Loading...
HomeMy WebLinkAbout_ALL Volume 2 Conformed Set 331DHDHDHDH123 456 891011121314151617181920 6.18.1 8.910.1 2.6 A B C D E F G H J K L M N P Q O R S T Q.1 Q.6 R.3 20.2 02 0205 0508 08 R.5 20.3 R.4 Elec 30062 Telecom 328 Touch-Down / Hoteling Workspace 301 Egress Stair W 30001 West Corridor 30040 Office-Students 302 Office-Students 304 Dry / Computational Lab 306 Emeritus Suite 310 Office-Students 314 Egress Stair N 30002 Elev P.3 30070 Shaft SH203 Men 30022 Service Corridor 30024 Women 30023 Custodial 30061 Unisex 30020 NE Corridor 30041West Corridor 30040West Corridor 30040 West Corridor 30040 Faculty Office 305 Faculty Office 307 Faculty Office 309 Faculty Office 311 Faculty Office 313 Faculty Office 315 Faculty Office 317 Faculty Office 319 Faculty Office 321 Sm. Conference 323 Shaft SH311 Hybrid Lab - Unassigned 325 Hybrid Lab - Unassigned 329 Open Stair NE 30003 Research Conference 331 Informal Collaboration 337 Office-Students 341 Faculty Service Center 340 South Corridor 30042 Faculty Office 343 Faculty Office 347 Sm. Conference 349 Faculty Office 351 Faculty Office 353 Faculty Office 355 Sm. Conference 357 Faculty Office 361 Faculty Office 363 Sm. Conference 365 Faculty Office 369 Faculty Office 371 Faculty Office 373 South Corridor 30042 South Corridor 30042 South Corridor 30042 South Corridor 30042 Sm. Office-Students 344 Shaft SH306 Hybrid Lab - Unassigned 342 Energy Environ Research Lab 348 Grain Flow Research Lab 350 Med. Office-Students 352 Hybrid Lab - Future Hire 354 Hybrid Lab - Unassigned 358 Biomechanics Lab 362 Hybrid/Wet - Integrated Nanotechnology 366 Sm. Office-Students 368 Hybrid Lab - Future Hire 372 Egress Stair S 30004 Shaft SH305 Elec 30063 Elev F.3 30071 Shaft 30066 Custodial 386 Circulation 30044 Support 376 Shaft SH310 Shaft SH310 Shaft SH309 Shaft SH307 Med. Office-Students 360 Biomechanics Computing Lab 322 Office 322A Conference 316 Office 322B Elec 30060 1 1 2 1 1 (TYP) (TYP) (TYP) (TYP) FA BOOSTER PANEL FA TERMINAL CABINET R Sheet Title Approved Checked Drawn Job Number Date Sheet Information Revisions MEP FP ME Engineers 29 West 38th Street, 5th Floor New York, NY 10018 t 212.447.6770 f 212.447.6615 STRUCTURAL ENGINEER/ SUSTAINABILITY CONSULTANT Thornton Tomasetti 51 Madison Ave. New York, N.Y. 10010 t 917.661.7800 f 917.661.7801 LIGHTING CONSULTANT Lumen Architecture 214 W 29th Street Suite 1005 New York, NY 10001 t 212.564.6469 f 917.591.2524 LANDSCAPE ARCHITECT Trowbridge Wolf Michaels 1001 West Seneca Street Suite 101 Ithaca, NY 14850 t 607.277.1400 f 000.000.0000 162345 A E B C D 162345 A E B C D Copyright © 2013 Perkins+Will 227 West 29th Street, 7th Flr. New York, NY 10001 t: 212 505-5955 f: 212 505-1648 CIVIL ENGINEER TG Miller PC 203 North Aurora Street Ithaca, NY 14850 t 607.272.6477 f 607.273.6322 AV / ACOUSTICS The Sextant Group 244 Madison Avenue Suite 311 New York NY 10016 t 877.684.2311 f 412.323.8538 CODE CONSULTANT Code Consultants Professional Engineers, PC 215 West 40th Street 15th Floor New York, NY 10018 t 212.216.9596 f 212.216.9619 C:\Users\edgar.avila\Documents\Upson Hall_ELEC_russell.kent.rvtFA-2003 FIRE ALARM CONSTRUCTION OVERALL PLAN - LEVEL 03 MEE MEE 031549.000 11/07/2014 MEE Upson Hall Renovation 124 Hoy Rd, Ithaca, NY 14850 Cornell University 215 Park Avenue South 4th Floor New York, NY 10003 t 212.251.7000 f 212.251.7111 www.perkinswill.com GENERAL NOTES 1. PROVIDE #14 AWG MINIMUM WIRING FOR ALL SIGNAL AND INITIATION DEVICES. 