Loading...
HomeMy WebLinkAbout_ALL Volume 2 Conformed Set 111123 5 891011121314151617181920 6.18.1 L M N P Q O R S T Q.1 Q.6 R.3 20.2 02 0205 0508 08 R.5 20.3 R.4 Faculty Office 343 Faculty Office 347 Faculty Office 351 Sm. Conference 349 Sm. Office-Students 344 Hybrid Lab - Unassigned 342 Grain Flow Research Lab 350 Energy Environ Research Lab 348 Hybrid Lab - Unassigned 329 Egress Stair N 30002 Elev P.3 30070 Faculty Office 305 Faculty Office 307 Faculty Office 309 Faculty Office 311 Faculty Office 315 Faculty Office 317 Faculty Office 319 Faculty Office 321 Faculty Office 313 Touch-Down / Hoteling Workspace 301 Emeritus Suite 310 Office-Students 314 Office-Students 302 NE Corridor 30041 Exhibition 30040A Shaft SH301 Hybrid Lab - Unassigned 325 Shaft SH303 Faculty Service Center 340 Shaft SH203 Shaft SH306 Sm. Conference 323 West Corridor 30040 Shaft SH308 Shaft SH311 Shaft SH312 Elec 30060 Open Stair NE 30003 Egress Stair W 30001 Dry / Computational Lab 306 Research Conference 331 Informal Collaboration 337 Shaft SH304 Office-Students 304 Office-Students 341 V12 FCU V12 FCU V10 FCU V10 FCU V10 FCU V12 FCU V02 FCU V02 FCU V02 FCU V02 FCU V02 FCU V02 FCU V02 FCU V02 FCU V02 FCU V08 FCU V08 FCU V08 FCU V08 FCU V03 FCU V03 FCU V03 FCU V04 FCU HR02 FCU V10 FCU V10 FCU V10 FCU V10 FCU HR02 FCU H08 FCU H02 FCU H02 FCU H02 FCU H03 FCU V10 FCU V12 FCU PIPE CHASE B 4"CHWS UP/DN 2 1/2"CHWR UP/DN 4"HWS UP/DN 2 1/2"HWR UP/DN 1"DR UP/DN PIPE CHASE C 4"CHWS UP/DN 2 1/2"CHWR UP/DN 4"HWS UP/DN 2 1/2"HWR UP/DN 1"DR UP/DN PIPE CHASE D 4"CHWS UP/DN 2 1/2"CHWR UP/DN 4"HWS UP/DN 2 1/2"HWR UP/DN 1"DR UP/DN PIPE CHASE E 4"CHWS UP/DN 2 1/2"CHWR UP/DN 4"HWS UP/DN 2 1/2"HWR UP/DN 1"DR UP/DN PIPE CHASE H 4"CHWS UP/DN 2 1/2"CHWR UP/DN 4"HWS UP/DN 2 1/2"HWR UP/DN 1"DR UP/DN PIPE CHASE I 4"CHWS UP/DN 2 1/2"CHWR UP/DN 4"HWS UP/DN 2 1/2"HWR UP/DN 1"DR UP/DN PIPE CHASE A 4"CHWS UP/DN 2 1/2"CHWR UP/DN 4"HWS UP/DN 2 1/2"HWR UP/DN 1"DR UP/DN V06 FCU HR06 FCU H06 FCU 2" CHWS&R UP/DN 20' FT-A 5' FT-A 36' FT-A 12' FT-A 3/4"CHWS&R 3/4"DR V02 FCU V12 FCU 3/4"CHWS&R 3/4"DR 3/4" CHWS&R 1 1/4" DR UP/DN 3/4" CHWS&R 3/4" DR 3/4" HWS UP TO 4TH FLOOR FINTUBE 3/4" HWR UP TO 4TH FLOOR FINTUBE 3/4" HWR DN TO 2ND FLOOR 3/4" HWS UP TO 4TH FLOOR FINTUBE 3/4" HWS DN TO FINTUBE 3/4" HWS UP 3/4" HWR UP/DN 1 1/4" DR UP/DN 1 1/4" DR UP/DN 1 1/4" DR UP/DN 1 1/4" DR