Loading...
HomeMy WebLinkAbout_ALL Volume 2 Conformed Set 327DHDHDHDHDHDH123 456 891011121314151617181920 6.18.1 8.910.1 2.6 A B C D E F G H J K L M N P Q O R S T Q.1 Q.6 R.3 20.2 02 0205 0508 08 R.5 20.3 R.4 Building Services 172A Elev F.1 10071 Egress Stair S 10004 Shaft 10066 Egress Stair N 10002 Elev P.1 10070 Egress Stair W 10001 Drop Tower Shaft 195 Small Medium Classroom 102 Large Multi-Purpose Conference 106 Pantry Kitchen 110 Informal Collaboration 115 AV Storage 102A AV Storage 106A AV Storage 142A AV Storage 152A Lounge 116 Small Classroom 152 MAE Wind Tunnel Equipment 154 Small Classroom 146 Large Flexible Classroom 142 Fluid Dynamics - Wind Tunnel Lab 166 Wind Energy Lab (Barthelmie) 168 Fluid Dynamics - Tow Tank Lab 160 Fluid Dynamics - Water Channel Lab 162 AV Storage 146A Terrace Vestibule 119 West Corridor 10040 NE Lobby 10041 NE Vestibule 10046 Shaft SH101 Shaft SH102 Grumman Corridor 10048 Toilets 10024 Custodial 10026 Shaft SH103 Shaft SH104 Open Stair NE 10003 Exhibition 140 Exhibition 325 Shaft SH107 Elec 10060 Elec 10063 Mail Room 141 Acct Representatives 143 Acct Representatives 147 Lead Finance 149 Research Admin 151 Telecom 128 Women 10023 Men 10022 Toilets 10025 Elec 10062 West Corridor 10040 NE Lobby 10041 West Corridor 10040 Undergrad Advisor/Coord. 129 Director Administration 137 Director MAE 139 NE Lobby 10041 MAE Wind Tunnel Equipment 154 MAE Wind Tunnel Equipment 154 Research Admin 151 NE Lobby 10041 South Corridor 10042 South Corridor 10042 Circulation 10047 Large Flexible Classroom 142 Custodial 10061 Unisex 10020 Duffield Vestibule 123 Service Corridor 10027 UG Program Asst & Work Study 127 Office Service Center 132 Sm. Conference 135 MAE Administration Office 130 Storage / Closet 133 Storage 131 Facilities Coordinator 153 Circulation 172 1 2 1 1 1 R FA TERMINAL CABINET FA BOOSTER PANEL WP(TYP) (TYP) (TYP) (TYP) KNOX BOX Sheet Title Approved Checked Drawn Job Number Date Sheet Information Revisions MEP FP ME Engineers 29 West 38th Street, 5th Floor New York, NY 10018 t 212.447.6770 f 212.447.6615 STRUCTURAL ENGINEER/ SUSTAINABILITY CONSULTANT Thornton Tomasetti 51 Madison Ave. New York, N.Y. 10010 t 917.661.7800 f 917.661.7801 LIGHTING CONSULTANT Lumen Architecture 214 W 29th Street Suite 1005 New York, NY 10001 t 212.564.6469 f 917.591.2524 LANDSCAPE ARCHITECT Trowbridge Wolf Michaels 1001 West Seneca Street Suite 101 Ithaca, NY 14850 t 607.277.1400 f 000.000.0000 162345 A E B C D 162345 A E B C D Copyright © 2013 Perkins+Will 227 West 29th Street, 7th Flr. New York, NY 10001 t: 212 505-5955 f: 212 505-1648 CIVIL ENGINEER TG Miller PC 203 North Aurora Street Ithaca, NY 14850 t 607.272.6477 f 607.273.6322 AV / ACOUSTICS The Sextant Group 244 Madison Avenue Suite 311 New York NY 10016 t 877.684.2311 f 412.323.8538 CODE CONSULTANT Code Consultants Professional Engineers, PC 215 West 40th Street 15th Floor New York, NY 10018 t 212.216.9596 f 212.216.9619 C:\Users\edgar.avila\Documents\Upson Hall_ELEC_russell.kent.rvtFA-2001 FIRE ALARM CONSTRUCTION OVERALL PLAN - LEVEL 01 MEE MEE 031549.000 11/07/2014 MEE Upson Hall Renovation 124 Hoy Rd, Ithaca, NY 14850 Cornell University 215 Park Avenue South 4th Floor New York, NY 10003 t 212.251.7000 f 212.251.7111 www.perkinswill.com GENERAL NOTES 1. PROVIDE #14 AWG MINIMUM WIRING FOR ALL SIGNAL AND INITIATION DEVICES. 