2. ALL EXPOSED CONDUIT SHALL BE ROUTED PERPENDICULAR AND PARALLEL TO COLUMNS AND BEAMS. ALL EXPOSED CONDUIT ROUTING SHALL BE COORDINATED WITH OWNER'S REP. PRIOR TO INSTALLATION. NO ADDITIONAL COST TO THE OWNER WILL BE ALLOWED FOR RELOCATING CONDUIT DUE TO LACK OF COORDINATION WITH THE OWNER'S REP. 3. ALL BACK BOXES SHALL BE FLUSH MOUNTED UNLESS OTHERWISE NOTED. CONTRACTOR SHALL COORDINATE INSTALLATION OF CONDUIT AND BACK BOXES IN POURED CONCRETE, PRE-CAST CONCRETE, MASONRY AND GYP. WALLS. 4. ELECTRICAL CONTRACTOR SHALL COORDINATE EXACT QUANTITY AND LOCATIONS OF ALL FIRE SPRINKLER SYSTEM TAMPER AND FLOW SWITCHES WITH CONSTRUCTION MANAGER PRIOR TO BID. CONNECT ALL TAMPER AND FLOW SWITCHES TO FIRE ALARM SYSTEM. 5. CONTRACTOR SHALL COORDINATE EXACT LOCATION AND QUANTITY OF ALL DUCT TYPE SMOKE DETECTORS WITH MECHANICAL CONTRACTOR. ELECTRICAL CONTRACTOR SHALL HARD WIRE TO RELAY STARTER. INCLUDE ALL NECESSARY COSTS IN BID. 6. PROVIDE (1) DUCT TYPE SMOKE DETECTORS FOR EACH FAN COIL UNIT, AIR HANDLING UNIT, SUPPLY FAN, AND HEAT PUMP OF 2,000 CFM AND GREATER. PROVIDE (2) DUCT TYPE SMOKE DETECTORS FOR EACH FAN COIL UNIT, AIR HANDLING UNIT, HEAT PUMP AND SUPPLY FAN OF 15,000 CFM AND GREATER. INCLUDE ALL NECESSARY COSTS IN BID. 7. PROVIDE SMOKE AND HEAT DETECTORS WITHIN ELEVATOR MACHINE ROOMS AND ELEVATOR HOIST PITS. 8. PROVIDE CONNECTION OF FA SYSTEMS TO ALL MAGNETIC DOOR HOLD-OPEN DEVICES TO AUTOMATICALLY CLOSE DOORS (INCLUDING OVERHEAD STORAGE DOORS) DURING ALARM CONDITIONS. 9. DEVICES INDICATED ON FIRE ALARM ONE- LINE ARE FOR REFERENCE ONLY. REFER TO PLAN DRAWINGS AND SPECIFICATIONS FOR QUANTITIES. REFER TO ARCHITECTURAL DOOR SCHEDULE FOR MAGNETIC DOOR HOLDER AND BLOW OPEN DOOR REQUIREMENTS. 10. ALL VISUAL DEVICES SHALL BE SYNCHRONIZED. 11. CONTRACTOR SHALL REFER TO MECHANICAL DRAWINGS FOR EXACT LOCATION OF ALL FIRE SMOKE DAMPERS. CONTRACTOR SHALL PROVIDE QUANTITY OF CONNECTIONS PER THE MECHANICAL DRAWINGS. 12. REFER TO ARCHITECTURAL DRAWINGS FOR DESIGN GUIDELINES FOR LAYOUT AND PLACEMENT OF ALL EXPOSED INFRASTRUCTURE INCLUDING PIPING, SPRINKLERS, CONDUIT, DUCTWORK, CABLE TRAYS, LIGHTING AND CEILING DEVICES. CONSULT ARCHITECT IF ANY QUESTIONS ARISE ABOUT DESIGN INTENT. KEYNOTES# 1 PROVIDE DUCT-TYPE SMOKE DETECTOR, FIRE ALARM MONITOR RELAY FOR DAMPER POSITION, AND FIRE ALARM CONTROL RELAY FOR CONTROL DAMPER MOTOR POWER (PER NYS BUILDING CODE SECTION 716.3.2.1(1)). ROUTE POWER VIA FIRE ALARM RELAY. PROVIDE REMOTE LEDS FOR DETECTORS WHICH ARE NOT READILY VISIBLE OR ACCESSIBLE 2 CONNECT ALL ELEVATOR LOBBY SMOKE DETECTORS TO ELEVATOR CONTROLLER FOR ELEVATOR RECALL. PROVIDE SHUNT TRIP DEVICE AT DISCONNECT FOR ALL ELEVATOR CONTROLLERS. PROVIDE A HEAT DETECTOR AT THE TOP OF ELEVATOR SHAFT AND ADJACENT TO EACH SPRINKLER HEAD IN ALL ELEVATOR MACHINE ROOMS. ACTIVATION OF HEAT DETECTOR TO INITIATE SHUNT-TRIP. 2 NO ISSUE DATE 1 100% DD DOCUMENTS 14/08/28 2 50% CONSTRUCTION DOCUMENTS 14/11/07 3 BID SET 15/02/27 4 Addendum No. 3 15/03/31 3/32" = 1'-0"1 FIRE ALARM CONSTRUCTION OVERALL PLAN - LEVEL 03