UP/DN 1 1/4" DR UP/DN MATCHLINE SEE /1 M-2103B MATCHLINE SEE /1 M-2103B 3/4"DR HR04 FCU HR04 FCU Elec 30062 Telecom 328 Custodial 30061 Unisex 30020 NE Corridor 30041 Women 30023 Men 30022 Service Corridor 30024 Biomechanics Computing Lab 322 Conference 316 Office 322B Office 322A 3/4" DR DN TO MOP SINK 3/4" CHWS&R 3/4" DR 2" HWS&R UP/DN 3/4" HWS&R TO FINTUBE 8' FT-C 2" HWS&R UP/DN 3/4" HWS&R TO FINTUBE 1 1/4" CHWS&R 1 1/4" HWS&R 3/4" DR IN PIPE ENCLOSURE BENEATH WINDOWS 1 1/4" CHWS&R 1 1/4" HWS&R 3/4" DR IN PIPE ENCLOSURE BENEATH WINDOWS 1 1/2" CHWS&R 2" HWS&R 1" DR IN PIPE ENCLOSURE BENEATH WINDOWS 1 1/2" CHWS&R 2" HWS&R 1" DR IN PIPE ENCLOSURE BENEATH WINDOWS 1 1/2" CHWS&R 2" HWS&R IN PIPE ENCLOSURE BENEATH WINDOWS 3/4" CHWS&R 3/4"CHWS&R 3/4"DR 3/4"CHWS&R 3/4"DR 3/4"CHWS&R 3/4"DR 1"CHWS&R 3/4"DR 3/4"CHWS&R 3/4"DR 3/4" DR DN 3/4"CHWS&R 3/4"DR 3/4"CHWS&R 3/4"DR 1 1/4" CHWS&R 1 1/4" HWS&R IN PIPE ENCLOSURE BENEATH WINDOWS 1 1/4" CHWS&R 1 1/4" HWS&R 3/4" DR IN PIPE ENCLOSURE BENEATH WINDOWS 1 1/2" CHWS&R 1 1/2" HWS&R 3/4" DR IN PIPE ENCLOSURE BENEATH WINDOWS 1 1/2" CHWS&R 1 1/2" HWS&R IN PIPE ENCLOSURE BENEATH WINDOWS 1 1/2" CHWS&R 1 1/2" HWS&R 3/4" DR IN PIPE ENCLOSURE BENEATH WINDOWS 1 1/2" CHWS&R 1 1/2" HWS&R 3/4" DR IN PIPE ENCLOSURE BENEATH WINDOWS 1 1/2" CHWS&R 1 1/2" HWS&R IN PIPE ENCLOSURE BENEATH WINDOWS 3/4" HWR 3/4" HWS 3/4" HWS&R 3/4" HWR UP 3/4" HWS UP 3/4" HWR 1" CHWS&R 1" HWS&R 3/4" DR IN PIPE ENCLOSURE BENEATH WINDOWS 1" CHWS&R 1" HWS&R IN PIPE ENCLOSURE BENEATH WINDOWS 1" CHWS&R 1" HWS&R 3/4" DR IN PIPE ENCLOSURE BENEATH WINDOWS 1" CHWS&R 1" HWS&R 3/4" DR IN PIPE ENCLOSURE BENEATH WINDOWS 1" CHWS&R 1" HWS&R 3/4" DR IN PIPE ENCLOSURE BENEATH WINDOWS 1" CHWS&R 1" HWS&R 3/4" DR IN PIPE ENCLOSURE BENEATH WINDOWS 1" CHWS&R 1" HWS&R 3/4" DR IN PIPE ENCLOSURE BENEATH WINDOWS 1 1/4" CHWS&R 1 1/4" HWS&R 1" DR 3/4" HWS 1" HWR 1" HWS&R 1" HWS&R 1 1/4" CHWS&R 1 1/4" HWS&R 3/4" DR IN PIPE ENCLOSURE BENEATH WINDOWS 1 1/4" CHWS&R 1 1/2" HWS&R 3/4" DR IN PIPE ENCLOSURE BENEATH WINDOWS 1 1/4" CHWS&R 1 1/2" HWS&R IN PIPE ENCLOSURE BENEATH WINDOWS 1 1/4" CHWS&R 1 1/2" HWS&R 3/4" DR IN PIPE ENCLOSURE BENEATH WINDOWS 3/4" HWS 3/4" HWS DN TO 2ND FLOOR 3/4" HWS UP TO 4TH FLOOR FINTUBE 3/4" HWS DN TO FINTUBE 2" RHHWS&R FOR FUTURE USE FINTUBE TO BE MOUNTED AGAINST UNDERSIDE OF LANDING FINTUBE TO BE MOUNTED AGAINST UNDERSIDE