HomeMy WebLinkAboutDelta Upsilon Fraternity House Interior Renovations - Laundry-ElectricNOTE: REFER TO FINISH PLANS FOR ROOM FINISH KEYAND ADDITIONAL ABBREVIATIONSAAC ASBESTOS ABATEMENT CONTRACTORAAD AUTOMATIC AIR DAMPERAB ANCHOR BOLT, AIR BARRIERAC AIR CONDITIONING, ALTERNATING CURRENTACCMP ASPHALT COATED CORR METAL PIPEACM ASBESTOS CONTAINING MATERIALACT ACOUSTICAL CEILING TILEACU AIR CONDITIONICO NG UNITAD AREA DRAINADA AMERICAN DISABILITIES ACTADD ADDENDUMADDL ADDITIONALADDN ADDITIONADH ADHESIVEADJ ADJACENTADR ACCESS DOORAESS ARCH EXPOSED STRUCTURAL STEELAFF ABOVE FINISH FLOORAH ACCESS HATCHAHU AIR HANDLING UNITAIB AIR INFILTRATION BARRIERALT ALTERNATEALTB ACOUSTICALLY LINED TRANSFER BOXALTN ALTERATION ALUM ALUMINUMAMP AMPEREANOD ANODIZEDANT ACID NEUTRALIZATION TANKAP ACCESS PANELAPPROX APPROXIMATE (LY)APC ARCHITECTURAL PRECAST CONCRETEARCH ARCHITECT (URAL)A/S AIR SEPARATORASB ASBESTOSASPH ASPHALTATV ATMOSPHERIC VENTAUD AUDITORIUMAUTO AUTOMATICAV ACID VENTAVE AVERAGEAVTR ACID VENT THRU ROOFAW ACID WASTEB BOILER, BRICK, BOTTOMBB BASKETBALLBBD BOILER BLOWDOWNBC BOTTOM OF CURBBCU BLOWER COIL UNITBCX BOTTOM CHORD EXTENSIONBD BOARDBDD BACKDRAFT DAMPERBFP BACK FLOW PREVENTERBG BOTTOM GRILLEBIT BITUMINOUSBLDG BUILDING BLOCKBLK BLOCKING BLKGBM BEAMBO BY OTHERSBOD BOTTOM OF DUCTBOF BOTTOM OF FOOTINGBOS BOTTOM OF STEELBOT BOTTOMBPL BEARING PLATEBR BOTTOM REGISTERBRDG BRIDGINGBRG BEARINGBRK BRICKBRSH BRICKSHELFBRZ BRONZEBS BOTH SIDES, BOTTOM OF STAIRBSMT BASEMENTBSPL BACKSPLASHBT BENTBTU BRITISH THERMAL UNITSBTUH BRITISH THERMAL UNITS PER HOURBUR BUILT-UP ROOFINGBW BOTTOM OF WALLBWC BACK WATER CHECK VALVEC1 CARPET TYPE 1C CONDUIT, CONVECTOR, CONDENSOR, COMMONCA COMPRESSED AIRCAB CABINETCATV CABLE TELEVISIONCB CATCH BASIN, CIRCUIT BREAKER, CHALKBOARDCCTV CLOSED CIRCUIT TELEVISIONCD CEILING DIFFUSER, CONDENSATE DRAINCEM CEMENTCER CERAMIC CF CUBIC FEET, CEILING FANCFM CUBIC FEET PER MINUTECFMF COLD FORMED METAL FRAMINGCFT1 CERAMIC FLOOR TILE TYPE 1CG CEILING GRILLECHAN CHANNELCHUV CEILING HUNG UNIT VENTILATORCI CAST IRONCIP CAST IN PLACECIRC CIRCUMFERENCECJ CONTROL JOINTCL CENTER LINECLG CEILINGCLKG CAULKINGCLL CONTRACT LIMIT LINECLR CLEAR (ING) (ENCE)CLRM CLASSROOMCMP CORRUGATED METAL PANELCMT CERAMIC MOSAIC TILECMU CONCRETE MASONRY UNITCO CLEAN OUTCODP CLEAN OUT DECK PLATECOL COLUMNCOMB COMBINATIONCOMP COMPRESS (ED) (ION) (IBLE), COMPOSITECONC CONCRETECOND CONDENSATECONN CONNECTIONCONST CONSTRUCTIONCONT CONTINOUSCONTR CONTRACT (OR)COORD COORDINATECORR CORRUGATED, CORRIDORCOWP CLEAN OUT WALL PLATECPVC CHLORINATED POLY VINYL CHLORIDECR CEILING REGISTERCRS COURSE (S)CSK COUNTERSINKCSMT CASEMENTCT COMPUTER TERMINAL, CERAMIC BASE TILECTD COATEDCTOP COUNTER TOPCTR CENTERCU CUBICCUH CABINET UNIT HEATERCV CONVECTOR, CURB VALVECW COLD WATERCWR CHILLED WATER RETURNCWS CHILLED WATER SUPPLYCWT1 CERAMIC WALL TILE TYPE 1D1 DANCE FLOORING TYPE 1D DIESEL FUEL, DEPTHDB DRY BULBDC DIRECT CURRENTDDC DIRECT DIGITAL CONTROLDE DELONIZED WATERDEG DEGREESDEMO DEMOLISHDEP DEPRESS (ED) (ION)DET DETAIL (ED)DF DRINKING FOUNTAINDH DOUBLE HUNGDHU DEHUMIDIFICATION UNITDI DROP INLET, DUCTILE IRON, DISTILLED WATERDIA DIAMETERDIAG DIAGONALDIM DIMENSIONDISP DISPENSERDIST DISTANCEDIV DIVISIONDL DEAD LOADDN DOWNDO DITTODP DAMPPROOF (ING)DPR DAMPERDR DOOR, DEEP RIBDWG DRAWINGDS DOWNSPOUT, DRAINAGE STRUCTUREDT DRAIN TILEDTA DOVETAIL ANCHORDTL DETAILDW DUMBWAITER, DISHWASHERDWL DOWELDWR DRAWERE EASTEA EXHAUST AIR, EACHEAT ENTERING AIR TEMPERATUREEB EXPANSION BOLTEC ELECTRICAL CONTRACTORECF ENHANCED CONCRETE FLOORINGEIFS EXTERIOR INSULATION SYSTEMEF EACH FACE, EXHAUST FANEJ EXPANSION JOINTELEC ELECTRIC (AL)ELEM ELEMENTELEV ELEVATION, ELEVATOREM EMERGENCYEMT ELECTRICAL METALLIC TUBINGENC ENCLOSUREEOD EDGE OF DECKEOS EDGE OF SLABEQ EQUAL, EQUIVALENTEQC EQUIPMENT CONTRACTOREQUIP EQUIPMENTES EXPOSED SURFACE, EXPOSED STRUCTUREESF ELASTIC SHEET FLASHINGESM ELASTIC SHEET MEMBRANEEW EACH WAYEWC ELECTRIC WATER COOLEREWT ENTERING WATER TEMPERATUREEXH EXHAUSTEXG EXISTINGEXP EXPANSIONEXT EXTERIOR, EXTERNALF FAHRENHEITFA FIRE ALARMFAI FRESH AIR INTAKEFCU FAN COOLING UNITFD FLOOR DRAIN, FIRE DAMPERFDC FIRE DEPARTMENT CONNECTIONFE FIRE EXTINGUISHERFEC FIRE EXTINGUISHER CABINETFF FINISH FLOOR, FACTORY FINISHFFE FINISH FLOOR ELEVATIONFFL FINISH FLOOR LINEFG FLOOR GRILLEFH FIRE HYDRANTFHC FIRE HOSE CABINETFIN FINISH (ED)FIXT FIXTUREFL FLUSHFLD FLOOR DUCTFLEX FLEXIBLEFLG FLASHINGFLR FLOOR (ING)FLUOR FLUORESCENTFM FLOOR MOUNTEDFMC FLEXIBLE METAL CONDUITFND FOUNDATIONFOB FREIGHT ON BOARD, FLAT ON BOTTOMFOG FUEL OIL GAUGEFOR FUEL OIL RETURNFOS FUEL OIL SUPPLYFOT FLAT ON TOPFP FIREPROOF (ING)FPM FEET PER MINUTEFR FRAME, FLOOR REGISTERFRA FRESH AIRFRC FIRE RESISTANT COATINGFRP FIBERGLASS REINFORCED PANELFRT FIRE RETARDANTFS FLOOR SINKFSD FIRE AND SMOKE DAMPERFT FEET, FLOOR TREATMENTFTG FOOTINGFTR FIN TUBE RADIATIONFV FLUSH VALVEG GAS, GLYCOLGA GAUGEGAL GALLONGALV GALVANIZEDGASK GASKET (ED)GC GENERAL CONTRACT (OR)GCMU GLAZED CONCRETE MASONRY UNITGCO GRADE CLEANOUT GF GROUND FACEGL GLASS, GLAZINGGND GROUNDGPM GALLONS PER MINUTEGR GRADE (ING), GLYCOL RETURNGS GLYCOL SUPPLYGVL GRAVELGWB GYPSUM WALL BOARDGYP GYPSUMHHEIGHTHB HOSE BIBHBD HARD BOARDHC HEATING CONTRACT (OR), HANDICAPHCR HOT/CHILLED RETURNHCS HOT/CHILLED SUPPLYHD HEAVY DUTYHDPE HIGH DENSITY POLYETHYLENEHDR HEADERHDW HARDWAREHG HOT GLYCOLHIP HIGH IMPACT PANELHM HOLLOW METALHORZ HORIZONTALHP HORSEPOWER, HIGH PRESSURE, HEAT PUMPHPS HEAT PUMP LOOP WATER SUPPLYHPR HEAT PUMP LOOP WATER RETURNHPC HIGH PERFORMANCE COATINGHPL HIGH PRESSURE LAMINATEHR HANDRAIL, HOURHT HEIGHTHTG HEATINGHV HIGH VOLTAGEHVAC HEATING/VENTILATING/AIR CONDITIONINGHVU HEATING AND VENTILATING UNITHW HOT WATERHWH HOT WATER HEATERHWP HOT WATER PUMPHWR HOT WATER RETURNHWS HOT WATER SUPPLYID INSIDE DIAMETERIE INVERT ELEVATIONIN INCHESINCL INCLUDE (D) (ING)INS INSULATE (D) (ION)INT INTERIORINV INVERTIP IRON PIPEIPS IRON PIPE SIZEIW INDIRECT WASTEJJANITORS CLOSETJAN JANITORS CLOSETJB JUNCTION BOXJC JANITORS CLOSETJCT JUNCTIONJT JOINTKW KILOWATTKWH KILOWATT PER HOURKV KILOVOLTKVA KILOVOLT AMPEREL LENGTH, LONGLAB LABORATORYLAD LADDERLAM LAMINATE (D)LAT LEAVING AIR TEMPERATURELAV LAVATORYLB POUNDLBL LABELLBP LEAD BASED PAINTLC LANDSCAPE CONTRACTOR (SITE)LCC LEAD COATED COPPERLDR LEADERLEV LEVELLF LINEAR FOOTLFMC LIQUID-TIGHT FLEXIBLE METAL CONDUITLFNC LIQUID-TIGHT FLEXIBLE NONMETALLIC CONDUITLG LENGTH, LONGLGI LARGE GROUP INSTRUCTIONLH LEFT HANDLIN LINEARLKR LOCKERLL LIVE LOADLP LOW PRESSURELPC LOW PRESSURE CONDENSATELPS LOW PRESSURE STEAMLPT LOW POINTLS LINOLEUM SHEET TYPE 1LT LIGHTLT1 LINOLEUM TILE TYPE 1LTL LINTELLV LOW VOLTAGELVR LOUVERLWT LEAVING WATER TEMPERATUREMAN MANUALMAS MASONRYMAT MATERIALMAU MAKE UP AIR UNITMAX MAXIMUMMB MARKER BOARDMBH THOUSAND BTUHMBR MEMBERMD MOTORIZED DAMPERME MECHANICAL EQUIPMENTMECH MECHANICAL (LY)MED MEDIUMMEMB MEMBRANEMEZZ MEZZANINEMF MIXING FAUCETMFR MANUFACTURE (R)MH MAN HOLEMIN MINIMUMMIR MIRRORMISC MISCELLANEOUSMO MASONRY OPENINGMOD MODULE (OR), MODELMR MOP RECEPTORMP MULTICOLOR WALL COATINGMT MOUNTMTD MOUNTEDMTG MOUNTINGMTL METALMTH MARBLE THRESHOLDMTR METERMULL MULLIONMVEJ MASONRY VENEER EXPANSION JOINTN NORTH, NO WORK REQUIREDNAT NATURALNC NORMALLY CLOSEDNEC NATIONAL ELECTRIC CODENEG NEGATIVENEUT NEUTRALIZATIONNIC NOT IN CONTRACTNO NUMBER, NORMALLY OPENNOM NOMINALNRC NOISE REDUCTION COEFFICIENTNTS NOT TO SCALEOA OVERALL, OUTSIDE AIROC ON CENTEROD OUTSIDE DIAMETEROH OVERHEADOPNG OPENINGOPP OPPOSITEOPP HD OPPOSITE HANDP PAINT SURFACE(S) INCLUDING SOFFITSPAR PARALLELPART PARTITIONPC PLUMBING CONTRACT (OR),PIGMENTED CONCRETEPCC PRECAST CONCRETEPE PORCELAIN ENAMELPERF PERFORATE (ION) (ED)PERI PERIMETERPERP PERPENDICULARPL PLATE, PROPERTY LINEPLAM PLASTIC LAMINATEPLAS PLASTER, PLASTICPLF POUNDS PER LINEAR FOOTPLYWD PLYWOODPM PLUGMOLDPNL PANELPOC POINT OF CURVATURE, POINT OF CONNECTIONPOL POLISHEDPOS POSITIVEPOT POINT OF TANGENCYPR PAIRPRE POWER ROOF EXHAUSTERPREP PREPARE (ATION)PRF PREFORMEDPROJ PROJECTPS PAINT EXPOSED STRUCTURE/DECKPSF POUNDS PER SQUARE FOOTPSI POUNDS PER SQUARE INCHPT POINTPT1 PORCELAIN TILE TYPE 1PTD PAINTEDPTFR PRESSURE TREATED FIRE RETARDANTPTP PRESSURE TREATED PRESERVATIVEPVC POLYVINYL CHLORIDEPVMT PAVEMENTPWE POWER WALL EXHAUSTERQF QUARTZ FLOORINGQT QUARRY TILER RADIUS, RETURN, REFRIGERANTRA RETURN AIRRAD RADIATIONRAF RETURN AIR FAN, RESILIENT ATHLETIC FLOORINGRB RESILIENT BASERC ROOFING CONTRACT (OR)RCA RECYCLED CONCRETE AGGREGATERCP REINFORCED CONCRETE PIPE,REFLECTED CEILING PLANRCU REMOTE CONDENSING UNITRD ROOF DRAINRECEPT RECEPTACLEREF REFERENCEREFL REFLECT (ED) (IVE) (OR)REFR REFRIGERATORREG REGISTERREINF REINFORCE (D) (ING)REM REMOVEDREQD REQUIREDRESIL RESILIENTRET RETAINING, RETURNREV REVISION, REVISED, REVEALRF RUBBER FLOORING TYPE 1RFG ROOFINGRFH ROOF HATCHRFM RECESSED FLOOR MATRG RETURN GRILLERGS RIGID GALVANIZED STEELRH RIGHT HANDRHC REHEAT COILRI ROUGH-INRL RAIN LEADERRLG RAIL (ING)RM ROOMRMC RIGID METAL CONDUITRNC RIGID NONMETALLIC CONDUITRNT RUNNING TRAPRO ROUGH OPENINGROW RIGHT OF WAYRPM REVOLUTIONS PER MINUTERR REMOVE EXISTING AND REPLACE WITH NEWRS RUBBER STAIR TREAD/RISERRTH ROOF TOP HOODRTU ROOF TOP UNITRW RAW WATERS SOUTH, SUPPLY, SURGE PROTECTEDSA SUPPLY AIRSAN SANITARYSAS SMOOTH ALL SIDESSC SOLID CORE, SILL COCK, SEALED CONCRETESCHED SCHEDULESCT STRUCTURAL CLAY TILESD STORM DRAIN, SPLITTER DAMPER,SMOKE DAMPERSEC SECTIONSF SQUARE FEETSGI SMALL GROUP INSTRUCTIONSGT STRUCTURAL GLAZED TILESH SHELF, SHELVING, SMOKE HATCHSHR SHOWER, SHEAR WALLSHT SHEETSHTHG SHEATHINGSIM SIMILARSK SINKSL SOUND LINED, SKYLIGHTSLC SILLCOCKSLV SLEEVESLVR STORM LOUVERSMH SANITARY MANHOLESOG SLAB ON GRADESP STATIC PRESSURE, STANDPIPE,SPACE (ING) (ES)SPEC SPECIFICATION (S)SPKR SPRINKLERSPL SPECIALSQ SQUARESS STAINLESS STEELSST STRUCTURAL STEEL TUBINGST STORM, STORAGESTA STATIONSTC SHOWER TEMPERATURE CONTROLLER,STAINED CONCRETESTD STANDARDSTG SEATINGSTL STEELSTN STAIN (ED)STOR STORAGESTRU STRUCTURALSURF SURFACESUSP SUSPENDEDSV SHEET VINYL, STEAM VENTSW SWITCH, SOFTENED WATERSWCI SERVICE WEIGHT CAST IRONSYM SYMMETRICALSYN SYNTHETICSYS SYSTEMT TREAD, TOP, TOILET ROOM, TONST1 TERRAZZO TYPE 1TB TOP AND BOTTOM, TACK BOARD,TERRAZZO BASETBD TO BE DETERMINEDTC TEMPERATURE CONTROL, TEMPERED CLEAR,TELECOMMUNICATIONS CONTRACTOR,TOP OF CURBTCX TOP CHORD EXTENTIONTDV TRIPLE DUTY VALVETEL TELEPHONETEMP TEMPERATURETG TOP GRILLE, TONGUE AND GROOVETHK THICKNESSTHR THRESHOLDTME TO MATCH EXISTINGTMV THERMOSTATIC MIXING VALVETOD TOP OF DUCTTOF TOP OF FASCIATOL TOLERANCETOM TOP OF MASONRYTOP TOP OF PIPE, TOP OF PIERTOS TOP OF STEEL, TOP OF STAIRTPART TOILET PARTITIONTR TOP REGISTERTRN TRANSOMTS TOP OF STAIRTV TELEVISIONTW TEMPERED WATER, TOP OF WALLTYP TYPICALUC UNDERCUTUD UNDERDRAINUE UNDERGROUND ELECTRICUG UNDERGROUNDUH UNIT HEATERUNF UNFINISHEDUNIF UNIFORMUNO UNLESS NOTED OTHERWISEUR URINALUT UNDERGROUND TELEPHONEUV UNIT VENTILATORVVENT, VOLTVAR VARIES, VARIABLEVARN VARNISHVAT VINYL ASBESTOS TILEVAV VARIABLE AIR VOLUMEVB VACUUM BREAKER, VAPOR RETARDER BARRIER,VOLLEYBALLVCB VENTED COVE BASEVCT1 VINYL COMPOSITE TILE TYPE 1VD VOLUME DAMPERVERM VERMICULITEVERT VERTICALVEST VESTIBULEVIF VERIFY IN FIELDVIN VINYLVIT VITREOUS TILEVNR VENEERVOL VOLUMEVTR VENT THROUGH ROOFVWC VINYL WALL COVERINGW WEST, WIDTH, WIDE, WASTE, WATTWB WET BULBWC WATER CLOSET, WALL COVERINGWD WOODWD1 WOOD FLOORING - GYMWD2 WOOD FLOORING - STAGEWDW WINDOWWDWC WINDOW CONTRACTORWF WASH FOUNTAINWG WALL GRILLE, WATER GAUGEWH WALL HUNG, WALL HYDRANTWI WROUGHT IRONWM WIREMOLDWP WATER PROOFING, WORKING POINTWR WATER REPELLENT, WIDE RIB, WALL REGISTERWS WATER STOPWSCT WAINSCOTWT WEIGHTWWHP WATER TO WATER HEAT PUMPWWM WELDED WIRE MESHW/ WITHW/O WITHOUTXHCI EXTRA HEAVY CAST IRONYD YARD DRAIN, YARDMATCH LINEELEVATIONINTERIORELEVATIONNROOM10151st FF100'-0"AABB2A122134A12A122A122A122A122A12Standard SymbolsCLLACOLUMN CENTERLINECONTRACT LIMIT LINEPROPERTY LINESTANDARD REFERENCE BUBBLEDRAWING TITLE & SCALEFloor Plan1/8"=1'-0"DRAWING REVISIONNUMBERCENTER LINECUT LINENORTH ARROWROOM NAME ANDNUMBERDETAILWALL SECTIONBUILDING SECTIONDRAWING NUMBERDETAIL NUMBERMETAL, STEELSANDGRAVELCONCRETEBRICKEARTHCONCRETE MASONRY UNITSPLYWOODFINISHED WOOD TRIMROUGH WOODINSULATION (LOOSE OR BATT)RIGID INSULATIONCERAMIC TILEACOUSTICAL PANELPLASTER, CEMENT, GROUT, GYPSUMWALL BOARDRESILIENT FLOORINGTERRAZZOSTRUCTURAL GLAZED TILEADA 5' TURNINGRADIUSELEVATION CALL OUTA10'-0"P3.8A110010011100Architectural SymbolsNUMBERPARTITION TYPEEQUIPMENT, FURNITURE, OR CASEWORKEM2 X 2 PATTERN2 X 4 FIXTURE INW/ METAL STUD WALL(MATERIAL INDICATION VARIES)(MATERIAL INDICATION VARIES)EXISTING TO REMAINNEW WORKDEMOLITION WORKNEW WORK IN EXISTINGCMU WALLGYPSUM BOARD PARTITION(ROOM NO W/ DOOR NO)WINDOW TYPEDOOR NUMBERREFLECTED CEILING SYMBOLSBOTTOM OF CEILING AFFCEILING GRILLECEILING DIFFUSEREXIT LIGHTEMERGENCY LIGHTFINISH CHANGECEILING MATERIALSEE ELECTRICAL,MECHANICAL, ANDPLUMBING SYMBOLSFOR ADDITIONALSYMBOLS THAT MAY BEUSED ON REFLECTEDCEILING PLANSEXGVSTTTPPGCHLORIDEVENTPIPE ELBOW UPCAP OR PLUGPIPE DOWN WITHPIPE DOWN WITH SHUTOFF VALVECLEANOUT AT BASEUNION CONNECTIONTOP PIPE CONNECTIONPIPE ELBOW DOWNBOTTOM PIPE CONNECTIONINDIRECT WASTESANITARY (BURIED)SANITARY (ABOVEGRADE)CHLORINATED POLY VINYL(PETE'S PLUG)MANUAL AIR VENTFLEX CONNECTORPRESSURE/TEMPERATUREGASAQUASTATBALL VALVECHECK VALVE2-WAY CONTROLBALANCING VALVEBACKFLOW PREVENTORMODULATING VALVEDIRECTION OF FLOWPITCH PIPING (DOWN)WYE STRAINER180° HOT WATER140° HOT WATEREXISTING 180° HOT WATEREXISTING 140° HOT WATER110° HOT WATEREXISTING 110° HOT WATEREXG HOT WATER RETURNEXISTING HOT WATEREXISTING COLD WATERFIRE SPRINKLERHOT WATER RETURNHOT WATERCOLD WATERFIRE MAINVALVEGLOBE VALVEPLUG VALVEAIR SEPARATOREXISTING PIPINGCONNECTION TOCIRCULATING PUMPTEMP AND PRESSURE RELIEF VALVESOLENOID (ELECTRIC) ON/OFFGAS PRESSURE REGULATORPRESSURE REDUCING VALVEHOSE BIBBFIRE DEPARTMENT CONNECTIONRECESSED SPRINKLER HEADSIDEWALL SPRINKLER HEADCONCEALED SPRINKLER HEADPENDANT SPRINKLER HEADUPRIGHT SPRINKLER HEADEXG PLUMBING FIXTUREPLUMBING FIXTUREEXG PLUMBING FIXTURETO BE REMOVEDMAKE-UP COLD WATERMECHANICAL EQUIPMENT(NON-POTABLE)FLOOR DRAINSFLOOR SINKSWALL HYDRANTFIRE EXTINGUISHERCABINET W/ EXTINGUISHERATVATMOSPHERIC VENTDUCT UP NEGATIVE PRESSUREDUCT DOWN POSITIVE PRESSUREDUCT UP POSITIVE PRESSUREDUCT DOWN NEGATIVE PRESSUREHWRHOT WATER RETURNPDEXISTING HVAC PIPEPUMP DISCHARGEREMOVE EXG. DUCT, PIPING,W/VOLUME DAMPERFLEXIBLE CONNECTIONSTANDARD BRANCH DUCTRECTANGULAR ELBOWW/TURNING VANESFIRE DAMPERVOLUME DAMPERFLEXIBLE DUCTAIR FLOWAUTOMATIC AIR DAMPERDUCT AIR FLOWEXISTING DUCTWORKSWITCHHOT WATER SUPPLYHWSCODPCLEANOUT DECK PLATECLEANOUT PLUGTHERMOSTAT W/ GUARDTEMPERATURE SENSORFFIRE RISER VALVE ASSEMBLYVALUEVALUECFM, GPM, CAPACITYEQUIPMENT TAG (MOTORIZED)EQUIPMENT TAG (NON-MOTORIZED)CFMREGISTER, GRILLE, DIFFUSERTAG NO.TAG NO.TAG NO.NECK SZ.FT-XFIN TUBE RADIATIONSWEEP ELBOW WITHSWEEP ELBOWTURNING/SPLITTER VANESPIPE UP WITH SHUTOFF VALVEPIPE UP AND DOWNFIN TUBE RADIATIONPRESSURE RELIEF VALVEEQUIPMENT(UP / TOWARDS)(DOWN / AWAY)(UP / TOWARDS)(DOWN / AWAY)BSBURNER SHUT OFFDUCT BREAKPIPE BREAKPOINT OF CONNECTIONTRIPLE DUTY VALVEFLANGE CONNECTIONPOCSANSANFSPRKGMUBALL VALVESHOCK ABSORBER W/SHOCK ABSORBEREXG FIRE HYDRANT110°180°140°180°140°110°DABSMechanical SymbolsFDAADIWCPVCPR-XPANEL TYPE RADIATIONTYPE XTYPE XS###FFFFFSSDHFAAFACPFAGAFFFF###OSTVCOSREMRElectrical and Technology SymbolsFIRE ALARM GRAPHIC ANNUNCIATORFIRE ALARM CONTROL PANELFIRE ALARM ANNUNCIATOR PANELLIGHT SWITCHEMERGENCY FIXTURE# DENOTES TYPEW/STROBE W/0 STROBEW/STROBE W/0 STROBESINGLE RECEPTACLESURFACE RACEWAYTYPE AS DESCRIBED ON DWGS.EXIT LIGHT -WALL MOUNTED# DENOTES TYPEEXIT LIGHT- CEILING MOUNTED# DENOTES TYPEEMERGENCY FIXTURE# DENOTES TYPEEMER. LIGHT/WALL MOUNT# DENOTES TYPEEMERGENCY LIGHT W/BATTERY PACK# DENOTES TYPECOMBINATION EXIT/EMERGENCY LIGHT# DENOTES TYPELIGHT FIXTURE# DENOTES TYPELIGHT FIXTURE# DENOTES TYPE#MOTORP#OCCUPANCY SENSORFIRE ALARM MANUAL PULL STATIONSMOKE DETECTORFIRE ALARM BELL-FIRE ALARM HORN-FIRE ALARM STROBE LIGHTMAGNETIC DOOR HOLDEREXISTING PANEL TO REMAINEXISTING PANEL TO REPLACENEW PANELDUPLEX RECEPTACLEDOUBLE DUPLEX RECEPTACLESPECIAL PURPOSE RECEPTACLEDUPLEX FLOOR RECEPTACLENON-FUSED DISCONNECT SWITCHFUSED DISCONNECT SWITCHUTILITY POLETELEVISION OUTLETCOMPUTER OUTLETAC = ABOVE CEILINGTYPICAL FORALL ELEC SYMBOLS= REPLACE EXISTING= MOVE EXISTING= EXISTING TO REMAINSymbol Tags= REMOVE EXISTINGWP = WEATHERPROOFWG = WIRE GUARDA = ABOVE (CASEWORK)B = BELOW (CASEWORK)H = HORIZONTALTK = TOE KICKTS = TEACHER STATIONOS - OCCUPANCY SENSOR3 - 3 WAYK - KEY OPERATEDD - DIMMERP - W/PILOT LIGHT4 - 4 WAYCOCOMPUTER OUTLET(WIRELESS ACCESS POINT)WPENGSTATEOFNEWYOR K REENILANOISSEFORPDESNECIL079083KEVINCHARLESTERRY
