Loading...
HomeMy WebLinkAbout_ALL Volume 2 Conformed Set 79F/SF/SF/SF/SF/SF/SF/SF/S123 5 891011121314151617181920 6.18.1 L M N P Q O R S T Q.1 Q.6 R.3 20.2 02 0205 0508 08 R.5 20.3 R.4 Egress Stair N 10002 Elev P.1 10070 Egress Stair W 10001 Small Medium Classroom 102 Large Multi-Purpose Conference 106 Pantry Kitchen 110 Informal Collaboration 115 AV Storage 102A AV Storage 106A AV Storage 142A AV Storage 152A Lounge 116 Small Classroom 146 Large Flexible Classroom 142 AV Storage 146A Terrace Vestibule 119 West Corridor 10040 NE Lobby 10041 NE Vestibule 10046 Shaft SH101 Shaft SH103 Shaft SH104 Open Stair NE 10003 Exhibition 140 Exhibition 325 Elec 10060 Mail Room 141 Acct Representatives 143 Acct Representatives 147 Lead Finance 149 Research Admin 151 Elec 10062 Telecom 128 Unisex 10020 Men 10022 Women 10023 Custodial 10061 Bench Seating 10040A Shaft SH106 Director MAE 139 UG Program Asst & Work Study 127 Undergrad Advisor/Coord. 129 Director Administration 137 DUCT SHAFT 10 14X20 SAD UP 14X20 RAD UP DUCT SHAFT 2 10x6 SAD UP DUCT SHAFT 14 16x14 SAD DN 26x24 SAD UP 16x14 RAD DN 26x24 RAD UP V10 FCU H02 FCU HR02 FCU 24"x10"SA 20"x10"RA V02 FCU HR08 FCU HR08 FCU V02 FCU V02 FCU V04 FCU V02 FCU V06 FCU HC12 FCU HH10 FCU TYP. OF 6 1-7 VAVS 1-8 VAVS 1-9 VAVS 1-12 VAVS 1-11 VAVS 1-10 VAV 1-13 VAVS 30 ZRT TYP. OF 6 HC12 FCU 6' LD 1275 CFM 6' LD 1275 CFM HC12 FCU 6' LD 1275 CFM HC12 FCU 6' LD 1275 CFM HC12 FCU 6' LD 1275 CFM V10 FCUTYP. OF 3 TYP. OF 3 50 ZRT HR02 FCU HR03 FCU HR03 FCU 50 ZRT 30 ZRT CD 120 CFM 20X16 TEX UP 20X10 TEX DN CR 500 CFM CD 500 CFM CD 390 CFM CR 390 CFM CR 490 CFM CR 280 CFM CR 370 CFM 30 ZRT HR04 FCU 1-1 VAVS 1-5 VAVS 1-2 VAVR 1-5 VAVR V03 FCU 1-3 VAVS CD 200 CFM CR 200 CFM 24"x10"SA24"x10"SA24"x10"SA24"x10"SA24"x10"SAV02 FCU CR 310 CFM 1-6 VAVR 1-7 VAVR CR 120 CFM H06 FCU V10 FCU V10 FCU CD 300 CFM CD 120 CFM 50 ZRT CD 490 CFM CD 280 CFM CD 370 CFM 14"x6"SA 14"x6"SA14"x6"RA 1-10 VAVR V02 FCU V02 FCU V02 FCU V02 FCU 20"x12"TRANSFER TG 16"x16" TYP (4)75 ZRT 75 ZRT 1-1 VAVE 1-2 VAVE 20"x10"EA 8' FT-A 8' FT-A 8' FT-A 6' FT-A 6' FT-A 1-2 VAVS 16"x8"EA 1-6 VAVS 12"x6"SA 10"x6"SA 1-1 VAVR 4"øEA 20"x10"EA1-3 VAVR MATCHLINE SEE /1 M-2001B MATCHLINE SEE /1 M-2001B DUCT SHAFT 15 20X16 EAD UP/DN 12X12 RAD UP/DN 20X30 SAD UP/DN DUCT SHAFT 9 55X18 SAN UP/DN 22X18 RAD UP/DN 24X18 EAD UP/DN 14"x8"RA 