Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
_ALL Volume 2 Conformed Set 159
123 456 891011121314151617181920 6.18.1 8.910.1 2.6 A B C D E F G H J K L M N P Q O R S T Q.1 Q.6 R.3 20.2 02 0205 0508 08 R.5 20.3 R.4 2" W UP FD 2"W UP/DN 2"W DN 3/4"C/HW DN 1-1/2"V UP 3/4"CW UP 3/4"HW UP 3/4"HWC UP 2"V UP/DN 2"W UP 123 456 891011121314151617181920 6.18.1 8.910.1 2.6 A B C D E F G H J K L M N P Q O R S T Q.1 Q.6 R.3 20.2 02 0205 0508 08 R.5 20.3 R.4 (4)1-1/2"V AND (1) 2"V DN TO FLOOR DRAINS TYPICAL BATHROOM GROUP FLOORS 1-5 SEE ENLARGED PLAN ON P-3000 3"CW 2"HW 1-1/2"HWC 1"CA UP/DN INSTALL RISERS DURING PHASE 1 3/4"C/HW DN HB HB SINK SINK SINK A A W 1 W 4 W 5 W 2 4"W UP 5"W DN FD FDFD W 12 4"W UP/DN 4"W UP/DN 4"W UP/DN W 11 2"W DNW 11 2"W DN W 10 W 102"W UP 2"W DN 3/4"C/HW DN 6"ST/OST UP ST 2 8"ST/OST DN ST 2 4"ST/OST UP/DN ST 1 5"ST/OST UP/DN ST 3 1/2"CW CONNECTION TO PARTS WASHER (JC-3) W/VACUUM BREAKER AND SHUT-OFF VALVE 3"RD PROVIDE 3/4" STUB, VALVED AND CAPPED FOR FUTURE CONNECTION 3"AD Building Services 172A Elev F.1 10071 Egress Stair S 10004 Egress Stair N 10002 Elev P.1 10070 Egress Stair W 10001 Drop Tower Shaft 195 South Corridor 10042 Small Medium Classroom 102 Large Multi-Purpose Conference 106 Pantry Kitchen 110 Informal Collaboration 115 AV Storage 102A AV Storage 106A AV Storage 142A AV Storage 152A Lounge 116 Small Classroom 152 MAE Wind Tunnel Equipment 154 Small Classroom 146Large Flexible Classroom 142 Fluid Dynamics - Wind Tunnel Lab 166 Wind Energy Lab (Barthelmie) 168 Fluid Dynamics - Tow Tank Lab 160 Fluid Dynamics - Water Channel Lab 162 AV Storage 146A Terrace Vestibule 119 West Corridor 10040 NE Lobby 10041 NE Vestibule 10046 Shaft SH101 Service Corridor 10027 Shaft SH102 Grumman Corridor 10048 Toilets 10024 Custodial 10026 Shaft SH103 Shaft SH104 Open Stair NE 10003 Exhibition 140 Exhibition 325 Shaft SH107 Elec 10060 Elec 10063 Circulation 10047 Mail Room 141 Acct Representatives 143 Acct Representatives 147 Lead Finance 149 Research Admin 151 Elec 10062 Telecom 128 Unisex 10020 Custodial 10061 Toilets 10025 Grumman Labs GRU10 Grumman Offices GRU11 Grumman Offices GRU12 Grumman Labs GRU13 Bench Seating 10040A Shaft SH106 Director MAE 139 UG Program Asst & Work Study 127 Undergrad Advisor/Coord. 129 Director Administration 137 Storage 131 Sm. Conference 135MAE Student Support Office 125 MAE Administration Office 130 Office Service Center 132 Storage / Closet 133 Duffield Vestibule 123 Facilities Coordinator 153 Circulation 172 Building Services 172A Elev F.1 10071 Egress Stair S 10004 Shaft 10066 Egress Stair N 10002 Elev P.1 10070 Egress Stair W 10001 Drop Tower Shaft 195 South Corridor 10042 Small Medium Classroom 102 Large Multi-Purpose Conference 106 Pantry Kitchen 110 Informal Collaboration 115 AV Storage 102A AV Storage 106A AV Storage 142A AV Storage 152A Lounge 116 Small Classroom 152 MAE Wind Tunnel Equipment 154 Small Classroom 146Large Flexible Classroom 142 Fluid Dynamics - Wind Tunnel Lab 166 Wind Energy Lab (Barthelmie) 168 Fluid Dynamics - Tow Tank Lab 160 Fluid Dynamics - Water