Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
_ALL Volume 2 Conformed Set 168
123 456 891011121314151617181920 6.18.1 8.910.1 2.6 A B C D E F G H J K L M N P Q O R S T Q.1 Q.6 R.3 20.2 02 0205 0508 08 R.5 20.3 R.4 2"W UP 3/4"CW UP 1"CW DN 3/4"HW UP 1"HW DN 3/4"HWC UP/DN 1-1/2"V UP/DN 2"W UP 2"W DN 2"W DN SINK SINK SINK SINK SINK SINK 4"ST UP TO RD 2"W UP 6"ST UP/DN 2"W DN 3/4"CW UP 1"CW DN 3/4"HW UP 1"HW DN 3/4"HWC UP/DN 2"V UP 1-1/2"V DN 3/4"CW UP 1"CW DN 3/4"HW UP 1"HW DN 3/4"HWC UP/DN 2-1/2"V UP/DN 2"W DN 2"W DN 2"W DN 2"W UP SEE ENLARGED PLAN ON P-3000 SINK 123 456 891011121314151617181920 6.18.1 8.910.1 2.6 A B C D E F G H J K L M N P Q O R S T Q.1 Q.6 R.3 20.2 02 0205 0508 08 R.5 20.3 R.4 4"W UP/DN 4"W UP/DN 4"W UP/DN 4"W UP/DN CW/HW/HWC UP/DN 5"V UP 4"V DN CW/HW/HWC/A UP/DN A A A A A A 3/4" HWC 3/4"HW 3/4"CW 1-1/2"V W 3 W 7 W 9 W 10 W 1 W 2 W 4 W 5 W 7 W 8 W 9 DW 3 DW 4 DW 2 4"ST/OST DN 6"ST/OST DN ST 2 ST 1 4"ST UP TO OD 4"ST UP TO RD 4"ST UP TO OD 5"ST/OST DN ST 3 ESH ESH ESH 1/2"CW CONNECTION TO PARTS WASHER (JC-3) W/VACUUM BREAKER AND SHUT- OFF VALVE ST 4 5"ST/OST DN 2"W UP/DN 3"ST UP TO RD 3"ST DN PROVIDE 2" COPPER LINE FROM OUTLET OF THERMAL VACUUM CHAMBER (TVC) TO ROOF. TERMINATE PIPING AT ROOF WITH GOOSENECK, 4FT MINIMUM ABOVE ROOF SURFACE. 2"COPPER LINE FOR TVC UP TO ROOF Faculty Office 473 Office-Students 402 Office-Students 404 Office-Students 416 Hybrid Lab - Unassigned 418 Emeritus Suite 410 Faculty Office 405 Faculty Office 407 Faculty Office 409 Faculty Office 411 Faculty Office 413 Faculty Office 415 Faculty Office 417 Office-Lecturer 419 Faculty Office 421 Med. Conference 423 Touch-Down / Hoteling Workspace 401 Egress Stair W 40001 Egress Stair N 40002 Elev P.4 40070 M.Eng Fab Area 425 Hybrid Lab - Soft Systems 442 Hybrid Lab - SIOS (Space) Lab 454 Hybrid Lab - Future Hire 466 Hybrid Lab - Unassigned 472 Office-Students 446 Office-Students 452 Hybrid Lab - SEAK Space 462 Support 476 Elev F.4 40071 Shaft SH410 Faculty Office 443 Faculty Office 451 Faculty Office 453 Faculty Office 455 Sm. Conference 457 Faculty Office 461 Faculty Office 463 Sm. Conference 465 Office-Lecturer 469 Faculty Office 471 Office-Students 468 Office-Students 460 Faculty Service Center 440 Shared Student Office 406 Elec 40063 Shaft SH403 Shaft SH401 Shaft SH402 Exhibition 40040A Shaft SH404 Shaft SH203 Shaft SH405 Shaft SH406 Shaft SH407 Service Corridor 40024 West Corridor 40040 Egress Stair S 40004 South Corridor 40042 Shaft SH408 Shaft SH409 Elec 40060 Open Stair NE 40003 Circulation 40044 Dry / Computational Lab 414 Hybrid Lab - Spacecraft Systems 450 Research Conference 431 Office-Students 441 Informal Collaboration 437 M.Eng Study Area 429 NE Corridor 40041 Unisex 40020 M.Eng Study Area 429A M.Eng Study Area 429B Hybrid Lab - Future Hire 458 Faculty Office 449 Sm. Conference 447 Shaft SH412 Shaft SH411 Elec 40062 Telecom 428 Men 40022 Custodial 40061 Machine Shop / Support 442A Hood Lab 442B Shaft SH413 Faculty Office 473 Office-Students 402 Office-Students 404 Office-Students 416 Hybrid Lab - Unassigned 418 Emeritus Suite 410 Faculty Office 405 Faculty Office 407 Faculty Office 409 Faculty Office 411 Faculty Office 413 Faculty Office 415 Faculty Office 417 Office-Lecturer 419 Faculty Office 421 Med. Conference 423 Touch-Down / Hoteling Workspace 401 Egress Stair W 40001 Egress Stair N 40002 Elev P.4 40070 M.Eng Fab Area 425 Hybrid