Loading...
HomeMy WebLinkAbout_ALL Volume 2 Conformed Set 209123 456 891011121314151617181920 6.18.1 8.910.1 2.6 A B C D E F G H J K L M N P Q O R S T Q.1 Q.6 R.3 20.2 02 0205 0508 08 R.5 20.3 R.4 Elev F.P 60071 Shaft SH601 Mech Penthouse Area 60064 Egress Stair N 60002 Elev. Machine Room 60070 Shaft 60061 Mech Penthouse Area 60060 Egress Stair S Top 60004 Elev. Control 60073 (E)FCVA (E)4"COMBINED STANDPIPE EXTEND 4" TO NEW FCVA (E)FHV PROVIDE DUAL WALL MOUNT HOSE VALVES ON EXTERIOR OF WALL, WITH BALL DRIP AND ISOLATION VALVE. PROVIDE DUAL WALL MOUNT HOSE VALVES ON EXTERIOR OF WALL, WITH BALL DRIP AND ISOLATION VALVE. 4"FP CONNECT NEW 6"FP TO (E)FCVA 2"FP DN 1 1 1/2"FP PROVIDE ISOLATION VALVE, TAMPER AND FLOW SWITCH FOR BRANCH SERVING MACHINE ROOM AND TOP OF HOISEWAY PROVIDE ISOLATION VALVE, TAMPER AND FLOW SWITCH FOR BRANCH SERVING MACHINE ROOM AND TOP OF HOISEWAY COVERAGE DESIGN DENSITY SHALL BE 0.15 GPM/S.F. 3"FP 3"FP 4"FP 4"FP COVERAGE DESIGN DENSITY SHALL BE 0.15 GPM/S.F. Sheet Title Approved Checked Drawn Job Number Date Sheet Information Revisions MEP FP ME Engineers 29 West 38th Street, 5th Floor New York, NY 10018 t 212.447.6770 f 212.447.6615 STRUCTURAL ENGINEER/ SUSTAINABILITY CONSULTANT Thornton Tomasetti 51 Madison Ave. New York, N.Y. 10010 t 917.661.7800 f 917.661.7801 LIGHTING CONSULTANT Lumen Architecture 214 W 29th Street Suite 1005 New York, NY 10001 t 212.564.6469 f 917.591.2524 LANDSCAPE ARCHITECT Trowbridge Wolf Michaels 1001 West Seneca Street Suite 101Ithaca, NY 14850 t 607.277.1400 f 000.000.0000 162345 A E B C D 162345 A E B C D Copyright © 2013 Perkins+Will 227 West 29th Street, 7th Flr. New York, NY 10001 t: 212 505-5955 f: 212 505-1648 CIVIL ENGINEER TG Miller PC 203 North Aurora Street Ithaca, NY 14850 t 607.272.6477 f 607.273.6322 AV / ACOUSTICS The Sextant Group 244 Madison Avenue Suite 311 New York NY 10016 t 877.684.2311 f 412.323.8538 CODE CONSULTANT Code Consultants Professional Engineers, PC 215 West 40th Street 15th Floor New York, NY 10018 t 212.216.9596 f 212.216.9619 C:\Users\edgar.avila\Documents\Upson Hall_MECH_PLUMB_FP_brian.shassian@me-engineers.com.rvtFP-2006 FIRE PROTECTION CONSTRUCTION OVERALL PLAN - LEVEL 06 MEE MEE 031549.000 11/07/2014 MEE Upson Hall Renovation 124 Hoy Rd, Ithaca, NY 14850 Cornell University 215 Park Avenue South 4th Floor New York, NY 10003 t 212.251.7000 f 212.251.7111 www.perkinswill.com GENERAL NOTES 1. PROVIDE FLUSHING VALVES ON MAINS AND BRANCHES TO FACILITATE POST- CONSTRUCTION CLEANING AND FLUSHING OF THE SYSTEM. VALVES SHALL BE LOCATED BY THE CONTRACTOR DURING THE SHOP DRAWING PHASE. VALVES SHALL BE SIZED PER NFPA 25 IN ORDER TO OBTAIN MINIMUM OF 10 FT/S VELOCITY. ENGINEER OF RECORD SHALL USE HYDRAULIC CALCULATIONS TO DETERMINE NUMBER OF VALVES REQUIRED. 2. ALL FLOOR CONTROL VALVE ASSEMBLIES (FCVA) SHALL INCLUDE THE GLOBAL VISION INC ZONE CHECK FLOW SWITCH ASSEMBLY WITH KEY-OPERATED WALL SWITCH. 3. EACH SPRINKLER HEAD SHOWN ON PLANS SHALL BE PROVIDED WITH AN ADDITIONAL 2 FEET OF PIPING FOR CONNECTION TO NEAREST BRANCH OR MAIN. 4. SPRINKLER PIPING SERVING UP TO 2 SPRINKLER HEADS SHALL BE 1" UNLESS OTHERWISE NOTED. 5. COVERAGE DESIGN DENSITY SHALL BE 0.10 GPM/S.F., UNLESS OTHERWISE NOTED. 6. PROVIDE 2" DRAIN FROM EACH FLOOR CONTROL VALVE ASSEMBLY TO EXISTING DRAIN RISER. SEE RISER DIAGRAM ON FP- 0000. 7. ALL BRANCH PIPES 2" AND UNDER, OVER 5' LONG, IN EXPOSED CEILINGS SHALL BE INSTALLED TIGHT TO CEILING. ADDITIONAL OFFSETS, ELBOWS, ETC MAY BE REQUIRED FOR COORDINATION WITH STRUCTURAL ELEMENTS OR OTHER SYSTEMS NOT EXPLICITLY SHOWN ON DRAWINGS. 8. REFER TO ARCHITECTURAL DRAWINGS FOR DESIGN GUIDELINES FOR LAYOUT AND PLACEMENT OF ALL EXPOSED INFRASTRUCTURE INCLUDING PIPING, SPRINKLERS, CONDUIT, DUCTWORK, CABLE TRAYS, LIGHTING AND CEILING DEVICES. CONSULT ARCHITECT IF ANY QUESTIONS ARISE ABOUT DESIGN INTENT. KEYNOTES# 3/32" = 1'-0"1 FIRE PROTECTION CONSTRUCTION OVERALL PLAN - LEVEL 06 NO ISSUE DATE 1 100% DD DOCUMENTS 14/08/28 2 50% CONSTRUCTION DOCUMENTS 14/11/07 3 BID SET 15/02/27 4 Addendum No. 3 15/03/31 1 PROVIDE SPRINKLERS IN SPRAY BOOTH AND SPRAY BOOTH EXHAUST DUCT. COVERAGE IN BOOTH SHALL BE 0.3 GPM/SF. HEADS IN DUCTS SHALL BE SPACED 12’ O.C. HORIZONTALLY OR 24’ O.C. VERTICALLY. COORDINATE WITH DUCT ACCESS DOORS. HEADS SHALL BE COVERED WITH POLYETHYLENE OR CELLOPHANE BAGS HAVING A MAXIMUM THICKNESS OF 0.003 IN, OR WITH THIN PAPER BAGS. SEE DETAIL ON DRAWING FP-3000.