Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
_ALL Volume 2 Conformed Set 81
F/SF/SF/SF/SF/SF/SF/SF/S F/S 12 456 88.1 8.910.1 2.6 A B C D E F G H J K L 02 0205 0508 08 Building Services 172A Elev F.1 10071 Egress Stair S 10004 Shaft 10066 Drop Tower Shaft 195 South Corridor 10042 AV Storage 142A Small Classroom 152 MAE Wind Tunnel Equipment 154 Fluid Dynamics - Wind Tunnel Lab 166 Wind Energy Lab (Barthelmie) 168 Fluid Dynamics - Tow Tank Lab 160 Fluid Dynamics - Water Channel Lab 162 Shaft SH102 Grumman Corridor 10048 Toilets 10024 Custodial 10026 Shaft SH107 Elec 10063 Circulation 10047 Toilets 10025 Grumman Labs GRU10 Grumman Offices GRU11 DUCT SHAFT 5 20X20 EAD UP 18X18 RAD UP 20X20 SAD UP V10 FCU V12 FCU HR08 FCU H06 FCU H06 FCU H06 FCU H10 FCU H08 FCU H08 FCU HH06 FCU 1-18 VAVS 1-17 VAVS 1-16 VAV (TYP. OF 3) 1-19 VAVS 1-15 VAVS CR 370 CFM CR 490 CFM CD 370 CFM 14"x6"SA 14"x8"RA 14"x6"RA V02 FCU CD 510 CFM CD 510 CFM CD 510 CFM 14"x8"SACD 370 CFM 18"x8"SA CD 360 CFM 18"x8"RA 1-14 VAVS CR 360 CFM CR 510 CFM CR 510 CFM CR 510 CFM CD 420 CFM 26"x10"SA CD 570 CFM 8' FT-A 8' FT-A 8' FT-A 8' FT-A 8' FT-A 8' FT-A 8' FT-A 1-13 VAVR 1-11 VAVR 1-12 VAVR CR 420 CFM 1-15 VAVR 1-14 VAVR CR 570 CFM 1-3 VAVE 14"x8"SA MATCHLINE SEE /1 M-2001A MATCHLINE SEE /1 M-2001A DUCT SHAFT 4 30X24 SAD UP/DN 30X26 EAD UP/DN 30X30 SPRAY BOOTH EX UP/DN GENERATOR COOLANT UP/DN DUCT SHAFT 6 20X22 RAD UP 20X44 SAD UP HH08 FCU 16x12 SAD UP/DN 1-20 VAVS CD 120 CFM 80 ZRT CD 490 CFM 24"x8"RA26"x10"RA 14"x8"RA14"x8"RA14"x6"RA CR 370 CFM 14"x6"RA 26"x10"SA14"x8"SA25"x8"SA26"x10"SA14"x8"RA 16"x6"RA16"x6"SA 18"x10"RA 18"x10"SA 25"x10"RA 12"x5"SACR WG 580 CFM 10" ENGINE EXHAUST WITH 4" INSULATION UP TO ROOF. 12"x5"SA 4" TAP W/CAP (TYP. OF 4) 14"x8"EA 14"x8"EA14"x8"EA 12"x6"SA (E)GRUMMAN LAB EXHAUST UP 90X60 INTAKE LOUVER WITH 12" DEEP PLENUM 90X60 RELIEF LOUVER WITH 12" DEEP PLENUM 60X24 MAKEUP AIR DUCT DN TO BASEMENT GENERATOR ROOM. 60X24 RELIEF AIR DUCT DN TO BASEMENT GENERATOR ROOM. 14"x6"SA L06 EXISTING TO REMAIN UNIT HEATER. MAINTAIN PIPING AND POWER. 60 ZRT Sheet Title Approved Checked Drawn Job Number Date Sheet Information Revisions MEP FP ME Engineers 29 West 38th Street, 5th Floor New York, NY 10018 t 212.447.6770 f 212.447.6615 STRUCTURAL ENGINEER/ SUSTAINABILITY CONSULTANT Thornton Tomasetti 51 Madison Ave. New York, N.Y. 10010 t 917.661.7800 f 917.661.7801 LIGHTING CONSULTANT Lumen Architecture 214 W 29th Street Suite 1005 New York, NY 10001 t 212.564.6469 f 917.591.2524 LANDSCAPE ARCHITECT Trowbridge Wolf Michaels 1001 West Seneca Street Suite 101Ithaca, NY 14850 t 607.277.1400 f 000.000.0000 162345 A E B C D 162345 A E B C D Copyright © 2013 Perkins+Will 227 West 29th Street, 7th Flr. New York, NY 10001 t: 212 505-5955 f: 212 505-1648 CIVIL ENGINEER TG Miller PC 203 North Aurora Street Ithaca, NY 14850 t 607.272.6477 f 607.273.6322 AV / ACOUSTICS The Sextant Group 244 