS. 9. ROUND SUPPLY DUCT SIZES TO VAV BOXES ARE EQUAL TO CONNECTION SIZE UNLESS NOTED OTHERWISE. 10. PROVIDE RECOMMENDED STRAIGHT DUCT INLET LENGTHS FOR ALL SOUND ATTENUATORS AND VAV BOXES. 11. ALL VAV BOXES SHALL BE INSTALLED ABOVE CEILINGS. 12. COORDINATE WITH ALL TRADES TO MAINTAIN ACCESS CLEARANCE TO EQUIPMENT. 13. CONTRACTOR TO FIELD COORDINATE ACCESS PANELS IN FINISH CEILING TO MAINTAIN ACCESS TO EXISTING DUCT MOUNTED ACCESS DOORS. SUBMIT PROPOSED ACCESS PANEL LOCATIONS FOR APPROVAL PRIOR TO INSTALLATION. 14. ALL DUCTS PENETRATING 1-HOUR RATED CONSTRUCTION SHALL BE EQUIPPED WITH AN APPROVED FIRE DAMPER AND INSTALLED AS PER DETAIL. 15. ALL DUCTS PENETRATING RATED SHAFTS AND 2-HOUR RATED CONSTRUCTION SHALL BE EQUIPPED WITH AN APPROVED FIRE SMOKE DAMPER AND INSTALLED AS PER DETAIL. 16. ALL PIPING PENETRATION 1-HOUR AND 2- HOUR RATED CONSTRUCTION SHALL BE INSTALLED AS PER DETAIL. 17. ALL DIFFUSERS SHALL BE HARD DUCTED AS PER DETAIL. 18. ALL PIPING FOR VERTICAL FAN COIL UNITS IS TO BE LOCATED WITHIN PIPE ENCLOSURE BELOW WINDOWS. 19. CONTROL VALVES SHALL BE PROVIDED FOR EACH PIECE OF HYDRONIC EQUIPMENT. SEE DETAIL SHEETS FOR PIPING CONFIGURATION. 19. REFER TO ARCHITECTURAL DRAWINGS FOR DESIGN GUIDELINES FOR LAYOUT AND PLACEMENT OF ALL EXPOSED INFRASTRUCTURE INCLUDING PIPING, SPRINKLERS, CONDUIT, DUCTWORK, CABLE TRAYS, LIGHTING AND CEILING DEVICES. CONSULT ARCHITECT IF ANY QUESTIONS ARISE ABOUT DESIGN INTENT. KEYNOTES# NO ISSUE DATE 1 100% DD DOCUMENTS 14/08/28 2 50% CONSTRUCTION DOCUMENTS 14/11/07 3 BID SET 15/02/27 4 Addendum No. 3 15/03/31 1/8" = 1'-0"1 MECHANICAL CONSTRUCTION PLAN - LEVEL 04 PART A