Loading...
HomeMy WebLinkAbout_ALL Volume 2 Conformed Set 83F/S F/S F/SF/S F/S F/SF/SF/SF/SF/SF/SF/SF/SF/S F/SF/S123 5 891011121314151617181920 6.18.1 L M N P Q O R S T Q.1 Q.6 R.3 20.2 02 0205 0508 08 R.5 20.3 R.4 Taylor Design Studio 242 Machine Shop / Support 252 Exam Storage/Workroom 246 Egress Stair W 20001 Med. Conf./Study 205A Small Medium Classroom 202 Medium Classroom 206 Medium Large Classroom 216 Medium Classroom 222 Egress Stair N 20002 CIT Computer Lab 225 Meeting 215 CIT Lab Staff Office 223 Teaching Support 248 Elev P.2 20070 AV Storage 206A AV Storage 222A Lactation Room 221 Sm. Conference 219 AV Storage 216A AV Storage 202A Informal Collaboration 231 Swanson Lab for Adv. Engineering Simulation 240 Shaft SH202 Shaft SH203 Shaft SH204 West Corridor 20040 NE Corridor 20041 Service Corridor 20024 Shaft SH209 Shaft SH210 Elec 20060 Homework Collection 281 Shaft SH201 Open Stair NE 20003 Elec 20062 Telecom 228 Unisex 20020 Men 20022 Women 20023 Custodial 20061 Med. Conf./Study 205 Med. Conf./Study 205C Med. Conf./Study 205B Touch-Down / Hoteling Workspace 201 V10 FCU V10 FCU V10 FCU V10 FCU V10 FCU V10 FCU V02 FCU V02 FCU V02 FCU V08 FCU V08 FCU V08 FCU V10 FCU V10 FCU V10 FCU V10 FCU HR08 FCU HR08 FCU HR02 FCU H10 FCU H04 FCU H06 FCU H06 FCU H10 FCU HR02 FCU 2-1 VAVS 2-4 VAVS 2-7 VAVS 60 ZRT 120 ZRT 2-3 VAVS 2-9 VAVS 2-10 VAVS CD 300 CFM CR 420 CFM CR 250 CFM CD 250 CFM CR 230 CFMCD 230 CFM CD 420 CFM 2-14 VAVS CR 440 CFM CD 220 CFM CR 500 CFM CD 280 CFM CD 500 CFM CD 560 CFM CR 560 CFM CD 210 CFM CR 490 CFM CR 450 CFM CD 450 CFM CD 490 CFM 2-5 VAVR 2-6 VAVS 2-5 VAVS 80 ZRT 28X16 TEX UP 20X16 TEX DN 2-2 VAVS 10"x6"SA 12"x6"SA CD 420 CFM H06 FCU 50 ZRT 18"x8"SA CD 440 CFM CR 440 CFM 20"x12"TRANSFER TG 16"x16" TYP (4) 75 ZRT 75 ZRT EG 450 CFM 2-1 VAVE 2-2 VAVE 20"x10"EA EG 450 CFM 2-4 VAVR 2-1 VAVR 2-2 VAVR 20' FT-A 7' FT-A 7' FT-A 36' FT-A 12' FT-A 7' FT-A 7' FT-A 7' FT-A 3' FT-A 2-9 VAVR 2-6 VAVR 2-13 VAVS 2-8 VAVS CR 420 CFM 20"x8"RA 12"x8"RA 16"x10"SA 18"x8"SA2-12 VAVS 2-8 VAVR 18"x8"EA 2-3 VAVE 60 ZRT 16"x8"EA DUCT SHAFT 12 14X10 SAD UP/DN DUCT SHAFT 11 14X10 SAD UP DUCT SHAFT 10 14X20 RAD UP DUCT SHAFT 8 20X16 EAD UP 20X18 FUTURE DUCT UP 20X16 RAD UP 20X35 SAD UP DUCT SHAFT 9 55X18 SAN UP/DN 22X18 RAD UP/DN 24X18 EAD UP/DN DUCT SHAFT 15 20X16 EAD UP/DN 12X12 RAD UP/DN 20X30 SAD UP/DNDUCT SHAFT 14 26X24 SAD UP/DN 26X24 RAD UP/DN DUCT