Loading...
HomeMy WebLinkAbout_ALL Volume 2 Conformed Set 243F/SF/SF/SF/SF/SF/SF/SF/S F/S FD FD J J J J J J J J J J J J J J J J JJ J JJ J J 12 456 88.1 8.910.1 2.6 A B C D E F G H J K L 02 0205 0508 08 E-5001 3 HH06 FCU V12 FCU H10 FCU H06 FCU H06 FCU H06 FCU V12 FCU V12 FCU V10 FCU H08 FCU H08 FCU HR08 FCU V02 FCU 60A 50A WIND TUNNEL Building Services 172A Elev F.1 10071 Egress Stair S 10004 Shaft 10066 Drop Tower Shaft 195 AV Storage 142A Small Classroom 152 MAE Wind Tunnel Equipment 154 Fluid Dynamics - Wind Tunnel Lab 166 Wind Energy Lab (Barthelmie) 168 Fluid Dynamics - Tow Tank Lab 160 Fluid Dynamics - Water Channel Lab 162 Shaft SH102 Grumman Corridor 10048 Toilets 10024 Custodial 10026 Shaft SH107 Elec 10063 Toilets 10025 MAE Wind Tunnel Equipment 154 NE Lobby 10041 South Corridor 10042 South Corridor 10042 Circulation 10047 1-14 VAVS 1-15 VAVS 1-16 VAV 1-12 VAVR 1-11 VAVR 1-13 VAVR 1-17 VAVS 1-14 VAVR 1-19 VAVS 1-18 VAVS 1-15 VAVR 1-3 VAVE HPP-1-1:23 HPP-1-1:25 HPP-1-1:8 HPP-1-1:10 HPP-1-1:27 38 ZRT TO TO TO TO TO TO TO TO TO TO TO TO MATCHLINE SEE /1 E-2001A MATCHLINE SEE /1 E-2001A LELP-2:3 200A 125A WIND TUNNEL HPP-1-2:1,3,5 3#1/0, #6G IN 1-1/2"C HPP-1-2:2,4,6 3#6, #10G IN 1"C Grumman Labs GRU10 Grumman Offices GRU11 Facilities Coordinator 153 Circulation 172 1-20 VAVS HH08 FCU 80 ZRT 1 (TYP) 1 (TYP.) TO TO LPP-1-8:1,3 2#10, #10G IN 3/4"C LPP-1-8:5,7 2#10, #10G IN 3/4"C LPP-1-8:9,11 2#10, #10G IN 3/4"C LPP-1-8:13,15 2#10, #10G IN 3/4"C LPP-1-8:17,19 2#10, #10G IN 3/4"C LPP-1-8:21,23 2#10, #10G IN 3/4"C LPP-1-8:25,27 2#10, #10G IN 3/4"C LPP-1-8:29,31 2#10, #10G IN 3/4"C LPP-1-8:33,35 2#10, #10G IN 3/4"C LPP-1-8:37,39 2#10, #10G IN 3/4"C LPP-1-8:2,4 2#10, #10G IN 3/4"C LPP-1-8:6,8 2#8, #10G IN 3/4"C LPP-1-8:10,12 2#8, #10G IN 3/4"C LPP-1-8:14,16 2#8, #10G IN 3/4"C LPP-1-8:18,20 2#8, #10G IN 3/4"C LPP-1-8:22,24 2#6, #8G IN 3/4"C LPP-1-8:26,28 2#6, #8G IN 3/4"C LPP-1-8:30,32 2#6, #8G IN 3/4"C LPP-1-8:34,36 2#6, #8G IN 3/4"C LPP-1-8:38,40 2#6, #8G IN 3/4"C LPP-1-8:41 LPP-1-8:42 1 (TYP.) Sheet Title Approved Checked Drawn Job Number Date Sheet Information Revisions MEP FP ME Engineers 29 West 38th Street, 5th Floor New York, NY 10018 t 212.447.6770 f 212.447.6615 STRUCTURAL ENGINEER/ SUSTAINABILITY CONSULTANT Thornton Tomasetti 51 Madison Ave. New York, N.Y. 10010 t 917.661.7800 f 917.661.7801 LIGHTING CONSULTANT Lumen Architecture 214 W 29th Street Suite 1005 New York, NY 10001 t 212.564.6469 f 