2. ALL EXPOSED CONDUIT SHALL BE ROUTED PERPENDICULAR AND PARALLEL TO COLUMNS AND BEAMS. ALL EXPOSED CONDUIT ROUTING SHALL BE COORDINATED WITH OWNER'S REP. PRIOR TO INSTALLATION. NO ADDITIONAL COST TO THE OWNER WILL BE ALLOWED FOR RELOCATING CONDUIT DUE TO LACK OF COORDINATION WITH THE OWNER'S REP. 3. ALL BACK BOXES SHALL BE FLUSH MOUNTED UNLESS OTHERWISE NOTED. CONTRACTOR SHALL COORDINATE INSTALLATION OF CONDUIT AND BACK BOXES IN POURED CONCRETE, PRE-CAST CONCRETE, MASONRY AND GYP. WALLS. 4. ELECTRICAL CONTRACTOR SHALL COORDINATE EXACT QUANTITY AND LOCATIONS OF ALL FIRE SPRINKLER SYSTEM TAMPER AND FLOW SWITCHES WITH CONSTRUCTION MANAGER PRIOR TO BID. CONNECT ALL TAMPER AND FLOW SWITCHES TO FIRE ALARM SYSTEM. 5. CONTRACTOR SHALL COORDINATE EXACT LOCATION AND QUANTITY OF ALL DUCT TYPE SMOKE DETECTORS WITH MECHANICAL CONTRACTOR. ELECTRICAL CONTRACTOR SHALL HARD WIRE TO RELAY STARTER. INCLUDE ALL NECESSARY COSTS IN BID. 6. PROVIDE (1) DUCT TYPE SMOKE DETECTORS FOR EACH FAN COIL UNIT, AIR HANDLING UNIT, SUPPLY FAN, AND HEAT PUMP OF 2,000 CFM AND GREATER. PROVIDE (2) DUCT TYPE SMOKE DETECTORS FOR EACH FAN COIL UNIT, AIR HANDLING UNIT, HEAT PUMP AND SUPPLY FAN OF 15,000 CFM AND GREATER. INCLUDE ALL NECESSARY COSTS IN BID. 7. PROVIDE SMOKE AND HEAT DETECTORS WITHIN ELEVATOR MACHINE ROOMS AND ELEVATOR HOIST PITS. 8. PROVIDE CONNECTION OF FA SYSTEMS TO ALL MAGNETIC DOOR HOLD-OPEN DEVICES TO AUTOMATICALLY CLOSE DOORS (INCLUDING OVERHEAD STORAGE DOORS) DURING ALARM CONDITIONS. 9. DEVICES INDICATED ON FIRE ALARM ONE- LINE ARE FOR REFERENCE ONLY. REFER TO PLAN DRAWINGS AND SPECIFICATIONS FOR QUANTITIES. REFER TO ARCHITECTURAL DOOR SCHEDULE FOR MAGNETIC DOOR HOLDER AND BLOW OPEN DOOR REQUIREMENTS. 10. ALL VISUAL DEVICES SHALL BE SYNCHRONIZED. 11. CONTRACTOR SHALL REFER TO MECHANICAL DRAWINGS FOR EXACT LOCATION OF ALL FIRE SMOKE DAMPERS. CONTRACTOR SHALL PROVIDE QUANTITY OF CONNECTIONS PER THE MECHANICAL DRAWINGS. 12. REFER TO ARCHITECTURAL DRAWINGS FOR DESIGN GUIDELINES FOR LAYOUT AND PLACEMENT OF ALL EXPOSED INFRASTRUCTURE INCLUDING PIPING, SPRINKLERS, CONDUIT, DUCTWORK, CABLE TRAYS, LIGHTING AND CEILING DEVICES. CONSULT ARCHITECT IF ANY QUESTIONS ARISE ABOUT DESIGN INTENT. KEYNOTES# 1 PROVIDE DUCT-TYPE SMOKE DETECTOR, FIRE ALARM MONITOR RELAY FOR DAMPER POSITION, AND FIRE ALARM CONTROL RELAY FOR CONTROL DAMPER MOTOR POWER (PER NYS BUILDING CODE SECTION 716.3.2.1(1)). ROUTE POWER VIA FIRE ALARM RELAY. PROVIDE REMOTE LEDS FOR DETECTORS WHICH ARE NOT READILY VISIBLE OR ACCESSIBLE 2 CONNECT ALL ELEVATOR LOBBY SMOKE DETECTORS TO ELEVATOR CONTROLLER FOR ELEVATOR RECALL. PROVIDE SHUNT TRIP DEVICE AT DISCONNECT FOR ALL ELEVATOR CONTROLLERS. PROVIDE A HEAT DETECTOR AT THE TOP OF ELEVATOR SHAFT AND ADJACENT TO EACH SPRINKLER HEAD IN ALL ELEVATOR MACHINE ROOMS. ACTIVATION OF HEAT DETECTOR TO INITIATE SHUNT-TRIP. 2 NO ISSUE DATE 1 100% DD DOCUMENTS 14/08/28 2 50% CONSTRUCTION DOCUMENTS 14/11/07 3 BID SET 15/02/27 4 Addendum No. 3 15/03/31 3/32" = 1'-0"1 FIRE ALARM CONSTRUCTION OVERALL PLAN - LEVEL 01