Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
_ALL Volume 2 Conformed Set 300
123 5 891011121314151617181920 6.18.1 L M N P Q O R S T Q.1 Q.6 R.3 20.2 02 0205 0508 08 R.5 20.3 R.4 EM EM EM EM EM EM EM EM EM EM EM EM EM EM EM EM EM EM L12L12 L12 L12 L12 L12 L12L12 L12aL12a L12L12 L12 L12 L12a L12a L12a L01 L02 L02L02 L02 L02d L09 L01b L01b L15 L15 L15 L15 L16e L07 L07 L07 L07 L07L07 L12 L12 L12 L12 L17 L17 L17 L17 L18 L18 L17 L17 L09 L01 L01 L01 L01 L10 L10L10L10 L10 L10 L10 L10 L10 L10 L10 L10 L10 L10 L10 L10 L10 L10 L02dL02dL02d L12a L12a L12a L02 L02d UP DOWN UP DOWN 1 1 L07 L07 L10 L10 L25 L07 L17 EM LCComputational Lab - Ferrari 529Hybrid Lab - Unassigned 525 Research Conference 531 Informal Collaboration 537 Open Stair NE 50003 NE Corridor 50041 West Corridor 50040 Roof Access Area 50072 Research Storage 522 Egress Stair N 50002 Elev P.5 50070 Men 50022 Women 50023 Custodial 50061 Unisex 50020 Telecom 528 NE Corridor 50041 Elec 50062 Faculty Service Center 540 Office-Students 541 Faculty Office 543 Faculty Office 547 Sm. Conference 549 Faculty Office 551 Hybrid Lab - ASL Robot Testing 542 Office-Students 546 Service Corridor 50024 L16a L16b L16g L16g L16b L16e L16b L17 L17 L16d L07 EM EM EM EM L01d L01d L01d L01d L01d EM EM MATCHLINE SEE /1 E-2205B MATCHLINE SEE /1 E-2205B L10 L10 2 EM Shaft SH507 Shaft SH502 Shaft SH503 Shaft SH509 LPP-5-1:20 EM LPP-5-1:21 3 (TYP.) 3 (TYP.) (TYP.) 3 L07EM Sheet Title Approved Checked Drawn Job Number Date Sheet Information Revisions MEP FP ME Engineers 29 West 38th Street, 5th Floor New York, NY 10018 t 212.447.6770 f 212.447.6615 STRUCTURAL ENGINEER/ SUSTAINABILITY CONSULTANT Thornton Tomasetti 51 Madison Ave. New York, N.Y. 10010 t 917.661.7800 f 917.661.7801 LIGHTING CONSULTANT Lumen Architecture 214 W 29th Street Suite 1005 New York, NY 10001 t 212.564.6469 f 917.591.2524 LANDSCAPE ARCHITECT Trowbridge Wolf Michaels 1001 West Seneca Street Suite 101 Ithaca, NY 14850 t 607.277.1400 f 000.000.0000 162345 A E B C D 162345 A E B C D Copyright © 2013 Perkins+Will 227 West 29th Street, 7th Flr. New York, NY 10001 t: 212 505-5955 f: 212 505-1648 CIVIL ENGINEER TG Miller PC 203 North Aurora Street Ithaca, NY 14850 t 607.272.6477 f 607.273.6322 AV / ACOUSTICS The Sextant Group 244 Madison Avenue Suite 311 New York NY 10016 t 877.684.2311 f 412.323.8538 CODE CONSULTANT Code Consultants Professional Engineers, PC 215 West 40th Street 15th Floor New York, NY 10018 t 212.216.9596 f 212.216.9619 C:\Users\edgar.avila\Documents\Upson Hall_ELEC_russell.kent.rvtE-2205A ELECTRICAL LIGHTING CONSTRUCTION PARTIAL PLAN - LEVEL 05 PART A MEE MEE 031549.000 11/07/2014 MEE Upson Hall Renovation 124 Hoy Rd, Ithaca, NY 14850 Cornell University 215 Park Avenue South 4th Floor New York, NY 10003 t 212.251.7000 f 212.251.7111 www.perkinswill.com GENERAL NOTES 1. REFER TO LIGHTING DESIGNER/ARCHITECTURAL DRAWINGS FOR LIGHT FIXTURE INFORMATION. 2. ALL SURFACE MOUNTED CONDUIT SHALL BE ROUTED PERPENDICULAR AND PARALLEL TO BEAMS AND COLUMNS. ALL CONDUIT ROUTING SHALL BE COORDINATED WITH THE ARCHITECT PRIOR TO INSTALLATION AND INSTALLED IN A NEAT AND CONSISTENT MANNER. ALL SURFACE MOUNTED CONDUIT WHERE EXPOSED TO PUBLIC AREAS SHALL BE PAINTED. PAINT COLOR TO BE DETERMINED BY THE ARCHITECT. 3. ALL FLUORESCENT BALLASTS SHALL BE ELECTRONIC PROGRAMMED RAPID START. ALSO PROVIDE DIMMABLE BALLASTS WHERE NOTED PER LIGHTING CONTROL. 4. ELECTRICAL CONTRACTOR SHALL FIELD VERIFY EXACT FIXTURE LENGTHS FOR ALL CONTINUOUS LINEAR FIXTURES. 5. ELECTRICAL CONTRACTOR TO COORDINATE WITH MECHANICAL CONTRACTOR FOR PLACEMENT OF FIXTURES WITHIN MECHANICAL ROOMS. 6. ALL EXIT LIGHTS OF ALL TYPES SHALL BE MOUNTED AT 8'-0" AFF UNLESS OTHERWISE NOTED. 7. FIXTURES WITHIN ELECTRICAL, TELECOMMUNICATION, MECHANICAL AND FIRE PUMP ROOMS SHALL BE PROVIDED WITH 90 MINUTES INTEGRAL BATTERY UNITS. 8. PROVIDE EMERGENCY LIGHTING CONTROL UNIT TO PROVIDE AUTOMATIC, FULL ON DURING LOSS OF POWER. 9. REFER TO MEP SHEETS FOR LIGHTING CONTROL SCHEDULES AND DIAGRAMS. 10. REFER TO EL-2100 SERIES FOR LIGHTING CONTROL ZONES. 11. REFER TO ARCHITECTURAL DRAWINGS FOR DESIGN GUIDELINES FOR LAYOUT AND PLACEMENT OF ALL EXPOSED INFRASTRUCTURE INCLUDING PIPING, SPRINKLERS, CONDUIT, DUCTWORK, CABLE TRAYS, LIGHTING AND CEILING DEVICES. CONSULT ARCHITECT IF ANY QUESTIONS ARISE ABOUT DESIGN INTENT. KEYNOTES# 1/8" = 1'-0"1 ELECTRICAL LIGHTING CONSTRUCTION PARTIAL PLAN - LEVEL 05 PART A 1 CONNECT ALTERNATE STAIR LIGHT FIXTURES ON TWO BRANCH CIRCUITS. 2 CONNECT EXTERIOR BUILDING LIGHTING FIXTURES TO CIRCUIT HELP-B:13. 3 CONNECT EXIT SIGNS TO UNSWITCHED LEG OF EMERGENCY CIRCUIT SERVING AREA. NO ISSUE DATE 1 100% DD DOCUMENTS 14/08/28 2 50% CONSTRUCTION DOCUMENTS 14/11/07 3 BID SET 15/02/27 4 Addendum No. 3 15/03/31