Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
_ALL Volume 2 Conformed Set 108
12 456 88.1 8.910.1 2.6 A B C D E F G H J K L 02 0205 0508 08 South Corridor 20042 V12 FCU V12 FCU V12 FCU V10 FCU V10 FCU V10 FCU HR06 FCU H10 FCU H10 FCU V04 FCU V04 FCU HR02 FCU HR02 FCU PIPE CHASE F 4"CHWS UP 3"CHWS DN 2 1/2"CHWR UP 3" CHWR DN 4" HWS UP 3" HWS DN 2 1/2"HWR UP 3" HWR DN 1"DR UP/DN PIPE CHASE G 4"CHWS UP 2 1/2"CHWR UP 4"HWS UP 2 1/2"HWR UP 1"DR UP 6" CHWS&R UP/DN 4" HWS&R UP/DN Bellis Fluid Mechanics Instruction 256 Engineered Materials Instruction 264 Teaching Labs Support Shop 270 Teaching Support Specialist 268 Teaching Support Specialist 266 Heat Transfer Instruction 260 Teaching Support 264A Drop Tower Prep Lab 272 Teaching Support Specialist 273 2 1/2" S&R PROCESS COOLING CHILLED WATER PIPES UP/DN 3"RHHW S&R DN 7' FT-A 7' FT-A 7' FT-A 7' FT-A 7' FT-A 7' FT-A V06 FCU V06 FCU 1 1/4" DR UP/DN 1 1/4" DR UP/DN 1 1/4" DR UP/DN 1 1/4" DR UP/DN 3/4" HWR DN 3/4" HWR DN 3/4" HWS DN 3/4" HWR DN 3/4" HWS DN 3" RHHWS&R UP MATCHLINE SEE /1 M-2102A MATCHLINE SEE /1 M-2102A 1" CHWS&R 1" RHHWS&R 3" GENERATOR COOLANT UP/DN Egress Stair S 20004 Shaft 20066 Elev F.2 20071 Shaft SH205 Shaft SH206 Restroom 20027 Custodial 20064 Shaft SH207 Shaft SH208 Storage / Closet 264B Elec 20063 Circulation 20044 Grumman Labs GRU22 Grumman Offices GRU21 Circulation 20046 HR10 FCU 2" RHHWS&R FOR FUTURE USE 3"HWS 2 1/2"HWR 3"CHWS 2 1/2"CHWR 1"DR 3/4" CHWS&R 3/4" DR 3/4" CHWS&R 3/4" DR PIPE CHASE G 2"CHWS DN 3"CHWR DN 2 1/2"HWS DN 3"HWR DN 1"DR DN HH08 FCU 3/4" CHWS&R 3/4" HWS&R 3/4" DR 3/4"CHWS&R 3/4" DR 3/4" CHWS&R 3/4"DR 3/4" CHWS&R 1" CHWS&R 8 FT-C 2-3 HC 3/4"DR3/4"DR1 1/2" CHWS&R 1 1/2" HWS&R 3/4" DR IN PIPE ENCLOSURE BENEATH WINDOWS 1 1/2" CHWS&R 1 1/2" HWS&R 3/4" DR IN PIPE ENCLOSURE BENEATH WINDOWS 1 1/4" CHWS&R 1 1/4" HWS&R IN PIPE ENCLOSURE BENEATH WINDOWS 1 1/4" CHWS&R 1 1/4" HWS&R 3/4" DR IN PIPE ENCLOSURE BENEATH WINDOWS 3/4" CHWS&R 3/4" HWS&R 3/4" DR IN PIPE ENCLOSURE BENEATH WINDOWS 2" RHHWS&R FOR FUTURE USE 2" HWS&R UP/DN 3/4" HWS&R TO FINTUBE 3/4" CHWS&R 3/4" HWS&R 3/4" DR IN PIPE ENCLOSURE BENEATH WINDOWS 1 1/4" CHWS&R 1 1/4" HWS&R 3/4" DR IN PIPE ENCLOSURE BENEATH WINDOWS 3/4" DR DN TO MOP SINK CAP 2" PROCESS CHWS&R FOR FUTURE USE 2" PROCESS CHWS&R FOR FUTURE USE FINTUBE TO BE MOUNTED AGAINST UNDERSIDE OF LANDING Sheet Title Approved Checked Drawn Job Number Date Sheet Information Revisions MEP FP ME Engineers 29 West 38th Street, 5th Floor New York, NY 10018 t 212.447.6770 f 212.447.6615 STRUCTURAL ENGINEER/ SUSTAINABILITY CONSULTANT Thornton Tomasetti 51 Madison Ave. New York, N.Y. 10010 t 917.661.7800 f 917.661.7801 LIGHTING CONSULTANT Lumen Architecture 214 W 29th Street Suite 1005 New York, NY 10001 t 212.564.6469 f 917.591.2524 LANDSCAPE ARCHITECT Trowbridge Wolf Michaels 1001 West Seneca Street Suite 101Ithaca, NY 14850 t 607.277.1400 f 000.000.0000 162345 A E B C D 162345 A E B C D Copyright © 2013 Perkins+Will 227 West 29th Street, 7th Flr. New York, NY 10001 t: 212 505-5955 f: 212 505-1648 CIVIL ENGINEER TG Miller PC 203 North Aurora Street Ithaca, NY 14850 t 607.272.6477 f 607.273.6322 AV / ACOUSTICS The Sextant Group 244 Madison Avenue Suite 