Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
_ALL Volume 2 Conformed Set 220
F/SF/SF/SF/SF/SF/SF/S F/S F/S F/S F/S F/S F/S F/SF/SF/S J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J 123 5 891011121314151617181920 6.18.1 L M N P Q O R S T Q.1 Q.6 R.3 20.2 02 0205 0508 08 R.5 20.3 R.4 H06 FCU H06 FCU H06 FCU VP12 FCU VP12 FCU HH04 FCU H06 FCU HR06 FCU HR02 FCU HR02 FCU H12 FCU H12 FCU H12 FCU H02 FCU H06 FCU H06 FCU VP02 FCU H06 FCU H06 FCU H06 FCU E-5003 1 Mechanical B0063 Elec B0065 Elec B0064 Telecom B34 Projects Storage B32 Team Conference B02 Team Conference B04 Teams Pod Design Area B10 Swanson Director B06 Egress Stair W B0001 West Vestibule B01 Storage B11 West Corridor B0040 Teams Pod Build Area B14 Teams Pod Design Area B15 Teams Pod Design Area B19 Teams Pod Build Area B18 Cage Storage B0046 Cage Storage B0047 Cage Storage B0048 Cage Storage B0043 Cage Storage B0045 Cage Storage B0051 Cage Storage B0049 Cage Storage B0050 Rapid Prototyping Lab B22 Egress Stair N B0002 Teams Pod Design Area B23 West Corridor B0040West Corridor B0040 Shaft SHB01 Men B0022 Elev P.0 B0070 Exhibition B0040A South Corridor B0042 Elec B35 Women B0023 Custodial B0061 Areaway SHB03 Areaway SHB04 CAD/CAM Lab B38 Vending B39 East Corridor B0041 Staff Office B36 Staff Office B40A Storage B40B Emerson Manufacturing Teaching Lab B40 Emerson Manufacturing Teaching Lab B40 Teams Pod Build Area B56 South Corridor B0042 South Corridor B0042 Student Orgs. Office B50 Shower Room B30 Teams Pod Design Area B52 H02 FCU B-7 VAVR B-11 VAVS B-8 VAVS B-6 VAVR B-9 VAVS B-5 VAVE B-4 VAVE B-3 VAVE B-6 VAVS B-1 VAVE B-7 VAVS B-5 VAVS B-4 VAVS VP06 FCU VP06 FCU B-2 VAVS B-1 VAVR B-2 VAVR B-1 VAVS B-4 VAVR B-3 VAVR H06 FCU B-10 VAVE HPP-B-1:1 HPP-B-1:3 HPP-B-1:5 HPP-B-1:7 HPP-B-1:9 HPP-B-1:2 HPP-B-1:4 HPP-B-1:11 HPP-B-1:13 HPP-B-1:15 HPP-B-1:6 HPP-B-1:17 30 ZRT 75 ZRT 50 ZRT 60 ZRT 50 ZRT 30 ZRT 30 ZRT TO TO TO TO TO TO TO TO TO TO TO TOTO TO TO TOTO TO TO TO TO TO TO TO 1 1 HSPP-B:1 UP TO LEVEL 01 MATCHLINE SEE /1 E-2000B MATCHLINE SEE /1 E-2000B LELP-B:3 TO SP-1 LSPP-B:1 OPEN STAIR NW B0005 B-7 VAVE B-3 VAVS 30 ZRT 2 (TYP) 2 (TYP) LELP-B:7 LELP-B:2 50 ZRT B-10 VAVS B-2 VAVE TO HR02 FCU Sheet Title Approved Checked Drawn Job Number Date Sheet Information Revisions MEP FP ME Engineers 29 West 38th Street, 5th Floor New York, NY 10018 t 212.447.6770 f 212.447.6615 STRUCTURAL ENGINEER/ SUSTAINABILITY CONSULTANT Thornton Tomasetti 51 Madison Ave. New York, N.Y. 10010 t 917.661.7800 f 917.661.7801 LIGHTING CONSULTANT Lumen