917.591.2524 LANDSCAPE ARCHITECT Trowbridge Wolf Michaels 1001 West Seneca Street Suite 101 Ithaca, NY 14850 t 607.277.1400 f 000.000.0000 162345 A E B C D 162345 A E B C D Copyright © 2013 Perkins+Will 227 West 29th Street, 7th Flr. New York, NY 10001 t: 212 505-5955 f: 212 505-1648 CIVIL ENGINEER TG Miller PC 203 North Aurora Street Ithaca, NY 14850 t 607.272.6477 f 607.273.6322 AV / ACOUSTICS The Sextant Group 244 Madison Avenue Suite 311 New York NY 10016 t 877.684.2311 f 412.323.8538 CODE CONSULTANT Code Consultants Professional Engineers, PC 215 West 40th Street 15th Floor New York, NY 10018 t 212.216.9596 f 212.216.9619 C:\Users\edgar.avila\Documents\Upson Hall_ELEC_russell.kent.rvtE-2001B ELECTRICAL CONSTRUCTION MECHANICAL EQUIPMENT PLAN - LEVEL 01 PART B MEE MEE 031549.000 11/07/2014 MEE Upson Hall Renovation 124 Hoy Rd, Ithaca, NY 14850 Cornell University 215 Park Avenue South 4th Floor New York, NY 10003 t 212.251.7000 f 212.251.7111 www.perkinswill.com NO ISSUE DATE 1 BID SET 15/02/27 2 Addendum No. 3 15/03/31 GENERAL NOTES 1. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS AND BE FAMILIAR WITH THE JOB SITE PRIOR TO BID. 2. ALL EQUIPMENT PROVIDED BY OTHERS SUCH AS: MECHANICAL, PLUMBING, FIRE PROTECTION, IT, AV, AND/OR ARCHITECTURAL, ETC IS SHOWN FOR ELECTRICAL CIRCUITING INFORMATION ONLY. FOR EXACT QUANTITIES AND LOCATIONS REFER TO THE DISCIPLINES PLANS/SPECIFICATIONS ACCORDINGLY. 3. COORDINATE WITH ARCHITECTURAL PLANS FOR EXACT LOCATIONS AND MOUNTINGS HEIGHT OF ALL ELECTRICAL DEVICES. 4. ELECTRICAL CONTRACTOR SHALL COORDINATE EXACT LOCATION OF ALL MECHANICAL UNITS WITH MECHANICAL CONTRACTOR. 5. ALL EXPOSED CONDUIT SHALL BE ROUTED PERPENDICULAR, PARALLEL, AND TIGHT TO COLUMNS AND BEAMS. 6. PROVIDE CONDUIT, WIRE, BACKBOXES, ETC AS REQUIRED FOR ALL SECURITY DEVICES. 7. ALL BACK BOXES SHALL BE FLUSH MOUNTED UNLESS NOTED OTHERWISE. 8. PROVIDE A 120V, 20A EMERGENCY CONNECTION TO ALL SMOKE AND FIRE/SMOKE DAMPERS. DAMPERS SHALL CLOSE UPON ACTIVATION OF LOCAL SMOKE OR DUCT SMOKE DETECTOR. 9. CONDUIT ROUTING IS SHOWN FOR GENERAL INFORMATION ONLY. EXACT ROUTING IS TO BE COORDINATED IN FIELD. 10. ALL RECEPTACLES LOCATED IN ELEVATOR SHAFTS, ELEVATOR MACHINE ROOMS, AND EXTERIOR AREAS ARE TO BE WEATHER PROOF, GFI TYPE. 11. REFER TO TECHNOLOGY DRAWINGS FOR CONDUIT AND BACKBOX REQUIREMENTS AND LOCATIONS OF TEL/DATA DEVICES. 