Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
_ALL Volume 2 Conformed Set 329
DHDHDHDH123 456 891011121314151617181920 6.18.1 8.910.1 2.6 A B C D E F G H J K L M N P Q O R S T Q.1 Q.6 R.3 20.2 02 0205 0508 08 R.5 20.3 R.4 Elec 20062 Telecom 228 Circulation 20046 Restroom 20027 Shaft 20066 Custodial 20064 Elev F.2 20071 Circulation 20044 Egress Stair S 20004 Shaft SH205 Elec 20063 Teaching Support Specialist 273 Shaft SH206 Drop Tower Prep Lab 272 Engineered Materials Instruction 264 Shaft SH208 Storage / Closet 264B Teaching Labs Support Shop 270 Teaching Support Specialist 266 Teaching Support Specialist 268 South Corridor 20042 South Corridor 20042 Bellis Fluid Mechanics Instruction 256 Shaft SH207 Heat Transfer Instruction 260 South Corridor 20042 Machine Shop / Support 252 Taylor Design Studio 242 Exam Storage/Workroom 246 Teaching Support 248 South Corridor 20042 Shaft SH204 Swanson Lab for Adv. Engineering Simulation 240 NE Corridor 20041 Open Stair NE 20003 Informal Collaboration 231 CIT Computer Lab 225 NE Corridor 20041 Unisex 20020 Custodial 20061 Women 20023 Service Corridor 20024 Men 20022 Elev P.2 20070 Shaft SH203 Egress Stair N 20002 West Corridor 20040 CIT Lab Staff Office 223 Lactation Room 221 West Corridor 20040 Medium Classroom 222 Homework Collection 281 Sm. Conference 219 Meeting 215 Shaft SH202 AV Storage 222A AV Storage 216A Medium Large Classroom 216 Med. Conf./Study 205C Med. Conf./Study 205B Med. Conf./Study 205A Med. Conf./Study 205 Touch-Down / Hoteling Workspace 201 Egress Stair W 20001 West Corridor 20040 Small Medium Classroom 202 Elec 20060 Shaft SH210 AV Storage 206A AV Storage 202A Medium Classroom 206 FA TERMINAL CABINET FA BOOSTER PANEL 1 1 2 1 (TYP) (TYP) (TYP) R Teaching Support 264A Sheet Title Approved Checked Drawn Job Number Date Sheet Information Revisions MEP FP ME Engineers 29 West 38th Street, 5th Floor New York, NY 10018 t 212.447.6770 f 212.447.6615 STRUCTURAL ENGINEER/ SUSTAINABILITY CONSULTANT Thornton Tomasetti 51 Madison Ave. New York, N.Y. 10010 t 917.661.7800 f 917.661.7801 LIGHTING CONSULTANT Lumen Architecture 214 W 29th Street Suite 1005 New York, NY 10001 t 212.564.6469 f 917.591.2524 LANDSCAPE ARCHITECT Trowbridge Wolf Michaels 1001 West Seneca Street Suite 101 Ithaca, NY 14850 t 607.277.1400 f 000.000.0000 162345 A E B C D 162345 A E B C D Copyright © 2013 Perkins+Will 227 West 29th Street, 7th Flr. New York, NY 10001 t: 212 505-5955 f: 212 505-1648 CIVIL ENGINEER TG Miller PC 203 North Aurora Street Ithaca, NY 14850 t 607.272.6477 f 607.273.6322 AV / ACOUSTICS The Sextant Group 244 Madison Avenue Suite 311 New York NY 10016 t 877.684.2311 f 412.323.8538 CODE CONSULTANT Code Consultants Professional Engineers, PC 215 West 40th Street 15th Floor New York, NY 10018 t 212.216.9596 f 212.216.9619 C:\Users\edgar.avila\Documents\Upson Hall_ELEC_russell.kent.rvtFA-2002 FIRE ALARM CONSTRUCTION OVERALL PLAN - LEVEL 02 MEE MEE 031549.000 11/07/2014 MEE Upson Hall Renovation 124 Hoy Rd, Ithaca, NY 14850 Cornell University 215 Park Avenue South 4th Floor New York, NY 10003 t 212.251.7000 f 212.251.7111 www.perkinswill.com GENERAL NOTES 1. PROVIDE #14 AWG MINIMUM WIRING FOR ALL SIGNAL AND INITIATION DEVICES. 