Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
_ALL Volume 2 Conformed Set 85
F/SF/SF/SF/SF/SF/SF/SF/SF/SF/S F/S F/S 12 456 88.1 8.910.1 2.6 A B C D E F G H J K L 02 0205 0508 08 South Corridor 20042 V12 FCU V12 FCU V12 FCU V10 FCU V10 FCU V10 FCU HR06 FCU H10 FCU H10 FCU V04 FCU V04 FCU HR02 FCU HR02 FCU 60 ZRT 60 ZRT CR 440 CFM CR 430 CFM 2-16 VAVS CD 430 CFM 40 ZRT Bellis Fluid Mechanics Instruction 256 Engineered Materials Instruction 264 Teaching Labs Support Shop 270 347 SF Teaching Support Specialist 268 Teaching Support Specialist 266 Heat Transfer Instruction 260 812 SF Teaching Support 264A Drop Tower Prep Lab 272 2-17 VAVS Teaching Support Specialist 273 60 ZRT CD 140 CFM CR 140 CFM 2-19 VAVS 20"x10"SA7' FT-A 7' FT-A 7' FT-A 7' FT-A 7' FT-A 7' FT-A 2-11 VAVR V06 FCU V06 FCU 2-15 VAVS CD 450 CFM 2-10 VAVR 14"x10"SA 12"x8"RA 18"x10"SA 14"x10"SA CD 350 CFM CD 355 CFM CR 355 CFM CR 350 CFM 2-12 VAVR 2-18 VAVS 2-13 VAVR 14"x10"RA CD 540 CFM 20"x10"SA CR 470 CFM CR 470 CFM DUCT SHAFT 1 12X8 SAD UP DUCT SHAFT 5 20X20 EAD UP/DN 18X18 RAD UP/DN 20X20 SAD UP/DN DUCT SHAFT 6 20X22 RAD UP/DN 20X44 SAD UP/DN DUCT SHAFT 7 20X15 RAD UP 20X34 SAD UP DUCT SHAFT 4 30X24 SAD UP/DN 30X26 EAD UP/DN 30X30 SPRAY BOOTH EX UP/DN GENERATOR COOLANT UP/DN MATCHLINE SEE /1 M-2002A MATCHLINE SEE /1 M-2002A Circulation 20046 Restroom 20027 Shaft 20066 Custodial 20064 Elev F.2 20071 Egress Stair S 20004 South Corridor 20042 Circulation 20044 Grumman Offices GRU21 HH08 FCU 16x12 SAD UP/DN 2-21 VAVS CD 100 CFM CD 100 CFM WG 300 CFM 12"x7"SA 16"x10"SA14"x7"SA14"x7"SA8 FT-C CD 440 CFM CR 440 CFM CR 450 CFM CR CR CR HR10 FCU CR GENERAL LAB EXHAUST TAP WITH FSD TAPPED SEPARATELY FROM FUME HOOD TAP WITH 2- HOUR FIRE WRAP. 2-1 LVAV 2-2 LVAV CR 470 CFM 2-3 LVAV CD 540 CFM 12"x5"SA 12"x5"SA 8"øEA 13"øEA 20"x10"EA9"øEA14"x12"SA8"øEA 2-3 HC 20"x10"SA 10" ENGINE EXHAUST WITH 4" INSULATION UP TO ROOF. 12"x8"SA 4" TAP W/CAP (TYP. OF 3) 14"x8"EA (E)GRUMMAN LAB EXHAUST UP FINTUBE TO BE MOUNTED AGAINST UNDERSIDE OF LANDING 14"x6"SA 14"x8"RA 12"x7"RA12"x7"RAHORIZONTAL FSD HORIZONTAL FSD HORIZONTAL FSD Sheet Title Approved Checked Drawn Job Number Date Sheet Information Revisions MEP FP ME Engineers 29 West 38th Street, 5th Floor New York, NY 10018 t 212.447.6770 f 212.447.6615 STRUCTURAL ENGINEER/ SUSTAINABILITY CONSULTANT Thornton Tomasetti 51 Madison Ave. New York, N.Y. 10010 t 917.661.7800 f 917.661.7801 LIGHTING CONSULTANT Lumen Architecture 214 W 29th Street Suite 1005 New York, NY 10001 t 212.564.6469 f 917.591.2524 LANDSCAPE ARCHITECT Trowbridge Wolf Michaels 1001 West Seneca Street Suite 101Ithaca, NY 14850 t 607.277.1400 f 000.000.0000 162345 A E B C D 162345 A E B C D Copyright © 2013 Perkins+Will 227 West 29th Street, 7th Flr. New York, NY 10001 t: 212 505-5955 f: 212 505-1648 CIVIL ENGINEER TG Miller PC 203 North Aurora Street Ithaca, NY 14850 t 607.272.6477 f 607.273.6322 AV / ACOUSTICS The Sextant Group 244 Madison Avenue Suite 311 New York NY 10016 t 877.684.2311 f 412.323.8538 CODE CONSULTANT Code Consultants Professional Engineers, PC 