OF LANDING 1 1 1 1 2 CAP 4"RHHWS&R UP/DN 6"CHWS&R UP/DN 4"HWS&R UP/DN 3/4"CHWS&R 3/4"DRHR06 FCU Sheet Title Approved Checked Drawn Job Number Date Sheet Information Revisions MEP FP ME Engineers 29 West 38th Street, 5th Floor New York, NY 10018 t 212.447.6770 f 212.447.6615 STRUCTURAL ENGINEER/ SUSTAINABILITY CONSULTANT Thornton Tomasetti 51 Madison Ave. New York, N.Y. 10010 t 917.661.7800 f 917.661.7801 LIGHTING CONSULTANT Lumen Architecture 214 W 29th Street Suite 1005 New York, NY 10001 t 212.564.6469 f 917.591.2524 LANDSCAPE ARCHITECT Trowbridge Wolf Michaels 1001 West Seneca Street Suite 101Ithaca, NY 14850 t 607.277.1400 f 000.000.0000 162345 A E B C D 162345 A E B C D Copyright © 2013 Perkins+Will 227 West 29th Street, 7th Flr. New York, NY 10001 t: 212 505-5955 f: 212 505-1648 CIVIL ENGINEER TG Miller PC 203 North Aurora Street Ithaca, NY 14850 t 607.272.6477 f 607.273.6322 AV / ACOUSTICS The Sextant Group 244 Madison Avenue Suite 311 New York NY 10016 t 877.684.2311 f 412.323.8538 CODE CONSULTANT Code Consultants Professional Engineers, PC 215 West 40th Street 15th Floor New York, NY 10018 t 212.216.9596 f 212.216.9619 C:\Users\edgar.avila\Documents\Upson Hall_MECH_PLUMB_FP_Josue.Avila.rvtM-2103A MECHANICAL PIPING CONSTRUCTION PLAN - LEVEL 03 PART A MEE MEE 031549.000 11/07/2014 MEE Upson Hall Renovation 124 Hoy Rd, Ithaca, NY 14850 Cornell University 215 Park Avenue South 4th Floor New York, NY 10003 t 212.251.7000 f 212.251.7111 www.perkinswill.com NO ISSUE DATE 1 BID SET 15/02/27 2 Addendum No. 3 15/03/31 GENERAL NOTES 1. SEE PHASING NOTES ON LEGEND SHEETS 2. CONDENSATE DRAIN PIPE SHALL BE PITCHED AT 1/8" PER FOOT. 3. DRAWINGS ARE DIAGRAMMATIC IN NATURE, AND ARE PROVIDED TO CONVEY THE DESIGN INTENT. REGARDLESS OF HOW INDICATED, ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH ALL MANUFACTURER'S RECOMMENDATIONS AND AS REQUIRED TO PROVIDE NEC, SERVICE AND MAINTENANCE CLEARANCES. PROVIDE ADDITIONAL OFFSETS AND FITTINGS AS REQUIRED FOR DUCTWORK AND PIPING. 4. REFER TO SPECS FOR INSULATION REQUIREMENTS ON DUCTWORK AND PIPING. ALL CONCEALED DUCTWORK AND PIPING SHALL BE INSULATED PER ENERGY CODE. 5. ALL EXPOSED DUCTWORK SHALL BE PAINTED AS PER ARCHITECT SPECIFICATION AND NOT INSULATED. ALL CONCEALED DUCTWORK SHALL BE INSULATED AS PER SPECIFICATIONS. 6. ALL VAV BOX AND FAN COIL HOUSING SHALL BE LINED AS PER ACOUSTICAL ENGINEERS REPORT. 