Loading...
HomeMy WebLinkAbout_ALL Volume 2 Conformed Set 157123 456 891011121314151617181920 6.18.1 8.910.1 2.6 A B C D E F G H J K L M N P Q O R S T Q.1 Q.6 R.3 20.2 02 0205 0508 08 R.5 20.3 R.4 Elev P.0 B0070 Mechanical B0063 Sprinkler Valve B0069 Mechanical B0067 Upson Automotive Lab (Existing) B74 Elev F.0 B0071 Shaft B0066 Corridor B0043 Loading Dock B0044 GM Auto Lab B70A Universal Waste - Holding B68 Shaft SHB01 Areaway SHB03 Areaway SHB04 Egress Stair W B0001 Egress Stair N B0002 Teams Pod Build Area B56 Team Conference B60 Teams Pod Design Area B52 Toilets B88 Teams Pod Design Area B23 Staff Office B36 West Corridor B0040 West Vestibule B01 Emerson Manufacturing Teaching Lab B40 Cage Storage B56B Cage Storage B56C Cage Storage B56A CAD/CAM Lab B38 6"ST TO (E)ST SERVICE COORDINATE LOCATION WITH SITE DRAWINGS (INV=786.8') 6"W TO (E)8"W AND HOUSE TRAP 1 SEP SEE RISER DIAGRAM AND UNDERGROUND PLUMBING PLAN FOR MORE INFORMATION 2" W DN 2"W UP 2"W UP 3/4"C/HW UP TO FIRST FLOOR SINK 2"W UP 2"W UP (E) CMP EXISTING TO REMAIN AIR COMPRESSOR. CONNECT TO NEW CA RISER DURING PHASE 1 DISCONNECT EXISTING CA SYSTEM IN PHASE 2 (E)FD (E)FD (E)FD PIPING TO SEP TO REMAIN (TYP) (E)FD (E)FD (E)FD PIPING TO SEP TO REMAIN (TYP) FD-1 FD-1 CONNECT 4"CW TO (E) CW SERVICE PROVIDE STAINER, METER, 4"RPZ AND ISOLATION VALVES (SEE DETAILS AND RISER DIAGRAM) 6"ST TO (E)ST SERVICE COORDINATE EXACT LOCATION WITH SITE DRAWINGS (INV=790') 1 DHWH 2"W DN TO (E)SEP 2"W UP SH 2"W UP2 SEP SEE RISER DIAGRAM AND UNDERGROUND PLUMBING PLAN FOR MORE INFORMATION CONNECT UGW PIPING TO SEWAGE EJECTOR PUMPS INSTALL SEP-2 DURING PHASE 1 123 456 891011121314151617181920 6.18.1 8.910.1 2.6 A B C D E F G H J K L M N P Q O R S T Q.1 Q.6 R.3 20.2 02 0205 0508 08 R.5 20.3 R.4 2"W UP TO FD 2"W UP TO FD DW FEED TO GRUMMAN CONTRACTOR TO VERIFY EXACT LOCATION AND SIZE IN FIELD SEE ENLARGED PLAN ON DRAWING P-3000 FOR PIPE SIZES AND ADDITIONAL SCOPE Teams Pod Build Area B56 Shower Room B30 3"CW UP 2"HW UP 1-1/2"HWC UP 1"CA UP INSTALL RISERS DURING PHASE 1 SINK 1/2"CW FOR PARTS WASHER (JC-1) W/VACUUM BREAKERS AND SHUT-OFF VALVES (4)1-1/2"V UP 2"V UP 3/4" C/HW UPSINK 3/4" C/HW UP Emerson Manufacturing Teaching Lab B40 DF DF A A A A A A 4"W UP 4"W UP 4"W UP 5"W UP 3"V UP 2"W DN TO SP-1 1 HWCP 2"CW 1"HW 3/4"HWC W 1 W 2 W 4 W 5 2-1/2"CW 1-1/2"HW 1"HWC 3/4"CA2"W DN PROVIDE 2" INDRECT WASTE W/ TRAP PRIMER IN CABINET BENEATH SINK FOR FIRE DEPT. CONNECTION DRAIN 6"OVERFLOW ST SPILL TO DAYLIGHT (SEE DETAIL) 5"ST/OST UP ST 3 ESH 