2. ALL EXPOSED CONDUIT SHALL BE ROUTED PERPENDICULAR AND PARALLEL TO COLUMNS AND BEAMS. ALL EXPOSED CONDUIT ROUTING SHALL BE COORDINATED WITH OWNER'S REP. PRIOR TO INSTALLATION. NO ADDITIONAL COST TO THE OWNER WILL BE ALLOWED FOR RELOCATING CONDUIT DUE TO LACK OF COORDINATION WITH THE OWNER'S REP. 3. ALL BACK BOXES SHALL BE FLUSH MOUNTED UNLESS OTHERWISE NOTED. CONTRACTOR SHALL COORDINATE INSTALLATION OF CONDUIT AND BACK BOXES IN POURED CONCRETE, PRE-CAST CONCRETE, MASONRY AND GYP. WALLS. 4. ELECTRICAL CONTRACTOR SHALL COORDINATE EXACT QUANTITY AND LOCATIONS OF ALL FIRE SPRINKLER SYSTEM TAMPER AND FLOW SWITCHES WITH CONSTRUCTION MANAGER PRIOR TO BID. CONNECT ALL TAMPER AND FLOW SWITCHES TO FIRE ALARM SYSTEM. 5. CONTRACTOR SHALL COORDINATE EXACT LOCATION AND QUANTITY OF ALL DUCT TYPE SMOKE DETECTORS WITH MECHANICAL CONTRACTOR. ELECTRICAL CONTRACTOR SHALL HARD WIRE TO RELAY STARTER. INCLUDE ALL NECESSARY COSTS IN BID. 6. PROVIDE (1) DUCT TYPE SMOKE DETECTORS FOR EACH FAN COIL UNIT, AIR HANDLING UNIT, SUPPLY FAN, AND HEAT PUMP OF 2,000 CFM AND GREATER. PROVIDE (2) DUCT TYPE SMOKE DETECTORS FOR EACH FAN COIL UNIT, AIR HANDLING UNIT, HEAT PUMP AND SUPPLY FAN OF 15,000 CFM AND GREATER. INCLUDE ALL NECESSARY COSTS IN BID. 7. PROVIDE SMOKE AND HEAT DETECTORS WITHIN ELEVATOR MACHINE ROOMS AND ELEVATOR HOIST PITS. 8. PROVIDE CONNECTION OF FA SYSTEMS TO ALL MAGNETIC DOOR HOLD-OPEN DEVICES TO AUTOMATICALLY CLOSE DOORS (INCLUDING OVERHEAD STORAGE DOORS) DURING ALARM CONDITIONS. 9. DEVICES INDICATED ON FIRE ALARM ONE- LINE ARE FOR REFERENCE ONLY. REFER TO PLAN DRAWINGS AND SPECIFICATIONS FOR QUANTITIES. REFER TO ARCHITECTURAL DOOR SCHEDULE FOR MAGNETIC DOOR HOLDER AND BLOW OPEN DOOR REQUIREMENTS. 10. ALL VISUAL DEVICES SHALL BE SYNCHRONIZED. 11. CONTRACTOR SHALL REFER TO MECHANICAL DRAWINGS FOR EXACT LOCATION OF ALL FIRE SMOKE DAMPERS. CONTRACTOR SHALL PROVIDE QUANTITY OF CONNECTIONS PER THE MECHANICAL DRAWINGS. 12. REFER TO ARCHITECTURAL DRAWINGS FOR DESIGN GUIDELINES FOR LAYOUT AND PLACEMENT OF ALL EXPOSED INFRASTRUCTURE INCLUDING PIPING, SPRINKLERS, CONDUIT, DUCTWORK, CABLE TRAYS, LIGHTING AND CEILING DEVICES. CONSULT ARCHITECT IF ANY QUESTIONS ARISE ABOUT DESIGN INTENT. KEYNOTES# 1 PROVIDE DUCT-TYPE SMOKE DETECTOR, FIRE ALARM MONITOR RELAY FOR DAMPER POSITION, AND FIRE ALARM CONTROL RELAY FOR CONTROL DAMPER MOTOR POWER (PER NYS BUILDING CODE SECTION 716.3.2.1(1)). ROUTE POWER VIA FIRE ALARM RELAY. PROVIDE REMOTE LEDS FOR DETECTORS WHICH ARE NOT READILY VISIBLE OR ACCESSIBLE 2 CONNECT ALL ELEVATOR LOBBY SMOKE DETECTORS TO ELEVATOR CONTROLLER FOR ELEVATOR RECALL. PROVIDE SHUNT TRIP DEVICE AT DISCONNECT FOR ALL ELEVATOR CONTROLLERS. PROVIDE A HEAT DETECTOR AT THE TOP OF ELEVATOR SHAFT AND ADJACENT TO EACH SPRINKLER HEAD IN ALL ELEVATOR MACHINE ROOMS. ACTIVATION OF HEAT DETECTOR TO INITIATE SHUNT-TRIP. 2 NO ISSUE DATE 1 100% DD DOCUMENTS 14/08/28 2 50% CONSTRUCTION DOCUMENTS 14/11/07 3 BID SET 15/02/27 4 Addendum No. 3 15/03/31 3/32" = 1'-0"1 FIRE ALARM CONSTRUCTION OVERALL PLAN - LEVEL 02