311 New York NY 10016 t 877.684.2311 f 412.323.8538 CODE CONSULTANT Code Consultants Professional Engineers, PC 215 West 40th Street 15th Floor New York, NY 10018 t 212.216.9596 f 212.216.9619 C:\Users\edgar.avila\Documents\Upson Hall_MECH_PLUMB_FP_Josue.Avila.rvtM-2102B MECHANICAL PIPING CONSTRUCTION PLAN - LEVEL 02 PART B MEE MEE 031549.000 11/07/2014 MEE Upson Hall Renovation 124 Hoy Rd, Ithaca, NY 14850 Cornell University 215 Park Avenue South 4th Floor New York, NY 10003 t 212.251.7000 f 212.251.7111 www.perkinswill.com NO ISSUE DATE 1 BID SET 15/02/27 2 Addendum No. 3 15/03/31 GENERAL NOTES 1. SEE PHASING NOTES ON LEGEND SHEETS 2. CONDENSATE DRAIN PIPE SHALL BE PITCHED AT 1/8" PER FOOT. 3. DRAWINGS ARE DIAGRAMMATIC IN NATURE, AND ARE PROVIDED TO CONVEY THE DESIGN INTENT. REGARDLESS OF HOW INDICATED, ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH ALL MANUFACTURER'S RECOMMENDATIONS AND AS REQUIRED TO PROVIDE NEC, SERVICE AND MAINTENANCE CLEARANCES. PROVIDE ADDITIONAL OFFSETS AND FITTINGS AS REQUIRED FOR DUCTWORK AND PIPING. 4. REFER TO SPECS FOR INSULATION REQUIREMENTS ON DUCTWORK AND PIPING. ALL CONCEALED DUCTWORK AND PIPING SHALL BE INSULATED PER ENERGY CODE. 5. ALL EXPOSED DUCTWORK SHALL BE PAINTED AS PER ARCHITECT SPECIFICATION AND NOT INSULATED. ALL CONCEALED DUCTWORK SHALL BE INSULATED AS PER SPECIFICATIONS. 6. ALL VAV BOX AND FAN COIL HOUSING SHALL BE LINED AS PER ACOUSTICAL ENGINEERS REPORT. 7. BRANCH DUCT SIZES TO AIR DEVICES ARE EQUAL TO AIR DEVICE NECK SIZE, UNLESS NOTED OTHERWISE. 8. PROVIDE AN ACCESSIBLE, MANUAL VOLUME DAMPER AT EVERY BRANCH DUCT AND FOR EVERY INLET/OUTLET. PROVIDE MANUAL VOLUME DAMPER UPSTREAM OF ALL ZONE REGISTER TERMINALS. 9. ROUND SUPPLY DUCT SIZES TO VAV BOXES ARE EQUAL TO CONNECTION SIZE UNLESS NOTED OTHERWISE. 10. PROVIDE RECOMMENDED STRAIGHT DUCT INLET LENGTHS FOR ALL SOUND ATTENUATORS AND VAV BOXES. 11. ALL VAV BOXES SHALL BE INSTALLED ABOVE CEILINGS. 12. COORDINATE WITH ALL TRADES TO MAINTAIN ACCESS CLEARANCE TO EQUIPMENT. 13. CONTRACTOR TO FIELD COORDINATE ACCESS PANELS IN FINISH CEILING TO MAINTAIN ACCESS TO EXISTING DUCT MOUNTED ACCESS DOORS. SUBMIT PROPOSED ACCESS PANEL LOCATIONS FOR APPROVAL PRIOR TO INSTALLATION. 14. ALL DUCTS PENETRATING 1-HOUR RATED CONSTRUCTION SHALL BE EQUIPPED WITH AN APPROVED FIRE DAMPER AND INSTALLED AS PER DETAIL. 15. ALL DUCTS PENETRATING RATED SHAFTS AND 2-HOUR RATED CONSTRUCTION SHALL BE EQUIPPED WITH AN APPROVED FIRE SMOKE DAMPER AND INSTALLED AS PER DETAIL. 16. ALL PIPING PENETRATION 1-HOUR AND 2- HOUR RATED CONSTRUCTION SHALL BE INSTALLED AS PER DETAIL. 17. ALL DIFFUSERS SHALL BE HARD DUCTED AS PER DETAIL. 18. ALL PIPING FOR VERTICAL FAN COIL UNITS IS TO BE LOCATED WITHIN PIPE ENCLOSURE BELOW WINDOWS. 19. CONTROL VALVES SHALL BE PROVIDED FOR EACH PIECE OF HYDRONIC EQUIPMENT. SEE DETAIL SHEETS FOR PIPING CONFIGURATION. 19. REFER TO ARCHITECTURAL DRAWINGS FOR DESIGN GUIDELINES FOR LAYOUT AND PLACEMENT OF ALL EXPOSED INFRASTRUCTURE INCLUDING PIPING, SPRINKLERS, CONDUIT, DUCTWORK, CABLE TRAYS, LIGHTING AND CEILING DEVICES. CONSULT ARCHITECT IF ANY QUESTIONS ARISE ABOUT DESIGN INTENT. KEYNOTES# 1/8" = 1'-0"1 MECHANICAL PIPING CONSTRUCTION PLAN - LEVEL 02 PART B