Loading...
HomeMy WebLinkAbout_ALL Volume 2 Conformed Set 77F/S F/SF/SF/S 12 456 88.1 8.910.1 2.6 A B C D E F G H J K L 02 0205 0508 08 Sprinkler Valve B0069 Mechanical B0067 Upson Automotive Lab (Existing) B74 Egress Stair S B0006 Elev F.0 B0071 Shaft B0066 Corridor B0043 Loading Dock B0044 GM Auto Lab B70A Drop Tower Base B70C Universal Waste - Holding B68 Team Conference B60 Lab Support B76 Toilets B88 Cage Storage B56B Cage Storage B56C Cage Storage B56A Custodial B77 MDF (EXISTING)B0069 RHODES Grumman Labs GRU01 CAC HX J/W HX SURGE TANK DUPLEX GENERATOR RADIATOR CIRCULATOR (E) 7.5HP CHW PUMPS SERVING GRUMMAN DUCT SHAFT 4 30X24 SAD UP 30X26 EAD UP 30X30 SPRAY BOOTH EXHAUST UP GENERATOR COOLANT UP H12 FCU H12 FCU H12 FCU HH12 FCU HH08 FCU HH10 FCU H02 FCU HR06 FCU B-12 VAVS CR 380 CFM CR 140 CFM CR 625 CFM CR 625 CFM CD 625 CFM CD 625 CFM CD 625 CFM CD 625 CFM SEE M-5000 FOR ENLARGED MECHANICAL ROOM PLAN EXISTING PUMPS SHALL BE REBALANCED TO ONLY SERVE GRUMMAN CHILLED WATER LOAD. EXISTING TO REMAIN VFD FOR CHW PUMP EXISTING FLOW METER CR 550 CFM CD 500 CFM 20"x12"SA 4' FT-A 4' FT-A 4' FT-A B-7 VAVR B-8 VAVR 12"x10"EAComposites Fabrication B70E Sheet Metal Fabrication B70F Shock Testing B70D Engine Room B70B Generator B0068 CR 150 CFM CR 625 CFM CR 625 CFM 26"x12"EA 16"x8"EA 16"x12"EA CR 625 CFM CR 625 CFM 24"x16"EA CR 625 CFM16"x12"EACR 625 CFM CD 625 CFM 20"x14"SA22"x14"SA 40"x16"SACD 625 CFM 26"x14"SA B-10 VAVE B-13 VAVS B-9 VAVE CD 625 CFM MATCHLINE SEE /1 M-2000A MATCHLINE SEE /1 M-2000A 20"x12"EA24"x18"EA16x12 SAD UP B-15 VAVS CD 100 CFM 12"x5"SA CD 100 CFM 1 UH20"x12"EACR 200 CFM CD 625 CFM B-14 VAVS 16"x8"SA 10" ENGINE EXHAUST GENERATOR SILENCER 10" ENGINE EXHAUST WITH 4" INSULATION UP TO ROOF. WMS WMS 12"x8"SA14"x8"SACD 500 CFM CR 12"x5"SA CD 430 CFM CD 430 CFM CD 430 CFM 14"x8"EACD 430 CFM12"x8"SACR 550 CFM CR 550 CFM CD 140 CFM 10"x6"RA CR 150 CFM 16"x8"SA45"x20"EA16"x14"SA 45"x20"EA TO SPRAY BOOTH 1 EF 60X24 MAKEUP AIR DUCT UP TO FIRST FLOOR LOUVER. PROVIDE MOTORIZED DAMPER 50X24 EAD UP TO FIRST FLOOR LOUVER. PROVIDE MOTORIZED DAMPER 14"x8"EA B-8 VAVE 18"x12"EA4" TAP W/ CAP (TYP. 3) Sheet Title Approved Checked Drawn Job Number Date Sheet Information Revisions MEP FP ME Engineers 29 West 38th Street, 5th Floor New York, NY 10018 t 212.447.6770 f 212.447.6615 STRUCTURAL ENGINEER/ SUSTAINABILITY CONSULTANT Thornton Tomasetti 51 Madison Ave. New York, N.Y. 10010 t 917.661.7800 f 917.661.7801 LIGHTING CONSULTANT Lumen Architecture 214 W 29th Street Suite 1005 New York, NY 10001 t 212.564.6469 f 917.591.2524 LANDSCAPE ARCHITECT Trowbridge Wolf Michaels 1001 West Seneca Street Suite 101Ithaca, NY 14850 t 607.277.1400 f 000.000.0000 162345 A E B C D 162345 A E B C D Copyright © 2013 Perkins+Will 227 West 29th Street, 7th Flr. New York, NY 10001 t: 212 505-5955 f: 212 505-1648 CIVIL ENGINEER TG Miller PC 203 North Aurora Street Ithaca, NY 14850 t 607.272.6477 f 607.273.6322 AV / ACOUSTICS The Sextant Group 244 Madison Avenue Suite 311 New York NY 10016 t 877.684.2311 f 412.323.8538 CODE CONSULTANT Code Consultants Professional Engineers, PC 215 West 40th Street 