215 West 40th Street 15th Floor New York, NY 10018 t 212.216.9596 f 212.216.9619 C:\Users\edgar.avila\Documents\Upson Hall_MECH_PLUMB_FP_Josue.Avila.rvtM-2002B MECHANICAL CONSTRUCTION PLAN - LEVEL 02 PART B MEE MEE 031549.000 11/07/2014 MEE Upson Hall Renovation 124 Hoy Rd, Ithaca, NY 14850 Cornell University 215 Park Avenue South 4th Floor New York, NY 10003 t 212.251.7000 f 212.251.7111 www.perkinswill.com NO ISSUE DATE 1 BID SET 15/02/27 2 Addendum No. 3 15/03/31 GENERAL NOTES 1. SEE PHASING NOTES ON LEGEND SHEETS 2. CONDENSATE DRAIN PIPE SHALL BE PITCHED AT 1/8" PER FOOT. 3. DRAWINGS ARE DIAGRAMMATIC IN NATURE, AND ARE PROVIDED TO CONVEY THE DESIGN INTENT. REGARDLESS OF HOW INDICATED, ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH ALL MANUFACTURER'S RECOMMENDATIONS AND AS REQUIRED TO PROVIDE NEC, SERVICE AND MAINTENANCE CLEARANCES. PROVIDE ADDITIONAL OFFSETS AND FITTINGS AS REQUIRED FOR DUCTWORK AND PIPING. 4. REFER TO SPECS FOR INSULATION REQUIREMENTS ON DUCTWORK AND PIPING. ALL CONCEALED DUCTWORK AND PIPING SHALL BE INSULATED PER ENERGY CODE. 5. ALL EXPOSED DUCTWORK SHALL BE PAINTED AS PER ARCHITECT SPECIFICATION AND NOT INSULATED. ALL CONCEALED DUCTWORK SHALL BE INSULATED AS PER SPECIFICATIONS. 6. ALL VAV BOX AND FAN COIL HOUSING SHALL BE LINED AS PER ACOUSTICAL ENGINEERS REPORT. 7. BRANCH DUCT SIZES TO AIR DEVICES ARE EQUAL TO AIR DEVICE NECK SIZE, UNLESS NOTED OTHERWISE. 8. PROVIDE AN ACCESSIBLE, MANUAL VOLUME DAMPER AT EVERY BRANCH DUCT AND FOR EVERY INLET/OUTLET. PROVIDE MANUAL VOLUME DAMPER UPSTREAM OF ALL ZONE REGISTER TERMINALS. 9. ROUND SUPPLY DUCT SIZES TO VAV BOXES ARE EQUAL TO CONNECTION SIZE UNLESS NOTED OTHERWISE. 10. PROVIDE RECOMMENDED STRAIGHT DUCT INLET LENGTHS FOR ALL SOUND ATTENUATORS AND VAV BOXES. 11. ALL VAV BOXES SHALL BE INSTALLED ABOVE CEILINGS. 12. COORDINATE WITH ALL TRADES TO MAINTAIN ACCESS CLEARANCE TO EQUIPMENT. 13. CONTRACTOR TO FIELD COORDINATE ACCESS PANELS IN FINISH CEILING TO MAINTAIN ACCESS TO EXISTING DUCT MOUNTED ACCESS DOORS. SUBMIT PROPOSED ACCESS PANEL LOCATIONS FOR APPROVAL PRIOR TO INSTALLATION. 14. ALL DUCTS PENETRATING 1-HOUR RATED CONSTRUCTION SHALL BE EQUIPPED WITH AN APPROVED FIRE DAMPER AND INSTALLED AS PER DETAIL. 15. ALL DUCTS PENETRATING RATED SHAFTS AND 2-HOUR RATED CONSTRUCTION SHALL BE EQUIPPED WITH AN APPROVED FIRE SMOKE DAMPER AND INSTALLED AS PER DETAIL. 16. ALL PIPING PENETRATION 1-HOUR AND 2- HOUR RATED CONSTRUCTION SHALL BE INSTALLED AS PER DETAIL. 17. ALL DIFFUSERS SHALL BE HARD DUCTED AS PER DETAIL. 18. ALL PIPING FOR VERTICAL FAN COIL UNITS IS TO BE LOCATED WITHIN PIPE ENCLOSURE BELOW WINDOWS. 19. CONTROL VALVES SHALL BE PROVIDED FOR EACH PIECE OF HYDRONIC EQUIPMENT. SEE DETAIL SHEETS FOR PIPING CONFIGURATION. 19. REFER TO ARCHITECTURAL DRAWINGS FOR DESIGN GUIDELINES FOR LAYOUT AND PLACEMENT OF ALL EXPOSED INFRASTRUCTURE INCLUDING PIPING, SPRINKLERS, CONDUIT, DUCTWORK, CABLE TRAYS, LIGHTING AND CEILING DEVICES. CONSULT ARCHITECT IF ANY QUESTIONS ARISE ABOUT DESIGN INTENT. KEYNOTES# 1/8" = 1'-0"1 MECHANICAL CONSTRUCTION PLAN - LEVEL 02 PART B