6"OVERFLOW ST SPILL TO DAYLIGHT (SEE DETAIL) 8"OVERFLOW ST SPILL TO DAYLIGHT (SEE DETAIL) 8"ST/OST UP ST 2 3"ST DN TO (E)STORM SERVICE VERIFY EXACT LOCATION IN FIELD Teams Pod Build Area B14 Teams Pod Build Area B18 PROVIDE 2"INDRECT WASTE W/ TRAP PRIMER IN CABINET BENEATH SINK FOR FIRE DEPT. CONNECTION DRAIN 2"W UP TO PENTHOUSE (2)FD 2"V UP 2"W FROM SP-2 AA A Composites Fabrication B70E TO 8"ST SERVICE PIPING. COORDINATE LOCATION WITH SITE DRAWINGS (INV=781.50') CONNECT TO (E)SANITARY SERVICE COORDINATE W/ SITE DRAWINGS (INV@MANHOLE=791.3") Generator B0068 Storage B40B Staff Office B40A Custodial B77 Elec B0064 Elec B0065 Projects Storage B32 Vending B39 Grumman Labs GRU01 Teams Pod Design Area B15 Teams Pod Design Area B19 Team Conference B04 Team Conference B02 Swanson Director B06 Teams Pod Design Area B10 Elec B35 ? ? East Corridor B0041 Cage Storage B0043 Cage Storage B0046 Cage Storage B0047 Cage Storage B0048 Cage Storage B0049 Cage Storage B0050 Cage Storage B0051 Sheet Metal Fabrication B70F Cage Storage B0059 OPEN STAIR NW B0005 Generator B0068 Mechanical B0067 Egress Stair S B0006 Shaft B0066 GM Auto Lab B70A Drop Tower Base B70C Universal Waste - Holding B68 Rapid Prototyping Lab B22 Shaft SHB01 Areaway SHB04 Egress Stair W B0001 Egress Stair N B0002 Teams Pod Build Area B56 Team Conference B60 Teams Pod Design Area B52 Lab Support B76 Staff Office B36 Exhibition B0040A Telecom B34 South Corridor B0042 West Corridor B0040 West Vestibule B01 Storage B40B Cage Storage B56B Cage Storage B56C Cage Storage B56A CAD/CAM Lab B38 Staff Office B40AStudent Orgs. Office B50 Custodial B77 MDF (EXISTING)B0069 RHODES Elec B0064 Elec B0065 Projects Storage B32 Vending B39 Grumman Labs GRU01 Teams Pod Design Area B15 Teams Pod Design Area B19 Teams Pod Build Area B14 Teams Pod Build Area B18 Team Conference B04 Team Conference B02 Swanson Director B06 Teams Pod Design Area B10 Elec B35 ? ? East Corridor B0041 Cage Storage B0045 Cage Storage B0046 Cage Storage B0047 Cage Storage B0048 Cage Storage B0049 Cage Storage B0050 Cage Storage B0051 Custodial B0061 Women B0023 Men B0022 Engine Room B70B Shock Testing B70D Sheet Metal Fabrication B70F Cage Storage B0059 OPEN STAIR NW B0005 CORRIDORB0042 RHODES DW 1 ST 1 6"ST/OST UP 3"ST UP TO AD 3/4"CW MAKE-UP TO MECH. EQUIPMENT SEE DRAWING P-3000 FOR BASEMENT ENLARGED PLAN CO CO CO CO CO CO CO CO CO CO CO CO CO 3"ST 3"ST 3"ST3"ST8"ST8"OST8"ST6"OST3"ST3"ST UP TO RD 1"CA 1"CA3/4"CA 3/4"CA3/4"CA3/4"CA 3/4"CA 3/4"CA 3"W 3"W 