7. BRANCH DUCT SIZES TO AIR DEVICES ARE EQUAL TO AIR DEVICE NECK SIZE, UNLESS NOTED OTHERWISE. 8. PROVIDE AN ACCESSIBLE, MANUAL VOLUME DAMPER AT EVERY BRANCH DUCT AND FOR EVERY INLET/OUTLET. PROVIDE MANUAL VOLUME DAMPER UPSTREAM OF ALL ZONE REGISTER TERMINALS. 9. ROUND SUPPLY DUCT SIZES TO VAV BOXES ARE EQUAL TO CONNECTION SIZE UNLESS NOTED OTHERWISE. 10. PROVIDE RECOMMENDED STRAIGHT DUCT INLET LENGTHS FOR ALL SOUND ATTENUATORS AND VAV BOXES. 11. ALL VAV BOXES SHALL BE INSTALLED ABOVE CEILINGS. 12. COORDINATE WITH ALL TRADES TO MAINTAIN ACCESS CLEARANCE TO EQUIPMENT. 13. CONTRACTOR TO FIELD COORDINATE ACCESS PANELS IN FINISH CEILING TO MAINTAIN ACCESS TO EXISTING DUCT MOUNTED ACCESS DOORS. SUBMIT PROPOSED ACCESS PANEL LOCATIONS FOR APPROVAL PRIOR TO INSTALLATION. 14. ALL DUCTS PENETRATING 1-HOUR RATED CONSTRUCTION SHALL BE EQUIPPED WITH AN APPROVED FIRE DAMPER AND INSTALLED AS PER DETAIL. 15. ALL DUCTS PENETRATING RATED SHAFTS AND 2-HOUR RATED CONSTRUCTION SHALL BE EQUIPPED WITH AN APPROVED FIRE SMOKE DAMPER AND INSTALLED AS PER DETAIL. 16. ALL PIPING PENETRATION 1-HOUR AND 2- HOUR RATED CONSTRUCTION SHALL BE INSTALLED AS PER DETAIL. 17. ALL DIFFUSERS SHALL BE HARD DUCTED AS PER DETAIL. 18. ALL PIPING FOR VERTICAL FAN COIL UNITS IS TO BE LOCATED WITHIN PIPE ENCLOSURE BELOW WINDOWS. 19. CONTROL VALVES SHALL BE PROVIDED FOR EACH PIECE OF HYDRONIC EQUIPMENT. SEE DETAIL SHEETS FOR PIPING CONFIGURATION. 19. REFER TO ARCHITECTURAL DRAWINGS FOR DESIGN GUIDELINES FOR LAYOUT AND PLACEMENT OF ALL EXPOSED INFRASTRUCTURE INCLUDING PIPING, SPRINKLERS, CONDUIT, DUCTWORK, CABLE TRAYS, LIGHTING AND CEILING DEVICES. CONSULT ARCHITECT IF ANY QUESTIONS ARISE ABOUT DESIGN INTENT. KEYNOTES# 1 FINNED TUBE ELEMENT LENGTHS ARE NOT CONTINUOUS. TOTAL FINNED LENGTH SHALL BE AS INDICATED BY TAG. FINS SHALL BE EVENLY DISTRIBUTED ALONG LENGTH OF ENCLOSURE IN SECTIONS, NO LONGER THAN 36”. TOTAL FIN LENGTH SHALL NOT EXCEED TAGGED VALUE. SEE ARCHITECTURAL FOR ENCLOSURE LENGTH. 2 FINAL LOCATION OF FAN COIL UNITS IN TELECOM ROOMS SHALL BE SELECTED TO AVOID PLACING FAN COIL OVER ELECTRONIC EQUIPMENTS. SELECT AND SUBMIT FAN COIL AFTER FINAL ROOM LAYOUT IS CONFIRMED. CONSIDER PROVIDING A VERTICAL FAN COIL IF MORE APPROPRIATE FOR FINAL ROOM LAYOUT. 1/8" = 1'-0"1 MECHANICAL CONSTRUCTION PLAN - LEVEL 03 PART A