Loading...
HomeMy WebLinkAbout_ALL Volume 2 Conformed Set 11123 456 891011121314151617181920 6.18.1 8.910.1 2.6 A B C D E F G H J K L M N P Q O R S T Q.1 Q.6 R.3 20.2 02 0205 0508 08 R.5 20.3 R.4 Elev P.0 B0070 Mechanical B0063 Sprinkler Valve B0069 Generator B0068 Mechanical B0067 Upson Automotive Lab (Existing) B74 Egress Stair S B0006 Elev F.0 B0071 Shaft B0066 Corridor B0043 Loading Dock B0044 GM Auto Lab B70A Drop Tower Base B70C Universal Waste - Holding B68 Rapid Prototyping Lab B22 Shaft SHB01 Areaway SHB03 Areaway SHB04 Egress Stair W B0001 Egress Stair N B0002 Teams Pod Build Area B56 Team Conference B60 Teams Pod Design Area B52 Lab Support B76 Toilets B88 Teams Pod Design Area B23 Staff Office B36 Exhibition B0040A Telecom B34 South Corridor B0042 West Corridor B0040 West Vestibule B01 Emerson Manufacturing Teaching Lab B40 Storage B40B Cage Storage B56B Cage Storage B56C Cage Storage B56A CAD/CAM Lab B38 Staff Office B40A Student Orgs. Office B50 Custodial B77 MDF (EXISTING)B0069 RHODES Elec B0064 Elec B0065 Projects Storage B32 Vending B39 Grumman Labs GRU01 Teams Pod Design Area B15 Teams Pod Design Area B19 Teams Pod Build Area B14 Teams Pod Build Area B18 Team Conference B04 Team Conference B02 Swanson Director B06 Teams Pod Design Area B10 Elec B35 Shower Room B30 ? ? East Corridor B0041 Cage Storage B0043 Cage Storage B0045 Cage Storage B0046 Cage Storage B0047 Cage Storage B0048 Cage Storage B0049 Cage Storage B0050 Cage Storage B0051 Custodial B0061 Women B0023 Men B0022 Engine Room B70B Shock Testing B70D Sheet Metal Fabrication B70F Cage Storage B0057 Cage Storage B0059 Composites Fabrication B70E T CD T T T T T TTT T T T T T T T T T T T T T T T CD T T CD CD CD T CD CD CD CD OPEN STAIR NW B0005 CORRIDORB0042 RHODES T H T T T T BMS CONTROLS LEGEND OCCUPANCY SENSOR DAYLIGHT SENSOR T H CD SPACE HUMIDSTAT CARBON DIOXIDE DETECTOR SPACE TEMPERATURE SENSOR DIMMER SWITCH LIGHT SWITCH Sheet Title Approved Checked Drawn Job Number Date Sheet Information Revisions MEP FP ME Engineers 29 West 38th Street, 5th Floor New York, NY 10018 t 212.447.6770 f 212.447.6615 STRUCTURAL ENGINEER/ SUSTAINABILITY CONSULTANT Thornton Tomasetti 51 Madison Ave. New York, N.Y. 10010 t 917.661.7800 f 917.661.7801 LIGHTING CONSULTANT Lumen Architecture 214 W 29th Street Suite 1005 New York, NY 10001 t 212.564.6469 f 917.591.2524 LANDSCAPE ARCHITECT Trowbridge Wolf Michaels 1001 West Seneca Street Suite 101Ithaca, NY 14850 t 607.277.1400 f 000.000.0000 162345 A E B C D 162345 A E B C D Copyright © 2013 Perkins+Will 227 West 29th Street, 7th Flr. New York, NY 10001 t: 212 505-5955 f: 212 505-1648 CIVIL ENGINEER TG Miller PC 203 North Aurora Street Ithaca, NY 14850 t 607.272.6477 f 607.273.6322 AV / ACOUSTICS The Sextant Group 244 Madison Avenue Suite 311 New York NY 10016 t 877.684.2311 f 412.323.8538 CODE CONSULTANT Code Consultants Professional Engineers, PC 215 West 40th Street 15th Floor New York, NY 10018 t 212.216.9596 f 212.216.9619 C:\Users\wtsui\Documents\REVIT 2015\Upson Hall_MECH_PLUMB_FP_wtsui.rvtMEP-2000 BMS CONTROL POINTS OVERALL PLAN - LEVEL 00 MEE MEE 031549.000 11/07/2014 MEE Upson Hall Renovation 124 Hoy Rd, Ithaca, NY 14850 Cornell University 215 Park Avenue South 4th Floor New York, NY 10003 t 212.251.7000 f 212.251.7111 www.perkinswill.com NO ISSUE DATE 1 BID SET 15/02/27 2 Addendum No. 3 15/03/31 GENERAL NOTES 1. - KEYNOTES# 3/32" = 1'-0"1 BMS CONTROL POINTS OVERALL PLAN – BASEMENT