Tetra Tech Engineers, Architects & Landscape Architects, P.C.ArchitectureEngineeringPlanningforHighPerformanceFacilitiesSet No.Project Location MapDrawing Number:ARCHITECTS & ENGINEERSN6 South AvenueIthaca, NY 14850Cornell University - Delta Upsilon Fraternity HouseInterior Renovations - Phase 108249-170023/27/2017 TDrawing ListGeneralT Title Sheet and Symbols and AbbreviationsCode ComplianceCC100 Code Compliance ReviewAbatementAR-101 Asbestos Abatement Notes and Basement Asbestos Abatement PlanAR-102 1st and 2nd Floor Asbestos Abatement PlanArchitecturalA100 Basement Floor Demolition PlanA101 First Floor Demolition PlanA110 Basement Floor PlanA111 First Floor PlanA120 Basement Floor Reflected Ceiling PlanA121 First Floor Reflected Ceiling PlanA160 Partition Types, Door Schedule, Types and DetailsA170 Interior ElevationsA180 Photo ReferencesMechanicalM-100 Basement Demolition PlanM-101 Basement Mechancial PlanM-102 First Floor Demolition PlanM-103 First Floor Mechanical PlanM-501 Equipment Schedules and DetailsElectricalE-100 Basement Demolition PlanE-101 First Floor Demolition PlanE-102 Basement Lighting PlanE-103 First Floor Lighting Plan and Site PlanE-104 Basement Power PlanE-105 First Floor Power PlanE-501 DetailsE-502 SchedulesPlumbingP100 Floor PlansP101 Details and SchedulesFire ProtectionFP100 Fire Protection Plans and Details
TSTSTSSTRUCTURAL LOADSRISK CATEGORY (TABLE 1604.5). . . . . . . . . . . . . . . . . .A. LIVE LOADSACCESS FLOOR SYSTEMS . . . . . . . . .ASSEMBLY AREAS:FIXED SEATS . . . . . . . . . . . . . .LOBBIES . . . . . . . . . . . . . . . . .MOVEABLE SEATS. . . . . . . . . . .BALCONIES . . . . . . . . . . . . . . . . . . . .CORRIDORS ABOVE FIRST FLOOR . . . .KITCHENS . . . . . . . . . . . . . . . . . . . . .LIBRARIES:READING ROOMS . . . . . . . . . . . .STACK ROOMS . . . . . . . . . . . . .TOILET ROOMS . . . . . . . . . . . . . . . . .MECHANICAL ROOMS . . . . . . . . . . . . .STAIRS . . . . . . . . . . . . . . . . . . . . . . .STORAGE:LIGHT . . . . . . . . . . . . . . . . . . .HEAVY . . . . . . . . . . . . . . . . . . .B. ROOF LOADSMINIMUM ROOF LIVE LOAD . . . . . . . . . . . . . . . . . . . . . . . .RAIN LOAD: RAIN SURCHARGE LOAD HAS BEEN APPLIED TO AREAS WHERE PONDING OCCURS IN ACCORDANCE WITH IBC SECTION 1611.C. SNOW LOADSD. WIND LOAD DESIGN CRITERIAE. SEISMIC DESIGN CRITERIARISK CATEGORY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .SEISMIC DESIGN CATEGORY . . . . . . . . . . . . . . . . . . . . . .SITE CLASS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . DBI I I20 PSF250 PSF125 PSF100 PSF100 PSF60 PSF150 PSF60 PSF100 PSF80 PSF100 PSF100 PSF100 PSF60 PSF100 PSFIBC 1607IBC 1607.12IBC 1608IBC 16091 1SNOW LOAD IMPORTANCE FACTOR, Is . . . . . . . . . . . . . .SNOW EXPOSURE FACTOR, Ce . . . . . . . . . . . . . . . . . . . .FLAT ROOF SNOW LOAD, Pf (ASCE-7) . . . . . . . . . . . . .GROUND SNOW LOAD, Pg (NYS SUPP. FIG. 1608.2). . . . .39 PSF1.01.1OCCUPANCY OR USEUNIFORM2000 LBSCONCENTRATED1000 LBS1000 LBS1000 LBS300 LBSREDUCTION IN LIVE LOADS . . . . AS PERMITTED PER BUILDING CODETHERMAL FACTOR, Ct . . . . . . . . . . . . . . . . . . . . . . . . . . 1.0115 MPHULTIMATE DESIGN WIND SPEED (3 SECOND GUST), Vult . .IBC 1613DESIGN SPECTRAL RESPONSE ACCELERATION AT SHORT PERIODS, SDS. . . . . . . . . . . . . . . . . . . 28.7 %g AT 1 SECOND PERIOD, SD1. . . . . . . . . . . . . . . . . . 14.5 %gOFFICES . . . . . . . . . . . . . . . . . . . . . .50 PSF 2000 LBS1000 LBS100 PSFFIRST FLOOR CORRIDORS . . . . . . . . .PER 1CC STANDARDCORNICES . . . . . . . . . . . . . . . . . . . . . 60 PSFINTERNAL PRESSURE COEFFICIENT, GCPi . . . . . . . . . . . . ±0.18OF IBC 1607.101.25SEISMIC IMPORTANCE FACTOR Ie . . . . . . . . . . . . . . . . . . .(WITH LIMITATIONS PER TABLE 1607.1 NOTE b.)EXPOSURE CATEGORY . . . . . . . . . . . . . . . . . . . . . . . . . BMAPPED SPECTRAL RESPONSE ACCELERATION AT SHORT PERIODS, Ss . . . . . . . . . . . . . . . . . . . . AT 1 SECOND PERIOD, S1 . . . . . . . . . . . . . . . . . . .27.3 %g9.1 %g40 PSF115 MPHNOMINAL DESIGN WIND SPEED, Vasd (TABLE 1609.3.1) . . .DRY STORAGEB06BMECHANICALB0062STORAGEB06AKITCHENB06BEDROOMB02BEDROOMB01UPPERBASEMENTB0042LOWERBASEMENTB04LAUNDRYB07ELECB0063RESTROOMB0022VESTIBULEB0041MENS TOILETB0021MENS TOILETB0020MECHB06CUNEXCAVATEDUNEXCAVATEDEGRESS PATH49' < 75' SO OK.CHAPTERROOM101GREAT HALL102STUDY ROOM103DISH ROOM104ADINING ROOM104FOYER10040STAIR10001STAIR10003LIBRARY101AENGSTATEOFNEWYOR K REENILANOISSEFORPDESNECIL079083KEVINCHARLESTERRYENGSTATEOFNEWYORKREENILANOISSEFORPDESNECIL079083KEVINCHARLESTERRY Date:Drawn By:Drawing Number:Project Number:1ABCDEFGHIJKLMN234567891011121314151617ABCDEFGHIJKLMNTetra Tech Engineers, Architects& Landscape Architects, P.C.CLEAR SOLUTIONScomplex worldARCHITECTS & ENGINEERS6 South AvenueIthaca, NY 14850Delta Upsilon Fraternity HouseInterior Renovations - Phase I6 South Ave08249-17002CC1003/27/2017Code Compliance ReviewKRGCODE COMPLIANCE REVIEWPROJECT SUMMARY:THIS PROJECT INCLUDES REPLACEMENT OF ELECTRICAL SERVICE AND FIRE ALARM SYSTEM. LEVEL 2 RENOVATIONSOF APPROXIMATELY 450 SQUARE FOOT IN THE BASEMENT, AND APPROXIMATELY 2000 SQUARE FOOT ON THE FIRST FLOOR.1. SPRINKLER SYSTEM ( CHAPTER 9 ):IS AN AUTOMATIC SPRINKLER SYSTEM PROVIDED. REFER TOBUILDING AREA DATA BELOW FOR SPECIFIC AREAS PROVIDED.YES2. OCCUPANCY CLASSIFICATION ( CHAPTER 3 ):A, R-23. CONSTRUCTION TYPE - EXISTING (CHAPTER 6)VB4.CONSTRUCTION TYPE - NEW ( CHAPTER 6 ):N/A5. ROOM USE DESIGNATIONS: FOR ROOM USE DESIGNATIONS- SEE A110.6. ROOM SQUARE FOOTAGES:FOR ROOM SQUARE FOOTAGES - SEE CC100.7.CORRIDOR ENCLOSURES (PER TABLE 1020.1):FOR CORRIDOR FIRE RESISTANCE - SEE ENLARGED PLANS, PARTITION TYPES AND DOOR SCHEDULE.BUILDING REQUIREMENTSGENERAL CODE NOTESA. COORDINATE WITH FLOOR PLANS, WALL SECTIONS AND PARTITIONTYPES FOR RATED WALL TYPES AND LOCATIONS. IMMEDIATELYNOTIFY ARCHITECT OF ANY WALL RATING DISCREPANCIESBETWEEN CC-SERIES DRAWINGS AND FLOOR PLANS.B. ALL WALLS SHALL EXTEND TO THE UNDERSIDE OF DECKING,SUPPORTING STRUCTURE OR ROOF ABOVE, TYPICAL UNLESSNOTED OTHERWISE.C. AT AREAS OF PROJECT WORK, COMPLETELY SEAL PENETRATIONSREQUIRED TO COMPLY WITH FIRE RESISTANCE RATINGSIDENTIFIED ON THE CC-SERIES DRAWINGS, REGARDLESS IF WALLIS NEW OR EXISTING, TYPICAL UNLESS NOTED OTHERWISE.LEGEND:UL DESIGN NUMBERS:1 HR. STUD PARTITIONS UL# U4652 HR. STUD PARTITIONS UL# U4111 HR. CMU PARTITIONS UL# U9052 HR. CMU PARTITIONS UL# U9051 HR. FLOOR/CEILING UL# L202, L512 FIRE RESISTANCE REQUIREMENTS Construction Classification VB Occupancy Classification A, R-2 EXTERIORBEARING WALLS TABLE 601 0NONBEARING WALLS - FIRE SEPARATION DISTANCE > 30' 0 - FIRE SEPARATION DISTANCE < 30' AND > 10' TABLE 602 0 - FIRE SEPARATION DISTANCE < 10' AND > 5' 0 - FIRE SEPARATION DISTANCE < 5' 0OCCUPANCY SEPARATIONTABLE 508.4 1INTERIORFIRE WALLS TABLE 706.4 NABEARING WALLS TABLE 601 0STAIRWAY ENCLOSURES - CONNECTING 4 STORIES OR MORE SECTION 1023 NA - CONNECTING LESS THAN 4 STORIES NASHAFTWAYS - CONNECTING 4 STORIES OR MORE SECTION 713 NA - CONNECTING LESS THAN 4 STORIES NACORRIDORS TABLE 1020.1 A OCC. 0 R OCC. .5STRUCTURAL FRAME INCLUDING COLUMNS, 0GIRDERS AND TRUSSES TABLE 601- SUPPORTING A ROOF ONLY 0FLOOR CONSTRUCTION AND TABLE 601 0ASSOCIATED SECONDARY MEMBERSROOF CONSTRUCTION AND TABLE 601 0ASSOCIATED SECONDARY MEMBERS EXISTING FIRE EXTINGUISHER LOCATIONNEW FIRE EXTINGUISHER LOCATIONTYPES1: 2.5 lb ABC2-HOUR FIRE BARRIER1-HOUR FIRE PARTITIONCOMMON EGRESS PATHBASED ON THE NEW YORK STATE UNIFORM FIRE PREVENTION AND BUILDING CODE INCLUDING APPLICABLE2015 ICC CODES AND 2016 NYS SUPPLEMENTS, AND 2009 ICC A117.1 ACCESSIBLE AND USABLE BUILDING ANDFACILITIES.FINAL MOUNTING LOCATIONS AND HEIGHTS ARE TO BECOORDINATED WITH CORNELL EH&S IN THE FIELD.SCALE 1/8" = 1'-0"1Basement Floor Life Safety PlanSCALE 1/8" = 1'-0"2First Floor Life Safety PlanRev. No.: Date: Description:Key PlanN.T.S.NCornell Facilities Code: 4722
B03CB03B0041B03BAR-101ASBESTOS ABATEMENTNOTES AND BASEMENTASBESTOS ABATEMENT PLAN³´³´³´³´x³´³´³´´x³´³´³´´³´³´³´³´´860 Hooper RoadEndwell, New York 13760Tel: 607.231.6600Fax: 607.231.6651Email: mail@delta-eas.comWeb: www.delta-eas.comCornell UniversityFacilities Engineering
105101ATERRACE102210AR-1021ST AND 2NDFLOOR ASBESTOSABATEMENT PLAN860 Hooper RoadEndwell, New York 13760Tel: 607.231.6600Fax: 607.231.6651Email: mail@delta-eas.comWeb: www.delta-eas.comCornell UniversityFacilities Engineering
DNUPUPUPUPDNUPUPUPDNDNLOWERBASEMENTB04BEDROOMB01CLOSETB01ACLOSETB01BCLOSETB01CUPPERBASEMENTB0042BEDROOMB02ROOMB05KITCHENB06STORAGEB06ADRY STORAGEB06BMECHB06CFREZZER-COOLER-STAIRB0003DUMBWAITERB0061CLOSETB02ACLOSETB02BMENS TOILETB0021MENS TOILETB0020MECHANICALB0062SPRINKLERB0060STORAGEB07STAIRB0002COMMUNICATIONB03DSTORAGEB03CLAUNDRYB03B1222442144225"3' - 8"1339999914141413ELECB03PROVIDE LINTELPER LINTELSCHEDULEENGSTATEOFNEWYOR K REENILANOISSEFORPDESNECIL079083KEVINCHARLESTERRYENGSTATEOFNEWYORKREENILANOISSEFORPDESNECIL079083KEVINCHARLESTERRY Date:Drawn By:Drawing Number:Project Number:1ABCDEFGHIJKLMN234567891011121314151617ABCDEFGHIJKLMNTetra Tech Engineers, Architects& Landscape Architects, P.C.CLEAR SOLUTIONScomplex worldARCHITECTS & ENGINEERS6 South AvenueIthaca, NY 14850Delta Upsilon Fraternity HouseInterior Renovations - Phase I6 South Ave08249-17002A1003/27/2017Basement Floor Demolition PlanKRGSCALE 3/16" = 1'-0"1Basement Floor Demolition PlanKey PlanN.T.S.NCornell Facilities Code: 4722Keyed Selective Demolition NotesSAW CUT NEW, OR ENLARGE EXG OPENING IN EXG WALL TOACCOMMODATE NEW DOOR, WINDOW OR LOUVER. PROVIDE LINTELPER LINTEL SCHEDULE. PATCH EXPOSED SURFACES TO MATCH EXGADJACENT FINISHES / SURFACES.REMOVE EXG INTERIOR PARTITION FULL-HT, PORTION AS INDICATED,OR AS REQUIRED TO PERFORM WORK.REMOVE EXG WINDOW SYSTEM AND FRAME COMPLETELY, (INCLUDINGSILL, FASTENERS, JOINT SEALANT, AND ASSOCIATED COMPONENTS).PATCH EXPOSED SURFACES TO MATCH EXG ADJACENT FINISHES /SURFACES. COORDINATE WITH ABATEMENT DRAWINGSREMOVE EXG DOOR AND FRAME COMPLETELY, INCLUDINGASSOCIATED COMPONENTS. PATCH EXPOSED SURFACES TO MATCHEXG ADJACENT FINISHES / SURFACES.REMOVE EXG HARDWOOD FLOOR. REMOVE, STORE AND PROTECTPORTIONS OF WOOD BASE AS REQUIRED TO COMPLETE WORK.INSPECT EXPOSED SUBFLOORING AND NOTIFY ARCHITECT IFCONDITIONS EXIST THAT ARE NOT IN COMPLIANCE WITH SCHEDULEDFLOORING MANUFACTURER'S RECOMMENDATIONS. PREPAREEXISTING SUB-FLOORING AS SPECIFIED BY ARCHITECT AND MFR OFFLOORING MATERIAL TO BE INSTALLED. PATCH AREAS OF WALLS TOREMAIN THAT WERE DAMAGED BY REMOVAL OF WALL BASE.COORDINATE WITH FINISH DWGS.REMOVE EXG CARPET AND HARDWOOD FLOOR. REMOVE, STORE ANDPROTECT PORTIONS OF WOOD BASE AS REQUIRED TO COMPLETEWORK. INSPECT EXPOSED SUBFLOORING AND NOTIFY ARCHITECT IFCONDITIONS EXIST THAT ARE NOT IN COMPLIANCE WITH SCHEDULEDFLOORING MANUFACTURER'S RECOMMENDATIONS. PREPAREEXISTING SUB-FLOORING AS SPECIFIED BY ARCHITECT AND MFR OFFLOORING MATERIAL TO BE INSTALLED. PATCH AREAS OF WALLS TOREMAIN THAT WERE DAMAGED BY REMOVAL OF WALL BASE.COORDINATE WITH FINISH DWGS.REMOVE EXG CARPET FLOOR FINISH, EXISTING WOOD FLOORINGBELOW TO REMAIN. REMOVE, STORE AND PROTECT PORTIONS OFWOOD BASE AS REQUIRED TO COMPLETE WORK. INSPECT EXPOSEDFLOORING AND NOTIFY ARCHITECT IF CONDITIONS EXIST THAT ARENOT IN COMPLIANCE WITH SCHEDULED FLOORING MANUFACTURER'SRECOMMENDATIONS. PREPARE EXISTING SUB-FLOORING ASSPECIFIED BY ARCHITECT AND MFR OF FLOORING MATERIAL TO BEINSTALLED. PATCH AREAS OF WALLS TO REMAIN THAT WEREDAMAGED BY REMOVAL OF WALL BASE. COORDINATE WITH FINISHDWGS.REMOVE EXG CEILING SYSTEM IN ITS ENTIRETY (INCLUDINGHANGERS, GRID, FRAMING, MASTIC AND ASSOCIATED COMPONENTS).EXISTING PLASTER CEILING ABOVE TO REMAIN.REMOVE EXG CEILING SYSTEM IN ITS ENTIRETY (INCLUDINGHANGERS, GRID, FRAMING, MASTIC AND ASSOCIATED COMPONENTS).REMOVE EXG CASEWORK, SHELVING AND SEATING IN THEIRENTIRETY. PATCH EXPOSED SURFACES TO MATCH EXG ADJACENTFINISHES/SURFACES. COORDINATE WITH CASEWORK DWGS.SAW CUT AND REMOVE PORTION OF EXISTING SEATING SURFACE.PREPARE EXPOSED EDGE FOR WOOD TRIM.SAW CUT AND REMOVE PORTION OF EXISTING CONCRETE STEP TOEXTENT REQUIRED TO COMPLETE WORK.REMOVE EXISTING WALL COVERING, MASTIC, AND ALL ASSOCIATEDCOMPONENTS IN THEIR ENTIRETY. PREPARE EXPOSED SURFACESFOR SCHEDULED FINISH. COORDINATE WITH ABATEMENT DRAWINGS.REMOVE EXISTING PAINT FLOOR FINISH. PREPARE CONCRETE SLABAS REQUIRED FOR SCHEDULED FINISH.REMOVE EXISTING DOOR AND HARDWARE ONLY. EXISTING WOODFRAME TO REMAIN. PREPARE FRAME AS REQUIRED FOR SCHEDULEDDOORS. COORDINATE WITH ABATEMENT DRAWINGS.REMOVE EXISTING FLOOR