Architecture 214 W 29th Street Suite 1005 New York, NY 10001 t 212.564.6469 f 917.591.2524 LANDSCAPE ARCHITECT Trowbridge Wolf Michaels 1001 West Seneca Street Suite 101 Ithaca, NY 14850 t 607.277.1400 f 000.000.0000 162345 A E B C D 162345 A E B C D Copyright © 2013 Perkins+Will 227 West 29th Street, 7th Flr. New York, NY 10001 t: 212 505-5955 f: 212 505-1648 CIVIL ENGINEER TG Miller PC 203 North Aurora Street Ithaca, NY 14850 t 607.272.6477 f 607.273.6322 AV / ACOUSTICS The Sextant Group 244 Madison Avenue Suite 311 New York NY 10016 t 877.684.2311 f 412.323.8538 CODE CONSULTANT Code Consultants Professional Engineers, PC 215 West 40th Street 15th Floor New York, NY 10018 t 212.216.9596 f 212.216.9619 C:\Users\edgar.avila\Documents\Upson Hall_ELEC_Russell.Kent.rvtE-2000A ELECTRICAL CONSTRUCTION MECHANICAL EQUIPMENT PLAN - LEVEL 00 PART A MEE MEE 031549.000 11/07/2014 MEE Upson Hall Renovation 124 Hoy Rd, Ithaca, NY 14850 Cornell University 215 Park Avenue South 4th Floor New York, NY 10003 t 212.251.7000 f 212.251.7111 www.perkinswill.com GENERAL NOTES 1. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS AND BE FAMILIAR WITH THE JOB SITE PRIOR TO BID. 2. ALL EQUIPMENT PROVIDED BY OTHERS SUCH AS: MECHANICAL, PLUMBING, FIRE PROTECTION, IT, AV, AND/OR ARCHITECTURAL, ETC IS SHOWN FOR ELECTRICAL CIRCUITING INFORMATION ONLY. FOR EXACT QUANTITIES AND LOCATIONS REFER TO THE DISCIPLINES PLANS/SPECIFICATIONS ACCORDINGLY. 3. COORDINATE WITH ARCHITECTURAL PLANS FOR EXACT LOCATIONS AND MOUNTINGS HEIGHT OF ALL ELECTRICAL DEVICES. 4. ELECTRICAL CONTRACTOR SHALL COORDINATE EXACT LOCATION OF ALL MECHANICAL UNITS WITH MECHANICAL CONTRACTOR. 5. ALL EXPOSED CONDUIT SHALL BE ROUTED PERPENDICULAR, PARALLEL, AND TIGHT TO COLUMNS AND BEAMS. 6. PROVIDE CONDUIT, WIRE, BACKBOXES, ETC AS REQUIRED FOR ALL SECURITY DEVICES. 7. ALL BACK BOXES SHALL BE FLUSH MOUNTED UNLESS NOTED OTHERWISE. 8. PROVIDE A 120V, 20A EMERGENCY CONNECTION TO ALL SMOKE AND FIRE/SMOKE DAMPERS. DAMPERS SHALL CLOSE UPON ACTIVATION OF LOCAL SMOKE OR DUCT SMOKE DETECTOR. 9. CONDUIT ROUTING IS SHOWN FOR GENERAL INFORMATION ONLY. EXACT ROUTING IS TO BE COORDINATED IN FIELD. 10. ALL RECEPTACLES LOCATED IN ELEVATOR SHAFTS, ELEVATOR MACHINE ROOMS, AND EXTERIOR AREAS ARE TO BE WEATHER PROOF, GFI TYPE. 11. REFER TO TECHNOLOGY DRAWINGS FOR CONDUIT AND BACKBOX REQUIREMENTS AND LOCATIONS OF TEL/DATA DEVICES. 12. ALL MOTORS AND MOTORIZED EQUIPMENT SHALL HAVE OVERCURRENT PROTECTION/DISCONNECTING MEANS AT THE MOTOR/UNIT UON. 13. PROVIDE (1) NEUTRAL FOR EACH HOT. NO COMMON NEUTRALS ARE ALLOWED PER HOME RUN. PROVIDE (1) COMMON GROUND FOR EACH HOMERUN UNLESS NOTED OTHERWISE. 