Madison Avenue Suite 311 New York NY 10016 t 877.684.2311 f 412.323.8538 CODE CONSULTANT Code Consultants Professional Engineers, PC 215 West 40th Street 15th Floor New York, NY 10018 t 212.216.9596 f 212.216.9619 C:\Users\edgar.avila\Documents\Upson Hall_MECH_PLUMB_FP_Josue.Avila.rvtM-2001B MECHANICAL CONSTRUCTION PLAN - LEVEL 01 PART B MEE MEE 031549.000 11/07/2014 MEE Upson Hall Renovation 124 Hoy Rd, Ithaca, NY 14850 Cornell University 215 Park Avenue South 4th Floor New York, NY 10003 t 212.251.7000 f 212.251.7111 www.perkinswill.com GENERAL NOTES 1. SEE PHASING NOTES ON LEGEND SHEETS 2. CONDENSATE DRAIN PIPE SHALL BE PITCHED AT 1/8" PER FOOT. 3. DRAWINGS ARE DIAGRAMMATIC IN NATURE, AND ARE PROVIDED TO CONVEY THE DESIGN INTENT. REGARDLESS OF HOW INDICATED, ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH ALL MANUFACTURER'S RECOMMENDATIONS AND AS REQUIRED TO PROVIDE NEC, SERVICE AND MAINTENANCE CLEARANCES. PROVIDE ADDITIONAL OFFSETS AND FITTINGS AS REQUIRED FOR DUCTWORK AND PIPING. 4. REFER TO SPECS FOR INSULATION REQUIREMENTS ON DUCTWORK AND PIPING. ALL CONCEALED DUCTWORK AND PIPING SHALL BE INSULATED PER ENERGY CODE. 5. ALL EXPOSED DUCTWORK SHALL BE PAINTED AS PER ARCHITECT SPECIFICATION AND NOT INSULATED. ALL CONCEALED DUCTWORK SHALL BE INSULATED AS PER SPECIFICATIONS. 6. ALL VAV BOX AND FAN COIL HOUSING SHALL BE LINED AS PER ACOUSTICAL ENGINEERS REPORT. 7. BRANCH DUCT SIZES TO AIR DEVICES ARE EQUAL TO AIR DEVICE NECK SIZE, UNLESS NOTED OTHERWISE. 8. PROVIDE AN ACCESSIBLE, MANUAL VOLUME DAMPER AT EVERY BRANCH DUCT AND FOR EVERY INLET/OUTLET. PROVIDE MANUAL VOLUME DAMPER UPSTREAM OF ALL ZONE REGISTER TERMINALS. 9. ROUND SUPPLY DUCT SIZES TO VAV BOXES ARE EQUAL TO CONNECTION SIZE UNLESS NOTED OTHERWISE. 10. PROVIDE RECOMMENDED STRAIGHT DUCT INLET LENGTHS FOR ALL SOUND ATTENUATORS AND VAV BOXES. 11. ALL VAV BOXES SHALL BE INSTALLED ABOVE CEILINGS. 12. COORDINATE WITH ALL TRADES TO MAINTAIN ACCESS CLEARANCE TO EQUIPMENT. 13. CONTRACTOR TO FIELD COORDINATE ACCESS PANELS IN FINISH CEILING TO MAINTAIN ACCESS TO EXISTING DUCT MOUNTED ACCESS DOORS. SUBMIT PROPOSED ACCESS PANEL LOCATIONS FOR APPROVAL PRIOR TO INSTALLATION. 14. ALL DUCTS PENETRATING 1-HOUR RATED CONSTRUCTION SHALL BE EQUIPPED WITH AN APPROVED FIRE DAMPER AND INSTALLED AS PER DETAIL. 15. ALL DUCTS PENETRATING RATED SHAFTS AND 2-HOUR RATED CONSTRUCTION SHALL BE EQUIPPED WITH AN APPROVED FIRE SMOKE DAMPER AND INSTALLED AS PER DETAIL. 16. ALL PIPING PENETRATION 1-HOUR AND 2- HOUR RATED CONSTRUCTION SHALL BE INSTALLED AS PER DETAIL. 17. ALL DIFFUSERS SHALL BE HARD DUCTED AS PER DETAIL. 18. ALL PIPING FOR VERTICAL FAN COIL UNITS IS TO BE LOCATED WITHIN PIPE ENCLOSURE BELOW WINDOWS. 19. CONTROL VALVES SHALL BE PROVIDED FOR EACH PIECE OF HYDRONIC EQUIPMENT. SEE DETAIL SHEETS FOR PIPING CONFIGURATION. 