FINISH AND BASE INCLUDING MASTIC.COORDINATE WITH ABATEMENT DRAWINGS FOR REMOVALS. PREPAREEXPOSED SUBSTRATE AS REQUIRED FOR SCHEDULED FINISHES.SALVAGE WOOD TRIM AND TURN OVER TO OWNER. REMOVE EXISTINGWOOD CASED OPENING AND PREPARE EXPOSED SURFACES ASREQUIRED FOR SCHEDULED WORK.REMOVE SELECT GLASS LITES AND GLAZING PUTTY. PREPAREEXISTING WOOD WINDOW FRAMES TO REMAIN AS REQUIRED TOACCEPT SCHEDULED REPLACEMENT GLASS. REMOVE ANY LOSEGLAZING PUTTY. REFER TO ELEVATIONS. COORDINATE WITHABATEMENT DRAWINGS.REMOVE WOOD STAIR TREADS, RISERS, AND ALL ASSOCIATEDCOMPONENTS.REMOVE LOOSE AREAS OF PLASTER AND PREPARE WALL FORPLASTER PATCH, VIF.PREPARE AREAS OF MINOR PLASTER CRACK FOR WALL PATCH WITHSIMILAR MATERIAL, VIF.REMOVE EXISTING LAMINATED GYPSUM WALL BOARD FROM WALLSURFACE. REMOVE, SALVAGE AND STORE FOR REINSTALLATIONWOOD TRIM AS REQUIRED TO PERFORM WORK, VIF. PREPARESUBSTRATE FOR SCHEDULED FINISHES.REMOVE, SALVAGE AND STORE EXISTING BRONZE PLAQUE FORREINSTALLATION. COORDINATE WITH OWNER FOR LOCATION TO BEREINSTALLED.REMOVE PORTION OF EXISTING MASONRY FIREPLACE LINING ASREQUIRED TO ALLOW INSTALLATION OF MECHANICAL EQUIPMENT.REFER TO MECHANICAL DRAWINGS, COORDINATE WITH GAS INSERTMANUFACTURER.123456789101112131415161718192021222324A. COORDINATE ALL DEMOLITION WITH OTHER DWGS AND SECTION02 41 19.B. REMOVAL INDICATED ON A-SERIES DRAWINGS DOES NOTNECESSARILY INDICATE FULL EXTENT OF PROJECT'S DEMOLITIONWORK. COORDINATE WORK IDENTIFIED ON ALL OTHER DEMOLITIONAND ABATEMENT DRAWINGS PRIOR TO BEGINNING ANY DEMOLITIONWORK. COORDINATE EXACT LOCATIONS AND EXTENTS OFDEMOLITION WORK (VIF, TYP ALL) WITH APPROPRIATE NEW WORKDRAWINGS PRIOR TO BEGINNING ANY DEMOLITION WORK, TYPICAL.C. ASBESTOS CONTAINING MATERIALS ARE PRESENT. ASBESTOSCONTAINING OR ASBESTOS CONTAMINATED MATERIALS SHALL BEABATED BY A LICENSED CONTRACTOR. ASBESTOS ABATEMENT WILLREQUIRE PRE-ABATEMENT REMOVALS OF SELECT UTILITIES AND MAYREQUIRE INSTALLATION OF NEW OR TEMPORARY SUPPORTMETHODS FOR PIPE HANGERS, BRACKETS, ETC. THAT AREFASTENED TO ACM SURFACES TO BE REMOVED. COORDINATE WITHWITH OTHER DEMOLITION DRAWINGS.D. REMOVE AND LEGALLY DISPOSE OF ALL MATERIALS INDICATED FOR REMOVAL. THE OWNER HAS THE RIGHT TO RETAIN ANY EXISTING MATERIALS INDICATED FOR REMOVAL. CHECK WITH THEOWNER'S REPRESENTATIVE FOR MATERIALS TO BE SALVAGEDPRIOR TO REMOVING ANY MATERIAL FROM THE SITE.E. AT LOCATIONS OF REMOVALS, PATCH EXPOSED SURFACESTO MATCH EXISTING ADJACENT FINISHES/SURFACES WHEREAPPLICABLE. FLASH PATCH AND LEVEL SUBSTRATES.F. AT WORK AREAS WHERE EXISTING FINISHES ARE NOT SCHEDULED TO BE REMOVED, PROTECT SURFACES FROMDAMAGE AND CONTACT WITH CONSTRUCTION DUST AND DEBRIS.G. KEYED DEMOLITION TAGS REFER TO SPECIFIC LOCATIONS ASFOLLOWS:a. DEMOLITION TAGS LOCATED WITHIN OR HAVE A LEADERPOINTING TO THE MIDDLE OF A SPACE REFER TO DEMOLITIONOF ALL ITEMS OF THAT SAME TYPE WITHIN THAT ENTIRE SPACE.b. DEMOLITION TAGS PLACED IMMEDIATELY ON OR ADJACENT TOA DASHED LINE INDICATING ITEM REMOVAL OR THAT HAVE ALEADER POINTING TO SPECIFIC ITEM(S) REFER TO DEMOLITIONOF THAT SPECIFIC ITEM ONLY OF THAT TYPE WITHIN THAT SPACE.c. DEMOLITION TAGS IN SERIES REFER TO DEMOLITION OF ALLTHOSE ITEMS EITHER WITHIN THAT ENTIRE SPACE OR TO THESPACE IDENTIFIED BY THAT LEADER.H. AT ALL AREAS OF FLOOR OR WALL FINISH REMOVAL, REMOVEAND/OR PREPARE SURFACE PER RECOMMENDATIONS OF NEWFLOORING OR WALL FINISH MATERIAL MANUFACTURER.DASHED LINE INDICATES ITEM TO BE REMOVED, TYPUNO.General Demolition NotesRev. No.: Date: Description:
UP
CLOSET
B01A
CLOSET
B01B
CLOSET
B01C
STAIR
B0002
COMMUNICATION
B03D
STORAGE
B03C
LAUNDRY
B03B
12
2
2
4
4
2
1
4
4
2
2
5"3' - 8"
13
3
9
9
9 9
14
14 14
13
ELEC
B03
PROVIDE LINTEL
PER LINTEL
SCHEDULE
13
14
149
EXG TO
REMAIN
9 14
2
2
TETRA TECH
ARCHITECTS & ENGINEERS
Drawing No.:
Rev.:Date:Tetra Tech Engineers, Architects & Landscape Architects, P.C.
Proj. No.: 08249-17002
Date:04/20/17
Drawn By: KRG
BID-A100
6 South Avenue Ithaca, NY 14850
Partial Basement Floor Demolition Plan
Delta Upsilon Fraternity House Interior Renovations - Phase I
SCALE 3/16" = 1'-0"1 Partial Basement Floor Demolition Plan
DRAWING PARTIALLY SUPERCEEDS 1/A100
2
2
COTVDNDNDNUPDNDNDNDNDNDNDNDNGREAT HALL102CHAPTERROOM101LIBRARY101ASTUDY ROOM103DINING ROOM104DISH ROOM104ADUMBWAITER10061FOYER10040ELEC10062CLOSET105CLOSET106CLOSET108TERRECE-STAIR10001STAIR10003NORTH DECK-EAST PATIO-5671010101010111 ' - 6 "8815151515151618181818171719REMOVE EXISTING FLOORREGISTER GRATE ANDTURN OVER TO OWNER.PREPARE OPENING FORSCHEDULED INFILL.REMOVE DAMAGED WOODBASE AND ALL ASSOCIATEDCOMPONENTS.2020212121222224EXGISING PLASTERSOFFIT TO REMAINFROM FACE OFPILASTERS TONORTH, REFER TORCP21REMOVE, PROTECT ANDSTORE SURFACE BOLTS23ENGSTATEOFNEWYOR K REENILANOISSEFORPDESNECIL079083KEVINCHARLESTERRYENGSTATEOFNEWYORKREENILANOISSEFORPDESNECIL079083KEVINCHARLESTERRY Date:Drawn By:Drawing Number:Project Number:1ABCDEFGHIJKLMN234567891011121314151617ABCDEFGHIJKLMNTetra Tech Engineers, Architects& Landscape Architects, P.C.CLEAR SOLUTIONScomplex worldARCHITECTS & ENGINEERS6 South AvenueIthaca, NY 14850Delta Upsilon Fraternity HouseInterior Renovations - Phase I6 South Ave08249-17002A1013/27/2017First Floor Demolition PlanKRGSCALE 3/16" = 1'-0"1First Floor Demolition PlanKey PlanN.T.S.NCornell Facilities Code: 4722Keyed Selective Demolition NotesSAW CUT NEW, OR ENLARGE EXG OPENING IN EXG WALL TOACCOMMODATE NEW DOOR, WINDOW OR LOUVER. PROVIDE LINTELPER LINTEL SCHEDULE. PATCH EXPOSED SURFACES TO MATCH EXGADJACENT FINISHES / SURFACES.REMOVE EXG INTERIOR PARTITION FULL-HT, PORTION AS INDICATED,OR AS REQUIRED TO PERFORM WORK.REMOVE EXG WINDOW SYSTEM AND FRAME COMPLETELY, (INCLUDINGSILL, FASTENERS, JOINT SEALANT, AND ASSOCIATED COMPONENTS).PATCH EXPOSED SURFACES TO MATCH EXG ADJACENT FINISHES /SURFACES. COORDINATE WITH ABATEMENT DRAWINGSREMOVE EXG DOOR AND FRAME COMPLETELY, INCLUDINGASSOCIATED COMPONENTS. PATCH EXPOSED SURFACES TO MATCHEXG ADJACENT FINISHES / SURFACES.REMOVE EXG HARDWOOD FLOOR. REMOVE, STORE AND PROTECTPORTIONS OF WOOD BASE AS REQUIRED TO COMPLETE WORK.INSPECT EXPOSED SUBFLOORING AND NOTIFY ARCHITECT IFCONDITIONS EXIST THAT ARE NOT IN COMPLIANCE WITH SCHEDULEDFLOORING MANUFACTURER'S RECOMMENDATIONS. PREPAREEXISTING SUB-FLOORING AS SPECIFIED BY ARCHITECT AND MFR OFFLOORING MATERIAL TO BE INSTALLED. PATCH AREAS OF WALLS TOREMAIN THAT WERE DAMAGED BY REMOVAL OF WALL BASE.COORDINATE WITH FINISH DWGS.REMOVE EXG CARPET AND HARDWOOD FLOOR. REMOVE, STORE ANDPROTECT PORTIONS OF WOOD BASE AS REQUIRED TO COMPLETEWORK. INSPECT EXPOSED SUBFLOORING AND NOTIFY ARCHITECT IFCONDITIONS EXIST THAT ARE NOT IN COMPLIANCE WITH SCHEDULEDFLOORING MANUFACTURER'S RECOMMENDATIONS. PREPAREEXISTING SUB-FLOORING AS SPECIFIED BY ARCHITECT AND MFR OFFLOORING MATERIAL TO BE INSTALLED. PATCH AREAS OF WALLS TOREMAIN THAT WERE DAMAGED BY REMOVAL OF WALL BASE.COORDINATE WITH FINISH DWGS.REMOVE EXG CARPET FLOOR FINISH, EXISTING WOOD FLOORINGBELOW TO REMAIN. REMOVE, STORE AND PROTECT PORTIONS OFWOOD BASE AS REQUIRED TO COMPLETE WORK. INSPECT EXPOSEDFLOORING AND NOTIFY ARCHITECT IF CONDITIONS EXIST THAT ARENOT IN COMPLIANCE WITH SCHEDULED FLOORING MANUFACTURER'SRECOMMENDATIONS. PREPARE EXISTING SUB-FLOORING ASSPECIFIED BY ARCHITECT AND MFR OF FLOORING MATERIAL TO BEINSTALLED. PATCH AREAS OF WALLS TO REMAIN THAT WEREDAMAGED BY REMOVAL OF WALL BASE. COORDINATE WITH FINISHDWGS.REMOVE EXG CEILING SYSTEM IN ITS ENTIRETY (INCLUDINGHANGERS, GRID, FRAMING, MASTIC AND ASSOCIATED COMPONENTS).EXISTING PLASTER CEILING ABOVE TO REMAIN.REMOVE EXG CEILING SYSTEM IN ITS ENTIRETY (INCLUDINGHANGERS, GRID, FRAMING, MASTIC AND ASSOCIATED COMPONENTS).REMOVE EXG CASEWORK, SHELVING AND SEATING IN THEIRENTIRETY. PATCH EXPOSED SURFACES TO MATCH EXG ADJACENTFINISHES/SURFACES. COORDINATE WITH CASEWORK DWGS.SAW CUT AND REMOVE PORTION OF EXISTING SEATING SURFACE.PREPARE EXPOSED EDGE FOR WOOD TRIM.SAW CUT AND REMOVE PORTION OF EXISTING CONCRETE STEP TOEXTENT REQUIRED TO COMPLETE WORK.REMOVE EXISTING WALL COVERING, MASTIC, AND ALL ASSOCIATEDCOMPONENTS IN THEIR ENTIRETY. PREPARE EXPOSED SURFACESFOR SCHEDULED FINISH. COORDINATE WITH ABATEMENT DRAWINGS.REMOVE EXISTING PAINT FLOOR FINISH. PREPARE CONCRETE SLABAS REQUIRED FOR SCHEDULED FINISH.REMOVE EXISTING DOOR AND HARDWARE ONLY. EXISTING WOODFRAME TO REMAIN. PREPARE FRAME AS REQUIRED FOR SCHEDULEDDOORS. COORDINATE WITH ABATEMENT DRAWINGS.REMOVE EXISTING FLOOR FINISH AND BASE INCLUDING MASTIC.COORDINATE WITH ABATEMENT DRAWINGS FOR REMOVALS. PREPAREEXPOSED SUBSTRATE AS REQUIRED FOR SCHEDULED FINISHES.SALVAGE WOOD TRIM AND TURN OVER TO OWNER. REMOVE EXISTINGWOOD CASED OPENING AND PREPARE EXPOSED SURFACES ASREQUIRED FOR SCHEDULED WORK.REMOVE SELECT GLASS LITES AND GLAZING PUTTY. PREPAREEXISTING WOOD WINDOW FRAMES TO REMAIN AS REQUIRED TOACCEPT SCHEDULED REPLACEMENT GLASS. REMOVE ANY LOSEGLAZING PUTTY. REFER TO ELEVATIONS. COORDINATE WITHABATEMENT DRAWINGS.REMOVE WOOD STAIR TREADS, RISERS, AND ALL ASSOCIATEDCOMPONENTS.REMOVE LOOSE AREAS OF PLASTER AND PREPARE WALL FORPLASTER PATCH, VIF.PREPARE AREAS OF MINOR PLASTER CRACK FOR WALL PATCH WITHSIMILAR MATERIAL, VIF.REMOVE EXISTING LAMINATED GYPSUM WALL BOARD FROM WALLSURFACE. REMOVE, SALVAGE AND STORE FOR REINSTALLATIONWOOD TRIM AS REQUIRED TO PERFORM WORK, VIF. PREPARESUBSTRATE FOR SCHEDULED FINISHES.REMOVE, SALVAGE AND STORE EXISTING BRONZE PLAQUE FORREINSTALLATION. COORDINATE WITH OWNER FOR LOCATION TO BEREINSTALLED.REMOVE PORTION OF EXISTING MASONRY FIREPLACE LINING ASREQUIRED TO ALLOW INSTALLATION OF MECHANICAL EQUIPMENT.REFER TO MECHANICAL DRAWINGS, COORDINATE WITH GAS INSERTMANUFACTURER.123456789101112131415161718192021222324A. COORDINATE ALL DEMOLITION WITH OTHER DWGS AND SECTION02 41 19.B. REMOVAL INDICATED ON A-SERIES DRAWINGS DOES NOTNECESSARILY INDICATE FULL EXTENT OF PROJECT'S DEMOLITIONWORK. COORDINATE WORK IDENTIFIED ON ALL OTHER DEMOLITIONAND ABATEMENT DRAWINGS PRIOR TO BEGINNING ANY DEMOLITIONWORK. COORDINATE EXACT LOCATIONS AND EXTENTS OFDEMOLITION WORK (VIF, TYP ALL) WITH APPROPRIATE NEW WORKDRAWINGS PRIOR TO BEGINNING ANY DEMOLITION WORK, TYPICAL.C. ASBESTOS CONTAINING MATERIALS ARE PRESENT. ASBESTOSCONTAINING OR ASBESTOS CONTAMINATED MATERIALS SHALL BEABATED BY A LICENSED CONTRACTOR. ASBESTOS ABATEMENT WILLREQUIRE PRE-ABATEMENT REMOVALS OF SELECT UTILITIES AND MAYREQUIRE INSTALLATION OF NEW OR TEMPORARY SUPPORTMETHODS FOR PIPE HANGERS, BRACKETS, ETC. THAT AREFASTENED TO ACM SURFACES TO BE REMOVED. COORDINATE WITHWITH OTHER DEMOLITION DRAWINGS.D. REMOVE AND LEGALLY DISPOSE OF ALL MATERIALS INDICATED FOR REMOVAL. THE OWNER HAS THE RIGHT TO RETAIN ANY EXISTING MATERIALS INDICATED FOR REMOVAL. CHECK WITH THEOWNER'S REPRESENTATIVE FOR MATERIALS TO BE SALVAGEDPRIOR TO REMOVING ANY MATERIAL FROM THE SITE.E. AT LOCATIONS OF REMOVALS, PATCH EXPOSED SURFACESTO MATCH EXISTING ADJACENT FINISHES/SURFACES WHEREAPPLICABLE. FLASH PATCH AND LEVEL SUBSTRATES.F. AT WORK AREAS WHERE EXISTING FINISHES ARE NOT SCHEDULED TO BE REMOVED, PROTECT SURFACES FROMDAMAGE AND CONTACT WITH CONSTRUCTION DUST AND DEBRIS.G. KEYED DEMOLITION TAGS REFER TO SPECIFIC LOCATIONS ASFOLLOWS:a. DEMOLITION TAGS LOCATED WITHIN OR HAVE A LEADERPOINTING TO THE MIDDLE OF A SPACE REFER TO DEMOLITIONOF ALL ITEMS OF THAT SAME TYPE WITHIN THAT ENTIRE SPACE.b. DEMOLITION TAGS PLACED IMMEDIATELY ON OR ADJACENT TOA DASHED LINE INDICATING ITEM REMOVAL OR THAT HAVE ALEADER POINTING TO SPECIFIC ITEM(S) REFER TO DEMOLITIONOF THAT SPECIFIC ITEM ONLY OF THAT TYPE WITHIN THAT SPACE.c. DEMOLITION TAGS IN SERIES REFER TO DEMOLITION OF ALLTHOSE ITEMS EITHER WITHIN THAT ENTIRE SPACE OR TO THESPACE IDENTIFIED BY THAT LEADER.H. AT ALL AREAS OF FLOOR OR WALL FINISH REMOVAL, REMOVEAND/OR PREPARE SURFACE PER RECOMMENDATIONS OF NEWFLOORING OR WALL FINISH MATERIAL MANUFACTURER.DASHED LINE INDICATES ITEM TO BE REMOVED, TYPUNO.General Demolition NotesRev. No.: Date: Description:
DNUPUPUPUPDNUPUPUPTSTSDDDWWWCLEAR5' - 0"+/- 8' - 7 1/4" VIF3' - 2"+/- 16' - 9 1/2" VIF+/- 14' - 4 1/4" VIFB03A1B081B091B031LOWERBASEMENTB04BEDROOMB01CLOSETB01ACLOSETB01BCLOSETB01CUPPERBASEMENTB0042BEDROOMB02VESTIBULEB0041ROOMB05KITCHENB06STORAGEB06ADRY STORAGEB06BMECHB06CFREZZER-COOLER-STAIRB0003DUMBWAITERB0061CLOSETB02ACLOSETB02BMENS TOILETB0021MENS TOILETB0020MECHANICALB0062ELECB0063RESTROOMB0022LAUNDRYB07SPRINKLERB0060STORAGEB07VIF+/- 4' - 8 5/8"5"PN**PNB0042pSCPNB13PNPNB0041MARBLETHRESHOLDAA16010PCFT1CWT1CWT1B0022PSCFRPRBB07P16.3P16.1P16.1P14.3P16.1STAIRB0002**PAINT NEWWALLS ONLYSHELVING,NICTABLE,NICTABLE,NICMARBLETHRESHOLDFLOOR FINISH ASSCHEDULEDHOLLOW METAL ORALUMINUM DOORFRAMECENTERLINEOF DOORHOLLOW METAL ORALUMINUM DOOR FRAMECENTERLINEOF DOORDOORPLANSECTIONFLOOR FINISH ASSCHEDULEDMARBLE THRESHOLDTILEPORCELAIN,CERAMIC ORQUARRY TILE.SEE FINISHPLANS FORREQUIREDFINISH1/4"1/2"3/16"DOORMARBLE THRESHOLDCONCRETE FLOOR1/2"CERAMIC TILE1/4"NOTE:REFER TO SPECIFICATION FOR THRESHOLD TYPES.REFER TO FINISH PLAN FOR LOCATIONS, TYPICALTHRESHOLD TO MEET ADA CRITERIA AND REQUIREMENTS.RATED DOOR UNDERCUT DISTANCE TO MEET REQUIRED NFPA CRITERIA3/16"WALL TILECERAMIC TILE STRAIGHT TILE BASE 2" HEXAGON CERAMIC FLOOR TILEAT FLOOR TO WALL LOCATIONS BOTH TOHAVE TILE FINISH - FIRST USE CEMENT BASEDFLOOR LEVELING COMPOUND TO INSURE WALLTILE TO ALIGN WITH EDGE OF FLOOR FINISH,TYPICALDOORSOLID ALUMINUMTHRESHOLDWOOD FLOORINGCENTER JOINTUNDER DOORCARPETNOTE:REFER TO SPECIFICATIONS FOR TRANSITION AND TYPESREFER TO FINISH PLANS FOR ALL LOCATIONS, TYPICAL.THRESHOLD TO MEET ALL ADA CRITERIARATED DOOR UNDERCUT DISTANCE TO MEET REQUIRED NFPA CRITERIA3/8" THICK PANEL CLADWITH .040 ACROVYNCONSTRUCTION GRADEADHESIVE MOUNTEDPANEL TRIM TO RUN HORIZONTALAND VERTICAL AROUND ALL SIDESOF WALL PANELS - MITER ALLCORNERS FOR SMOOTH FINISH.CEILING TRIM FORHORIZONTAL EDGEPANEL INTERSECTIONSRUBBER BASECEILINGFACE OF GYP.ON METAL STUD.ENGSTATEOFNEWYOR K REENILANOISSEFORPDESNECIL079083KEVINCHARLESTERRYENGSTATEOFNEWYORKREENILANOISSEFORPDESNECIL079083KEVINCHARLESTERRY Date:Drawn By:Drawing Number:Project Number:1ABCDEFGHIJKLMN234567891011121314151617ABCDEFGHIJKLMNTetra Tech Engineers, Architects& Landscape Architects, P.C.CLEAR SOLUTIONScomplex worldARCHITECTS & ENGINEERS6 South AvenueIthaca, NY 14850Delta Upsilon Fraternity HouseInterior Renovations - Phase I6 South Ave08249-17002A1103/27/2017Basement Floor PlanKRGSCALE 3/16" = 1'-0"1Basement Floor PlanKey PlanN.T.S.NCornell Facilities Code: 4722Room Finish KeyC1 CARPET TYPE 1CFT1 CERAMIC FLOOR TILE - TYPE 1CT CERAMIC COVE BASECWT1 CERAMIC WALL TILE - TYPE 1FRP FIBERGLASS REINFORCED PANELS (LAMINATE IMPACT PANELS)N NO WORK REQUIREDP PAINT SURFACES INCLUDING SOFFITSRB RUBBER