Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
_ALL Volume 2 Conformed Set 368
West Corridor 10040 Elev P.1 10070 Egress Stair W 10001 Informal Collaboration 115 Men 10022 NE Lobby 10041 Exhibition 140 Shaft SH103 Shaft SH101 Egress Stair N 10002 Large Multi-Purpose Conference 106 Terrace Vestibule 119 Large Flexible Classroom 142 Elec 10060 AV Storage 102A AV Storage 106A Small Medium Classroom 102 Small Classroom 152 Small Classroom 146 NE Vestibule 10046 Fluid Dynamics - Tow Tank Lab 160 Lounge 116 N6 N6 N6 N6 N6 N6 N6 N6 N6N6 N6 N6 N6 N6 N6 N6 N6 N6 N6 N6 1 1 2 2 3 4 4 6 6 7 7 8 8 9 9 10 10 11 11 12 12 13 13 14 14 15 15 16 16 17 17 18 18 19 19 20 20 6.18.1 8.1 2.6 2.6 KK LL MM NN P Q O O R SS TT Q.1 Q.6 R.3 R.3 20.2 20.2 Pantry Kitchen 110 Telecom 128 Open Stair NE 10003 AV Storage 146A AV Storage 152A Exhibition 325 AV Storage 142A T-500010 RISER 4 T-4500 RISER 5 T-4500 RISER 5 T-4500 RISER 6 T-4500 RISER 4 T-4500 RISER 4 T-4500 RISER 6 T-4500 J10N7P9 J10N7P9 J12 P4 P4 P4 J12 J11 J11 J11 J11J11J11 J10 N10 P10 J11 J11 J11 J11 J11J11J11J11 P4 N10J10 P10 J11 J11J12 P4 E1 P4P4 J11 J11 J11 J11 J10N10P10 J10N10P10 J12 B1 B1 J11 J11 J11J11 J11 J11 J11J11 J11 J11 J10 N7 P9 P9 J10 N7 J12 P4 P4 A1A1 C2 N9N9N9 N9 N9 N9 N9 N9 N9 N10 J10 P10 J11 J11 T-5000 T-5001 3 T-5001 5 T-5000 5 12 Acct Representatives 143 Mail Room 141 Director Administration 137 Sm. Conference 135 MAE Student Support Office 125 Acct Representatives 147 Lead Finance 149 Facilities Coordinator 153 UG Program Asst & Work Study 127 Office Service Center 132 Storage / Closet 133 Undergrad Advisor/Coord. 129 Director MAE 139 MAE Administration Office 130 Storage 131 T-3001B T-3001B J12 P4 P10N10J10 J13(N11,P11) J13(N11,P11) J13(N11,P11)J13(N11,P11) J13(N11,P11)J13(N11,P11)12"x2"CABLE TRAY12"x4"CABLE TRAY 12"x2"CABLE TRAY T-5000 16 9 6 7 8 15 18 17 2 12"x2"CABLE TRAY1 3 1 12"x2"CABLE TRAY 3 3 3 3 3 4 5 C2 J12 12"x2"CABLE TRAY E1 E1 Research Admin 151 T-7001 1 South Corridor 10042 Elec 10062 Unisex 10020 Women 10023 Service Corridor 10027 Custodial 10061 Large Flexible Classroom 142 7 7 7 6 6 CODED NOTES 1. (2) 2" EMT CONDUITS TO CONNECT CABLE TRAY SYSTEMS. COORDINATE PAINTING WITH ARCHITECT. 2. (2) 4" EMT CONDUITS FROM TELECOM ROOM TO CABLE TRAY SYSTEM. COORDINATE PAINTING OF EXPOSED SCTION WITH ARCHITECT. 3. NETWORK OUTLET CONDUITS IN THIS SPACE SHALL ROUTE FROM EACH OUTLET BOX AND TERMINATE AT NEAREST 12"X2" CABLE TRAY SYSTEM. 4. (4) 4" EMT CONDUITS SLEEVES, FIRESTOPPED, TO TR 228 ABOVE. 5. NETWORK OUTLETS IN THIS SPACE SHALL UTILIZE RAISED FLOOR SYSTEM TO DISTRIBUTE CABLES TO TR 128. 6. 6. (2) 2" EMT CONDUITS FIRESTOPPED FOR WALL PENETRATION 7. 7. (3) 4" EMT CONDUITS FIRESTOPPED FOR WALL PENETRATION Sheet Title Approved Checked Drawn Job Number Date Sheet Information Revisions MEP FP ME Engineers 29 West 38th Street, 5th Floor New York, NY 10018 t 212.447.6770 f 212.447.6615 STRUCTURAL ENGINEER/ SUSTAINABILITY CONSULTANT Thornton Tomasetti 51 Madison Ave. New York, N.Y. 10010 t 917.661.7800 f 917.661.7801 LIGHTING CONSULTANT Lumen Architecture 214 W 29th Street Suite 1005 New York, NY 10001 t 212.564.6469 f 917.591.2524 LANDSCAPE ARCHITECT Trowbridge Wolf Michaels 1001 West Seneca Street Suite 101 Ithaca, NY 14850 t 607.277.1400 f 000.000.0000 162345 A E B C D 162345 A E B C D Copyright © 2013 Perkins+Will 227 West 29th Street, 7th Flr. New York, NY 10001 t: 212 505-5955 f: 212 505-1648 CIVIL ENGINEER TG Miller PC 203 North Aurora Street Ithaca, NY 14850 t 607.272.6477 f 607.273.6322 AV/ IT/ ACOUSTICS The Sextant Group, Inc. 244 Madison Avenue Suite 311 New York NY 10016 t 877.684.2311 f 412.323.8538 CODE CONSULTANT Code Consultants Professional Engineers, PC 215 West 40th Street 15th Floor New York, NY 10018 t 212.216.9596 f 212.216.9619 T-3001A TECHNOLOGY INFRASTRUCTURE FIRST LEVEL PART A CEILING PLAN JP / PD JH / SH 031549.000 08/25/2015 DB Upson Hall Renovation 124 Hoy Rd, Ithaca, NY 14850 Cornell University 215 Park Avenue South 4th Floor New York, NY 10003 t 212.251.7000 f 212.251.7111 www.perkinswill.com 1/8" = 1'-0" TECHNOLOGY INFRASTRUCTURE FIRST LEVEL PART A CEILING PLAN NO ISSUE DATE 1 100% DD DOCUMENTS 14/08/25 2 50% CONSTRUCTION DOCUMENTS 14/11/07 3 BID SET 15/02/27 4 Addendum No. 5 15/04/08 NOTE: REFER TO ARCHITECTURAL DRAWINGS FOR DESIGN GUIDELINES FOR LAYOUT AND PLACEMENT OF ALL EXPOSED INFRASTRUCTURE INCLUDING PIPING, SPRINKLERS, CONDUIT, DUCTWORK, CABLE TRAYS, LIGHTING AND CEILING DEVICES. CONSULT ARCHITECT IF ANY QUESTIONS ARISE ABOUT DESIGN INTENT.