Loading...
HomeMy WebLinkAbout_ALL Volume 2 Conformed Set 292123 5 891011121314151617181920 6.18.1 L M N P Q O R S T Q.1 Q.6 R.3 20.2 02 0205 0508 08 R.5 20.3 R.4 L12 L12 L12 L12L12L12L12L12L12L12L12 L12L12 L12aL12a L12L12 L12L12 L12L12 L12 L12 L01a L01a L28d L28cL28c L28c L28c L28cL01aL01a L01b L01b L01b L01b L01b L28d L01a L01a L01b L01b L12a L12a L12a L01a L28c L28c L09 L09 L01b L01b L01b L01b L01b L07 L07 L07 L07 L07 L16h L16e L16b L16g L16e L04b L04d L04d L18 L18 L18 L18 L15 L15 L15 L15 L15 L15 L15 L17 L17 L17 L16b L12 L07 L03c L12L12L12L12L12L12L12L12L12L12 L16d L12 L12 L12 L12 L07 L17a L10 L10 L10 L10 L10L10 L12 L12 L12 L12 L01aL01a L01a L01a L01a L01a L01 L01 L01 L01a L01a L01a L01a L28c L28c L28c L28c L28c L28b L10 L10 L10 L10 L10 L10 L10 L10L10 L10L10 L10 L10L10 L10 L10 L10 L10L10 L10 L10 L10 L10 L10 L10 L10 L10 L10L10L10L10 L10 L10 L10 L10 L10 L10 L10 L10 L10 L10 L10 L10 L10 L10 L10 L10 L10 L10 L10 L10 L10 L10 L10 L18 L12a L12a L12a L28c L01b L01b L01b L01b L01a L01a L01a L01a EM EM EM EM EM EM EM EM EM EM EM EM EM EM EM EM EM EM EM EM EM EM EM EM EM EM EM EM EM EM EM EM EM UP DOWN UP DOWN DOWN DOWNUP UP 1 1 1 1 1 L10 L10 L10L10L10L10 L07 L10 L10 L10 L07 L07 L10 L10 L10 Sm. Conference 323 Faculty Office 321 Faculty Office 319 Faculty Office 317 Faculty Office 315 Faculty Office 313 Faculty Office 311 Faculty Office 309 Faculty Office 307 Faculty Office 305 Touch-Down / Hoteling Workspace 301 Egress Stair W 30001 West Corridor 30040 Office-Students 302 Office-Students 304 Dry / Computational Lab 306 Emeritus Suite 310 Office-Students 314 Egress Stair N 30002 Shaft SH203 Elev P.3 30070 Men 30022 Service Corridor 30024 Women 30023 Custodial 30061 Unisex 30020 NE Corridor 30041 Telecom 328 Elec 30062 Faculty Service Center 340 Hybrid Lab - Unassigned 325 Hybrid Lab - Unassigned 329 Open Stair NE 30003 Research Conference 331 Informal Collaboration 337 Hybrid Lab - Unassigned 342 Sm. Office-Students 344 Energy Environ Research Lab 348 Grain Flow Research Lab 350 Faculty Office 351 Sm. Conference 349 Faculty Office 347 Office-Students 341 L01aL01a L01a L01a L01a L01a L01a L01a L01a L16b L16b L17 L17 L10 L10 EM EM EM EM EM EM EM EM EM EM EM MATCHLINE SEE /1 E-2203B MATCHLINE SEE /1 E-2203B HLP-3:3 HLP-3:5 HELP-3:1 HELP-3:3 HLP-3:1 HLP-3:7 Faculty Office 343 L28a L28 L28a L28a L28a L28a L28a EM EM L28a L28a L28a L28a L28a L28a L28a L28a L28a L28a L28a L28b EM EM LPP-3-1:18 Exhibition 30040A Shaft SH301 Shaft SH303 Shaft SH306 Shaft SH308 Shaft SH311 Shaft SH312 Elec 30060 Shaft SH304 Biomechanics Computing Lab 322 Conference 316 Office 322B Office 322A LPP-3-3:29 EM EM 2 (TYP)23 (TYP) 3 3 L28b Sheet Title Approved Checked Drawn Job Number Date Sheet Information Revisions MEP FP ME Engineers 29 West 38th Street, 5th Floor New York, NY 10018 t 212.447.6770 f 212.447.6615 STRUCTURAL ENGINEER/ SUSTAINABILITY CONSULTANT Thornton Tomasetti 51 Madison Ave. New York, N.Y. 10010 t 917.661.7800 f 917.661.7801 