BASESC SEALED CONCRETE (PER SPEC SECTION 03 30 53)WD WOOD FLOORINGWC WALL COVERING * SEE REFLECTED CEILING PLANINDICATED CHANGE IN FLOOR FINISHNOTE: NOT ALL FINISHES LISTED ARE REQUIRED FOR THIS PROJECTFINISHES SHOWN IN ROOM FINISH BOX ARE FORALL WALLS AND ENTIRE FLOOR AND CEILINGREFER TO EACH ROOM FOR MORE INFORMATION.RM#CLG*FLR BASEWALLGeneral Finish Notes:ALL FINISH PRODUCTS ARE TO BE INSTALLED IN ACCORDANCE WITHCONTRACT SPECIFICATIONS AND MANUFACTURER'S INSTRUCTIONS. REFERTOSPECIFICATIONS AND FINISH DETAILS FOR ADDITIONAL INFORMATION ONINSTALLATION OF SPECIFIED MATERIALS,1. ALL PAINTS FOR INTERIOR AND EXTERIOR ARE TO BE APPLIEDIN ACCORDANCE WITH SPECIFICATION SECTION 09 91 00.2. IN AREAS INDICATED WITH ROOM FINISH BOX- EXPOSEDSTRUCTURES, INCLUDING BUT NOT LIMITED TOPIPING AND FIREPROOFING, CONDUIT AND ALL ASSOCIATEDEQUIPMENT ARE TO BE PAINTED.3. APPLY PAINT TO BOTH NEW AND EXISTING ITEMS IN ALL AREASINDICATED WITH A FINISH BOX AND/OR NOTES.4. FIELD AND ACCENT PAINT AS SHOWN ON DRAWINGS,CONTRACTOR IS TO ASSUME ALL FIELD AND ACCENT COLORSARE DIFFERENT ROOM TO ROOM. AS WELL AS WITHIN EACHROOM. REQUIREMENTS ARE TO INCLUDE BUT NOT LIMITED TO:-WALL, FIELD COLOR-WALL, ACCENT COLOR-CEILING CLOUDS, ACCENT COLOR5. PROVIDE PAINT AT ALL NEW SOFFITS, REFER TO REFLECTEDCEILING PLANS FOR ADDITIONAL LOCATIONS.6. ALL EXPOSED BRICK, GROUND FACE BLOCK IS TO REMAINUNPAINTED U.N.O.7. CERAMIC TILE IS TO RUN FLOOR TO CEILING U.N.O.8. PROVIDE TRANSITION STRIPS AT THE MIDDLE OF CLOSEDDOOR. REFER TO DETAILS.SCALE 1 1/2" = 1'-0"2ADA Marble Threshold DetailSCALE 12" = 1'-0"3Threshold DetailSCALE 3" = 1'-0"4Ceramic Tile Base at Ceramic FloorSCALE 6" = 1'-0"5Threshold DetailGeneral Plan Notes(2011-05)arch-plnA. WHERE EXISTING CONSTRUCTION IS DAMAGED OR DISTURBED,PATCH AS REQUIRED TO RESTORE SURFACES TO THEIRORIGINAL CONDITION.B. PARTITION TYPE TAGS APPLY TO ENTIRE LENGTH OF WALLINDICATED BY THAT TAG, REGARDLESS OF OPENINGS WITHINTHAT WALL, TYPICAL UNLESS NOTED OTHERWISE.1. ALL INTERIOR WALLS SHALL BE WALL/PARTITION TYPE P14.3,TYPICAL UNLESS NOTED OTHERWISE.C. REINSTALL BRONZE PLAQUE IN LOCATION SELECTED BY OWNER.PROVIDE PLASTER PATCH AT AREA OF DAMAGED WALL FINISH.MATCH EXISTING ADJACENT SURFACES FOR COLOR ANDTEXTURE. COORDINATE WITH DEMOLITION DRAWING.PROVIDE GLASS LITE IN EXISTING WOOD FRAME WINDOW. GLASSTYPE TO BE HS. MATCH EXISTING ADJACENT PROFILE ANDGLAZING PUTTY PROFILE. REFER TO ELEVATIONS. PAINTEXTERIOR OF WOOD WINDOWS TO MATCH EXISTING ADJACENTWINDOWS, INTERIOR AND EXTERIOR WINDOWS, VIF WHEREINTERIOR WINDOWS REMAIN.REMOVE, SALVAGE AND REPAIR EXISTING HARDWOOD PILASTERCONSTRUCTION. REINSTALL HARDWOOD PANEL TO MATCHEXISTING ADJACENT WOOD PILASTERSPROVIDE HARDWOOD WALL BASE PROFILE TO MATCH EXISTINGADJACENT BASE, STAIN ALL NEW WOOD TO MATCH EXISTINGADJACENT WOOD TRIMREPOSITION SHIFTED WOOD COLUMN TO ORIGINAL POSITION.SECURELY ATTACH BASE AND HEAD OF COLUMN. REINSTALL BASEAND HEAD TRIM.GAS FIRED APPLIANCE, REFER TO MECHANICAL AND PLUMBINGDRAWINGS.INSTALL CUSTOM WOOD CASEWORK FURNISHED BY OTHERS,COORDINATE WITH MECHANICAL, AND ELECTRICAL DRAWINGS.FURNISH WOOD FLOORING FROM SAME LOT AS THAT USED IN THEGREAT HALL AND CHAPTER ROOM. TURN OVER TO OWNER FORSTORAGE ON SITE. COORDINATE WITH OWNERSREPRESENTATIVE FOR LOCATION. (310sf, VIF)PROVIDE WOOD STAIR TREADS TO MATCH WOOD FLOORINGINSTALLED IN GREAT HALL.PROVIDE BASE TRIM CAP TO MATCH EXISTING ADJACENTPILASTERS FOR SPECIES, COLOR AND FINISH.PROVIDE COVE MOULDING TO MATCH EXISTING ADJACENT COVEMOLDING FOR SPECIES, COLOR AND FINISH.PROVIDE GYPSUM BOARD LAMINATED TO EXISTING WALLCONSTRUCTION. MATCH GYPSUM BOARD THICKNESS OFEXISTING, VIF. REINSTALL TRIM REMOVED AND TOUCH UPFINISHES AS REQUIRED. GYPSUM BOARD SURFACE TO RECEIVELEVEL 5 FINISH.PROVIDE WOOD MOLDING AT TOP EDGE OF FIREPLACE MANTEL.REFER TO ELEVATIONS. MATCH EXISTING TRIM PROFILE,SPECIES, COLOR, AND FINISH.Keyed Plan Notes(2011-05)arch-pln12345678910111213SCALE 12" = 1'-0"6FRP Laminated Panel DetailRev. No.: Date: Description:
DNDNDNDNDNDNDNDNDNTSDNDNA1703124102310211022101A1101A2GREAT HALL102CHAPTERROOM101LIBRARY101ASTUDY ROOM103DINING ROOM104DISH ROOM104ADUMBWAITER10061FOYER10040ELEC10062CLOSET105CLOSET106CLOSET108TERRECE-STAIR10001STAIR10003NORTH DECK-EAST PATIO-THICK LINE INDICATESAREA OF FULL WALLVINYL WALL COVERINGTYP.A1705*FINISH WOOD FLOOR AS PERSPECIFICATION, STAIN TO MATCHADJACENT WOOD COLOR AT ALLAREAS.-7777761615541043TYP2A11122222891112121011411113PWD*P, WCWD*102*PC1PWD101A*PWD**PWD**101**FINISH WOOD FLOOR AS PERSPECIFICATION, STAIN TO MATCHADJACENT WOOD COLOR AT ALLAREAS.INFILL WITH STUBJOISTS AND T&GWOOD DECKING TOMATCH EXGISTING, VIFA18011A18015A18019A18018A1808A1807A18010A1809A18013A180164TYP. BOTHSIDES OF HVACUNIT4TYP. BOTHSIDES OF HVACUNIT& 141' - 6"WOOD SILL AND SLOPEDWOOD BACK TO REMAINCUT BACK WOOD SEATTO A DEPTH OF 18", PROVIDEBULLNOSE EDGE. STAIN ALLAREAS TO MATCH ADJACENT.TYP.REMOVE OVERHANGBRACKET, STAIN REMOVEDAREAS TO MATCH ADJACENTTYP.ENGSTATEOFNEWYOR K REENILANOISSEFORPDESNECIL079083KEVINCHARLESTERRYENGSTATEOFNEWYORKREENILANOISSEFORPDESNECIL079083KEVINCHARLESTERRY Date:Drawn By:Drawing Number:Project Number:1ABCDEFGHIJKLMN234567891011121314151617ABCDEFGHIJKLMNTetra Tech Engineers, Architects& Landscape Architects, P.C.CLEAR SOLUTIONScomplex worldARCHITECTS & ENGINEERS6 South AvenueIthaca, NY 14850Delta Upsilon Fraternity HouseInterior Renovations - Phase I6 South Ave08249-17002A1113/27/2017First Floor PlanKRG/MHHSCALE 3/16" = 1'-0"1First Floor PlanKey PlanN.T.S.NCornell Facilities Code: 4722General Plan Notes(2011-05)arch-plnA. WHERE EXISTING CONSTRUCTION IS DAMAGED OR DISTURBED,PATCH AS REQUIRED TO RESTORE SURFACES TO THEIRORIGINAL CONDITION.B. PARTITION TYPE TAGS APPLY TO ENTIRE LENGTH OF WALLINDICATED BY THAT TAG, REGARDLESS OF OPENINGS WITHINTHAT WALL, TYPICAL UNLESS NOTED OTHERWISE.1. ALL INTERIOR WALLS SHALL BE WALL/PARTITION TYPE P14.3,TYPICAL UNLESS NOTED OTHERWISE.C. REINSTALL BRONZE PLAQUE IN LOCATION SELECTED BY OWNER.PROVIDE PLASTER PATCH AT AREA OF DAMAGED WALL FINISH.MATCH EXISTING ADJACENT SURFACES FOR COLOR ANDTEXTURE. COORDINATE WITH DEMOLITION DRAWING.PROVIDE GLASS LITE IN EXISTING WOOD FRAME WINDOW. GLASSTYPE TO BE HS. MATCH EXISTING ADJACENT PROFILE ANDGLAZING PUTTY PROFILE. REFER TO ELEVATIONS. PAINTEXTERIOR OF WOOD WINDOWS TO MATCH EXISTING ADJACENTWINDOWS, INTERIOR AND EXTERIOR WINDOWS, VIF WHEREINTERIOR WINDOWS REMAIN.REMOVE, SALVAGE AND REPAIR EXISTING HARDWOOD PILASTERCONSTRUCTION. REINSTALL HARDWOOD PANEL TO MATCHEXISTING ADJACENT WOOD PILASTERSPROVIDE HARDWOOD WALL BASE PROFILE TO MATCH EXISTINGADJACENT BASE, STAIN ALL NEW WOOD TO MATCH EXISTINGADJACENT WOOD TRIMREPOSITION SHIFTED WOOD COLUMN TO ORIGINAL POSITION.SECURELY ATTACH BASE AND HEAD OF COLUMN. REINSTALL BASEAND HEAD TRIM.GAS FIRED APPLIANCE, REFER TO MECHANICAL AND PLUMBINGDRAWINGS.INSTALL CUSTOM WOOD CASEWORK FURNISHED BY OTHERS,COORDINATE WITH MECHANICAL, AND ELECTRICAL DRAWINGS.FURNISH WOOD FLOORING FROM SAME LOT AS THAT USED IN THEGREAT HALL AND CHAPTER ROOM. TURN OVER TO OWNER FORSTORAGE ON SITE. COORDINATE WITH OWNERSREPRESENTATIVE FOR LOCATION. (310sf, VIF)PROVIDE WOOD STAIR TREADS TO MATCH WOOD FLOORINGINSTALLED IN GREAT HALL.PROVIDE BASE TRIM CAP TO MATCH EXISTING ADJACENTPILASTERS FOR SPECIES, COLOR AND FINISH.PROVIDE COVE MOULDING TO MATCH EXISTING ADJACENT COVEMOLDING FOR SPECIES, COLOR AND FINISH.PROVIDE GYPSUM BOARD LAMINATED TO EXISTING WALLCONSTRUCTION. MATCH GYPSUM BOARD THICKNESS OFEXISTING, VIF. REINSTALL TRIM REMOVED AND TOUCH UPFINISHES AS REQUIRED. GYPSUM BOARD SURFACE TO RECEIVELEVEL 5 FINISH.PROVIDE WOOD MOLDING AT TOP EDGE OF FIREPLACE MANTEL.REFER TO ELEVATIONS. MATCH EXISTING TRIM PROFILE,SPECIES, COLOR, AND FINISH.Keyed Plan Notes(2011-05)arch-pln12345678910111213Room Finish KeyC1 CARPET TYPE 1CFT1 CERAMIC FLOOR TILE - TYPE 1CT CERAMIC COVE BASECWT1 CERAMIC WALL TILE - TYPE 1FRP FIBERGLASS REINFORCED PANELS (LAMINATE IMPACT PANELS)N NO WORK REQUIREDP PAINT SURFACES INCLUDING SOFFITSRB RUBBER BASESC SEALED CONCRETE (PER SPEC SECTION 03 30 53)WD WOOD FLOORINGWC WALL COVERING * SEE REFLECTED CEILING PLANINDICATED CHANGE IN FLOOR FINISHNOTE: NOT ALL FINISHES LISTED ARE REQUIRED FOR THIS PROJECTFINISHES SHOWN IN ROOM FINISH BOX ARE FORALL WALLS AND ENTIRE FLOOR AND CEILINGREFER TO EACH ROOM FOR MORE INFORMATION.RM#CLG*FLR BASEWALLGeneral Finish Notes:ALL FINISH PRODUCTS ARE TO BE INSTALLED IN ACCORDANCE WITHCONTRACT SPECIFICATIONS AND MANUFACTURER'S INSTRUCTIONS. REFERTOSPECIFICATIONS AND FINISH DETAILS FOR ADDITIONAL INFORMATION ONINSTALLATION OF SPECIFIED MATERIALS,1. ALL PAINTS FOR INTERIOR AND EXTERIOR ARE TO BE APPLIEDIN ACCORDANCE WITH SPECIFICATION SECTION 09 91 00.2. IN AREAS INDICATED WITH ROOM FINISH BOX- EXPOSEDSTRUCTURES, INCLUDING BUT NOT LIMITED TOPIPING AND FIREPROOFING, CONDUIT AND ALL ASSOCIATEDEQUIPMENT ARE TO BE PAINTED.3. APPLY PAINT TO BOTH NEW AND EXISTING ITEMS IN ALL AREASINDICATED WITH A FINISH BOX AND/OR NOTES.4. FIELD AND ACCENT PAINT AS SHOWN ON DRAWINGS,CONTRACTOR IS TO ASSUME ALL FIELD AND ACCENT COLORSARE DIFFERENT ROOM TO ROOM. AS WELL AS WITHIN EACHROOM. REQUIREMENTS ARE TO INCLUDE BUT NOT LIMITED TO:-WALL, FIELD COLOR-WALL, ACCENT COLOR-CEILING CLOUDS, ACCENT COLOR5. PROVIDE PAINT AT ALL NEW SOFFITS, REFER TO REFLECTEDCEILING PLANS FOR ADDITIONAL LOCATIONS.6. ALL EXPOSED BRICK, GROUND FACE BLOCK IS TO REMAINUNPAINTED U.N.O.7. CERAMIC TILE IS TO RUN FLOOR TO CEILING U.N.O.8. PROVIDE TRANSITION STRIPS AT THE MIDDLE OF CLOSEDDOOR. REFER TO DETAILS.SCALE 1 1/2" = 1'-0"2Bench DetailRev. No.: Date: Description:
B6' - 5"B8' - 0"B8' - 0"B7' - 0"2A120EVARIESEVARIESEXISTING SOFFIT TO REMAIN,CONTINUE GYP SURFACE ONEXPOSED SIDE TO HIGHESTPOINT POSSIBLELOWERBASEMENTB04BEDROOMB01CLOSETB01ACLOSETB01BCLOSETB01CUPPERBASEMENTB0042BEDROOMB02VESTIBULEB0041ROOMB05KITCHENB06STORAGEB06ADRY STORAGEB06BMECHB06CFREZZER-COOLER-STAIRB0003DUMBWAITERB0061CLOSETB02ACLOSETB02BMENS TOILETB0021MENS TOILETB0020MECHANICALB0062ELECB0063RESTROOMB0022LAUNDRYB07SPRINKLERB0060STORAGEB07STAIRB0002PROVIDE LINTELPER LINTELSCHEDULE2' - 6 5/8"BRACE BACK TO STRUCTUREAT 4'-0" O.C. WITH METAL STUD5/8" TYPE "X" GYPSUM BOARD ON 35/8" METAL STUDS AT 16" O.C. ATTACHTO STRUCTURE ABOVEEXPOSED TEE SUSPENSIONSYSTEM BY CEILING SYSTEMMANUFACTURER5/8" TYPE "X" GYPSUM BOARD ONSUPPORT SYSTEMCORNER BEAD (TYP.)REFER TO RCPREFER TO RCPJ MOLD (TYP)REFER TO RCPENGSTATEOFNEWYOR K REENILANOISSEFORPDESNECIL079083KEVINCHARLESTERRYENGSTATEOFNEWYORKREENILANOISSEFORPDESNECIL079083KEVINCHARLESTERRY Date:Drawn By:Drawing Number:Project Number:1ABCDEFGHIJKLMN234567891011121314151617ABCDEFGHIJKLMNTetra Tech Engineers, Architects& Landscape Architects, P.C.CLEAR SOLUTIONScomplex worldARCHITECTS & ENGINEERS6 South AvenueIthaca, NY 14850Delta Upsilon Fraternity HouseInterior Renovations - Phase I6 South Ave08249-17002A1203/27/2017Basement Floor Reflected Ceiling PlanKRGSCALE 3/16" = 1'-0"1Basement Floor Refelected Ceiling PlanKey PlanN.T.S.NCornell Facilities Code: 4722NotesA. LIGHTING AND OTHER CEILING-MOUNTED FIXTURES ARE SHOWNFOR DRAWING CLARITY. COORDINATE ALL CEILING WORK PRIORTO INSTALLATION OF CEILING GRID.B. CEILING HEIGHT IS 9'-0" ABOVE FINISHED FLOOR (UNO).C. CENTER CEILING-MOUNTED ITEMS (LIGHTS, GRILLES, DETECTORS,SPRINKLER HEAD, ETC) WITHIN THE CEILING PANELS AND GRIDSUNLESS THE PANELS ARE SCORED. CENTER ITEMS WITHIN THEPATTERN OF SCORED PANELS.F. PATCH CEILING SYSTEMS TO REMAIN THAT HAVE BEEN DISTURBEDBY SCHEDULED WORK TO MATCH ADJACENT CONSTRUCTIONPRIOR TO PAINTING.G, DESIGNATES BOTTOM OF CEILING ABOVE FINISHED FLOOR AT THAT POINT UNO. DESIGNATION "ME" INDICATES MATCH EXISTING CEILING HEIGHT.Ceiling TypesACOUSTICAL PANEL CEILING. (1 HR RATEDFLOOR/CEILING UL# L202)PAINTED 1/2" GYPSUM CEILING BOARD ON SUPPORTMATERIALS (GRID SUSPENSION SYSTEM, TYP UNO). (1 HRRATED FLOOR/CEILING UL# L512)PAINTED EXPOSED STRUCTURAL SYSTEM, SUPPORTMATERIALS AND FASTENERS, MECHANICAL SYSTEM,ELECTRICAL ITEMS AND PIPING.UNPAINTED EXPOSED STRUCTURAL SYSTEM, SUPPORTMATERIALS AND FASTENERS, MECHANICAL SYSTEM,ELECTRICAL ITEMS AND PIPING.(2012-10)arch-clkyA1 X'-X"A1 X'-X"BX'-X"EX'-X"FX'-X"SCALE 1" = 1'-0"2Soffit DetailRev. No.: Date: Description:
A1 9' - 9"B9' - 9"A1 9' - 9"B9' - 9"2A121TYP2A121EQ14' - 0"EQEQ14' - 0"EQ2' - 0"23' - 11"+/- 1' - 6 1/2" VIFR 7' - 4"TYPEQ27' - 0"EQCHAPTERROOM101LIBRARY101AEXISTING PLASTERSOFFIT AND CEILNGCONSTRUCTION TOREMAINREPAIR JOINT AT SOFFIT,SEE PHOTO REFERENCECHANNELMOLDINGGYPSUM BOARDATTACHMENT CLIP#12 HANGER WIRE 4'-0" OCOR AS REQUIRED BY CODEREFERTO RCP5/8" GYPSUM BOARDMETAL EDGE BEADACOUSTICAL CEILING PANEL,REFER TO RCP FOR TYPETEE SUSPENSION SYSTEMEXISTING CROWNMOLDINGTO REMAIN, TYP. VIFSEE PLAN, TYP.ENGSTATEOFNEWYOR K REENILANOISSEFORPDESNECIL079083KEVINCHARLESTERRYENGSTATEOFNEWYORKREENILANOISSEFORPDESNECIL079083KEVINCHARLESTERRY Date:Drawn By:Drawing Number:Project Number:1ABCDEFGHIJKLMN234567891011121314151617ABCDEFGHIJKLMNTetra Tech Engineers, Architects& Landscape Architects, P.C.CLEAR SOLUTIONScomplex worldARCHITECTS & ENGINEERS6 South AvenueIthaca, NY 14850Delta Upsilon Fraternity HouseInterior Renovations - Phase I6 South Ave08249-17002A1213/27/2017First Floor Reflected Ceiling PlanKRGKey PlanN.T.S.NCornell Facilities Code: 4722SCALE 3/16" = 1'-0"1First Floor Reflected Ceiling PlanNotesA. LIGHTING AND OTHER CEILING-MOUNTED FIXTURES ARE SHOWNFOR DRAWING CLARITY. COORDINATE ALL CEILING WORK PRIORTO INSTALLATION OF CEILING GRID.B. CEILING HEIGHT IS 9'-0" ABOVE FINISHED FLOOR (UNO).C. CENTER CEILING-MOUNTED ITEMS (LIGHTS, GRILLES, DETECTORS,SPRINKLER HEAD, ETC) WITHIN THE CEILING PANELS AND GRIDSUNLESS THE PANELS ARE SCORED. CENTER ITEMS WITHIN THEPATTERN OF SCORED PANELS.F. PATCH CEILING SYSTEMS TO REMAIN THAT HAVE BEEN DISTURBEDBY SCHEDULED WORK TO MATCH ADJACENT CONSTRUCTIONPRIOR TO PAINTING.G, DESIGNATES BOTTOM OF CEILING ABOVE FINISHED FLOOR AT THAT POINT UNO. DESIGNATION "ME" INDICATES MATCH EXISTING CEILING HEIGHT.Ceiling TypesACOUSTICAL PANEL CEILING. (1 HR RATEDFLOOR/CEILING UL# L202)PAINTED 1/2" GYPSUM CEILING BOARD ON SUPPORTMATERIALS (GRID SUSPENSION SYSTEM, TYP UNO). (1 HRRATED FLOOR/CEILING UL# L512)PAINTED EXPOSED STRUCTURAL SYSTEM, SUPPORTMATERIALS AND FASTENERS, MECHANICAL SYSTEM,ELECTRICAL ITEMS AND PIPING.UNPAINTED EXPOSED STRUCTURAL SYSTEM, SUPPORTMATERIALS AND FASTENERS, MECHANICAL SYSTEM,ELECTRICAL ITEMS AND PIPING.(2012-10)arch-clkyA1 X'-X"A1 X'-X"BX'-X"EX'-X"FX'-X"SCALE 3" = 1'-0"2Ceiling DetailRev. No.: Date: Description:
TETRA TECH
ARCHITECTS & ENGINEERS
Drawing No.:
Rev.:Date:Tetra Tech Engineers, Architects & Landscape Architects, P.C.
