Loading...
HomeMy WebLinkAbout_ALL Volume 2 Conformed Set 280123 5 891011121314151617181920 6.18.1 L M N P Q O R S T Q.1 Q.6 R.3 20.2 02 0205 0508 08 R.5 20.3 R.4 L07a L03cL03cL03cL03c L05a L05a L05a L05a L05 L05 L05 L05a L05a L05a L05 L05a L05a L05 L05 L05a L05 L05a L05a L05 L01g L01g L01g L01g L01g L01g L01g L01g L01g L01g L01g L05L05a L05 L05a L05 L05a L05a L05a L05 L01g L01g L01g L01g L01g L01gL01g L01g L05 L05a L05a L12 L07a L28e L28e L01d L01d L01d L01d L07a L01d L03c L03b L16b L16e L18 L18 L12 L05a L10 L10 L17 L17 L10 L10 L10 L10 L10 L10 L10 L10 L10 L10 L10 L10 L10 L10 L10 L10 L10 L10 L10 L10 L10 L10 EM EM EM EM EM EM EM EM EM EM EM EM EM EM EM EM EM EM EM EM EM EM EMEM EM EM EM EM EM EM EM EM EM EM EM EM EM EM UP EM EM EM EM EM UP UP 1 1 1 L05 L05a L05 L05 L05a L05 L05 L17a L17a L17a L10 L10 L10 L10 L10 L10 L10 L10 L10 L10 L17a L17a L17a L10 L10 L10 L10 L10 L10 L10 L10 L10 L17a L18 L05 L05 L05a L03b L03c L03b L17a L17a L17a L04b L04b L07aL07a L16f L16i L17 L17 L17 L17 L17L17 L17 L06 L12 L12 L17 L07a L07a L18 L25 EM EM UP EM L16b L16 L16c L16h L07a L17 L07a West Vestibule B01 Storage B11 Egress Stair W B0001 West Corridor B0040 Teams Pod Design Area B15 Teams Pod Design Area B19 Teams Pod Design Area B23 Team Conference B02 Team Conference B04 Teams Pod Design Area B10 Teams Pod Build Area B14 Teams Pod Build Area B18 Rapid Prototyping Lab B22 Egress Stair N B0002 Shaft SHB01 Elev P.0 B0070 South Corridor B0042 Men B0022 Women B0023 Elec B35 Elec B0064 Elec B0065 Mechanical B0063 East Corridor B0041 CAD/CAM Lab B38 Shower Room B30 Projects Storage B32 Student Orgs. Office B50 Telecom B34 Staff Office B36 Emerson Manufacturing Teaching Lab B40 Staff Office B40A Storage B40B Teams Pod Design Area B52 Teams Pod Build Area B56 EM MATCHLINE SEE /1 E-2200B MATCHLINE SEE /1 E-2200B HLP-B:2 HLP-B:4 HELP-B:1 HELP-B:5 HELP-B:7 HELP-B:3 HELP-B:2 HLP-B:12 2 HLP-B:12 JS JS JSJS JS JSJS JS JS Swanson Director B06 Areaway SHB03 Areaway SHB04 Exhibition B0040A Vending B39 Cage Storage B0043 Cage Storage B0045 Cage Storage B0046 Cage Storage B0047 Cage Storage B0048 Cage Storage B0049 Cage Storage B0050 Cage Storage B0051 Custodial B0061 OPEN STAIR NW B0005 L27 LPP-B-1:33 LPP-B-7:27 EM L12 L12 L12 L12 L07a L07a L17 L17 L17 L17 L17 L17L17L17 3 (TYP.) 3 (TYP.) 3 3 3 333 3 3 3 3 L03a L17 L17 L17 EM L17 EM L21 L21 L21L21 L21 L21 L21 L21 L21 L21 L21 L21 L21 L21 L21L21L21L21L21 L21 L21 L21 L21 L21 L21L21L21L21L21 L21 L21 L21 L21 L21 L21L21L21L21L21 LPP-B-7:29,31 L17 L23 L23L23 L23L23 L23 EM LPP-B-1:34 Sheet Title Approved Checked Drawn Job Number Date Sheet Information Revisions MEP FP ME Engineers 29 West 38th Street, 5th Floor New York, NY 10018 t 212.447.6770 f 212.447.6615 STRUCTURAL ENGINEER/ SUSTAINABILITY CONSULTANT Thornton Tomasetti 51 Madison Ave. New York, N.Y. 10010 t 917.661.7800 f 917.661.7801 LIGHTING CONSULTANT Lumen Architecture 214 W 29th Street Suite 1005 New York, NY 10001 t 212.564.6469 f 917.591.2524 LANDSCAPE ARCHITECT Trowbridge