Loading...
HomeMy WebLinkAbout_ALL Volume 2 Conformed Set 28212 456 88.1 8.910.1 2.6 A B C D E F G H J K L 02 0205 0508 08 L01d L01b L01b L18 L18 L17L17 L06 L06 L17a L17a L17a L17 L17L17 L17L17 L10L10 L10 L10 L10 L18 L07a L17 L11a L11 L07a EM EM EM EM EM EM EM EM EM EM EM EM EM EM EM EM EM EM EM EM EM EMEM UP UP1 1 L07a L07a L25 L25 Cage Storage B56A Cage Storage B56B Cage Storage B56C Team Conference B60 Sprinkler Valve B0069 Sheet Metal Fabrication B70F Generator B0068 GM Auto Lab B70A Engine Room B70B Shock Testing B70D Composites Fabrication B70E Upson Automotive Lab (Existing) B74 Drop Tower Base B70C Egress Stair S B0006 Corridor B0043 Loading Dock B0044 Lab Support B76 MDF (EXISTING)B0069 RHODES Toilets B88 Shaft B0066 Custodial B77 Elev F.0 B0071 Mechanical B0067 Universal Waste - Holding B68 L11 L11a EM MATCHLINE SEE /1 E-2200A MATCHLINE SEE /1 E-2200A HLP-B:8 HELP-B:6 HELP-B:11 HELP-B:9 HLP-B:10 2 2 JS JS JS Grumman Labs GRU01 Cage Storage B0057 Cage Storage B0059 CORRIDORB0042 RHODES L17a L17a EM L17 L17 3 (TYP.) 3 (TYP.) 33 JS JS L21L21L21L21L21 L21 L21 L21 L21 L21L21L21L21L21 L21 L21 L21 L21 L21 L21 L21L21L21 L21L21 L21 L21 L21 L21 L21L21L21L21 L21L21L21 L21 L21 L21 L21 L21 L21 L21 L21 L21 L21 L21L21 L21L21L21 L21 L21 L21 L21 L21 L21 L21L21L21L21L21L21L21L21 L21 L21 L21L21 L21 L21 L21 L21L21L21 L21 L21 L21 L21 L21 L21 L21 L21 L21 L21 Sheet Title Approved Checked Drawn Job Number Date Sheet Information Revisions MEP FP ME Engineers 29 West 38th Street, 5th Floor New York, NY 10018 t 212.447.6770 f 212.447.6615 STRUCTURAL ENGINEER/ SUSTAINABILITY CONSULTANT Thornton Tomasetti 51 Madison Ave. New York, N.Y. 10010 t 917.661.7800 f 917.661.7801 LIGHTING CONSULTANT Lumen Architecture 214 W 29th Street Suite 1005 New York, NY 10001 t 212.564.6469 f 917.591.2524 LANDSCAPE ARCHITECT Trowbridge Wolf Michaels 1001 West Seneca Street Suite 101 Ithaca, NY 14850 t 607.277.1400 f 000.000.0000 162345 A E B C D 162345 A E B C D Copyright © 2013 Perkins+Will 227 West 29th Street, 7th Flr. New York, NY 10001 t: 212 505-5955 f: 212 505-1648 CIVIL ENGINEER TG Miller PC 203 North Aurora Street Ithaca, NY 14850 t 607.272.6477 f 607.273.6322 AV / ACOUSTICS The Sextant Group 244 Madison Avenue Suite 311 New York NY 10016 t 877.684.2311 f 412.323.8538 CODE CONSULTANT Code Consultants Professional Engineers, PC 215 West 40th Street 15th Floor New York, NY 10018 t 212.216.9596 f 212.216.9619 C:\Users\edgar.avila\Documents\Upson Hall_ELEC_russell.kent.rvtE-2200B ELECTRICAL LIGHTING CONSTRUCTION PARTIAL PLAN - LEVEL 00 PART B MEE MEE 031549.000 11/07/2014 MEE Upson Hall Renovation 124 Hoy Rd, Ithaca, NY 14850 Cornell University 215 Park Avenue South 4th Floor New York, NY 10003 t 212.251.7000 f 212.251.7111 www.perkinswill.com GENERAL NOTES 1. REFER TO LIGHTING DESIGNER/ARCHITECTURAL DRAWINGS FOR LIGHT FIXTURE INFORMATION. 2. ALL SURFACE MOUNTED CONDUIT SHALL BE ROUTED PERPENDICULAR AND PARALLEL TO BEAMS AND COLUMNS. ALL CONDUIT ROUTING SHALL BE COORDINATED WITH THE ARCHITECT PRIOR TO INSTALLATION AND INSTALLED IN A NEAT AND CONSISTENT MANNER. ALL SURFACE MOUNTED CONDUIT WHERE EXPOSED TO PUBLIC AREAS SHALL BE PAINTED. PAINT COLOR TO BE DETERMINED BY THE ARCHITECT. 3. ALL FLUORESCENT BALLASTS SHALL BE ELECTRONIC PROGRAMMED RAPID START. ALSO PROVIDE DIMMABLE BALLASTS WHERE NOTED PER LIGHTING CONTROL. 4. ELECTRICAL CONTRACTOR SHALL FIELD VERIFY EXACT FIXTURE LENGTHS FOR ALL CONTINUOUS LINEAR FIXTURES. 5. ELECTRICAL CONTRACTOR TO COORDINATE WITH MECHANICAL CONTRACTOR FOR PLACEMENT OF FIXTURES WITHIN MECHANICAL ROOMS. 6. ALL EXIT LIGHTS OF ALL TYPES SHALL BE MOUNTED AT 8'-0" AFF UNLESS OTHERWISE NOTED. 7. FIXTURES WITHIN ELECTRICAL, TELECOMMUNICATION, MECHANICAL AND FIRE PUMP ROOMS SHALL BE PROVIDED WITH 90 MINUTES INTEGRAL BATTERY UNITS. 8. PROVIDE EMERGENCY LIGHTING CONTROL UNIT TO PROVIDE AUTOMATIC, FULL ON DURING LOSS OF POWER. 9. REFER TO MEP SHEETS FOR LIGHTING CONTROL SCHEDULES AND DIAGRAMS. 10. REFER TO EL-2100 SERIES FOR LIGHTING CONTROL ZONES. 11. REFER TO ARCHITECTURAL DRAWINGS FOR DESIGN GUIDELINES FOR LAYOUT AND PLACEMENT OF ALL EXPOSED INFRASTRUCTURE INCLUDING PIPING, SPRINKLERS, CONDUIT, DUCTWORK, CABLE TRAYS, LIGHTING AND CEILING DEVICES. CONSULT ARCHITECT IF ANY QUESTIONS ARISE ABOUT DESIGN INTENT. KEYNOTES# 1/8" = 1'-0"1 ELECTRICAL LIGHTING CONSTRUCTION PARTIAL PLAN - LEVEL 00 PART B 1 POWER CONNECTION TO MECHANICAL DAMPERS AND FIRE/SMOKE DAMPER. CONTRACTOR SHALL COORDINATE EXACT QUANTITIES AND REQUIREMENTS WITH MECHANICAL CONTRACTOR. EXACT LOCATION SHALL BE FIELD COORDINATED. 2 CONNECT EXTERIOR BUILDING LIGHTING FIXTURES TO CIRCUIT HELP-B:13. 3 CONNECT EXIT SIGNS TO UNSWITCHED LEG OF EMERGENCY CIRCUIT SERVING AREA. NO ISSUE DATE 1 BID SET 15/02/27 2 Addendum No. 3 15/03/31