Proj. No.: 08249-17002
Date:04/13/17
Drawn By: Author
BID-A180
6 South Avenue Ithaca, NY 14850
Great Hall Soffit Joint
Delta Upsilon Fraternity House Interior Renovations - Phase I
NTS20Great Hall Soffit Joint
REPAIR JOINT AT SOFFIT,
TYPICAL FULL LENGTH
TFOR EACH 4" THICKNESS OF WALLMASONRY5'-0"6'-0"7'-0"8'-0"9'-0"10'-0"L3 1/2X3 1/2X5/16FOR 6" THICK WALLS1. ALL OPENINGS 1'-0" AND OVER REQUIRE LINTELS.2. STEEL TO BE A36.3. THIS SCHEDULE IS TYPICAL FOR ALL MASONRY OPENINGS IN NON-LOAD BEARING WALLS UNLESS OTHERWISE NOTED.4. ALL LINTELS TO HAVE MINIMUM 8" BEARING BOTH ENDS.5. BACK TO BACK ANGLES ARE TO BE STITCH WELDED TOGETHER BEFORE PLACEMENT.6. ALL LINTELS ARE TO HAVE BOTH ENDS BEAR ON SOLID MASONRY OR SOLIDLY GROUTED HOLLOW MASONRY.7. WHERE MINIMUM 8" BEARING LENGTH CANNOT BE PROVIDED DUE TO COLUMN INTERFERENCE, PROVIDE CONNECTION OF LINTEL TO COLUMN.8. THIS LINTEL SCHEDULE IS APPLICABLE FOR USE IN EXISTING BUILDING. SHORE EXISTING STRUCTURE AND WALL AS REQD FOR INSTALLATIONOPENINGLINTELANGLEL4X3 1/2X 5/16 LLVL5X3 1/2X5/16 LLVL5X3 1/2X5/16 LLVL6X3 1/2X5/16 LLVL6X3 1/2X5/16 LLV2- L3 1/2X2 1/2X5/16 LLV2- L3 1/2X2 1/2X5/16 LLV2- L3X2 1/2X5/16 LLVANGLELINTELOPENING2- L2 1/2X2 1/2X5/168'-0"7'-0"6'-0"5'-0"MASONRYLINTEL NOTESFOR 8", 12", AND 16" THICK WALLS:FOR 4" THICK WALLSOPENINGMASONRYANGLELINTELMT 6X5.9UP TO 6'-4"1.3.2.( )<( )< DRAWINGS FOR SIZE AND LOCATION OF OPENINGS. OF NEW MAS AND LINTEL. SEE ARCHITECTURAL AND MECHANICALF.F.E.WALL BASESTEEL RUNNER TRACKGAP NOT TO EXCEED 1/2"5/8" GWB OR SUBSTRATE REQUIRED FORSCHED FINISHES EACH SIDE OF METAL STUDS.FOR FINISHES, REFER TO FINISH PLANS.BRACING 1 1/2" CONT. CHANNEL, SPACINGAS REQ'D BY METAL STUD MANUF.TOP DRYWALL SCREW (2 1/2" DOWN)TYPE KEYP12.3, P12.4, AND P12.6 (NO RATING)P13.3 UL DESIGN #U465 (1 HOUR)P13.4 UL DESIGN #U465 (1 HOUR)P13.6 UL DESIGN #U465 (1 HOUR)KEY LEGEND.3 = 3-5/8" MTL. STUDS.4 = 4" MTL. STUDS.6 = 6" MTL. STUDSREFER TO R.C.P. FOR CEILING INFOCONTINUOUS ACOUSTICAL SEALANT, TYP BSSTEEL RUNNER TRACKSOUND ATTENUATION BATTS,SIZED TO FIT STUD CAVITY"J" MOLD AT EXPOSED STRUCTURE, TYP BSCONTINUOUS ACOUSTICAL SEALANTAT NON-RATED WALLS1/2"BOTTOM OF STRUCTUREF.F.E.WALL BASESTEEL RUNNER TRACKGAP NOT TO EXCEED 1/2"2 LAYERS OF 5/8" GWB OR SUBSTRATE REQUIREDFOR SCHED FINISHES EACH SIDE OF METALSTUDS. FOR FINISHES, REFER TO FINISH PLANS.BRACING 1 1/2" CONT. CHANNEL, SPACINGAS REQ'D BY METAL STUD MANUF.TOP DRYWALL SCREW (2 1/2" DOWN)TYPE KEYP14.3 UL DESIGN #U411 (2 HOUR)P14.4 UL DESIGN #U411 (2 HOUR)P14.6 UL DESIGN #U411 (2 HOUR)KEY LEGEND.3 = 3-5/8" MTL. STUDS.4 = 4" MTL. STUDS.6 = 6" MTL. STUDSREFER TO R.C.P. FOR CEILING INFOCONTINUOUS ACOUSTICAL SEALANT, TYP BSSTEEL RUNNER TRACKSOUND ATTENUATION BATTS,SIZED TO FIT STUD CAVITY"J" MOLD AT EXPOSED STRUCTURE, TYP BSCONTINUOUS ACOUSTICAL SEALANTAT NON-RATED WALLS1/2"BOTTOM OF STRUCTUREF.F.E.WALL BASESTEEL RUNNER TRACKGAP NOT TO EXCEED 1/2"5/8" GWB OR SUBSTRATE REQUIRED FORSCHED FINISHES EACH SIDE OF METAL STUDS.FOR FINISHES, REFER TO FINISH PLANS.BRACING 1 1/2" CONT. CHANNEL, SPACINGAS REQ'D BY METAL STUD MANUF.TOP DRYWALL SCREW (2 1/2" DOWN)REFER TO R.C.P. FOR CEILING INFOCONTINUOUS ACOUSTICAL SEALANT, TYP BSSTEEL RUNNER TRACK"J" MOLD AT EXPOSED STRUCTURE, TYP BSCONTINUOUS ACOUSTICAL SEALANT1/2"BOTTOM OF STRUCTURETYPE KEYP16.3P16.4P16.6P16.1KEY LEGEND.3 = 3-5/8" MTL. STUDS.4 = 4" MTL. STUDS.6 = 6" MTL. STUDS.1 = 1 1/2" MTL. STUDSSEALANT, BOTH SIDESMETAL STUD PARTITION,TYPE VARIESHOLLOW METAL FRAME4"5/8"1/2"1 15/16"SEALANT, BOTH SIDESMETAL STUD PARTITION,TYPE VARIESHOLLOW METAL FRAME1/2"5/8"2"1 15/16"J-131 15/16"PART +1"PART +1"H-13SEALANT, BOTH SIDESEXISTING MASONRY ORCONCRETE, WIDTH VARIESSTEEL LINTEL SHOWN,CONDITION SIMILAR ATMASONRY LINTEL, REFERTO LINTEL SCHEDULEHOLLOW METAL FRAME,GROUT SOLID1/2"5/8"4"1 15/16"1 15/16"SEALANT, BOTH SIDESEXISTING MASONRY ORCONCRETE, WIDTH VARIESHOLLOW METAL FRAME,GROUT SOLID5/8"2"1 15/16"1 15/16"1/2"1/2"EXPANSION ANCHOR,COUNTERSINK, FILL, ANDGRIND SMOOTHJ-2H-2SEE DOOR SCHEDULE FORADDITIONAL INFORMATION.SEE DETAILS FOR DIMENSIONSFW1F16"3' - 8"6"7' - 0"3"1' - 2"6"2"VARIES2"7' - 0"4"REFER TOSCHEDULEFOR GLASSTYPEHOSPITALSTOPSSEE DOOR SCHEDULE FOR ADDITIONAL INFORMATIONFFG24VARIESVARIES6"2' - 8"6"8"5' - 5"11"3' - 8"7' - 0"FG5"VARIES5"5"7' - 4"8"8' - 5"FLUSH WOOD DOORSTILE AND RAILWOOD DOORWOOD TERRACE DOOR4' - 0" VIF3' - 4" VIFFFE2' - 11" VIFGLASS TYPE: FCE/FCAROD AND SEALANTBOTH SIDESALUMINUM WINDOWSYSTEMSHIMWRAP FRP PANEL WALLFINISH, PREPARESUBSTRATE AS REQUIREDFOR INSTALLATIONME, VIFEXISTING WALLCONSTRUCTION TOREMAIN, VIF1' - 6" VIFLEVEL SURFACEAS REQUIRED TO PROVIDEP16.1SOLID SURFACE WINDOWSTOOL BELOWVIF1"ME, VIFROD AND SEALANTBOTH SIDESALUMINUM WINDOWSYSTEMSHIMWRAP FRP PANEL WALLFINISH, PREPARESUBSTRATE AS REQUIREDFOR INSTALLATIONEXISTING WALLCONSTRUCTION TOREMAIN, VIF1' - 6" VIFLEVEL SURFACEAS REQUIRED TO PROVIDEP16.1VIFCORNER TRIM BY FRPPANEL MANUFACTUREREXISTING BRICK BEYONDALUMINUM WINDOW SYSTEMSOLID SURFACE WINDOW STOOLW/ TIERED BULLNOSE INSTALLEDON 3/4" MARINE GRADEPLYWOOD DUPONT CORIAN -COLOR BISQUE (A) ORAPPROVED EQUALSHIM, ROD AND SEALANTBOTH SIDESEXTRUDED ALUMINUM SILLRECEIVEREXISTING WALL CONSTRUCTIONTO REMAIN, VIFME, VIFCLEAN DEBRIS FROMBOTTOM OF WINDOWWELL, VIFP16.1VIFAS REQUIRED TO PROVIDE LEVEL SURFACE1' - 6" VIFNOTIFY ARCHITECT IF NO PITCHIS PRESENT AT EXISTING SILLTTDSDMMPTDRESTROOMB0022DOORLEVERACTIONHARDWAREMIRRORPAPER TOWELDISPENSERTO BOT OF3' - 4"3' - 10"3' - 6"ELEVATION GENERAL USEREFLECTIVE SURFACETOILETPAPERDISPENSERTO BOT1' - 6"8"SOAPDISPENSER3' - 2"F.F.E.WALL BASEGAP NOT TO EXCEED 1/2"5/8" GWB OR SUBSTRATE REQUIRED FORSCHED FINISHES EACH SIDE OF METAL STUDS.FOR FINISHES, REFER TO FINISH PLANS.REFER TO R.C.P. FOR CEILING INFO7/8" HAT CHANNELS AT 16" O.C.HORIZONTAL - SHIM AND PLUMB6' MINEXISTING WALL, VIF.PATCH EXPOSED PLASTER ATFRAMED OPENING REMOVAL TOMATCH EXISTING ADJACENTPLASTER SURFACE.PROVIDE WOOD TRIM TO MATCHEXISTING ADJACENT TRIMWOOD BLOCKING AS REQUIREDTO RESIZE OPENING,COORDINATE WITH DOORSCHEDULEWOOD FRAME1' - 2"ME5"PATCH EXPOSED PLASTER ATFRAMED OPENING REMOVAL TOMATCH EXISTING ADJACENTPLASTER SURFACE.PROVIDE WOOD TRIM TOMATCH EXISTING ADJACENTTRIM PROFILE, SPECIES ANDFINISHWOOD BLOCKING AS REQUIREDTO RESIZE OPENING,COORDINATE WITH DOORSCHEDULEWOOD FRAME5"LAMINATED GLASS LITE1' - 2" VIFENGSTATEOFNEWYOR K REENILANOISSEFORPDESNECIL079083KEVINCHARLESTERRYENGSTATEOFNEWYORKREENILANOISSEFORPDESNECIL079083KEVINCHARLESTERRY Date:Drawn By:Drawing Number:Project Number:1ABCDEFGHIJKLMN234567891011121314151617ABCDEFGHIJKLMNTetra Tech Engineers, Architects& Landscape Architects, P.C.CLEAR SOLUTIONScomplex worldARCHITECTS & ENGINEERS6 South AvenueIthaca, NY 14850Delta Upsilon Fraternity HouseInterior Renovations - Phase I6 South Ave08249-17002A1603/27/2017Partition Types, Door Schedule, Typesand DetailsKRGDoor ScheduleRoomNumberDoorNumberDoor FrameHDW Set Remarks Type Material Quantity Width Height Rating GlazingTypeMaterial Rating Glazing Head Jamb SillFG24 WD 1 3' - 8" 7' - 0" - - F1 HM - - - - - -101A 1 FG24 WD 1 3' - 8" 7' - 0" - LG FW1 WD - LG 9/A160 8/A160 - 4.0101A 2 FG24 WD 1 3' - 8" 7' - 0" - LG FW1 WD - LG 9/A160 8/A160 - 4.0102 1 FG WD 1 3' - 2" 8' - 5" - **EXGWD - - EXG EXG EXG 6.0 PROVIDE FIXED PANELS ON EACH SIDE OF DOOR IN EXG OPENINGS,VIF102 2 FG WD 2 2' - 11" 8' - 5" - ** EXG WD - - EXG EXG EXG 7.0 REINSTALL EXISTING SURFACE BOLTS102 3 FG WD 2 2' - 11" 8' - 5" - ** EXG WD - - EXG EXG EXG 7.0 REINSTALL EXISTING SURFACE BOLTSB03 1 F WD 1 3' - 0" 7' - 0" - - F1 HM - - H-13 J-13 - 1.0B03A 1 F WD 1 3' - 0" 7' - 0" 45 MIN - F1 HM 45 MIN - H-13 J-13 - 2.0B08 1 F WD 1 3' - 0" 7' - 0" - - F1 HM - - H-13 J-13 * 3.0B09 1 F WD 1 3' - 4" 7' - 0" 45 MIN - F1 HM 45 MIN - H-2 J-2 - 5.0SCALE 1 1/2" = 1'-0"1Metal Stud Partition Type P12 and P13SCALE 1 1/2" = 1'-0"2Metal Stud Partition Type P14SCALE 1 1/2" = 1'-0"3Metal Stud Partition Type P16SCALE 1 1/2" = 1'-0"7Hollow Metal Frame DetailsSCALE 1/4" = 1'-0"6Frame TypesSCALE 1/4" = 1'-0"5Door TypesSCALE 1/4" = 1'-0"Window TypesSCALE 1 1/2" = 1'-0"15Window Jamb DetailSCALE 1 1/2" = 1'-0"13Window Head DetailSCALE 1 1/2" = 1'-0"14Window Sill DetailRev. No.: Date: Description:SCALE 1/2" = 1'-0"10Restroom B0021 Enlarged PlanToilet Room Accessory ScheduleItem Description CommentsMM MIRROR, GLASS CENTER OVER LAVATORYPTD SURFACE MOUNT PAPER TOWEL DISPENSERSD SOAP DISPENSER COORDINATE FINAL MOUNTING LOCATION WITHOWNERTTD TOILET TISSUE DISPENSERSCALE 1/2" = 1'-0"11Toilet Accessories - Mounting HeightsSCALE 12" = 1'-0"12Lintel ScheduleSCALE 1 1/2" = 1'-0"4Metal Stud Partition Type P21SCALE 1 1/2" = 1'-0"8Jamb DetailSCALE 1 1/2" = 1'-0"9Head DetailKey PlanN.T.S.NCornell Facilities Code: 4722* MARBLE THRESHOLD** INSULATED GLAZING PROVIDED BY WOOD TERRACE DOOR MANUFACTURER
GAS INSERT IN EXISTINGFIREPLACE, SEEMECHANICAL DRAWINGS.CUSTOM SURROUND TOCOVER MASONRY SURFACESON ALL SIDES. TYPICAL ATLIBRARY AND CHAPTERROOM.EXISTING WOOD MANTELTO REMAINREPLACE DAMAGEDMOLDING AT TOP OFEXISTING MANTEL, TYP 3SIDESPROVIDE WALL INFILL TOMATCH EXISTINGCONSTRUCTION ASREQUIRED FOR DOORINSTALLATION. PLASTERFINISHES TO MATCHEXISTING ADJACENTSURFACES FOR TEXTURE,TYP OF 2101A1101A28A1705"5"EQ3"4' - 11"3"EQ2' - 6"PROVIDEREPLACEMENT GLASSLIGHTS ON INNER SETOF WINDOWSREPLACE GLAZINGPUTTY AT INTERIORWOOD WINDOWSYSTEMREPLACE GLAZINGPUTTY AT EXTERIORLIGHT INDICATED ONLYPROVIDE FULL FINISHEDSIDE SUPPORT PANELSSIMILAR TO INTERMEDIATEPANELS - TYP BOTH SIDES .CASEWORK FURNISHED BY OWNERTO BE INSTALLED BY CONTRACTOR.DETAILS ARE SHOWN FORREFERENCE AND CLARITY7A1709A1703' - 9"4' - 4"2' - 0"2' - 3"4' - 3"2 9/16"6"CASEWORK FURNISHED BY OWNERTO BE INSTALLED BY CONTRACTOR.DETAILS ARE SHOWN FORREFERENCE AND CLARITYPROVIDE TWO SLIDEBOLTS PER DOORTYP. ALL DOORSPIPE CHASEFOR HVACPROVIDE EQUALLYDIVIDED LITES BOTHVERTICALLY ANDHORIZONTALLYREFER TO ELEVATION4/A170. TYP. ALL DOORSWITH DIVIDED LITES.6A1706"2' - 1"6' - 5"2 9/16"4' - 0"4' - 0"4' - 0"CASEWORK FURNISHED BY OWNERTO BE INSTALLED BY CONTRACTOR.DETAILS ARE SHOWN FORREFERENCE AND CLARITYEQEQEQEQEQEQEQEQPROVIDE EQUALLY SPACEDLITES AS SHOWN - TYPALL DOORS6' - 2"1' - 10 1/2"PROVIDE TWO SLIDEBOLTS PER DOORTYP. ALL DOORS102110231022PROVIDE IN OPERABLE PANELS TOMATCH DOOR 102/1 TO FITEXISTING OPENINGS, VIF8' - 5 1/4"First Floor100' - 0"1" THICK OAK VENEER PLYWOOD ATBACK WALL, TOP AND BOTTOM.1" THICK OAK PLYWOOD BACK WITHFABRIC COVERED TACKABLE SURFACE-FULL HEIGHT AND LENGTH OF EACHSECTION.ADJUSTABLE TEMPERED GLASSSHELVES, TYP. 2 PER EACH SECTION.1" THICK OAK VENEER PLYWOODBOTTOMLED STRIP LIGHT-REFER TOELECTRICAL DRAWINGS.PROVIDE FULL DEPTH AND FULL LENGTHPULL OUT WOOD DRAWERS, HIGH BACK,WITH SLOPED SIDES TO FRONT STOP ASSHOWN - TYP. 3 PER SECTION.PROVIDE LOCKS ON ALL DOORS-TYP.CAP MOLDING SIM. TO"WOOD MOLDING PROFILE"#WM51BASE MOLDING SIM. TOWOOD MOLDING PROFILE#WM7406"1" THICK OAK VENEERPLYWOOD CAP WITHBULLNOSE AS SHOWN1 X 4 OAK TRIM1" THICK OAK VENEERPLYWOOD FACE PANEL1 X 4 OAK TRIM10"6" METAL GRILLEREFER TO NOTESOAK BASE7 1/2"6" METAL GRILLEREFER TO NOTESHEATING ELEMENT REFER TO HVAC DWGS.2' - 6"2' - 0"1" THICK OAK CAP WITH BULLNOSEEDGE, OVERHANG EACH SIDE 1"3" THICK SOLID OAK CENTER DIVIDER ANDBASE PANEL. PROFILE EDGE AS SHOWNSTRAIGHT FINISHED BACK.2' - 5 1/2"2' - 8"PROVIDE 6" X 3" DEEPELECTRICAL TROUGH ATBACK OF CARREL SURFACEAS SHOWN, COORDINATEPOWER STRIP WITHELECTRICAL DRAWINGS.EXISTING WOOD HEATINGELEMENT ENCLOSURE TOREMAIN2" THICK OAK WORKSURFACEWITH BREADBOARD EDGE2' - 6"6"2 1/4"4"3/4"EXISTING TOP GRILLETO REMAIN1" THICK OAK VENEERPLYWOOD FACE PANELAND ELEC TROTH, TYP.NEW BASE GRILLESEE NOTES.1" THICK OAK VENEER FACEDFINISHED PLYWOOD AT BACK WALL,TOP AND BOTTOM.ADJUSTABLE 1" THICK OAK SHELVES,TYP. 3 PER EACH SECTION.LED STRIP LIGHT-REFER TOELECTRICAL DRAWINGS.CAP MOLDING SIM. TOWOOD MOLDING PROFILE#WM51BASE MOLDING SIM. TOWOOD MOLDING PROFILE#WM7402' - 6"2' - 1"PROVIDE ALUM. BRUSH GROMMETSIM TO DOUG MOCKETT MAX6-942" FROM BACK, CENTER ON WORK-SURFACE.PROVIDE 1" THICK OAK FINISHEDADJUSTABLE SHELF PER SECTIONALLOW 3" SPACE AT THE BACK FORWIRES/CORDS AS SHOWN.6"PROVIDE 6" PIPE CHASE AT BACKPANEL FOR LEFT SIDE CABINETONLY.1' - 2"11' - 0"2' - 6"1 1/2"SOLID WOOD TOP WITH BUILT UPEDGE, PROVIDE BREADBOARDEDGE DETAIL AT EACH END.PROVIDE QUARTER ROUND OAKMOLDING SIMILAR TO WOOD MOULDING PROFILEMW103 1 1/16" AT TOP AND AROUND FACE AS SHOWN.PROVIDE HALF ROUND OAKMOLDING SIMILAR TO WOOD MOULDINGPROFILE WM120 1/2" X 1" AROUNDFACE AND SIDES AS SHOWN.PROVIDE FLOOR BASE OAK MOLDINGBASE SIMILAR TO WOOD MOULDING PROFILEWM622, 3 1/3" H, PROVIDE OAK BASE MOULDINGPROFILE WM425 IN FRONT OF BASE MOULDINGAS SHOWNOAK BASE WITH ROUNDED EDGESALL SIDES.4"2"4" X 4" HOLLOW OAK STRETCHERAS SHOWN, REFER TOP DETAILPEGGED STRETCHER ENDSTYPICAL BOTH SIDESRECESSED VERTICALFOR ELECTRICALWIRE.11A170Sim12A170Sim2' - 1"2' - 1"EQEQ2"EQ2"ELECTRICAL POWER BOXESELECTRICAL BOX SPACING- PLAN8"3"SOLID WOOD TOP WITH BUILT UPEDGE, PROVIDE BREADBOARDEDGE DETAIL AT EACH END.PROVIDE QUARTER ROUND OAKMOLDING SIMILAR TO WOOD MOULDING PROFILEMW103 1 1/16" AT TOP AND AROUND FACE AS SHOWN.PROVIDE HALF ROUND OAKMOLDING SIMILAR TO WOOD MOULDINGPROFILE WM120 1/2" X 1" AROUNDFACE AND SIDES AS SHOWN.PROVIDE FLOOR BASE OAK MOLDINGBASE SIMILAR TO WOOD MOULDING PROFILEWM622, 3 1/3" H, PROVIDE OAK BASE MOULDINGPROFILE WM425 IN FRONT OF BASE MOULDINGAS SHOWN1 1/2"6 3/4"2' - 6"1' - 7"2 3/4"2' - 0"2' - 8"3' - 8"OAK BASE WITH ROUNDED EDGESALL SIDES.4' - 6"2' - 6"3' - 8"4"PROVIDE OAK VENEER PLYWOOD ATINTERNAL ELECTRICAL TRY 3/4" THICKAS SHOWN. PROVIDE 3/4" INTERNAL,HORIZONTAL SURFACE FOR ELECOUTLETS, RECESS AS SHOWN. PROVIDEOPENING AT END TO ALLOW ELEC CABLETO FOLLOW END PANEL DOWN TO HOLLOWSTRINGER AS SHOWN.7 1/2"5 1/2"4"4"REFER TO ELECTRICAL DRAWINGSFOR BOX TYPES AND SIZES.ELECTRICAL RECESSED TRAYIS TYPICAL AT LIBRARY CARRELSECTIONS AND WORKSURFACE.3"PROVIDE MOVABLE BOTTOM PANELFOR ELECTRICAL ACCESS.PROVIDE "LADDER STYLE "WOOD SLATS AT BOTTOM OF STRINGERFOR POWER CORD SUPPORTENGSTATEOFNEWYOR K REENILANOISSEFORPDESNECIL079083KEVINCHARLESTERRYENGSTATEOFNEWYORKREENILANOISSEFORPDESNECIL079083KEVINCHARLESTERRY Date:Drawn By:Drawing Number:Project Number:1ABCDEFGHIJKLMN234567891011121314151617ABCDEFGHIJKLMNTetra Tech Engineers, Architects& Landscape Architects, P.C.CLEAR SOLUTIONScomplex worldARCHITECTS & ENGINEERS6 South AvenueIthaca, NY 14850Delta Upsilon Fraternity HouseInterior Renovations - Phase I6 South Ave08249-17002A1703/27/2017Interior ElevationsKRG/MHHSCALE 1/2" = 1'-0"1Library Interior Elevation - WestSCALE 1/2" = 1'-0"2Library Interior Elevation - NorthSCALE 1/2" = 1'-0"3Library Interior Elevation - EastSCALE 1/2" = 1'-0"4Library Interior Elevation - SouthSCALE 1/2" = 1'-0"5Great Hall Interior Elevation - WestSCALE 1/2" = 1'-0"6Tall Display Section DetailSCALE 1/2" = 1'-0"7Heating Element Enclousure SectionSCALE 1/2" = 1'-0"8Carrel SectionGENERAL NOTES FOR CABINETS :-ALL SIDES, TOPS, BOTTOMS TO BE FINISHED OAK UNLESS NOTEDOTHERWISE.