Lab - Soft Systems 442 Hybrid Lab - SIOS (Space) Lab 454 Hybrid Lab - Future Hire 466 Hybrid Lab - Unassigned 472 Office-Students 446 Office-Students 452 Hybrid Lab - SEAK Space 462 Support 476 Elev F.4 40071 Shaft SH410 Faculty Office 443 Faculty Office 451 Faculty Office 453 Faculty Office 455 Sm. Conference 457 Faculty Office 461 Faculty Office 463 Sm. Conference 465 Office-Lecturer 469 Faculty Office 471 Office-Students 468 Office-Students 460 Faculty Service Center 440 Shared Student Office 406 Elec 40063 Shaft SH403 Shaft SH401 Shaft SH402 Exhibition 40040A Shaft SH404 Shaft SH203 Shaft SH405 Shaft SH406 Shaft SH407 Service Corridor 40024 West Corridor 40040 Egress Stair S 40004 South Corridor 40042 Shaft SH408 Shaft SH409 Elec 40060 Open Stair NE 40003 Circulation 40044 Dry / Computational Lab 414 Hybrid Lab - Spacecraft Systems 450 Research Conference 431 Office-Students 441 Informal Collaboration 437 M.Eng Study Area 429 NE Corridor 40041 Unisex 40020 M.Eng Study Area 429A M.Eng Study Area 429B Hybrid Lab - Future Hire 458 Faculty Office 449 Sm. Conference 447 Shaft SH412 Shaft SH411 Elec 40062 Telecom 428 Men 40022 Women 40023 Custodial 40061 Machine Shop / Support 442A Hood Lab 442B Shaft SH413 1"CW 1"HW 3/4"HWC 1-1/2"V 1"CW 1"HW 3/4"HWC 3/4"CW 1-1/2"V 3/4"HW 1-1/2"V 3/4"HW 3/4"CW 1-1/2"V 3/4"CW 3/4"HW 3"ST CO CO CO CO CO CO 5"ST/OST Note: Refer to architectural drawings for design guidelines for layout and placement of all exposed infrastructure including piping, sprinklers, conduit, ductwork, cable trays, lighting and ceiling devices. Consult architect if any questions arise about design intent. 1"CW 1"HW 3/4"HWC 1"CW 1"HW EXTEND 1-1/2"V PIPING TO FD SERVING ESH (TYP FOR ALL) SEE DETAIL FOR HWC CONNECTION TO HW PIPE (TYPICAL FOR ALL LOCATIONS)3/4"CA3/4"CA3/4"CAESH 3/4"C/HW DN 4"ST/OST UPDNST 5 Sheet Title Approved Checked Drawn Job Number Date Sheet Information Revisions MEP FP ME Engineers 29 West 38th Street, 5th Floor New York, NY 10018 t 212.447.6770 f 212.447.6615 STRUCTURAL ENGINEER/ SUSTAINABILITY CONSULTANT Thornton Tomasetti 51 Madison Ave. New York, N.Y. 10010 t 917.661.7800 f 917.661.7801 LIGHTING CONSULTANT Lumen Architecture 214 W 29th Street Suite 1005 New York, NY 10001 t 212.564.6469 f 917.591.2524 LANDSCAPE ARCHITECT Trowbridge Wolf Michaels 1001 West Seneca Street Suite 101Ithaca, NY 14850 t 607.277.1400 f 000.000.0000 162345 A E B C D 162345 A E B C D Copyright © 2013 Perkins+Will 227 West 29th Street, 7th Flr. New York, NY 10001 t: 212 505-5955 f: 212 505-1648 CIVIL ENGINEER TG Miller PC 203 North Aurora Street Ithaca, NY 14850 t 607.272.6477 f 607.273.6322 AV / ACOUSTICS The Sextant Group 244 Madison Avenue Suite 311 New York NY 10016 t 877.684.2311 f 412.323.8538 CODE CONSULTANT Code Consultants Professional Engineers, PC 215 West 40th Street 15th Floor New York, NY 10018 t 212.216.9596 f 212.216.9619 C:\Users\edgar.avila\Documents\Upson Hall_MECH_PLUMB_FP_ethan.case.rvtP-2004 PLUMBING CONSTRUCTION OVERALL PLAN - LEVEL 04 MEE MEE 031549.000 11/07/2014 MEE Upson Hall Renovation 124 Hoy Rd, Ithaca, NY 14850 Cornell University 215 Park Avenue South 4th Floor New York, NY 10003 t 212.251.7000 f 212.251.7111 www.perkinswill.com 3/32" = 1'-0"1 PLUMBING CONSTRUCTION OVERALL PLAN - LEVEL 04 NO ISSUE DATE 1 100% DD DOCUMENTS 14/08/28 2 50% CONSTRUCTION DOCUMENTS 14/11/07 3 BID SET 15/02/27 4 Addendum No. 3 15/03/31