14. PROVIDE ALL WIRE, CONDUIT, ETC. FOR ALL DEVICES AS REQUIRED. 15. PROVIDE #10 WIRING FOR ALL BRANCH CIRCUITS WHERE CIRCUIT LENGTH EXCEEDS 70 FEET, UNLESS NOTED OTHERWISE. 16. FIRE STOP ALL PENETRATIONS THROUGH WALLS AND FLOORS. 17. FOR MORE INFORMATION REFER TO DETAILS SHEETS. 18. PROVIDE EXPANSION FITTINGS FOR ALL CONDUIT CROSSING EXPANSION JOINTS, AND/OR MOVING STRUCTURES THAT MOVE AT DIFFERENT RATE RELATIVE TO EACH OTHER. 19. ROUTE ALL CIRCUITRY FOR FIRE SMOKE DAMPERS VIA FIRE ALARM RELAY. 20. FOR ALL RECEPTACLES LOCATED AT MILLWORK, CONTRACTOR SHALL MOUNT RECEPTACLES FLUSH WITH MILLWORK. COORDINATE WITH MILLWORK CONTRACTOR. 21. ALL WIRE ROUTED IN EXPOSED CEILING SHALL BE ROUTED IN CONDUIT UNLESS OTHERWISE NOTED. ROUTE EXPOSED CONDUIT PERPENDICULAR, PARALLEL, AND TIGHT TO COLUMNS AND BEAMS. ALL EXPOSED CONDUIT ROUTING SHALL BE COORDINATED WITH ENGINEER AND ARCHITECT PRIOR TO INSTALLATION. NO ADDITIONAL COST TO OWNER WILL BE ALLOWED FOR RELOCATING CONDUIT DUE TO THE LACK OF COORDINATION WITH ARCHITECT. 22. ALL DISCONNECTS INDICATED ON DRAWINGS SHALL BE HEAVY DUTY TYPE FUSIBLE UON. ALL DISCONNECTS AND STARTERS SHALL BE NEMA 3R WHEN LOCATED ON ROOFS AND IN OUTDOOR ENVIRONMENT. 23. COORDINATE PHASING, SHUTDOWNS, AND SWING-OVER OF FEEDERS WITH OWNER/FACILITIES THREE WEEKS IN ADVANCE. PROVIDE ALL SHUTDOWNS AND SWING-OVERS OF ALL FEEDERS AT NIGHT. 24. PROVIDE ALL REQUIRED SECURITY CABLING AND RACEWAY FOR ALL DOOR ACCESS CONTROL COMPONENTS (CARD READER, ELECTRIC STRIKE, ETC.) ROUTED FROM DOOR TO TEL/DATA CLOSET SERVING AREA. REFER TO ELECTRICAL DETAILS SHEET (E-4002/X,Y,Z,AA) FOR TYPICAL DOOR ACCESS CONTROL LAYOUT AND ARCHITECTURAL PLAN FOR ACCESS CONTROL DEVICE LOCATIONS AND QUANTITY. 25. REFER TO ARCHITECTURAL DRAWINGS FOR DESIGN GUIDELINES FOR LAYOUT AND PLACEMENT OF ALL EXPOSED INFRASTRUCTURE INCLUDING PIPING, SPRINKLERS, CONDUIT, DUCTWORK, CABLE TRAYS, LIGHTING AND CEILING DEVICES. CONSULT ARCHITECT IF ANY QUESTIONS ARISE ABOUT DESIGN INTENT. KEYNOTES# NO ISSUE DATE 1 100% DD DOCUMENTS 14/08/28 2 50% CONSTRUCTION DOCUMENTS 14/11/07 3 BID SET 15/02/27 4 Addendum No. 3 15/03/31 1/8" = 1'-0"1 ELECTRICAL MECHANICAL EQUIPMENT PARTIAL PLAN - LEVEL 00 PART A 1 CONNECT ZRT TO CIRCUIT HPP-B-1:14. 2 POWER CONNECTION TO MECHANICAL DAMPERS AND FIRE/SMOKE DAMPER. CONTRACTOR SHALL COORDINATE EXACT QUANTITIES AND REQUIREMENTS WITH MECHANICAL CONTRACTOR. EXACT LOCATION SHALL BE FIELD COORDINATED.