14"x8"SA 26"x12"SACD 490 CFM 26"x10"SA 18"x10"SA 22"x12"RA 1-9 VAVR 1-8 VAVR HC12 FCU 6' LD 1275 CFM 24"x6"SA 14"x8"RA 14"x8"SA 12"x8"SA 12"x8"RA 12"x8"SA 1-4 VAVS 18"x10"SA 18"x8"SA WG 480 CFM18"x8"RA 480 CFM CR 450 CFM CR 450 CFM 4"øEA UG Program Asst & Work Study 127 Office Service Center 132 Sm. Conference 135 MAE Administration Office 130 Storage 131 Storage / Closet 133 12"x6"SA 14"x8"SA14"x8"RA 16"x8"RA14"x8"RA16"x6"RAV10 FCU 10"x6"SA 7' FT-C 8' FT-C CR CR CR CR CR CR CR 26"x10"SA 12"x5"RA 12"x6"RA WG 400 CFM 120 ZRT 6"øEA FINTUBE TO BE MOUNTED AGAINST UNDERSIDE OF LANDING FINTUBE TO BE MOUNTED AGAINST UNDERSIDE OF LANDING Sheet Title Approved Checked Drawn Job Number Date Sheet Information Revisions MEP FP ME Engineers 29 West 38th Street, 5th Floor New York, NY 10018 t 212.447.6770 f 212.447.6615 STRUCTURAL ENGINEER/ SUSTAINABILITY CONSULTANT Thornton Tomasetti 51 Madison Ave. New York, N.Y. 10010 t 917.661.7800 f 917.661.7801 LIGHTING CONSULTANT Lumen Architecture 214 W 29th Street Suite 1005 New York, NY 10001 t 212.564.6469 f 917.591.2524 LANDSCAPE ARCHITECT Trowbridge Wolf Michaels 1001 West Seneca Street Suite 101Ithaca, NY 14850 t 607.277.1400 f 000.000.0000 162345 A E B C D 162345 A E B C D Copyright © 2013 Perkins+Will 227 West 29th Street, 7th Flr. New York, NY 10001 t: 212 505-5955 f: 212 505-1648 CIVIL ENGINEER TG Miller PC 203 North Aurora Street Ithaca, NY 14850 t 607.272.6477 f 607.273.6322 AV / ACOUSTICS The Sextant Group 244 Madison Avenue Suite 311 New York NY 10016 t 877.684.2311 f 412.323.8538 CODE CONSULTANT Code Consultants Professional Engineers, PC 215 West 40th Street 15th Floor New York, NY 10018 t 212.216.9596 f 212.216.9619 C:\Users\edgar.avila\Documents\Upson Hall_MECH_PLUMB_FP_Josue.Avila.rvtM-2001A MECHANICAL CONSTRUCTION PLAN - LEVEL 01 PART A MEE MEE 031549.000 11/07/2014 MEE Upson Hall Renovation 124 Hoy Rd, Ithaca, NY 14850 Cornell University 215 Park Avenue South 4th Floor New York, NY 10003 t 212.251.7000 f 212.251.7111 www.perkinswill.com NO ISSUE DATE 1 BID SET 15/02/27 2 Addendum No. 3 15/03/31 GENERAL NOTES 1. SEE PHASING NOTES ON LEGEND SHEETS 2. CONDENSATE DRAIN PIPE SHALL BE PITCHED AT 1/8" PER FOOT. 3. DRAWINGS ARE DIAGRAMMATIC IN NATURE, AND ARE PROVIDED TO CONVEY THE DESIGN INTENT. REGARDLESS OF HOW INDICATED, ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH ALL MANUFACTURER'S RECOMMENDATIONS AND AS REQUIRED TO PROVIDE NEC, SERVICE AND MAINTENANCE CLEARANCES. PROVIDE ADDITIONAL OFFSETS AND FITTINGS AS REQUIRED FOR DUCTWORK AND PIPING. 