-ALL DOORS TO HAVE LOCKS, TYP, COORDINATE KEYINGWITH OWNER.-ALL WOOD MOLDINGS AND TRIMS TO BE OAK.-ALL METAL GRILLE COVERS SIMILAR TO "VENT AND COVER"CUSTOM GRILLED AND REGISTERS, BRONZE SERIES STYLE TUSCAN6" WIDE- 4 EQUAL GRILLES, BOTH TOP AND BOTTOM, VIF-SEEELEVATION.-ALL DOORS TO BE FLUSH MOUNTED.- ALL DOOR LATCHES TO BE SIMILAR TO "ROCKLER" 5148-VB-PBERENSON CONVERTIBLE LATCH IN BRONZE.ALL HINGES TO BE SIMILAR TO "ROCKLER" DELUXE BUTT HINGES2"L X 1-3/4"W, BALL TIP WITH SWAGED LEAF DESIGN OIL RUBBEDBRONZE FINISH.ALL DOORS TO BE SIMILAR TO "ROCKLER" AUBURN SHAKER STYLE FLATPANEL CABINET DOOR- NO CENTER RAIL. OAK, STAIN TO BESELECTED.-ALL GLASS FRONT OAK CABINET DOORS TO BE SIMILAR TO"ROCKLER" REVERE TRADITIONAL STYLE FRAMED CABINET DOORSIZES AS SHOWN ON DRAWINGS. TRUE DIVIDED LITES, BOTHSIDES. LAMINATED GLASS, TYP.PROVIDE 2 SLIDE BOLTS BER DOOR, AT BOTH TOP AND BOTTOM, SIM"ROCKLER" SLIDING BOLT #30923, BRONZE FINISH.SCALE 1/2" = 1'-0"9Printer Station SectionSCALE 1" = 1'-0"10Trestle Tables -Side ElevationRev. No.: Date: Description:SCALE 1" = 1'-0"11Trestle Table End ElevationSCALE 1" = 1'-0"12Trestle Tables -End SectionCASEWORK INCLUDING TABLE ARE FURNISHED BY OWNER ANDINSTALLED BY CONTRACTOR. DETAIL AND SPECS ARE SHOWN FORREFERENCE AND CLARITY. COORDINATE WITH HEATING ANDELECTRICAL DRAWINGS.Key PlanN.T.S.NCornell Facilities Code: 4722-ALL HARDWARE NOTES ON DRAWINGS AND DETAIL TO BE SIMILAR TO"ROCKLER WOODWORK AND HARDWARE, ALL MILLWORK TRIM SIMILARTO WHOLESALE MILLWORK COMPANY. .
WIDTH OF TRIM IS 5", TYPICAL AT CHAPTER ROOM AND LIBRARYHEIGHT OF TRIM IS APROXIMATLY 10" OVERALLHEIGHT OF TRIM IS APROXIMATLY 10" OVERALLRESECURE LOOSETRIM, TYPICALPROVIDE BASE CAP TRIMTO MATCH EXISTING,TYPICAL AT LOCATIONSOF MISSING TRIM. SEEPLANS FOR LOCATIONSCENTER COLUMN ON COLUMN BASE.PROVIDE COVE TRIM TO MATCHSIMILAR COLUMNS IN GREAT HALLRESET COLUMN TO BE CENTEREDON EXISTING WOOD CAPTYPICAL PLASTER CROWM MOLDINGDETAIL IN GREAT HALL, COORDINATEWITH SCHEDULED FINISHESPROVIDE BASE CAP TRIMTO MATCH EXISTING,TYPICAL AT LOCATIONSOF MISSING TRIM. SEEPLANS FOR LOCATIONSEXISTING PLASTER CROWNMOLDING AT CHAPTER ROOMAND LIBRARY TO REMAIN, VIF.REPLACE DAMAGED BASE TRIM. PROVIDEBACKING STRUCTURE AS REQUIRED, VIFREPALCE TOP MOLDING AT PERIMIETEROF MANTEL, MATCH EXISTING TRIMPROFILE. TRIM IS APPROXIMATLY 27/16" DEEP AND 1 7/8" HIGH, VIFPATCH AREAS OF PALSTERDAMAGE TO MATCH EXISTINGADJACNET SURFACES.REMOVE MATERIAL AT PLASTER ATCRACKS AS REQUIRED TO PATCH, PATCHWITH SIMLAR MATERAILS TO MATCHEXISTING ADJACNET SURFACES, VIF. TYP.ENGSTATEOFNEWYOR K REENILANOISSEFORPDESNECIL079083KEVINCHARLESTERRYENGSTATEOFNEWYORKREENILANOISSEFORPDESNECIL079083KEVINCHARLESTERRY Date:Drawn By:Drawing Number:Project Number:1ABCDEFGHIJKLMN234567891011121314151617ABCDEFGHIJKLMNTetra Tech Engineers, Architects& Landscape Architects, P.C.CLEAR SOLUTIONScomplex worldARCHITECTS & ENGINEERS6 South AvenueIthaca, NY 14850Delta Upsilon Fraternity HouseInterior Renovations - Phase I6 South Ave08249-17002A1803/27/2017Photo ReferencesKRGRev. No.: Date: Description:NTS16Great Hall RegisterNTS1Typical Trim at Library and Chapter RoomNTS2Typical Base Molding at Library and ChapterRoomNTS3Typical Trim at Great HallNTS4Typical Base Molding at Great HallNTS5Typical Plinth Block at Library and ChapterRoomSCALE 1" = 1'-0"6Typical Pilaster Base at Great HallSCALE 1" = 1'-0"7Shifted Column Base at Great HallNTS8Shifted Column Top at Great HallSCALE 1" = 1'-0"10Damaged Pilaster at Great HallSCALE 1" = 1'-0"9Pilaster Missing Base CapNTS12Crown Molding at Library and Chapter RoomNTS11Base Trim to be Replaced at Chapter RoomNTS13Library FireplaceNTS14Library Fireplace Mantel TrimNTS15Chapter Room FireplaceNTS17Inner Window at LibraryNTS18Plaster Damage at Library FireplaceNTS19Plaster Cracking at Library PilasterWIDTH OF TRIM IS 6", TYPICAL AT GREAT HALLPROVIDE PLINTH BLOCK AT DOORS BETWEEN LIBRARYAND CHAPER ROOM, TYPICAL BOTH SIDES OF OPENINGSPATCH AREAS OF PALSTERDAMAGE TO MATCH EXISTINGADJACNET SURFACES.Key PlanN.T.S.NCornell Facilities Code: 4722
POCREMOVE UNITHEATER ANDBRANCH PIPINGBACK TO MAIN. CAPAT MAIN.BOILER ROOMEXISTING HEATINGHOT WATERDISTRIBUTIONEXISTING HEATINGHOT WATERDISTRIBUTIONEXISTING HEATINGHOT WATERDISTRIBUTIONREMOVE BOILER VENT ANDCOMBUSTION AIR DUCTFROM EXTERIOR WALLTERMINATION TO BOILERROOM. REMOVEENCASEMENT DUCTWORKACROSS CORRIDOR.REMOVE CONDENSATEPUMP AND PIPING. STORETERMINATIONS FORREINSTALLATION.KITCHENB06DRY STORAGEB06BMECHB06CMECHANICALB0062MENS TOILETB0021BEDROOMB01UPPERBASEMENTB0042LOWERBASEMENTB04BEDROOMB02STORAGEB07SPRINKLERB0060LAUNDRYB07ELECB0063VESTIBULEB0041STAIRB0003POCREMOVE HEATING HOTWATER PIPING ANDREROUTE INCORRIDOR.EXISTING EXHAUSTDUCT , 20" X 7".EXISTINGCHIMNEYENGSTATEOFNEWYOR K REENILANOISSEFORPDESNECIL079083KEVINCHARLESTERRYENGSTATEOFNEWYORKREENILANOISSEFORPDESNECIL079083KEVINCHARLESTERRY Date:Drawn By:Drawing Number:Project Number:1ABCDEFGHIJKLMN234567891011121314151617ABCDEFGHIJKLMNTetra Tech Engineers, Architects& Landscape Architects, P.C.CLEAR SOLUTIONScomplex worldARCHITECTS & ENGINEERSCornell UniversityIthaca, NYDelta Upsilon Fraternity HouseInterior Renovations6 South Ave08249-17002M-1003/27/2017Basement Demolition PlanAuthor SEVSCALE 1/4" = 1'-0"1Basement Mechanical Demolition PlanKey PlanN.T.S.NCornell Facilities Code: 472217.ALL EXCESS MATERIALS AND SCRAPS ARE CONTRACTOR'SPROPERTY. PROMPTLY REMOVE FROM SITE UNLESS SPECIFICALLYDIRECTED OTHERWISE.18.EXISTING HVAC COMPONENTS IN THIS BUILDING MAY CONTAIN, BEIN PROXIMITY TO, OR, WORK ON THEM MAY CAUSE DISTURBANCE OF,ASBESTOS CONTAINING OR OTHER HAZARDOUS MATERIALS. REFER TOABATEMENT SERIES DRAWINGS AND SPECIFICATIONS COMPLETE FORADDITIONAL INFORMATION. PROVIDE FOR RE-INSULATION ASSPECIFIED FOR ALL EXISTING TO REMAIN HVAC COMPONENTS WHEREINSULATION IS REMOVED AS A PART OF ABATEMENT WORK.Rev. No.: Date: Description:GENERAL NOTES1.REMOVAL INDICATED ON M-SERIES DRAWINGS DOES NOT NECESSARILYINDICATE FULL EXTENT OF PROJECT'S DEMOLITION WORK. COORDINATEWORK IDENTIFIED ON ALL OTHER DEMOLITION AND ABATEMENT DRAWINGSPRIOR TOBEGINNING ANY DEMOLITION WORK. COORDINATE EXACTLOCATIONS AND EXTENTS OF DEMOLITION WORK (VIF, TYP ALL) WITHAPPROPRIATE NEW WORK DRAWINGS PRIOR TO BEGINNING ANY DEMOLITIONWORK, TYPICAL. ASBESTOS ABATEMENT WILL REQUIRE PRE-ABATEMENTREMOVALS OF SELECT UTILITIES AND MAY REQUIRE INSTALLATION OF NEWOR TEMPORARY SUPPORT METHODS FOR PIPE HANGERS, BRACKETS,ETC. THAT ARE FASTENED TO ACM SURFACES TO BE REMOVED.2.THE FOLLOWING GENERAL NOTES APPLY TO ALL "M" SERIES DRAWINGS.3.REFER TO ALL CONTRACT DOCUMENTS; DRAWINGS AND SPECIFICATIONS,FOR DETAILED STANDARDS AND REQUIREMENTS.4.REPORT UNSAFE OR UNSATISFACTORY CONDITIONS IN WRITING TOOWNER AND ARCHITECT AND RESOLVE ISSUES BEFORE PROCEEDING.5.WORK INCLUDES ALL LABOR AND MATERIALS REQUIRED TO PROVIDECOMPLETE WORKING SYSTEMS.6.COORDINATE PHASING REQUIREMENTS AT JOB MEETINGS AND ON WORKSCHEDULES.7.DO NOT SCALE DRAWINGS. PIPING AND DUCTWORK ARE SHOWNDIAGRAMMATICALLY. IT IS NOT POSSIBLE TO SHOW EVERY TRANSITION,FITTING, ASPECT RATIO CHANGE, ETC..; PROVIDE AS REQUIRED TO FITWITHIN STRUCTURAL CONSTRAINTS. EXAMINE CONDITIONS UNDER WHICHTHE WORK IS TO BE PERFORMED AND VERIFY ALL ACCESS, LOCATIONS,DIMENSIONS, ARRANGEMENTS, ELECTRICAL CHARACTERISTICS, ANDINTERFERENCE IN THE FIELD PRIOR TO BID.8.VERIFY EXTENT OF CEILING WORK SHOWN ELSEWHERE IN THE CONTRACTDOCUMENTS. PROVIDE FOR ADDITIONAL CEILING SYSTEM REMOVAL,PROTECTION, AND REINSTALLATION AS REQUIRED FOR CONTRACT WORK.9.DEMOLITION DRAWINGS SHOW THE GENERAL SCOPE OF ITEMS ANDSYSTEMS TO BE REMOVED. IT IS NOT THE INTENT TO SHOW ALL ITEMS TO BEREMOVED. FIELD VERIFY AND REMOVE ALL ASSOCIATED ITEMS BACK TOPOINT OF CONTINUED SERVICE, UNLESS OTHERWISE NOTED. VERIFY WHATALL EQUIPMENT SERVES PRIOR TO REMOVAL.10.GIVE ALL REMOVED EQUIPMENT TO THE OWNER. DELIVER ON SITE WHEREDESIGNATED BY THE OWNER. PROMPTLY REMOVE FROM THE SITE ANDLEGALLY DISPOSE OF ANY SUCH ITEMS DECLINED BY OWNER.11.IF UNANTICIPATED MECHANICAL, ELECTRICAL, OR STRUCTURALCONFLICTS ARE ENCOUNTERED, INVESTIGATE AND REPORT BOTH NATUREAND EXTENT OF THE CONFLICT. RE-ROUTE WORK OR EXISTING ELECTRICALOR PLUMBING AS REQUIRED.12.CUT, DRILL, OR OTHERWISE CREATE OPENINGS AS NEATLY AS POSSIBLE,AS REQUIRED FOR THE INDICATED CONTRACT WORK. PROVIDE SUPPORTAS REQUIRED FOR AND USE METHODS LEAST LIKELY TO DAMAGE ELEMENTSTO REMAIN. PRIOR TO WORK, VERIFY LOCATIONS OF ALL STRUCTURALMEMBERS INCLUDING CROSS BRACING, ELECTRICAL WIRING, PLUMBING, ETC.PROMPTLY NOTIFY ARCHITECT OF ANY CONFLICTS. DO NOT CUT ANYSTRUCTURAL MEMBERS OR OTHER SERVICES UNTIL SPECIFICALLYDIRECTED TO DO SO. PENDING RECEIPT OF DIRECTIVE, REARRANGESCHEDULE AS NECESSARY TO CONTINUE OVERALL JOB PROGRESSWITHOUT DELAY.13.PATCH ALL DISTURBANCES RESULTING FROM DEMOLITION OR NEW WORKTO MATCH SURROUNDING SURFACES. PATCH FOLLOWING DEMOLITION, ANDAGAIN FOLLOWING CONTRACT WORK. WHERE HOLES REMAIN FROMREMOVALS, INFILL AND PATCH TO MATCH UNLESS HOLE IS TO BE REUSED.14.PROTECT ALL CONTRACT EQUIPMENT, ELEMENTS TO REMAIN, OWNER'SBELONGINGS, AND EQUIPMENT TO BE REUSED OR RETAINED BY OWNERDURING ALL CONTRACT WORK. AT NO ADDITIONAL COST TO OWNER REPAIROR REPLACE ITEMS WHICH ARE DAMAGED.15.THOROUGHLY CLEAN FOLLOWING DEMOLITION AND BEFORE BEGINNINGCONTRACT INSTALLATIONS. THOROUGHLY CLEAN AGAIN DURING ANDFOLLOWING CONTRACT WORK AS REQUIRED. LEAVE ALL WORK AREASCLEANER THAN FOUND. LEGALLY DISPOSE OF ALL CONSTRUCTION DEBRIS.16.PROVIDE TEMPORARY PIPING, DUCT, HEAT, WEATHERPROOFING ETC.. TOSERVICES TO REMAIN UNTIL PERMANENT INSTALLATIONS CAN BE MADE.
DDDWWWTSTSCUT HOLE IN MASONRY FOR PASSAGE OF DRYER VENTS.PROVIDE EACH DRYER 4" DRYER VENT TERMINAL WITHBACKDRAFT DAMPER, SEIHO SFB-PRUN 4" GALVANIZED STEEL WITH CAM LOCKCONNECTIONS FROM VENT TERMINAL TO DRYERCONNECTION.CUHB-13/4" HWSAND HWR DNTO CUHB-1.1-1/2" HWS &HWR UP, EXG3/4" HWSUP, EXG3/4" HWS &HWR UP, EXGBOILER ROOMEXISTING HEATINGHOT WATERDISTRIBUTIONEXISTING HEATINGHOT WATERDISTRIBUTIONEXISTING HEATINGHOT WATERDISTRIBUTIONPROVIDE ELECTRIC SUPPLY LEG TOEACH DRYER WITH CURRENTSWITCH WATT-STOPPER RELAY. 12X 12 AAD TO OPEN ON ANYCURRENT SWITCH ACTIVATION.PROVIDE EACH DRYER WITH A RECESSED DRYER BOX.DRYERBOX MODEL DB-480.1M-501POCKITCHENB06DRY STORAGEB06BMECHB06CMECHANICALB0062BEDROOMB02BEDROOMB01UPPERBASEMENTB0042LOWERBASEMENTB04VESTIBULEB0041ELECB0063LAUNDRYB07169 SFSTAIRB0003MENS TOILETB0021MENS TOILETB0020POC6"x6"G-A50 CFMPOCPOCRUN 4" CPVC BOILERVENT AND COMBUSTIONAIR TO NEWTERMINATIONS ONEXTERIOR WALL. PITCHBOILER VENT UP TODRAIN BACK TO BOILER1/4" UP PER 1'FD12"x12"G-A400 CFMAADCUT HOLE IN MASONRY FORPASSAGE OF 12" x 12" DUCT.PATCH MASONRY HOLES TO MATCH EXISTING.CUT HOLE IN THE BOTTOM OF EXISTINGSTEEL PLATE COVERING RISERCONNECTING TO EXISTING LOUVER BOX ONTHE FRONT PORCH. CONNECT 12 X 12DUCT TO BOTTOM OF RISER. INSULATERELOCATE SPRINKLER LINE AROUND NEWDUCTWORK. PROVIDE ADDITIONALSPRINKLER BRANCH LINES AND HEADS FORCOVERAGE.FT-3FT-412" x 12" TRANSFER AIR DUCT.PROVIDE OFF-SETS AS NEEDED3/4"HWS,HWR3/4"HWS,HWR1-1/4"HWS ,HWR3/4" HWS UP TO PR-23/4" HWR UP TO FT-1AND PR-2 .3/4"HWS,HWREXISTINGCHIMNEY5" øFT-5PROVIDE SHEET METALDRAIN PANS FORPIPING AND VENTS.DESIGN AND PLACEDRAIN PANS TOPREVENTCONDENSATION ORLEAKS FROM DRIPPINGONTO ELECTRICALEQUIPMENT..CAP PIPES ANDPATCH HOLES.ENGSTATEOFNEWYOR K REENILANOISSEFORPDESNECIL079083KEVINCHARLESTERRYENGSTATEOFNEWYORKREENILANOISSEFORPDESNECIL079083KEVINCHARLESTERRY Date:Drawn By:Drawing Number:Project Number:1ABCDEFGHIJKLMN234567891011121314151617ABCDEFGHIJKLMNTetra Tech Engineers, Architects& Landscape Architects, P.C.CLEAR SOLUTIONScomplex worldARCHITECTS & ENGINEERSCornell UniversityIthaca, NYDelta Upsilon Fraternity HouseInterior Renovations6 South Ave08249-17002M-1013/27/2017Basement Mechancial PlanAuthor SEVSCALE 1/4" = 1'-0"1Basement HVAC PlanKey PlanN.T.S.NCornell Facilities Code: 4722Rev. No.: Date: Description:GENERAL NOTES1.REFER TO M-100 FOR GENERAL NOTES.