Channel Lab 162 AV Storage 146A Terrace Vestibule 119 West Corridor 10040 NE Lobby 10041 NE Vestibule 10046 Shaft SH101 Service Corridor 10027 Shaft SH102 Grumman Corridor 10048 Toilets 10024 Custodial 10026 Shaft SH103 Shaft SH104 Open Stair NE 10003 Exhibition 140 Exhibition 325 Shaft SH107 Elec 10060 Elec 10063 Circulation 10047 Mail Room 141 Acct Representatives 143 Acct Representatives 147 Lead Finance 149 Research Admin 151 Elec 10062 Telecom 128 Unisex 10020 Men 10022 Women 10023 Custodial 10061 Toilets 10025 Grumman Labs GRU10 Grumman Offices GRU11 Grumman Offices GRU12 Grumman Labs GRU13 Bench Seating 10040A Shaft SH106 Director MAE 139 UG Program Asst & Work Study 127 Undergrad Advisor/Coord. 129 Director Administration 137 Storage 131 Sm. Conference 135MAE Student Support Office 125 MAE Administration Office 130 Office Service Center 132 Storage / Closet 133 Duffield Vestibule 123 Facilities Coordinator 153 Circulation 172 ST 4 5"ST/OST UP5"ST/OST DN ST 4 5"ST 5"OST 3/4"CA3/4"CA3/4"CA 3/4"CA8"ST/OST2"W1/2"CW TO HB 3/4"C/HW TO (2)SINK 1-1/2"V1/2"CW TO HB 3/4"C/HW 2"W 2"W2"W Note: Refer to architectural drawings for design guidelines for layout and placement of all exposed infrastructure including piping, sprinklers, conduit, ductwork, cable trays, lighting and ceiling devices. Consult architect if any questions arise about design intent. SEE DETAIL FOR HWC CONNECTION TO HW PIPING (TYPICAL FOR ALL LOCATIONS) CO CO CO CO CO 3/4"3/4"COCO CO CO 2"W UP/DN8"ST/OSTSINK-2 4"ST/OST UP/DN ST 5 Sheet Title Approved Checked Drawn Job Number Date Sheet Information Revisions MEP FP ME Engineers 29 West 38th Street, 5th Floor New York, NY 10018 t 212.447.6770 f 212.447.6615 STRUCTURAL ENGINEER/ SUSTAINABILITY CONSULTANT Thornton Tomasetti 51 Madison Ave. New York, N.Y. 10010 t 917.661.7800 f 917.661.7801 LIGHTING CONSULTANT Lumen Architecture 214 W 29th Street Suite 1005 New York, NY 10001 t 212.564.6469 f 917.591.2524 LANDSCAPE ARCHITECT Trowbridge Wolf Michaels 1001 West Seneca Street Suite 101Ithaca, NY 14850 t 607.277.1400 f 000.000.0000 162345 A E B C D 162345 A E B C D Copyright © 2013 Perkins+Will 227 West 29th Street, 7th Flr. New York, NY 10001 t: 212 505-5955 f: 212 505-1648 CIVIL ENGINEER TG Miller PC 203 North Aurora Street Ithaca, NY 14850 t 607.272.6477 f 607.273.6322 AV / ACOUSTICS The Sextant Group 244 Madison Avenue Suite 311 New York NY 10016 t 877.684.2311 f 412.323.8538 CODE CONSULTANT Code Consultants Professional Engineers, PC 215 West 40th Street 15th Floor New York, NY 10018 t 212.216.9596 f 212.216.9619 C:\Users\edgar.avila\Documents\Upson Hall_MECH_PLUMB_FP_ethan.case.rvtP-2001 PLUMBING CONSTRUCTION OVERALL PLAN - LEVEL 01 MEE MEE 031549.000 11/07/2014 MEE Upson Hall Renovation 124 Hoy Rd, Ithaca, NY 14850 Cornell University 215 Park Avenue South 4th Floor New York, NY 10003 t 212.251.7000 f 212.251.7111 www.perkinswill.com 3/32" = 1'-0"1 PLUMBING CONSTRUCTION OVERALL PLAN - LEVEL 01 NO ISSUE DATE 1 100% DD DOCUMENTS 14/08/28 2 50% CONSTRUCTION DOCUMENTS 14/11/07 3 BID SET 15/02/27 4 Addendum No. 3 15/03/31