4. REFER TO SPECS FOR INSULATION REQUIREMENTS ON DUCTWORK AND PIPING. ALL CONCEALED DUCTWORK AND PIPING SHALL BE INSULATED PER ENERGY CODE. 5. ALL EXPOSED DUCTWORK SHALL BE PAINTED AS PER ARCHITECT SPECIFICATION AND NOT INSULATED. ALL CONCEALED DUCTWORK SHALL BE INSULATED AS PER SPECIFICATIONS. 6. ALL VAV BOX AND FAN COIL HOUSING SHALL BE LINED AS PER ACOUSTICAL ENGINEERS REPORT. 7. BRANCH DUCT SIZES TO AIR DEVICES ARE EQUAL TO AIR DEVICE NECK SIZE, UNLESS NOTED OTHERWISE. 8. PROVIDE AN ACCESSIBLE, MANUAL VOLUME DAMPER AT EVERY BRANCH DUCT AND FOR EVERY INLET/OUTLET. PROVIDE MANUAL VOLUME DAMPER UPSTREAM OF ALL ZONE REGISTER TERMINALS. 9. ROUND SUPPLY DUCT SIZES TO VAV BOXES ARE EQUAL TO CONNECTION SIZE UNLESS NOTED OTHERWISE. 10. PROVIDE RECOMMENDED STRAIGHT DUCT INLET LENGTHS FOR ALL SOUND ATTENUATORS AND VAV BOXES. 11. ALL VAV BOXES SHALL BE INSTALLED ABOVE CEILINGS. 12. COORDINATE WITH ALL TRADES TO MAINTAIN ACCESS CLEARANCE TO EQUIPMENT. 13. CONTRACTOR TO FIELD COORDINATE ACCESS PANELS IN FINISH CEILING TO MAINTAIN ACCESS TO EXISTING DUCT MOUNTED ACCESS DOORS. SUBMIT PROPOSED ACCESS PANEL LOCATIONS FOR APPROVAL PRIOR TO INSTALLATION. 14. ALL DUCTS PENETRATING 1-HOUR RATED CONSTRUCTION SHALL BE EQUIPPED WITH AN APPROVED FIRE DAMPER AND INSTALLED AS PER DETAIL. 15. ALL DUCTS PENETRATING RATED SHAFTS AND 2-HOUR RATED CONSTRUCTION SHALL BE EQUIPPED WITH AN APPROVED FIRE SMOKE DAMPER AND INSTALLED AS PER DETAIL. 16. ALL PIPING PENETRATION 1-HOUR AND 2- HOUR RATED CONSTRUCTION SHALL BE INSTALLED AS PER DETAIL. 17. ALL DIFFUSERS SHALL BE HARD DUCTED AS PER DETAIL. 18. ALL PIPING FOR VERTICAL FAN COIL UNITS IS TO BE LOCATED WITHIN PIPE ENCLOSURE BELOW WINDOWS. 19. CONTROL VALVES SHALL BE PROVIDED FOR EACH PIECE OF HYDRONIC EQUIPMENT. SEE DETAIL SHEETS FOR PIPING CONFIGURATION. 19. REFER TO ARCHITECTURAL DRAWINGS FOR DESIGN GUIDELINES FOR LAYOUT AND PLACEMENT OF ALL EXPOSED INFRASTRUCTURE INCLUDING PIPING, SPRINKLERS, CONDUIT, DUCTWORK, CABLE TRAYS, LIGHTING AND CEILING DEVICES. CONSULT ARCHITECT IF ANY QUESTIONS ARISE ABOUT DESIGN INTENT. KEYNOTES# 1/8" = 1'-0"1 MECHANICAL CONSTRUCTION PLAN - LEVEL 01 PART A