REMOVE FAN COIL ANDPREPARE PIPING ANDELECTRICAL FOR NEWFAN COILREMOVEFINNED TUBERADIATIONAND PIPING.REMOVEFINNED TUBERADIATIONAND PIPING.REMOVE FINNED TUBERADIATION ANDABANDONED PIPINGREMOVEFINNED TUBERADIATIONAND PIPINGBACK TOMAIN.REMOVE FAN COIL ANDSTORE . RE-INSTALL WITH1/2" SEPARATION FROMBASEMOLDING AFTER NEWFLOOR, BASE MOLDING ANDMURAL ARE COMPLETE,PAINT ENCLOSURE TOMATCH BASE MOLDING.REMOVE FLOOR GRILLE.GREAT HALL102CHAPTERROOM101DINING ROOM104DISH ROOM104ASTUDY ROOM103FOYER10040STAIR10001STAIR10003ELEC10062CLOSET105REMOVE FAN COIL ANDSTORE . RE-INSTALL WITH1/2" SEPARATION FROMBASEMOLDING AFTER NEWFLOOR, BASE MOLDING ANDMURAL ARE COMPLETE.REPLACE DENTEDENCLOSURE AND PAINT TOMATCH BASE MOLDING.TYPICAL OF (2).ENGSTATEOFNEWYOR K REENILANOISSEFORPDESNECIL079083KEVINCHARLESTERRYENGSTATEOFNEWYORKREENILANOISSEFORPDESNECIL079083KEVINCHARLESTERRY Date:Drawn By:Drawing Number:Project Number:1ABCDEFGHIJKLMN234567891011121314151617ABCDEFGHIJKLMNTetra Tech Engineers, Architects& Landscape Architects, P.C.CLEAR SOLUTIONScomplex worldARCHITECTS & ENGINEERSCornell UniversityIthaca, NYDelta Upsilon Fraternity HouseInterior Renovations6 South Ave08249-17002M-1023/27/2017First Floor Demolition PlanAuthor SEVSCALE 1/4" = 1'-0"1First Floor Mechanical Demolition PlanKey PlanN.T.S.NCornell Facilities Code: 4722Rev. No.: Date: Description:GENERAL NOTES1.REFER TO M-100 FOR GENERAL NOTES.
TSPR-1RUN 3/4" HWS & HWR PIPES THROUGHEXISTING COLUMN CASINGPENETRATIONSMENDOTA FIREPLACE INSERT FV33iMENDOTA FIREPLACE INSERT FV44iFT-1FT-2EXISTING FLOORMOUNTED FAN COILSFCU1-1FCU1-2REMOVE,STORE AND RE-INSTALL FAN COIL UNIT.INSTALL WITH 1/2"SEPARATION FROMBASEMOLDING AFTER NEWFLOOR, BASE MOLDING ANDMURAL ARE COMPLETE.REPLACE ENCLOSURE.GREAT HALL102CHAPTERROOM101FOYER10040DINING ROOM104DISH ROOM104ASTUDY ROOM103STAIR10001STAIR10003ELEC10062CLOSET105PR-2LIBRARY101AREMOVE,STORE AND RE-INSTALL FAN COIL UNIT.INSTALL WITH 1/2"SEPARATION FROMBASEMOLDING AFTER NEWFLOOR, BASE MOLDING ANDMURAL ARE COMPLETE.REPLACE ENCLOSURE.RECONNECTPIPING TOCABINET UNITHEATERSPOCRE-INSULATEPIPING ANDPROVIDEPROTECTIVEJACKET.EXISTING BLOCKEDLOUVER. UNBLOCKLOUVER AND CLEANSHAFT FORCONNECTION TOLAUNDRY ROOMMAKE-UP AIR DUCT.ENCASE HWR PIPING IN PIPEENCLOSURE. PAINT ENCLOSURE TOMATCH PANEL RADIATOR.ENCASE HWR PIPING IN PIPEENCLOSURE. PAINT ENCLOSURE TOMATCH PANEL RADIATOR.PROVIDE TWO-HOUR TIMER SWITCH.CONNECT TO POWER SWITCHTERMINALS ON FIREPLACE INSERTBURNER. CONFIGURE REMOTE ANDSTORE IN KEYED DRAWER. SEESPECIFICATION FOR MORE DETAIL.TYPICAL OF 2.SSENGSTATEOFNEWYOR K REENILANOISSEFORPDESNECIL079083KEVINCHARLESTERRYENGSTATEOFNEWYORKREENILANOISSEFORPDESNECIL079083KEVINCHARLESTERRY Date:Drawn By:Drawing Number:Project Number:1ABCDEFGHIJKLMN234567891011121314151617ABCDEFGHIJKLMNTetra Tech Engineers, Architects& Landscape Architects, P.C.CLEAR SOLUTIONScomplex worldARCHITECTS & ENGINEERSCornell UniversityIthaca, NYDelta Upsilon Fraternity HouseInterior Renovations6 South Ave08249-17002M-1033/27/2017First Floor Mechanical PlanAuthor SEVSCALE 1/4" = 1'-0"1First Floor HVAC PlanKey PlanN.T.S.NCornell Facilities Code: 4722Rev. No.: Date: Description:GENERAL NOTES1.REFER TO M-100 FOR GENERAL NOTES.
TSRUN 3/4" HWS & HWR PIPES THROUGH
EXISTING COLUMN CASING
PENETRATIONS
MENDOTA FIREPLACE INSERT FV44i.
SEE 2/M-501.
FT-1
PR-2
LIBRARY
101A 3/4" HWR DN
THROUGH FLOOR,
WITHIN FIN TUBE
ENCLOSURE
3/4" HWS DN
THROUGH FLOOR,
WITHIN FIN TUBE
ENCLOSURE
TETRA TECH
ARCHITECTS & ENGINEERS
Drawing No.:
Rev.:Date:Tetra Tech Engineers, Architects & Landscape Architects, P.C.
Proj. No.: 08249-17002
Date:04/19/17
Drawn By: GPD
BID-M-01
Cornell University Ithaca, NY
Revised Partial First Floor Plan
Delta Upsilon Fraternity House 6 South Ave Interior Renovations
SCALE 1/4" = 1'-0"1 Partial Revised First Floor Plan
Drawing Issued by Bid Addendum No. 2
RUN 4" ALUMINUM DUCT FROMDRYERBOX CONNECTIONTHROUGH EXTERIOR WALL. USE2" WIDE FOIL BACKED TAPE ATCONNECTIONS. PROVIDETRANSITION DUCT FROM DRYERBOX TO DRYER. TRANSITIONDUCT SHALL BE UL LISTED2158A.SOFFIT.PANEL RADIATOR PR-2, 1' 6" AFF.SEE ARCHITECTURALELEVATIONSPIPING THOUGH EXISTINGPENETRATIONS IN COLUMNCASING.1" HWR.FIRST FLOOREXISTING FIRE BOXEXISTING FLUE SIZE, 7 X 11HEARTHPROVIDE COLLINEAR DIRECT VENT COMBUSTION AIRAND VENT DUCT. VERIFY LENGTH IN FIELD. PROVIDEWELDED 316L STAINLESS STEEL CHIMNEY CAP WITHMEANS TO CONNECT THE DIRECT VENT TERMINATIONTO THE STAINLESS STEEL CAP. PROVIDE BREAKS IN CAPTHAT MATCH EXISTING MASONRY CHIMNEY CAP.CONNECT FACTORY TERMINATIONS TO ADAPTER.ANCHOR ADAPTER TO EXISTING CHIMNEY CAP. PROVIDEVERTICAL SEPARATION BETWEEN TERMINATIONS PERMANUFACTURERS RECOMMENDATIONS. SEAL WATERTIGHT.FIREPLACE THROATFIREPLACEINSERTFIREPLACEINSERTENGSTATEOFNEWYOR K REENILANOISSEFORPDESNECIL079083KEVINCHARLESTERRYENGSTATEOFNEWYORKREENILANOISSEFORPDESNECIL079083KEVINCHARLESTERRY Date:Drawn By:Drawing Number:Project Number:1ABCDEFGHIJKLMN234567891011121314151617ABCDEFGHIJKLMNTetra Tech Engineers, Architects& Landscape Architects, P.C.CLEAR SOLUTIONScomplex worldARCHITECTS & ENGINEERSCornell UniversityIthaca, NYDelta Upsilon Fraternity HouseInterior Renovations6 South Ave08249-17002M-5013/27/2017Equipment Schedules and DetailsAuthor SEVCABINET UNIT HEATER SCHEDULEDRAWING LABEL MANUFACTURER MODEL LOCATION MOUNTING LOCATIONAIRFLOW(CFM)EAT (°F)LAT(°F)CAPACITY(MBH)EWT(°F)LWT(°F)FLOW(GPM)WPD(FT HD)HP(WATTS)V/PH COMMENTSCUHB-1 STERLING RWI ELECTRICRMWALL, INVERTED,RECESSED330 60 142 29.4 180 160 2.5 0.56 1/15 115/1FINNED TUBE SCHEDULEDRAWING LABEL MANUFACTURER MODEL AWT (°F) FLOW (GPM) EAT (°F) FIN SIZE (INCH) TUBE SIZE (INCH) FINS PER INCH FINNED LENGTH CAPACITY (BTUH) COMMENTSFT-1 STERLING B 170 .75 65 3-5/8 x 41/4 3/4 40 10' 0" 7400FT-2 STERLING B 170 .5 65 3-5/8 x 41/4 3/4 40 7' 0" 5180FT-3 STERLING JDVB 20 170 1.2 65 4-1/4 x 3-5/8 3/4 40 8' 0" 11680 TWO ROWFT-4 STERLING JDVB 20 170 1.2 65 4-1/4 x 3-5/8 3/4 40 8' 0" 11680 TWO ROWFT-5 STERLING JDVB 20 170 .5 65 4-1/4 x 3-5/8 3/4 40 1' 6" 2190 TWO ROWPANEL RADIATOR SCHEDULEDRAWING LABEL MANUFACTURER MODELHEIGHT(INCH)DEPTH(INCH)LENGTH(INCH)CAPACITY(BTUH/FT)CAPACITY(BTUH)EAT (°F) EWT (°F)FLOW(GPM)CONNECTIONSIZE (INCH)COMMENTSPR-1 RUNTAL THERMOTOUCH-4F 12 2-3/4 96 857 6856 65 170 1.37 1/2 10F DELTA TPR-2 RUNTAL THERMOTOUCH-4F 12 2-3/4 120 857 8570 65 170 1.71 1/2 10F DELTA TSCALE 1/2" = 1'-0"1Dryer Vent ElevationSCALE 3/4" = 1'-0"2Fire Place Insert PlanKey PlanN.T.S.NCornell Facilities Code: 4722Rev. No.: Date: Description:FAN COIL SCHEDULEDRAWING LABEL MANUFACTURER MODELAIRFLOW(CFM)NUMBEROF ROWSEAT (°F) EWT (°F) HEATING CAPACITY (MBH) HOT WATER FLOW (GPM)PRESSURE DROP(FT WG)COMMENTSFCU1-1 DAIKIN FHVC-02 200 2 70 180 14.1 .9 .3 1, 2, 3FCU1-2 DAIKIN FHVC-03 300 2 70 180 19.8 1.1 .4 1, 2, 31.PROVIDE 14 GAUGE ENCLOSURE.2.PROVIDE CUSTOM COLOR SELECTION.3.PROVDE ECM MOTORGENERAL NOTES1.REFER TO M-100 FOR GENERAL NOTES.
RFACPRE-1002UPPERBASEMENTB0042BEDROOMB02BEDROOMB01MENS TOILETB0021MENS TOILETB0020STORAGEB06AMECHANICALB0062DRY STORAGEB06BKITCHENB06PHONE DEMARKPHONEDATARACK 2VIDEOSPLITERSFIBEROPTICMAINDISTRIBUTIONPANELUTILITYMETERM21353344663333WIREMOLD777ENGSTATEOFNEWYOR K REENILANOISSEFORPDESNECIL079083KEVINCHARLESTERRYENGSTATEOFNEWYORKREENILANOISSEFORPDESNECIL079083KEVINCHARLESTERRY Date:Drawn By:Drawing Number:Project Number:1ABCDEFGHIJKLMN234567891011121314151617ABCDEFGHIJKLMNTetra Tech Engineers, Architects& Landscape Architects, P.C.CLEAR SOLUTIONScomplex worldARCHITECTS & ENGINEERSCornell UniversityIthaca, NYDelta Upsilon Fraternity HouseInterior Renovations6 South Ave08249-17002E-1003/27/2017Basement Demolition PlanJAS/crSCALE 3/16" = 1'-0"1Basement Demolition PlanKey PlanN.T.S.NCornell Facilities Code: 4722Keyed Notes1SCALE 1/4" = 1'-0"2Basement Enlarged Demolition PlanEXISTING SERVICE EQUIPMENT TO BE REMOVED ONCE NEWELECTRIC SERVICE HAS BEEN INSPECTED AND ACTIVATED.EXTEND EXISTING BRANCH AND FEEDER CIRCUITS TO NEWSERVICE LOCATIONS. REFER TO PANEL SCHEDULES FOR NEWCIRCUIT LOCATIONS.PROVIDE SUFFICIENT CONDUITS TO AVOIDNEC DERATING FACTORS.DISCONNECT AND REMOVE EXISTING CEILING LIGHTFIXTURES. RETAIN WIRING FOR CONNECTION TO NEW LIGHTFIXTURES.REMOVE EXISTING FIRE ALARM CONTROL PANEL, BATTERY RACK,DIGITIZE SYSTEMS, INC. “MUX PAD, CONTROL RELAYS, ETC.TURN EXISTING EQUIPMENT OVER TO OWNER AND COORDINATEWITH THE OWNER'S REPRESENTATIVE. PREPARE WIRING FOREXTENSION TO NEW LOCATION. CONTRACTOR TO COORDINATETIMING OF WORK AND COVERAGE SHUTDOWN WITH CORNELLEHS DEPARTMENT. CONTRACTOR SHALL PROVIDE FIRE WATCHDURING TRANSITION PERIOD BETWEEN EXISTING SYSTEM ANDNEW SYSTEM OPERATION. REFER TO SPECIFICATIONS SECTION28 31 11REMOVE EXISTING COMMUNICATIONS EQUIPMENT INPREPARATION FOR RELOCATION. COORDINATE REMOVALS ANDRELOCATONS WITH CORNELL CIT DEPARTMENT.2345DISCONNECT POWER FROM EXISTING UNIT HEATER SCHEDULEDTO BE REMOVED. REMOVE CIRCUIT CONDUCTORS TO THEEXTENT POSSIBLE WHILE KEEPING OTHER DEVICE ON THE SAMECIRCUIT ACTIVE.6General Notes:REMOVAL INDICATED ON E-SERIES DRAWINGS DOES NOTNECESSARILY INDICATE FULL EXTENT OF PROJECTS DEMOLTIONWORK. COORDINATE WORK IDENTIFIED ON ALL OTHER DEMOLITIONAND ABATEMENT DRAWINGS PRIOR TO BEGINNING ANY DEMOLITIONWORK, TYPICAL. ASBESTOS ABATEMENT WILL REQUIRE PRE-ABATEMENT REMOVALS OF SELECT UTILITIES AND MAY REQUIREINSTALLATION OF NEW OR TEMPORARY SUPPORT METHODS FORPIPE HANGERS, BRACKETS, ETC., THAT ARE FASTENED TO ACMSURFACES TO BE REMOVED.A.REFER TO DRAWING E-501 FOR GENERAL NOTES.B.Rev. No.: Date: Description:REMOVE ALL WIRING, CONDUIT, OUTLETS AND DEVICES INCONFLICT WITH NEW WORK.7
RFACPRPHONE DEMARK
PHONE
DATA
RACK 2
VIDEO
SPLITERS
FIBER
OPTIC
MAIN
DISTRIBUTION
PANEL
CIRCUIT
BREAKER
TYPICAL OF 4
SHALL BE REMOVED
UTILITY
METER
M
2 1
3
5
3
3
4
4
6
6
3
3
3
3
WIREMOLD
7
7
7
8
TETRA TECH
ARCHITECTS & ENGINEERS 1234567ABCDE
Drawing No.:
Rev.:Date:Description:Tetra Tech Engineers, Architects & Landscape Architects, P.C.
Proj. No.: 08249-17002
Date:04/19/17
Drawn By: JAS/cr
BID-E-02
Cornell University Ithaca, NY
Basement Power Plan-Demolition
Delta Upsilon Fraternity House 6 South Ave Interior Renovations
SCALE 1/4" = 1'-0"1 Basement Enlarged Demolition Plan BID 02
Keyed Notes
8 REMOVE EXISTING SERVICE ENTRANCE
CONDUCTORS, CONDUIT, WEATHERHEAD,
MAST AND OVERHEAD CONDUCTORS AFTER
NEW ELECTRIC SERVICE HAS BEEN
INSPECTED AND ACTIVATED.
MODIFIES DRAWING E-100
COTV1663235444CUH4CHAPTERROOM101GREAT HALL102DINING ROOM104STUDY ROOM103DISH ROOM104AFOYER10040STAIR10001STAIR1000333LIBRARY101APP1-1E7777777ENGSTATEOFNEWYOR K REENILANOISSEFORPDESNECIL079083KEVINCHARLESTERRYENGSTATEOFNEWYORKREENILANOISSEFORPDESNECIL079083KEVINCHARLESTERRY Date:Drawn By:Drawing Number:Project Number:1ABCDEFGHIJKLMN234567891011121314151617ABCDEFGHIJKLMNTetra Tech Engineers, Architects& Landscape Architects, P.C.CLEAR SOLUTIONScomplex worldARCHITECTS & ENGINEERSCornell UniversityIthaca, NYDelta Upsilon Fraternity HouseInterior Renovations6 South Ave08249-17002E-1013/27/2017First Floor Demolition PlanJAS/crKey PlanN.T.S.NCornell Facilities Code: 4722SCALE 3/16" = 1'-0"1First Floor Demolition PlanKeyed Notes1EXISTING WIRELESS ACCESS POINT INDICATED TO BE REMOVED BYCORNELL CIT DEPARTMENT. CABLING WILL REMAIN FOR RE-USE.COORDINATE WORK WITH CORNELL CIT DEPARTMENT.DISCONNECT AND REMOVE EXISTING CEILING LIGHT FIXTURE. RETAINWIRING FOR CONNECTION TO NEW LIGHT FIXTURES. TURN REMOVEDFIXTURE OVER TO OWNER.DISCONNECT AND REMOVE EXISTING CEILING LIGHT FIXTURE. RETAINWIRING FOR CONNECTION TO NEW LIGHT FIXTURES.REMOVE EXISTING EXIT SIGN. RETAIN WIRING FOR REUSE WITH NEWFIXTURE.REMOVE EXISTING EMERGENCY BATTERY LIGHT. RETAIN WIRING FORREUSE WITH NEW FIXTURE.23456DISCONNECT POWER FROM EXISTING UNIT HEATER SCHEDULEDTO BE REPLACED. TAG CONDUCTORS FOR REUSE.General Notes:REMOVAL INDICATED ON E-SERIES DRAWINGS DOES NOTNECESSARILY INDICATE FULL EXTENT OF PROJECTS DEMOLTIONWORK. COORDINATE WORK IDENTIFIED ON ALL OTHER DEMOLITIONAND ABATEMENT DRAWINGS PRIOR TO BEGINNING ANY DEMOLITIONWORK, TYPICAL. ASBESTOS ABATEMENT WILL REQUIRE PRE-ABATEMENT REMOVALS OF SELECT UTILITIES AND MAY REQUIREINSTALLATION OF NEW OR TEMPORARY SUPPORT METHODS FORPIPE HANGERS, BRACKETS, ETC., THAT ARE FASTENED TO ACMSURFACES TO BE REMOVED.A.REFER TO DRAWING E-501 FOR GENERAL NOTES.B.Rev. No.: Date: Description:REMOVE ALL WIRING, CONDUIT, OUTLETS AND DEVICES INCONFLICT WITH NEW WORK.7
3333UPPERBASEMENTB0042UPPERBASEMENTB0042MENS TOILETB0021MENS TOILETB0020ROOMB05BEDROOMB01BEDROOMB02KITCHENB06STAIRB0003STORAGEB06AMECHANICALB0062DRY STORAGEB06BELECB0063RESTROOMB0022VESTIBULEB0041E-1022LOWERBASEMENTB04FREZZER-COOLER-DUMBWAITERB0061CLOSETB02ACLOSETB02BSPRINKLERB0060STORAGEB07LAUNDRYB03BUPPERBASEMENTB0042303031202020132312313024111LAUNDRYB07ELECB0063RESTROOMB0022UPPERBASEMENTB0042VESTIBULEB00415OS5111A1A1A1A1A1B1B1B30MDP- 23MDP- 23MDP- 23MDP- 24MDP- 243ENGSTATEOFNEWYOR K REENILANOISSEFORPDESNECIL079083KEVINCHARLESTERRYENGSTATEOFNEWYORKREENILANOISSEFORPDESNECIL079083KEVINCHARLESTERRY Date:Drawn By:Drawing Number:Project Number:1ABCDEFGHIJKLMN234567891011121314151617ABCDEFGHIJKLMNTetra Tech Engineers, Architects& Landscape Architects, P.C.CLEAR SOLUTIONScomplex worldARCHITECTS & ENGINEERSCornell UniversityIthaca, NYDelta Upsilon Fraternity HouseInterior Renovations6 South Ave08249-17002E-1023/27/2017Basement Lighting PlanJAS/crKey PlanN.T.S.NCornell Facilities Code: 47221SCALE 3/16" = 1'-0"1Basement Lighting PlanKeyed Notes1SCALE 1/4" = 1'-0"2Basement Lighting Plan - Enlarged PlanCONNECT NEW LIGHT FIXTURES TO EXISTING LIGHTING CIRCUIT.EXTEND/MODIFY CIRCUITING TO ACCOMODATE NEW SPACECONFIGURATIONS.PROVIDE NEW TYPE 20 EXIT SIGN. EXTEND AND CONNECT TOEXISTING EXIT SIGN CIRCUIT.PROVIDE NEW TYPE 30 EMERGENCY BATTERY FIXTURE.CONNECT TO UNSWITCHED LEG OF LIGHTING CIRCUITSERVING THE AREA.PROVIDE NEW TYPE 31 EMERGENCY REMOTE FIXTURE.CONNECT TO DC OUTPUT OF NEAREST TYPE 30 FIXTURE.234General Notes:REFER TO DRAWING E-501 FOR GENERAL NOTES.A.PROVIDE POWER TO LIGHT FIXTURE. LIGHT SHALL BECONTROLLED BY THE LIGHT SWITCH SERVING THE ROOM.5Rev. No.: Date: Description:
GREAT HALL102STUDY ROOM103DISH ROOM104ADINING ROOM104FOYER10040STAIR10001STAIR10003CHAPTERROOM101LIBRARY101A3A4442031222222253330301245567DDDDDD2266666662222677777EPP1-1MDP- 26MDP- 27MDP- 27MDP- 27LOWERBASEMENTB04UPPERBASEMENTB0042SPRINKLERB0060BEDROOMB01MENS TOILETB0020ROOMB05DRY STORAGEB06BMECHANICALB0062VESTIBULEB0041UPPERBASEMENTB0042LAUNDRYB07RESTROOMB0022ELECB0063MNYSEG UTILITY POLEPPROVIDE (2) 4" SCHEDULE80 PVC CONDUITS.(1) ACTIVE - (3) 500 KCMIL(1) SPARE WITH PULLSTRING88910MDPAPPROXIMATE LOCATIONOF GROUNDING TRIADENGSTATEOFNEWYOR K REENILANOISSEFORPDESNECIL079083KEVINCHARLESTERRYENGSTATEOFNEWYORKREENILANOISSEFORPDESNECIL079083KEVINCHARLESTERRY Date:Drawn By:Drawing Number:Project Number:1ABCDEFGHIJKLMN234567891011121314151617ABCDEFGHIJKLMNTetra Tech Engineers, Architects& Landscape Architects, P.C.CLEAR SOLUTIONScomplex worldARCHITECTS & ENGINEERSCornell UniversityIthaca, NYDelta Upsilon Fraternity HouseInterior Renovations6 South Ave08249-17002E-1033/27/2017First Floor Lighting Plan and Site PlanJAS/crKeyed Notes1Key PlanN.T.S.NCornell Facilities Code: 4722CONNECT NEW LIGHT FIXTURES TO EXISTING LIGHTING CIRCUIT.EXTEND/MODIFY CIRCUITING TO ACCOMODATE NEW SPACECONFIGURATIONS.PROVIDE NEW TYPE 20 EXIT SIGN. EXTEND AND CONNECT TOEXISTING EXIT SIGN CIRCUIT.PROVIDE NEW TYPE 30 EMERGENCY BATTERY FIXTURE.CONNECT TO UNSWITCHED LEG OF LIGHTING CIRCUIT SERVINGTHE AREA.PROVIDE NEW TYPE 31 EMERGENCY REMOTE FIXTURE. CONNECTTO DC OUTPUT OF NEAREST TYPE 30 FIXTURE.PROVIDE NEW LIGHT FIXTURES AND NEW CIRCUIT ASSCHEDULED. CONTROL EACH FIXTURE WITH A SEPARATEDIMMER SWITCH.2345General Notes:REFER TO DRAWING E-501 FOR GENERAL NOTES.A.SCALE 3/16" = 1'-0"1First Floor Lighting PlanREPLACE EXISTING LIGHT SWITCH WITH DIMMING SWITCH.6PROVIDE DIMMING LIGHT SWITCH CONTROL FIXTURE IN THISAREA.7SCALE 3/16" = 1'-0"2Partial Site PlanCAP SPARE CONDUIT AT 12" A.F.G. AT BOTH NYSEG UTILITYPOLEAND BUILDING.8TERMINATE SCHEDULE 80 PVC CONDUIT 10' A.F.G. AT NYSEGUTILITY POLE.9PROVIDE 35' OF CONDUCTORS AT NYSEG UTILITY POLE. COILCONDUCTORS AT TOP OF CONDUIT.10Rev. No.: Date: Description:
33J
33STAIR
10003
CHAPTER
ROOM
101
LIBRARY
101A
3A
4
4
4
20 31
2 2
2
2
2
2
2
5
3
3
30
30
1
2
4
5
5
6
7
D
D
DD
D
22
6 6
6
6
6
6 6
22
22
6
7
MDP- 26
MDP- 27
MDP- 27
MDP- 27
13
12
13
11
D
TYPICAL
D
D
3D DDMDP- 26
MDP- 27
7
7
7
7
ITEM SYMBOL DESCRIPTION LUMENS WATTAGE TYPE
LAMPS
NAME MODEL OR SERIES
MANUFACTURERS (OR EQUAL)
LIGHT FIXTURE SCHEDULE
NOTES
7 220-
862 LED20LED STRIP LIGHT PHILIPS 523-000027-83
DELIVER TO CABINET
SUPPLIER FOR
INSTALLATION.