2"W2"W2"W2"W3"W4"W6"W6"W6"W4"CW3/4"CW 3/4"HW 3/4"HWC 2-1/2"CW 1-1/2"HW 1"HWC CO CO CO CO CO CO CO 2"W 3/4"HWC 3/4"HW 3/4"CW CO CO 6"OST6"ST5"ST 5"ST 5"OST 5"ST/OST UP ST 4 Note: Refer to architectural drawings for design guidelines for layout and placement of all exposed infrastructure including piping, sprinklers, conduit, ductwork, cable trays, lighting and ceiling devices. Consult architect if any questions arise about design intent. ISOLATION VALVES (TYP) CO 2-1/2"CW 1-1/2"HW 1"HWC 1-1/2"V1-1/2"V1-1/2"V1-1/2"V3/4"CA3/4"CA3/4"HWC 3/4"HW 3/4"CW 3/4"HWC 1"HW 1"CW CO SEE DETAIL FOR HWC CONNECTION TO HW PIPING (TYPICAL FOR ALL LOCATIONS) 3"CW 2"HW 1-1/2"HWC FD-1 1-1/2"V DN TO FD-12"V2"V 2"V DN 2"V DN TO FD-1 CO CO 3"W DN TO SEP-2 2"W 2"W 2"W3"W DN TO SEP-2 DW FEED TO GRUMMAN CONTRACTOR TO VERIFY EXACT LOCATION AND SIZE IN FIELD 8"ST/OST CO CO CO2"W4"ST 4"OST CO CO CO CO CO CO CO CO 4"OVERFLOW ST SPILL TO DAYLIGHT (SEE DETAIL) 4"ST/OST UP ST 5 Sheet Title Approved Checked Drawn Job Number Date Sheet Information Revisions MEP FP ME Engineers 29 West 38th Street, 5th Floor New York, NY 10018 t 212.447.6770 f 212.447.6615 STRUCTURAL ENGINEER/ SUSTAINABILITY CONSULTANT Thornton Tomasetti 51 Madison Ave. New York, N.Y. 10010 t 917.661.7800 f 917.661.7801 LIGHTING CONSULTANT Lumen Architecture 214 W 29th Street Suite 1005 New York, NY 10001 t 212.564.6469 f 917.591.2524 LANDSCAPE ARCHITECT Trowbridge Wolf Michaels 1001 West Seneca Street Suite 101Ithaca, NY 14850 t 607.277.1400 f 000.000.0000 162345 A E B C D 162345 A E B C D Copyright © 2013 Perkins+Will 227 West 29th Street, 7th Flr. New York, NY 10001 t: 212 505-5955 f: 212 505-1648 CIVIL ENGINEER TG Miller PC 203 North Aurora Street Ithaca, NY 14850 t 607.272.6477 f 607.273.6322 AV / ACOUSTICS The Sextant Group 244 Madison Avenue Suite 311 New York NY 10016 t 877.684.2311 f 412.323.8538 CODE CONSULTANT Code Consultants Professional Engineers, PC 215 West 40th Street 15th Floor New York, NY 10018 t 212.216.9596 f 212.216.9619 C:\Users\edgar.avila\Documents\Upson Hall_MECH_PLUMB_FP_ethan.case.rvtP-2000 PLUMBING CONSTRUCTION OVERALL PLAN - LEVEL 00 MEE MEE 031549.000 11/07/2014 MEE Upson Hall Renovation 124 Hoy Rd, Ithaca, NY 14850 Cornell University 215 Park Avenue South 4th Floor New York, NY 10003 t 212.251.7000 f 212.251.7111 www.perkinswill.com 3/32" = 1'-0"1 PLUMBING CONSTRUCTION OVERALL PLAN - LEVEL 00 NO ISSUE DATE 1 100% DD DOCUMENTS 14/08/28 2 50% CONSTRUCTION DOCUMENTS 14/11/07 3 BID SET 15/02/27 4 Addendum No. 3 15/03/31