12. ALL MOTORS AND MOTORIZED EQUIPMENT SHALL HAVE OVERCURRENT PROTECTION/DISCONNECTING MEANS AT THE MOTOR/UNIT UON. 13. PROVIDE (1) NEUTRAL FOR EACH HOT. NO COMMON NEUTRALS ARE ALLOWED PER HOME RUN. PROVIDE (1) COMMON GROUND FOR EACH HOMERUN UNLESS NOTED OTHERWISE. 14. PROVIDE ALL WIRE, CONDUIT, ETC. FOR ALL DEVICES AS REQUIRED. 15. PROVIDE #10 WIRING FOR ALL BRANCH CIRCUITS WHERE CIRCUIT LENGTH EXCEEDS 70 FEET, UNLESS NOTED OTHERWISE. 16. FIRE STOP ALL PENETRATIONS THROUGH WALLS AND FLOORS. 17. FOR MORE INFORMATION REFER TO DETAILS SHEETS. 18. PROVIDE EXPANSION FITTINGS FOR ALL CONDUIT CROSSING EXPANSION JOINTS, AND/OR MOVING STRUCTURES THAT MOVE AT DIFFERENT RATE RELATIVE TO EACH OTHER. 19. ROUTE ALL CIRCUITRY FOR FIRE SMOKE DAMPERS VIA FIRE ALARM RELAY. 20. FOR ALL RECEPTACLES LOCATED AT MILLWORK, CONTRACTOR SHALL MOUNT RECEPTACLES FLUSH WITH MILLWORK. COORDINATE WITH MILLWORK CONTRACTOR. 21. ALL WIRE ROUTED IN EXPOSED CEILING SHALL BE ROUTED IN CONDUIT UNLESS OTHERWISE NOTED. ROUTE EXPOSED CONDUIT PERPENDICULAR, PARALLEL, AND TIGHT TO COLUMNS AND BEAMS. ALL EXPOSED CONDUIT ROUTING SHALL BE COORDINATED WITH ENGINEER AND ARCHITECT PRIOR TO INSTALLATION. NO ADDITIONAL COST TO OWNER WILL BE ALLOWED FOR RELOCATING CONDUIT DUE TO THE LACK OF COORDINATION WITH ARCHITECT. 22. ALL DISCONNECTS INDICATED ON DRAWINGS SHALL BE HEAVY DUTY TYPE FUSIBLE UON. ALL DISCONNECTS AND STARTERS SHALL BE NEMA 3R WHEN LOCATED ON ROOFS AND IN OUTDOOR ENVIRONMENT. 23. COORDINATE PHASING, SHUTDOWNS, AND SWING-OVER OF FEEDERS WITH OWNER/FACILITIES THREE WEEKS IN ADVANCE. PROVIDE ALL SHUTDOWNS AND SWING-OVERS OF ALL FEEDERS AT NIGHT. 24. PROVIDE ALL REQUIRED SECURITY CABLING AND RACEWAY FOR ALL DOOR ACCESS CONTROL COMPONENTS (CARD READER, ELECTRIC STRIKE, ETC.) ROUTED FROM DOOR TO TEL/DATA CLOSET SERVING AREA. REFER TO ELECTRICAL DETAILS SHEET (E-4002/X,Y,Z,AA) FOR TYPICAL DOOR ACCESS CONTROL LAYOUT AND ARCHITECTURAL PLAN FOR ACCESS CONTROL DEVICE LOCATIONS AND QUANTITY. 25. REFER TO ARCHITECTURAL DRAWINGS FOR DESIGN GUIDELINES FOR LAYOUT AND PLACEMENT OF ALL EXPOSED INFRASTRUCTURE INCLUDING PIPING, SPRINKLERS, CONDUIT, DUCTWORK, CABLE TRAYS, LIGHTING AND CEILING DEVICES. CONSULT ARCHITECT IF ANY QUESTIONS ARISE ABOUT DESIGN INTENT. KEYNOTES# 1/8" = 1'-0"1 ELECTRICAL MECHANICAL EQUIPMENT PARTIAL PLAN - LEVEL 01 PART B 1 POWER CONNECTION TO MECHANICAL DAMPERS AND FIRE/SMOKE DAMPER. CONTRACTOR SHALL COORDINATE EXACT QUANTITIES AND REQUIREMENTS WITH MECHANICAL CONTRACTOR. EXACT LOCATION SHALL BE FIELD COORDINATED.