Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
_ALL Volume 2 Conformed Set 325
FAAPDH DH123 456 891011121314151617181920 6.18.1 8.910.1 2.6 A B C D E F G H J K L M N P Q O R S T Q.1 Q.6 R.3 20.2 02 0205 0508 08 R.5 20.3 R.4 (TYP) (TYP) FIRE ALARM TERMINAL CABINET FIRE ALARM PANEL Booster Panel Mechanical B0063 Elec B0065 Elec B0064 Telecom B34 MDF (EXISTING)B0069 RHODES Projects Storage B32 Team Conference B02 Team Conference B04 Teams Pod Design Area B10 Swanson Director B06 Egress Stair W B0001 West Vestibule B01 Storage B11 West Corridor B0040 Teams Pod Build Area B14 Teams Pod Design Area B15 Teams Pod Design Area B19 Teams Pod Build Area B18 Cage Storage B0046 Cage Storage B0047 Cage Storage B0048 Cage Storage B0043 Cage Storage B0045 Cage Storage B0051 Cage Storage B0049 Cage Storage B0050 Rapid Prototyping Lab B22 Egress Stair N B0002 Teams Pod Design Area B23 West Corridor B0040 West Corridor B0040 Shaft SHB01 Men B0022 Elev P.0 B0070 Exhibition B0040A South Corridor B0042 Elec B35 Women B0023 Custodial B0061 Areaway SHB03 Areaway SHB04 CAD/CAM Lab B38 Vending B39 East Corridor B0041 Staff Office B36 Staff Office B40A Storage B40B Emerson Manufacturing Teaching Lab B40 Emerson Manufacturing Teaching Lab B40 Sprinkler Valve B0069 Generator B0068 Egress Stair S B0006 Corridor B0043 Lab Support B76 Toilets B88 Shaft B0066 Custodial B77 Elev F.0 B0071 Loading Dock B0044 Drop Tower Base B70C GM Auto Lab B70AUpson Automotive Lab (Existing) B74 Universal Waste - Holding B68 Mechanical B0067 South Corridor B0042 Team Conference B60 Teams Pod Build Area B56 South Corridor B0042 South Corridor B0042 Student Orgs. Office B50 Shower Room B30 Teams Pod Design Area B52 Cage Storage B56C Cage Storage B56BCage Storage B56A Composites Fabrication B70E Sheet Metal Fabrication B70F Shock Testing B70D Engine Room B70B 1 2 1 OPEN STAIR NW B0005 RR WP Sheet Title Approved Checked Drawn Job Number Date Sheet Information Revisions MEP FP ME Engineers 29 West 38th Street, 5th Floor New York, NY 10018 t 212.447.6770 f 212.447.6615 STRUCTURAL ENGINEER/ SUSTAINABILITY CONSULTANT Thornton Tomasetti 51 Madison Ave. New York, N.Y. 10010 t 917.661.7800 f 917.661.7801 LIGHTING CONSULTANT Lumen Architecture 214 W 29th Street Suite 1005 New York, NY 10001 t 212.564.6469 f 917.591.2524 LANDSCAPE ARCHITECT Trowbridge Wolf Michaels 1001 West Seneca Street Suite 101 Ithaca, NY 14850 t 607.277.1400 f 000.000.0000 162345 A E B C D 162345 A E B C D Copyright © 2013 Perkins+Will 227 West 29th Street, 7th Flr. New York, NY 10001 t: 212 505-5955 f: 212 505-1648 CIVIL ENGINEER TG Miller PC 203 North Aurora Street Ithaca, NY 14850 t 607.272.6477 f 607.273.6322 AV / ACOUSTICS The Sextant Group 244 Madison Avenue Suite 311 New York NY 10016 t 877.684.2311 f 412.323.8538 CODE CONSULTANT Code Consultants Professional Engineers, PC 215 West 40th Street 15th Floor New York, NY 10018 t 212.216.9596 f 212.216.9619 C:\Users\edgar.avila\Documents\Upson Hall_ELEC_russell.kent.rvtFA-2000 FIRE ALARM CONSTRUCTION OVERALL PLAN - LEVEL 00 MEE MEE 031549.000 11/07/2014 MEE Upson Hall Renovation 124 Hoy Rd, Ithaca, NY 14850 Cornell University 215 Park Avenue South 4th Floor