Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
_ALL Volume 2 Conformed Set 170
123 456 891011121314151617181920 6.18.1 8.910.1 2.6 A B C D E F G H J K L M N P Q O R S T Q.1 Q.6 R.3 20.2 02 0205 0508 08 R.5 20.3 R.4 Hybrid Lab - Biorobotics & Locomotion 566 Hybrid Lab - Unassigned 562 Hybrid Lab - Autonomous Systems Lab (ASL) 550 Faculty Office 551 Sm. Conference 557 Sm. Conference 565 Research Storage 522 Faculty Office 573 Faculty Office 543 Faculty Office 547 Sm. Conference 549 Faculty Office 553 Faculty Office 561 Faculty Office 563 Faculty Office 569 Faculty Office 571 Office-Students 568 Office-Students 552 Office-Students 546 Support 576 Faculty Office 555 Roof Access Area 50072 Faculty Service Center 540 Hybrid Lab - CS Robotics / Guest 572 Elec 50063 South Corridor 50042 Shaft SH509 3/4"CW DN 3/4"HW DN 3/4"HWC DN 4"V UP THRU ROOF 2"V DN 4"V UP THRU ROOF 2-1/2"V DN 3/4"CW DN 3/4"HW DN 3/4"HWC DN 2"W DNW 3 W 7 W 9 W 10 DW 3 DW 4 4"RD 4"ST UP TO OD 4"ST/OST DN 4"ST UP TO RD 2"W DN 2"W DN 3/4"CW DN 3/4"HW DN 3/4"HWC DN 4"V UP THRU ROOF 1-1/2"V DN 2"W DN 4"ST UP TO RD 4"ST UP TO OD 4"ST UP TO RD 4"ST UP TO OD 4"OD SEE ENLARGED PLAN ON P-3000 123 456 891011121314151617181920 6.18.1 8.910.1 2.6 A B C D E F G H J K L M N P Q O R S T Q.1 Q.6 R.3 20.2 02 0205 0508 08 R.5 20.3 R.4 6"V UP TO ROOF OF PENTHOUSE 5"V DN 4"W DN 4"W DN CW DN HW DN 1"HWC DN 1"CA DN 4"W DN 4"W DN A A A A A A W 1 W 2 W 4 W 5 DW 1 DW 2 4"ST UP TO OD 4"ST UP TO RD5"OST5"ST6"ST/OST DN ST 2 ST 1 4"RD 4"OD 3"ST UP TO RD 3"RD 2"W UP TO FD 2"W UP TO FD Shaft SH501 Shaft SH504 Shaft SH503 Office-Students 541 Research Conference 531 NE Corridor 50041 Open Stair NE 50003 Shaft SH505 Elec 50062 Telecom 528 Unisex 50020 Men 50022 Custodial 50061 Service Corridor 50024 Circulation 50044 Hybrid Lab - Biorobotics & Locomotion 566 Hybrid Lab - Unassigned 525 Faculty Office 551 Sm. Conference 557 Sm. Conference 565 Hybrid Lab - ASL Robot Testing 542 Computational Lab - Ferrari 529 Egress Stair N 50002 Elev P.5 50070 Faculty Office 543 Faculty Office 547 Sm. Conference 549 Faculty Office 553 Faculty Office 561 Faculty Office 563 Faculty Office 569 Faculty Office 571 Office-Students 560 Office-Students 552 Support 576 Elev F.5 50071 Faculty Office 555 Roof Access Area 50072 Hybrid Lab - CS Robotics / Guest 572 Shaft SH501 Hybrid Lab 558 Shaft SH507 Shaft SH502 Elec 50063 Shaft SH508 Egress Stair S 50004 Shaft 50066 West Corridor 50040 Shaft SH504 Shaft SH503 Shaft SH509 Office-Students 541 Research Conference 531 Informal Collaboration 537 NE Corridor 50041 Open Stair NE 50003 Shaft SH505 Shaft SH506 Elec 50062 Telecom 528 Unisex 50020 Men 50022 Women 50023 Custodial 50061 Service Corridor 50024 Circulation 50044 2"W DN 2"W UP TO FD 2"W UP TO FD 2"COPPER LINE TO (TVC) UP/DN 3"ST UP TO OD 3"ST/OST 4"ST/OST3/4"HWC 3/4"HW 3/4"CW 1-1/2"V 2"W CO CO CO CO CO CO CO CO CO CO2"W2"W2"W 4"OST4"ST4"OST 4"ST 4"OST 4"ST 1"CW 1"HW 1-1/2"V 3/4"CA3/4"CA3/4"CA3/4"CA3/4"CA3/4"CA 3/4"CA 3/4"CA 3/4"CA Note: Refer to architectural drawings for design guidelines for layout and placement of all exposed infrastructure including piping, sprinklers, conduit, ductwork, cable trays, lighting and ceiling devices. Consult architect if any questions arise about design intent. 4"ST/OST UP/DNST 5 SINK EW SINK EW SINK EW SINK EW SINK EW ESH (FUTURE) PROVIDE DW PIPING TO LOCATE, VALVE AND CAPPED FOR FUTURE CONNECTON (TYPICAL) (2)ESH (FUTURE) (2)ESH (FUTURE) Sheet Title Approved Checked Drawn Job Number Date Sheet Information Revisions MEP FP ME Engineers 29 West 38th Street, 5th Floor New York, NY 10018 t 212.447.6770 f 212.447.6615 STRUCTURAL ENGINEER/ SUSTAINABILITY CONSULTANT Thornton Tomasetti 51 Madison Ave. New York, N.Y. 10010 t 917.661.7800 f 917.661.7801 LIGHTING CONSULTANT Lumen Architecture 214 W 29th Street Suite 1005 New York, NY 10001 t 212.564.6469 f 917.591.2524 LANDSCAPE ARCHITECT Trowbridge Wolf Michaels 1001 West Seneca Street Suite 101Ithaca, NY 14850 t 607.277.1400 f 000.000.0000 162345 A E B C D 162345 A E B C D Copyright © 2013 Perkins+Will 227 West 29th Street, 7th Flr. New York, NY 10001 t: 212 505-5955 f: 212 505-1648 CIVIL ENGINEER TG Miller PC 203 North Aurora Street Ithaca, NY 14850 t 607.272.6477 f 607.273.6322 AV / ACOUSTICS The Sextant Group 244 Madison Avenue Suite 311 New York NY 10016 t 877.684.2311 f 412.323.8538 CODE CONSULTANT Code Consultants Professional Engineers, PC 215 West 40th Street 15th Floor New York, NY 10018 t 212.216.9596 f 212.216.9619 C:\Users\edgar.avila\Documents\Upson Hall_MECH_PLUMB_FP_ethan.case.rvtP-2005 PLUMBING CONSTRUCTION OVERALL PLAN - LEVEL 05 MEE MEE 031549.000 11/07/2014 MEE Upson Hall Renovation 124 Hoy Rd, Ithaca, NY 14850 Cornell University 215 Park Avenue South 4th Floor New York, NY 10003 t 212.251.7000 f 212.251.7111 www.perkinswill.com 3/32" = 1'-0"1 PLUMBING CONSTRUCTION OVERALL PLAN - LEVEL 05 NO ISSUE DATE 1 100% DD DOCUMENTS 14/08/28 2 50% CONSTRUCTION DOCUMENTS 14/11/07 3 BID SET 15/02/27 4 Addendum No. 3 15/03/31 5 Addendum No. 5 15/04/08