19. REFER TO ARCHITECTURAL DRAWINGS FOR DESIGN GUIDELINES FOR LAYOUT AND PLACEMENT OF ALL EXPOSED INFRASTRUCTURE INCLUDING PIPING, SPRINKLERS, CONDUIT, DUCTWORK, CABLE TRAYS, LIGHTING AND CEILING DEVICES. CONSULT ARCHITECT IF ANY QUESTIONS ARISE ABOUT DESIGN INTENT. KEYNOTES# NO ISSUE DATE 1 100% DD DOCUMENTS 14/08/28 2 50% CONSTRUCTION DOCUMENTS 14/11/07 3 BID SET 15/02/27 4 Addendum No. 3 15/03/31 GENERAL NOTES 1. SEE PHASING NOTES ON LEGEND SHEETS 2. CONDENSATE DRAIN PIPE SHALL BE PITCHED AT 1/8" PER FOOT. 3. DRAWINGS ARE DIAGRAMMATIC IN NATURE, AND ARE PROVIDED TO CONVEY THE DESIGN INTENT. REGARDLESS OF HOW INDICATED, ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH ALL MANUFACTURER'S RECOMMENDATIONS AND AS REQUIRED TO PROVIDE NEC, SERVICE AND MAINTENANCE CLEARANCES. PROVIDE ADDITIONAL OFFSETS AND FITTINGS AS REQUIRED FOR DUCTWORK AND PIPING. 4. REFER TO SPECS FOR INSULATION REQUIREMENTS ON DUCTWORK AND PIPING. ALL CONCEALED DUCTWORK AND PIPING SHALL BE INSULATED PER ENERGY CODE. 5. ALL EXPOSED DUCTWORK SHALL BE PAINTED AS PER ARCHITECT SPECIFICATION AND NOT INSULATED. ALL CONCEALED DUCTWORK SHALL BE INSULATED AS PER SPECIFICATIONS. 6. ALL VAV BOX AND FAN COIL HOUSING SHALL BE LINED AS PER ACOUSTICAL ENGINEERS REPORT. 7. BRANCH DUCT SIZES TO AIR DEVICES ARE EQUAL TO AIR DEVICE NECK SIZE, UNLESS NOTED OTHERWISE. 8. PROVIDE AN ACCESSIBLE, MANUAL VOLUME DAMPER AT EVERY BRANCH DUCT AND FOR EVERY INLET/OUTLET. PROVIDE MANUAL VOLUME DAMPER UPSTREAM OF ALL ZONE REGISTER TERMINALS. 9. ROUND SUPPLY DUCT SIZES TO VAV BOXES ARE EQUAL TO CONNECTION SIZE UNLESS NOTED OTHERWISE. 10. PROVIDE RECOMMENDED STRAIGHT DUCT INLET LENGTHS FOR ALL SOUND ATTENUATORS AND VAV BOXES. 11. ALL VAV BOXES SHALL BE INSTALLED ABOVE CEILINGS. 12. COORDINATE WITH ALL TRADES TO MAINTAIN ACCESS CLEARANCE TO EQUIPMENT. 13. CONTRACTOR TO FIELD COORDINATE ACCESS PANELS IN FINISH CEILING TO MAINTAIN ACCESS TO EXISTING DUCT MOUNTED ACCESS DOORS. SUBMIT PROPOSED ACCESS PANEL LOCATIONS FOR APPROVAL PRIOR TO INSTALLATION. 14. ALL DUCTS PENETRATING 1-HOUR RATED CONSTRUCTION SHALL BE EQUIPPED WITH AN APPROVED FIRE DAMPER AND INSTALLED AS PER DETAIL. 15. ALL DUCTS PENETRATING RATED SHAFTS AND 2-HOUR RATED CONSTRUCTION SHALL BE EQUIPPED WITH AN APPROVED FIRE SMOKE DAMPER AND INSTALLED AS PER DETAIL. 16. ALL PIPING PENETRATION 1-HOUR AND 2- HOUR RATED CONSTRUCTION SHALL BE INSTALLED AS PER DETAIL. 17. ALL DIFFUSERS SHALL BE HARD DUCTED AS PER DETAIL. 18. ALL PIPING FOR VERTICAL FAN COIL UNITS IS TO BE LOCATED WITHIN PIPE ENCLOSURE BELOW WINDOWS. 19. CONTROL VALVES SHALL BE PROVIDED FOR EACH PIECE OF HYDRONIC EQUIPMENT. SEE DETAIL SHEETS FOR PIPING CONFIGURATION. 19. REFER TO ARCHITECTURAL DRAWINGS FOR DESIGN GUIDELINES FOR LAYOUT AND PLACEMENT OF ALL EXPOSED INFRASTRUCTURE INCLUDING PIPING, SPRINKLERS, CONDUIT, DUCTWORK, CABLE TRAYS, LIGHTING AND CEILING DEVICES. CONSULT ARCHITECT IF ANY QUESTIONS ARISE ABOUT DESIGN INTENT. KEYNOTES# 1/8" = 1'-0"1 MECHANICAL CONSTRUCTION PLAN - LEVEL 01 PART B