New York, NY 10003 t 212.251.7000 f 212.251.7111 www.perkinswill.com 1 PROVIDE DUCT-TYPE SMOKE DETECTOR, FIRE ALARM MONITOR RELAY FOR DAMPER POSITION, AND FIRE ALARM CONTROL RELAY FOR CONTROL DAMPER MOTOR POWER (PER NYS BUILDING CODE SECTION 716.3.2.1(1)). ROUTE POWER VIA FIRE ALARM RELAY. PROVIDE REMOTE LEDS FOR DETECTORS WHICH ARE NOT READILY VISIBLE OR ACCESSIBLE 2 CONNECT ALL ELEVATOR LOBBY SMOKE DETECTORS TO ELEVATOR CONTROLLER FOR ELEVATOR RECALL. PROVIDE SHUNT TRIP DEVICE AT DISCONNECT FOR ALL ELEVATOR CONTROLLERS. PROVIDE A HEAT DETECTOR AT THE TOP OF ELEVATOR SHAFT AND ADJACENT TO EACH SPRINKLER HEAD IN ALL ELEVATOR MACHINE ROOMS. ACTIVATION OF HEAT DETECTOR TO INITIATE SHUNT-TRIP. 2 GENERAL NOTES 1. PROVIDE #14 AWG MINIMUM WIRING FOR ALL SIGNAL AND INITIATION DEVICES. 2. ALL EXPOSED CONDUIT SHALL BE ROUTED PERPENDICULAR AND PARALLEL TO COLUMNS AND BEAMS. ALL EXPOSED CONDUIT ROUTING SHALL BE COORDINATED WITH OWNER'S REP. PRIOR TO INSTALLATION. NO ADDITIONAL COST TO THE OWNER WILL BE ALLOWED FOR RELOCATING CONDUIT DUE TO LACK OF COORDINATION WITH THE OWNER'S REP. 3. ALL BACK BOXES SHALL BE FLUSH MOUNTED UNLESS OTHERWISE NOTED. CONTRACTOR SHALL COORDINATE INSTALLATION OF CONDUIT AND BACK BOXES IN POURED CONCRETE, PRE-CAST CONCRETE, MASONRY AND GYP. WALLS. 4. ELECTRICAL CONTRACTOR SHALL COORDINATE EXACT QUANTITY AND LOCATIONS OF ALL FIRE SPRINKLER SYSTEM TAMPER AND FLOW SWITCHES WITH CONSTRUCTION MANAGER PRIOR TO BID. CONNECT ALL TAMPER AND FLOW SWITCHES TO FIRE ALARM SYSTEM. 5. CONTRACTOR SHALL COORDINATE EXACT LOCATION AND QUANTITY OF ALL DUCT TYPE SMOKE DETECTORS WITH MECHANICAL CONTRACTOR. ELECTRICAL CONTRACTOR SHALL HARD WIRE TO RELAY STARTER. INCLUDE ALL NECESSARY COSTS IN BID. 6. PROVIDE (1) DUCT TYPE SMOKE DETECTORS FOR EACH FAN COIL UNIT, AIR HANDLING UNIT, SUPPLY FAN, AND HEAT PUMP OF 2,000 CFM AND GREATER. PROVIDE (2) DUCT TYPE SMOKE DETECTORS FOR EACH FAN COIL UNIT, AIR HANDLING UNIT, HEAT PUMP AND SUPPLY FAN OF 15,000 CFM AND GREATER. INCLUDE ALL NECESSARY COSTS IN BID. 7. PROVIDE SMOKE AND HEAT DETECTORS WITHIN ELEVATOR MACHINE ROOMS AND ELEVATOR HOIST PITS. 8. PROVIDE CONNECTION OF FA SYSTEMS TO ALL MAGNETIC DOOR HOLD-OPEN DEVICES TO AUTOMATICALLY CLOSE DOORS (INCLUDING OVERHEAD STORAGE DOORS) DURING ALARM CONDITIONS. 9. DEVICES INDICATED ON FIRE ALARM ONE- LINE ARE FOR REFERENCE ONLY. REFER TO PLAN DRAWINGS AND SPECIFICATIONS FOR QUANTITIES. REFER TO ARCHITECTURAL DOOR SCHEDULE FOR MAGNETIC DOOR HOLDER AND BLOW OPEN DOOR REQUIREMENTS. 10. ALL VISUAL DEVICES SHALL BE SYNCHRONIZED. 11. CONTRACTOR SHALL REFER TO MECHANICAL DRAWINGS FOR EXACT LOCATION OF ALL FIRE SMOKE DAMPERS. CONTRACTOR SHALL PROVIDE QUANTITY OF CONNECTIONS PER THE MECHANICAL DRAWINGS. 12. REFER TO ARCHITECTURAL DRAWINGS FOR DESIGN GUIDELINES FOR LAYOUT AND PLACEMENT OF ALL EXPOSED INFRASTRUCTURE INCLUDING PIPING, SPRINKLERS, CONDUIT, DUCTWORK, CABLE TRAYS, LIGHTING AND CEILING DEVICES. CONSULT ARCHITECT IF ANY QUESTIONS ARISE ABOUT DESIGN INTENT. KEYNOTES# NO ISSUE DATE 1 100% DD DOCUMENTS 14/08/28 2 50% CONSTRUCTION DOCUMENTS 14/11/07 3 BID SET 15/02/27 4 Addendum No. 3 15/03/31 3/32" = 1'-0"1 FIRE ALARM CONSTRUCTION OVERALL PLAN - LEVEL 00