15th Floor New York, NY 10018 t 212.216.9596 f 212.216.9619 C:\Users\edgar.avila\Documents\Upson Hall_MECH_PLUMB_FP_Josue.Avila.rvtM-2000B MECHANICAL CONSTRUCTION PLAN - LEVEL 00 PART B MEE MEE 031549.000 11/07/2014 MEE Upson Hall Renovation 124 Hoy Rd, Ithaca, NY 14850 Cornell University 215 Park Avenue South 4th Floor New York, NY 10003 t 212.251.7000 f 212.251.7111 www.perkinswill.com GENERAL NOTES 1. SEE PHASING NOTES ON LEGEND SHEETS 2. CONDENSATE DRAIN PIPE SHALL BE PITCHED AT 1/8" PER FOOT. 3. DRAWINGS ARE DIAGRAMMATIC IN NATURE, AND ARE PROVIDED TO CONVEY THE DESIGN INTENT. REGARDLESS OF HOW INDICATED, ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH ALL MANUFACTURER'S RECOMMENDATIONS AND AS REQUIRED TO PROVIDE NEC, SERVICE AND MAINTENANCE CLEARANCES. PROVIDE ADDITIONAL OFFSETS AND FITTINGS AS REQUIRED FOR DUCTWORK AND PIPING. 4. REFER TO SPECS FOR INSULATION REQUIREMENTS ON DUCTWORK AND PIPING. ALL CONCEALED DUCTWORK AND PIPING SHALL BE INSULATED PER ENERGY CODE. 5. ALL EXPOSED DUCTWORK SHALL BE PAINTED AS PER ARCHITECT SPECIFICATION AND NOT INSULATED. ALL CONCEALED DUCTWORK SHALL BE INSULATED AS PER SPECIFICATIONS. 6. ALL VAV BOX AND FAN COIL HOUSING SHALL BE LINED AS PER ACOUSTICAL ENGINEERS REPORT. 7. BRANCH DUCT SIZES TO AIR DEVICES ARE EQUAL TO AIR DEVICE NECK SIZE, UNLESS NOTED OTHERWISE. 8. PROVIDE AN ACCESSIBLE, MANUAL VOLUME DAMPER AT EVERY BRANCH DUCT AND FOR EVERY INLET/OUTLET. PROVIDE MANUAL VOLUME DAMPER UPSTREAM OF ALL ZONE REGISTER TERMINALS. 9. ROUND SUPPLY DUCT SIZES TO VAV BOXES ARE EQUAL TO CONNECTION SIZE UNLESS NOTED OTHERWISE. 10. PROVIDE RECOMMENDED STRAIGHT DUCT INLET LENGTHS FOR ALL SOUND ATTENUATORS AND VAV BOXES. 11. ALL VAV BOXES SHALL BE INSTALLED ABOVE CEILINGS. 12. COORDINATE WITH ALL TRADES TO MAINTAIN ACCESS CLEARANCE TO EQUIPMENT. 13. CONTRACTOR TO FIELD COORDINATE ACCESS PANELS IN FINISH CEILING TO MAINTAIN ACCESS TO EXISTING DUCT MOUNTED ACCESS DOORS. SUBMIT PROPOSED ACCESS PANEL LOCATIONS FOR APPROVAL PRIOR TO INSTALLATION. 14. ALL DUCTS PENETRATING 1-HOUR RATED CONSTRUCTION SHALL BE EQUIPPED WITH AN APPROVED FIRE DAMPER AND INSTALLED AS PER DETAIL. 15. ALL DUCTS PENETRATING RATED SHAFTS AND 2-HOUR RATED CONSTRUCTION SHALL BE EQUIPPED WITH AN APPROVED FIRE SMOKE DAMPER AND INSTALLED AS PER DETAIL. 16. ALL PIPING PENETRATION 1-HOUR AND 2- HOUR RATED CONSTRUCTION SHALL BE INSTALLED AS PER DETAIL. 17. ALL DIFFUSERS SHALL BE HARD DUCTED AS PER DETAIL. 18. ALL PIPING FOR VERTICAL FAN COIL UNITS IS TO BE LOCATED WITHIN PIPE ENCLOSURE BELOW WINDOWS. 19. CONTROL VALVES SHALL BE PROVIDED FOR EACH PIECE OF HYDRONIC EQUIPMENT. SEE DETAIL SHEETS FOR PIPING CONFIGURATION. 19. REFER TO ARCHITECTURAL DRAWINGS FOR DESIGN GUIDELINES FOR LAYOUT AND PLACEMENT OF ALL EXPOSED INFRASTRUCTURE INCLUDING PIPING, SPRINKLERS, CONDUIT, DUCTWORK, CABLE TRAYS, LIGHTING AND CEILING DEVICES. CONSULT ARCHITECT IF ANY QUESTIONS ARISE ABOUT DESIGN INTENT. KEYNOTES# NO ISSUE DATE 1 100% DD DOCUMENTS 14/08/28 2 50% CONSTRUCTION DOCUMENTS 14/11/07 3 BID SET 15/02/27 4 Addendum No. 3 15/03/31 1/8" = 1'-0"1 MECHANICAL CONSTRCUTION PLAN - LEVEL 00 PART B