Wolf Michaels 1001 West Seneca Street Suite 101 Ithaca, NY 14850 t 607.277.1400 f 000.000.0000 162345 A E B C D 162345 A E B C D Copyright © 2013 Perkins+Will 227 West 29th Street, 7th Flr. New York, NY 10001 t: 212 505-5955 f: 212 505-1648 CIVIL ENGINEER TG Miller PC 203 North Aurora Street Ithaca, NY 14850 t 607.272.6477 f 607.273.6322 AV / ACOUSTICS The Sextant Group 244 Madison Avenue Suite 311 New York NY 10016 t 877.684.2311 f 412.323.8538 CODE CONSULTANT Code Consultants Professional Engineers, PC 215 West 40th Street 15th Floor New York, NY 10018 t 212.216.9596 f 212.216.9619 C:\Users\edgar.avila\Documents\Upson Hall_ELEC_russell.kent.rvtE-2200A ELECTRICAL LIGHTING CONSTRUCTION PARTIAL PLAN - LEVEL 00 PART A MEE MEE 031549.000 11/07/2014 MEE Upson Hall Renovation 124 Hoy Rd, Ithaca, NY 14850 Cornell University 215 Park Avenue South 4th Floor New York, NY 10003 t 212.251.7000 f 212.251.7111 www.perkinswill.com GENERAL NOTES 1. REFER TO LIGHTING DESIGNER/ARCHITECTURAL DRAWINGS FOR LIGHT FIXTURE INFORMATION. 2. ALL SURFACE MOUNTED CONDUIT SHALL BE ROUTED PERPENDICULAR AND PARALLEL TO BEAMS AND COLUMNS. ALL CONDUIT ROUTING SHALL BE COORDINATED WITH THE ARCHITECT PRIOR TO INSTALLATION AND INSTALLED IN A NEAT AND CONSISTENT MANNER. ALL SURFACE MOUNTED CONDUIT WHERE EXPOSED TO PUBLIC AREAS SHALL BE PAINTED. PAINT COLOR TO BE DETERMINED BY THE ARCHITECT. 3. ALL FLUORESCENT BALLASTS SHALL BE ELECTRONIC PROGRAMMED RAPID START. ALSO PROVIDE DIMMABLE BALLASTS WHERE NOTED PER LIGHTING CONTROL. 4. ELECTRICAL CONTRACTOR SHALL FIELD VERIFY EXACT FIXTURE LENGTHS FOR ALL CONTINUOUS LINEAR FIXTURES. 5. ELECTRICAL CONTRACTOR TO COORDINATE WITH MECHANICAL CONTRACTOR FOR PLACEMENT OF FIXTURES WITHIN MECHANICAL ROOMS. 6. ALL EXIT LIGHTS OF ALL TYPES SHALL BE MOUNTED AT 8'-0" AFF UNLESS OTHERWISE NOTED. 7. FIXTURES WITHIN ELECTRICAL, TELECOMMUNICATION, MECHANICAL AND FIRE PUMP ROOMS SHALL BE PROVIDED WITH 90 MINUTES INTEGRAL BATTERY UNITS. 8. PROVIDE EMERGENCY LIGHTING CONTROL UNIT TO PROVIDE AUTOMATIC, FULL ON DURING LOSS OF POWER. 9. REFER TO MEP SHEETS FOR LIGHTING CONTROL SCHEDULES AND DIAGRAMS. 10. REFER TO EL-2100 SERIES FOR LIGHTING CONTROL ZONES. 11. REFER TO ARCHITECTURAL DRAWINGS FOR DESIGN GUIDELINES FOR LAYOUT AND PLACEMENT OF ALL EXPOSED INFRASTRUCTURE INCLUDING PIPING, SPRINKLERS, CONDUIT, DUCTWORK, CABLE TRAYS, LIGHTING AND CEILING DEVICES. CONSULT ARCHITECT IF ANY QUESTIONS ARISE ABOUT DESIGN INTENT. KEYNOTES# 1 POWER CONNECTION TO MECHANICAL DAMPERS AND FIRE/SMOKE DAMPER. CONTRACTOR SHALL COORDINATE EXACT QUANTITIES AND REQUIREMENTS WITH MECHANICAL CONTRACTOR. EXACT LOCATION SHALL BE FIELD COORDINATED. 2 CONNECT EXTERIOR BUILDING LIGHTING FIXTURES TO CIRCUIT HELP-B:13. 3 CONNECT EXIT SIGNS TO UNSWITCHED LEG OF EMERGENCY CIRCUIT SERVING AREA. 1/8" = 1'-0"1 ELECTRICAL LIGHTING CONSTRUCTION PARTIAL PLAN - LEVEL 00 PART A NO ISSUE DATE 1 100% DD DOCUMENTS 14/08/28 2 50% CONSTRUCTION DOCUMENTS 14/11/07 3 BID SET 15/02/27 4 Addendum No. 3 15/03/31