SHAFT 13 16X14 SAD UP 16X14 RAD UP DUCT SHAFT 2 12X6 SAD UP/DN DUCT SHAFT 10 14X20 RAD DN 14X20 SAD UP/DN DUCT SHAFT 3 16X12 RAD UP 20X12 SAD UP V10 FCU V10 FCU V10 FCU MATCHLINE SEE /1 M-2002B MATCHLINE SEE /1 M-2002B 60 ZRT H02 FCU 7 FT-C 8 FT-C CD 440 CFM CR CR CR CR 2-4 VAVE 14"x8"SA 2-11 VAVS WG 400 CFM 12"x6"SA 12"x6"SA 12"x8"SA BMS CONTROL PANEL COORDINATE EXACT LOCATION WITH IT 12"x8"SA 4" TAP W/CAP (TYP. OF 3) 14"x8"EA 14"x8"EA120 ZRT 6"øEA FINTUBE TO BE MOUNTED AGAINST UNDERSIDE OF LANDING FINTUBE TO BE MOUNTED AGAINST UNDERSIDE OF LANDING 14"x6"SA 14"x6"SA 16"x10"SA 14"x8"SA14"x8"RA14"x8"RA 10"x10"RA 24"x8"SA HORIZONTAL FSD HORIZONTAL FSD HORIZONTAL FSD Sheet Title Approved Checked Drawn Job Number Date Sheet Information Revisions MEP FP ME Engineers 29 West 38th Street, 5th Floor New York, NY 10018 t 212.447.6770 f 212.447.6615 STRUCTURAL ENGINEER/ SUSTAINABILITY CONSULTANT Thornton Tomasetti 51 Madison Ave. New York, N.Y. 10010 t 917.661.7800 f 917.661.7801 LIGHTING CONSULTANT Lumen Architecture 214 W 29th Street Suite 1005 New York, NY 10001 t 212.564.6469 f 917.591.2524 LANDSCAPE ARCHITECT Trowbridge Wolf Michaels 1001 West Seneca Street Suite 101Ithaca, NY 14850 t 607.277.1400 f 000.000.0000 162345 A E B C D 162345 A E B C D Copyright © 2013 Perkins+Will 227 West 29th Street, 7th Flr. New York, NY 10001 t: 212 505-5955 f: 212 505-1648 CIVIL ENGINEER TG Miller PC 203 North Aurora Street Ithaca, NY 14850 t 607.272.6477 f 607.273.6322 AV / ACOUSTICS The Sextant Group 244 Madison Avenue Suite 311 New York NY 10016 t 877.684.2311 f 412.323.8538 CODE CONSULTANT Code Consultants Professional Engineers, PC 215 West 40th Street 15th Floor New York, NY 10018 t 212.216.9596 f 212.216.9619 C:\Users\edgar.avila\Documents\Upson Hall_MECH_PLUMB_FP_Josue.Avila.rvtM-2002A MECHANICAL CONSTRUCTION PLAN - LEVEL 02 PART A MEE MEE 031549.000 11/07/2014 MEE Upson Hall Renovation 124 Hoy Rd, Ithaca, NY 14850 Cornell University 215 Park Avenue South 4th Floor New York, NY 10003 t 212.251.7000 f 212.251.7111 www.perkinswill.com GENERAL NOTES 1. SEE PHASING NOTES ON LEGEND SHEETS 2. CONDENSATE DRAIN PIPE SHALL BE PITCHED AT 1/8" PER FOOT. 3. DRAWINGS ARE DIAGRAMMATIC IN NATURE, AND ARE PROVIDED TO CONVEY THE DESIGN INTENT. REGARDLESS OF HOW INDICATED, ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH ALL MANUFACTURER'S RECOMMENDATIONS AND AS REQUIRED TO PROVIDE NEC, SERVICE AND MAINTENANCE CLEARANCES. PROVIDE ADDITIONAL OFFSETS AND FITTINGS AS REQUIRED FOR DUCTWORK AND PIPING. 