LIGHTING CONSULTANT Lumen Architecture 214 W 29th Street Suite 1005 New York, NY 10001 t 212.564.6469 f 917.591.2524 LANDSCAPE ARCHITECT Trowbridge Wolf Michaels 1001 West Seneca Street Suite 101 Ithaca, NY 14850 t 607.277.1400 f 000.000.0000 162345 A E B C D 162345 A E B C D Copyright © 2013 Perkins+Will 227 West 29th Street, 7th Flr. New York, NY 10001 t: 212 505-5955 f: 212 505-1648 CIVIL ENGINEER TG Miller PC 203 North Aurora Street Ithaca, NY 14850 t 607.272.6477 f 607.273.6322 AV / ACOUSTICS The Sextant Group 244 Madison Avenue Suite 311 New York NY 10016 t 877.684.2311 f 412.323.8538 CODE CONSULTANT Code Consultants Professional Engineers, PC 215 West 40th Street 15th Floor New York, NY 10018 t 212.216.9596 f 212.216.9619 C:\Users\edgar.avila\Documents\Upson Hall_ELEC_russell.kent.rvtE-2203A ELECTRICAL LIGHTING CONSTRUCTION PARTIAL PLAN - LEVEL 03 PART A MEE MEE 031549.000 11/07/2014 MEE Upson Hall Renovation 124 Hoy Rd, Ithaca, NY 14850 Cornell University 215 Park Avenue South 4th Floor New York, NY 10003 t 212.251.7000 f 212.251.7111 www.perkinswill.com GENERAL NOTES 1. REFER TO LIGHTING DESIGNER/ARCHITECTURAL DRAWINGS FOR LIGHT FIXTURE INFORMATION. 2. ALL SURFACE MOUNTED CONDUIT SHALL BE ROUTED PERPENDICULAR AND PARALLEL TO BEAMS AND COLUMNS. ALL CONDUIT ROUTING SHALL BE COORDINATED WITH THE ARCHITECT PRIOR TO INSTALLATION AND INSTALLED IN A NEAT AND CONSISTENT MANNER. ALL SURFACE MOUNTED CONDUIT WHERE EXPOSED TO PUBLIC AREAS SHALL BE PAINTED. PAINT COLOR TO BE DETERMINED BY THE ARCHITECT. 3. ALL FLUORESCENT BALLASTS SHALL BE ELECTRONIC PROGRAMMED RAPID START. ALSO PROVIDE DIMMABLE BALLASTS WHERE NOTED PER LIGHTING CONTROL. 4. ELECTRICAL CONTRACTOR SHALL FIELD VERIFY EXACT FIXTURE LENGTHS FOR ALL CONTINUOUS LINEAR FIXTURES. 5. ELECTRICAL CONTRACTOR TO COORDINATE WITH MECHANICAL CONTRACTOR FOR PLACEMENT OF FIXTURES WITHIN MECHANICAL ROOMS. 6. ALL EXIT LIGHTS OF ALL TYPES SHALL BE MOUNTED AT 8'-0" AFF UNLESS OTHERWISE NOTED. 7. FIXTURES WITHIN ELECTRICAL, TELECOMMUNICATION, MECHANICAL AND FIRE PUMP ROOMS SHALL BE PROVIDED WITH 90 MINUTES INTEGRAL BATTERY UNITS. 8. PROVIDE EMERGENCY LIGHTING CONTROL UNIT TO PROVIDE AUTOMATIC, FULL ON DURING LOSS OF POWER. 9. REFER TO MEP SHEETS FOR LIGHTING CONTROL SCHEDULES AND DIAGRAMS. 10. REFER TO EL-2100 SERIES FOR LIGHTING CONTROL ZONES. 11. REFER TO ARCHITECTURAL DRAWINGS FOR DESIGN GUIDELINES FOR LAYOUT AND PLACEMENT OF ALL EXPOSED INFRASTRUCTURE INCLUDING PIPING, SPRINKLERS, CONDUIT, DUCTWORK, CABLE TRAYS, LIGHTING AND CEILING DEVICES. CONSULT ARCHITECT IF ANY QUESTIONS ARISE ABOUT DESIGN INTENT. KEYNOTES# 1/8" = 1'-0"1 ELECTRICAL LIGHTING CONSTRUCTION PARTIAL PLAN - LEVEL 03- PART A 1 CONNECT ALTERNATE STAIR LIGHT FIXTURES ON TWO BRANCH CIRCUITS. 2 CONNECT EXIT SIGNS TO UNSWITCHED LEG OF EMERGENCY CIRCUIT SERVING AREA. 3 NO ISSUE DATE 1 100% DD DOCUMENTS 14/08/28 2 50% CONSTRUCTION DOCUMENTS 14/11/07 3 BID SET 15/02/27 4 Addendum No. 3 15/03/31