4. REFER TO SPECS FOR INSULATION REQUIREMENTS ON DUCTWORK AND PIPING. ALL CONCEALED DUCTWORK AND PIPING SHALL BE INSULATED PER ENERGY CODE. 5. ALL EXPOSED DUCTWORK SHALL BE PAINTED AS PER ARCHITECT SPECIFICATION AND NOT INSULATED. ALL CONCEALED DUCTWORK SHALL BE INSULATED AS PER SPECIFICATIONS. 6. ALL VAV BOX AND FAN COIL HOUSING SHALL BE LINED AS PER ACOUSTICAL ENGINEERS REPORT. 7. BRANCH DUCT SIZES TO AIR DEVICES ARE EQUAL TO AIR DEVICE NECK SIZE, UNLESS NOTED OTHERWISE. 8. PROVIDE AN ACCESSIBLE, MANUAL VOLUME DAMPER AT EVERY BRANCH DUCT AND FOR EVERY INLET/OUTLET. PROVIDE MANUAL VOLUME DAMPER UPSTREAM OF ALL ZONE REGISTER TERMINALS. 9. ROUND SUPPLY DUCT SIZES TO VAV BOXES ARE EQUAL TO CONNECTION SIZE UNLESS NOTED OTHERWISE. 10. PROVIDE RECOMMENDED STRAIGHT DUCT INLET LENGTHS FOR ALL SOUND ATTENUATORS AND VAV BOXES. 11. ALL VAV BOXES SHALL BE INSTALLED ABOVE CEILINGS. 12. COORDINATE WITH ALL TRADES TO MAINTAIN ACCESS CLEARANCE TO EQUIPMENT. 13. CONTRACTOR TO FIELD COORDINATE ACCESS PANELS IN FINISH CEILING TO MAINTAIN ACCESS TO EXISTING DUCT MOUNTED ACCESS DOORS. SUBMIT PROPOSED ACCESS PANEL LOCATIONS FOR APPROVAL PRIOR TO INSTALLATION. 14. ALL DUCTS PENETRATING 1-HOUR RATED CONSTRUCTION SHALL BE EQUIPPED WITH AN APPROVED FIRE DAMPER AND INSTALLED AS PER DETAIL. 15. ALL DUCTS PENETRATING RATED SHAFTS AND 2-HOUR RATED CONSTRUCTION SHALL BE EQUIPPED WITH AN APPROVED FIRE SMOKE DAMPER AND INSTALLED AS PER DETAIL. 16. ALL PIPING PENETRATION 1-HOUR AND 2- HOUR RATED CONSTRUCTION SHALL BE INSTALLED AS PER DETAIL. 17. ALL DIFFUSERS SHALL BE HARD DUCTED AS PER DETAIL. 18. ALL PIPING FOR VERTICAL FAN COIL UNITS IS TO BE LOCATED WITHIN PIPE ENCLOSURE BELOW WINDOWS. 19. CONTROL VALVES SHALL BE PROVIDED FOR EACH PIECE OF HYDRONIC EQUIPMENT. SEE DETAIL SHEETS FOR PIPING CONFIGURATION. 19. REFER TO ARCHITECTURAL DRAWINGS FOR DESIGN GUIDELINES FOR LAYOUT AND PLACEMENT OF ALL EXPOSED INFRASTRUCTURE INCLUDING PIPING, SPRINKLERS, CONDUIT, DUCTWORK, CABLE TRAYS, LIGHTING AND CEILING DEVICES. CONSULT ARCHITECT IF ANY QUESTIONS ARISE ABOUT DESIGN INTENT. KEYNOTES# NO ISSUE DATE 1 100% DD DOCUMENTS 14/08/28 2 50% CONSTRUCTION DOCUMENTS 14/11/07 3 BID SET 15/02/27 4 Addendum No. 3 15/03/31 1/8" = 1'-0"1 MECHANICAL CONSTRUCTION PLAN - LEVEL 02 PART A