EC TO MAKE FINAL
CONNECTIONS.
TETRA TECH
ARCHITECTS & ENGINEERS 1234567ABCDE
Drawing No.:
Rev.:Date:Description:Tetra Tech Engineers, Architects & Landscape Architects, P.C.
Proj. No.: 08249-17002
Date:04/14/17
Drawn By: JAS/cr
BID-E-01
Cornell University Ithaca, NY
Partial Plan and Partial Light Fixture Schedule
Delta Upsilon Fraternity House 6 South Ave Interior Renovations
SCALE 1/8" = 1'-0"1 Library/Chapter Room
Keyed Notes
11 PROVIDE ROUGH-IN BOX FOR FUTURE TYPE
6 FIXTURE ABOVE CCEILING.
12 REFER TO REVISED LIGHT FIXTURE
SCHEDULE FOR SIZE AND NUMBER OF TYPE
7 LIGHT FIXTURES. PROVIDE TO CUSTOM
CABINET SUPPLIER FOR INSTALLATION.
FINAL WIRING AND CONNECTIONS BY EC.
13 PROVIDE REVERSE-PHASE CONTROL
DIMMER COMPATABLE WITH FIXTURES
SUPPLIED FOR THE CUSTOM CABINETS.
MODIFIES DRAWINGS E-103 AND E-502.
SCALE 6" = 1'-0"2 Light Fixture Schedule Rev
33J
33STAIR
10003
CHAPTER
ROOM
101
LIBRARY
101A
3A
4
4
4
20 31
2 2
2
2
2
2
2
5
3
3
30
30
1
2
4
5
5
6
7
D
D
DD
D
22
6 6
6
6
6
6 6
22
22
6
7
MDP- 26
MDP- 27
MDP- 27
MDP- 27
13
12
13
11
D
TYPICAL
OF 9
FIXTURES
D
D
3D DDMDP- 26
MDP- 27
7
7
7
7
12TYPICAL
OF 4
FIXTURES
ITEM SYMBOL DESCRIPTION LUMENS WATTAGE TYPE
LAMPS
NAME MODEL OR SERIES
MANUFACTURERS (OR EQUAL)
LIGHT FIXTURE SCHEDULE
NOTES
7 220-
862 LED20LED STRIP LIGHT PHILIPS 523-000027-83
CABINET
MANUFACTURER
TO PROVIDE. FINAL
WIRING BY CONTRACTOR.
QTY
13
TETRA TECH
ARCHITECTS & ENGINEERS 1234567ABCDE
Drawing No.:
Rev.:Date:Description:Tetra Tech Engineers, Architects & Landscape Architects, P.C.
Proj. No.: 08249-17002
Date:04/19/17
Drawn By: JAS/cr
BID-E-05
Cornell University Ithaca, NY
Partial Lighting Plan and Fixture Schedule - Casement Lighting
Delta Upsilon Fraternity House 6 South Ave Interior Renovations
MODIFIES DRAWINGS E-103 AND E-502.
Keyed Notes
11 PROVIDE ROUGH-IN BOX FOR FUTURE TYPE 6
FIXTURE ABOVE CEILING.
12 REFER TO REVISED LIGHT FIXTURE
SCHEDULE FOR SIZE AND NUMBER OF TYPE
7 LIGHT FIXTURES. CABINET
MANUFACTURER TO PROVIDE TYPE 7
FIXTURES. FINAL WIRING CONNECTIONS BY
CONTRACTOR.
13 PROVIDE REVERSE-PHASE CONTROL
DIMMER COMPATABLE WITH FIXTURES
SUPPLIED FOR THE CUSTOM CABINETS.
SCALE 1/8" = 1'-0"1 Library/Chapter Room - Casement Lighting
SCALE 6" = 1'-0"2 Light Fixture Schedule Rev. 2
CMSFACPSSLOWERBASEMENTB04UPPERBASEMENTB0042STORAGEB07SPRINKLERB0060BEDROOMB01BEDROOMB02MENS TOILETB0021MENS TOILETB0020ROOMB05STAIRB0003KITCHENB06DRY STORAGEB06BSTORAGEB06AMECHANICALB0062MECHB06CE-104212VESTIBULEB0041UPPERBASEMENTB0042LAUNDRYB07RESTROOMB0022ELECB006313DUMBWAITERB0061MTO NYSEG UTILITY POLEGROUND BARGFCI467TYPICAL OF 69253SELF CONTAINEDMETERVESTIBULEB0041UPPERBASEMENTB0042LAUNDRYB07RESTROOMB0022ELECB006310118148"145LPPB1MDP5GFCIGFCIGFCIGFCIGFCIGFCI48"LPPB1- 22LPPB1- 21LPPB1- 23LPPB1- 24LPPB1- 25LPPB1- 26LPPB1- 32LPPB1- 31LPPB1- 30LPPB1- 29LPPB1- 28LPPB1- 2712ENGSTATEOFNEWYOR K REENILANOISSEFORPDESNECIL079083KEVINCHARLESTERRYENGSTATEOFNEWYORKREENILANOISSEFORPDESNECIL079083KEVINCHARLESTERRY Date:Drawn By:Drawing Number:Project Number:1ABCDEFGHIJKLMN234567891011121314151617ABCDEFGHIJKLMNTetra Tech Engineers, Architects& Landscape Architects, P.C.CLEAR SOLUTIONScomplex worldARCHITECTS & ENGINEERSCornell UniversityIthaca, NYDelta Upsilon Fraternity HouseInterior Renovations6 South Ave08249-17002E-1043/27/2017Basement Power PlanJAS/crSCALE 3/16" = 1'-0"1Basement Power PlanKeyed Notes1Key PlanN.T.S.NCornell Facilities Code: 4722INSTALL NEW SELF CONTAINED, 400A, 1 PHASE METER BASE.OBTAIN METER BASE FROM THE NYSEG ITHACA OFFICE.PROVIDE TWO (2) 4” SCHEDULE 80 PVC CONDUIT AS SHOWN INDETAIL 3/E501, FROM BUILDING TO NYSEG POLE. PROVIDE (3)500KCMIL CONDUCTORS IN ONE CONDUIT. THE OTHER CONDUITSHALL BE A SPARE.PROVIDE 400A MAIN CIRCUIT BREAKER SERVICE RATED PANEL.INSTALL CIRCUIT BREAKERS AS SCHEDULED.PROVIDE NEW GAMEWELL FCI E3 FIRE ALARM CONTROL PANELAND ACCESSORIES. INCLUDE BATTERIES, RELAYS, ETC. EXTENDEXISTING CIRCUITS TO THE NEW CONTOL PANEL LOCATION.COORDINATE INSTALLATION AND PROGRAMMING WITH CORNELLEHS DEPARTMENT, BUT CONTRACTOR WILL PERFORM ALLWORK. PROVIDE DIGITIZE SYSTEM, INC. "MUX PAD" WITH E3CHIP AND DEDICATED PHONE LINE FOR CONNECTION TOCORNELL'S MONITORING STATION.PROVIDE SMOKE DETECTOR CONNECTED TO FIRE ALARMSYSTEM.PROVIDE CARBON MONOXIDE DETECTOR WITH SOUNDER BASE.CONNECT TO FIRE ALARM SYSTEM. PROVIDE ALL WIRING ANDPROGRAMMING REQUIRED.PROVIDE 20-AMP SINGLE RECEPTACLE ON DEDICATED CIRCUIT.PROVIDE ALL NECESSARY CONDUITS, BOXES, ETC FOR DATAAND OTHER COMMUNICATIONS CABLING NECESSARY TORELOCATE COMMUNICATIONS SYSTEMS TO NEW LOCATION.CONTRACTOR TO PROVIDE NEW CONDUIT AS REQUIRED.PROVIDE ¾” TREATED PLYWOOD BACKBOARD TO MOUNTRELOCATED EQUIPMENT. COORDINATE ALL WORK WITHCORNELL CIT. CORNELL CIT WILL RELOCATE/EXTEND THEEXISTING CABLES AND MAKE FINAL CONNECTIONS.ALL NEW CIRCUIT RECEPTACLES TO BE FED FROM ARC-FAULTCIRCUIT BREAKERS.PROVIDE POWER TO NEW EXHAUST FAN USING CIRCUIT FEEDINGLIGHT IN REST ROOM B08. FAN SHALL BE CONTROLLED BY THELIGHT SWITCH SERVING THE ROOM.PROVIDE POWER TO NEW CABINET UNIT HEATER, ASSCHEDULED.PROVIDE #1/0 COPPER GROUNDING ELECTRODE CONDUCTORFROM SERVICE ENTRANCE GROUND BUSBAR TO METALDOMESTIC AND SPRINKLER WATER PIPES. PROVIDE JUMPERSAROUND METERS AND OTHER NON-CONDUCTIVE DEVICES.REPLACE EXISTING 3 PHASE MOTOR ON THE DUMBWAITER WITHA COMPATIBLE SIZE SINGLE PHASE MOTOR RATED AT 240VOLTS. MODIFY EXISTING CONTROLS TO OPERATE AT SINGLEPHASE, 240 VOLTS. REPLACE ALL CONDUCTORS FROM MOTORTO CONTROLLER TO MDP WITH (3) #10, (1) #10 GND. REUSEEXISTING CONDUIT TO THE EXTENT POSSIBLE. EXISTINGDUMBWAITER IS MANUFACTURED BY OTIS WITH SERIAL NUMBER178146.PROVIDE DUPLEX RECEPTACLE FOR CONTROL POWER. MOUNTAT 48" A.F.F.23456789SCALE 3/8" = 1'-0"2Enlarged Basement Power PlanGeneral Notes:REFER TO DRAWING E-501 FOR GENERAL NOTES.A.1011121314Rev. No.: Date: Description:
HHHHCOFFFTVCMCMCOCO COTSSTUDY ROOM103DISH ROOM104AGREAT HALL102CHAPTERROOM101DINING ROOM104FOYER10040STAIR10001STAIR10003LIBRARY101AEEEEEWPEEEUSBUSBUSBUSBUSBUSBUSBUSBUSBUSBUSBSURFACE RACEWAYUSBUSBSURFACE RACEWAYUSBUSBUSBUSBFLUSH MOUNTED FLOOR BOXWITH 2-DUPLEX RECEPTACLESSURFACE RACEWAYUSBUSBUSBUSBUSBUSBUSB32USBUSBUSBUSBUSBUSB1ELECTRIC CONNECTIONFOR LOG SET INSERTS572222333634528SURFACE RACEWAY48"48"USBUSB3USBUSBUSBUSBUSBUSB396"96"1410USBUSBERR121211111313PP1-1LPPB1- 33LPPB1- 36LPPB1- 36LPPB1- 33PP1-1- 18PP1-1- 19PP1-1- 19PP1-1- 20LPPB1- 34LPPB1- 35PP1-1- 21 PP1-1- 22PP1-1- 23PP1-1- 24PP1-1- 25ELEC10062PP1-1- 26989ENGSTATEOFNEWYOR K REENILANOISSEFORPDESNECIL079083KEVINCHARLESTERRYENGSTATEOFNEWYORKREENILANOISSEFORPDESNECIL079083KEVINCHARLESTERRY Date:Drawn By:Drawing Number:Project Number:1ABCDEFGHIJKLMN234567891011121314151617ABCDEFGHIJKLMNTetra Tech Engineers, Architects& Landscape Architects, P.C.CLEAR SOLUTIONScomplex worldARCHITECTS & ENGINEERSCornell UniversityIthaca, NYDelta Upsilon Fraternity HouseInterior Renovations6 South Ave08249-17002E-1053/27/2017First Floor Power PlanJAS/crSCALE 3/16" = 1'-0"1First Floor Power PlanKeyed Notes1Key PlanN.T.S.NCornell Facilities Code: 4722PROVIDE A SINGLE 120V, 20-AMP CIRCUIT TO GAS LOG SETS.PROVIDE TAMPER RESISTANT, DUPLEX RECEPTACLE WITH (2) USBCHARGING PORTS MOUNTED IN SURFACE METAL RACEWAY, PAINTEDTO MATCH WALL.PROVIDE TAMPER RESISTANT, DUPLEX RECEPTACLE WITH (2) USBCHARGING PORTS MOUNTED IN SURFACE BOX, FED FROMBASEMENT.PROVIDE DATA OUTLET IN SURFACE METAL RACEWAY PAINTED TOMATCH WALL.PROVIDE CARBON MONOXIDE DETECTOR WITH SOUNDER BASE.CONNECT TO FIRE ALARM SYSTEM. PROVIDE ALL WIRING ANDPROGRAMMING REQUIRED.PROVIDE TV OUTLET. CONNECT TO TV SPLITTERS IN ELECTRICALROOM IN BASEMENT.23456ALL NEW RECEPTACLES SHALL BE FED FROM ARC-FAULT CIRCUITBREAKER.7General Notes:REFER TO DRAWING E-501 FOR GENERAL NOTES.A.PROVIDE DUPLEX RECEPTACLE AND DATA OUTLET IN SURFACERACEWAY. MOUNT INSIDE BASE CABINET. COORDINATE WITHCABINET SUPPLIER. SURFACE RACEWAY AND OUTLETS TO BE AT 6"A.F.F.8PROVIDE POWER CONNECTION FOR LIGHTS INSIDE THE CASEWORK.9PROVIDE TAMPER RESISTANT, DUPLEX RECEPTACLE WITH (2) USBCHARGING PORTS, MOUNTED IN SURFACE METAL RACEWAYFASTENED UNDER WINDOW SEATING, PAINTED TO MATCHSURFACE.10AFTER NEW CABINET HEATER IS INSTALLED, CONNECT EXISTINGPOWER CONDUCTORS. EXTEND/MODIFY CONDUCTORS ASREQUIRED.11DISCONNECT CABINET HEATER POWER FOR TEMPORARY REMOVAL.RECONNECT ONCE RE-INSTALLED. EXTEND/MODIFY CONDUCTORSAS REQUIRED.12REPLACE EXISTING RECEPTACLE WITH DUPLEX RECEPTACLE WITH(2) USB CHARGING PORTS.13PROVIDE LEGRAND WIREMOLD EVOLUTION FLOOR BOX EFB45SWITH (2) DUPLEX RECEPTACLES AND (2) DATA OUTLETS, COMPLETEWITH DEVICE PLATES. PROVIDE WITH FLUSH STYLE COVER WITHFLOOR INSERT, EFB45CTBK.14Rev. No.: Date: Description:
H
H
H
HCOFF FCM
CM
CO
CO CO TSJ
CHAPTER
ROOM
101
STAIR
10003
LIBRARY
101A
E
E
E
E
E
WP
E
E
E
USB
USB
USBSURFACE RACEWAY
USB
USB
USB
USB
FLUSH MOUNTED FLOOR BOX
WITH 2-DUPLEX RECEPTACLES
USB
USB
USB
USB
USB
USB
1ELECTRIC CONNECTION
FOR LOG SET INSERTS
5
3
4
5
2
8
SURFACE RACEWAY
48"
48"
USB
USB
USB
USB
14
10
USB
R
12
12
11
11
13
LPPB1- 33 LPPB1- 36
LPPB1- 36
LPPB1- 33
PP1-1- 19
PP1-1- 19
PP1-1- 20
LPPB1- 34
LPPB1- 35
PP1-1- 21 PP1-1- 22
PP1-1- 23
9 8 9
16
15
TETRA TECH
ARCHITECTS & ENGINEERS 1234567ABCDE
Drawing No.:
Rev.:Date:Description:Tetra Tech Engineers, Architects & Landscape Architects, P.C.
Proj. No.: 08249-17002
Date:04/19/17
Drawn By: JAS/cr
BID-E-03
Cornell University Ithaca, NY
Partial First Floor Power Plan
Delta Upsilon Fraternity House 6 South Ave Interior Renovations
SCALE 3/16" = 1'-0"1 Partial Floor Power Plan BID 03
Keyed Notes
1 PROVIDE A SINGLE 120V, 20-AMP CIRCUIT TO
GAS LOG SETS.
PROVIDE TAMPER RESISTANT, DUPLEX
RECEPTACLE WITH (2) USB CHARGING PORTS
MOUNTED IN SURFACE METAL RACEWAY,
PAINTED
TO MATCH WALL.
PROVIDE CARBON MONOXIDE DETECTOR WITH
SOUNDER BASE. CONNECT TO FIRE ALARM
SYSTEM. PROVIDE ALL WIRING AND
PROGRAMMING REQUIRED.
PROVIDE TV OUTLET. CONNECT TO TV
SPLITTERS IN ELECTRICAL ROOM IN
BASEMENT.
5
6
PROVIDE DUPLEX RECEPTACLE AND DATA
OUTLET IN SURFACE RACEWAY. MOUNT
INSIDE BASE CABINET. COORDINATE WITH
CABINET SUPPLIER. SURFACE RACEWAY AND
OUTLETS TO BE AT 6" A.F.F.
8
PROVIDE POWER CONNECTION FOR LIGHTS
INSIDE THE CASEWORK.
9
PROVIDE TAMPER RESISTANT, DUPLEX
RECEPTACLE WITH (2) USB CHARGING PORTS,
MOUNTED IN SURFACE METAL RACEWAY
FASTENED UNDER WINDOW SEATING, PAINTED
TO MATCH SURFACE.
10
AFTER NEW CABINET HEATER IS INSTALLED,
CONNECT EXISTING POWER CONDUCTORS.
EXTEND/MODIFY CONDUCTORS AS REQUIRED.
11
DISCONNECT CABINET HEATER POWER FOR
TEMPORARY REMOVAL. RECONNECT ONCE
RE-INSTALLED. EXTEND/MODIFY
CONDUCTORS AS REQUIRED.
12
REPLACE EXISTING RECEPTACLE WITH
DUPLEX RECEPTACLE WITH (2) USB CHARGING
PORTS.
13
PROVIDE LEGRAND WIREMOLD EVOLUTION
FLOOR BOX EFB45S WITH (2) DUPLEX
RECEPTACLES AND (2) DATA OUTLETS,
COMPLETE WITH DEVICE PLATES. PROVIDE
WITH FLUSH STYLE COVER WITH FLOOR
INSERT, EFB45CTBK.
14
ALL NEW RECEPTACLES SHALL BE FED FROM
ARC-FAULT CIRCUIT
BREAKER.
7
PROVIDE DATA OUTLET IN SURFACE METAL
RACEWAY PAINTED TO MATCH WALL.
4
PROVIDE TAMPER RESISTANT, DUPLEX
RECEPTACLE WITH (2) USB CHARGING PORTS
MOUNTED IN SURFACE BOX, FED FROM
BASEMENT.
3
2
REFER TO DETAIL 8/E501 FOR WIRING IN
LIBRARY TABLE.
15
USE WIREMOLD 800 THIS LOCATION.
CAREFULLY BEND TO MATCH RADIUS.
16
MODIFIES DRAWING E-105
6'-0" AFFEXCEPTWHEREOTHERWISENOTED12"10'-0"10'-0"10'-0"FIBERGLASS REINFORCEDPOLYESTER INSULATEDWITH 1/2"-13 THREADEDHOLE BOTH ENDSCOPPER BUS1/4" X 4"INSULATED WASHERLOCK WASHERCAP SCREW1/2" X 13 X 11/2" STUDEXPANDABLETHREADEDANCHOR3/4" DIA. x 10'- 0"COPPERWELD DRIVENGROUND ROD#2 CRUSHED STONE6" DIAMETER CAST IRON PIPE#1/0 STRANDED COPPERFINISHED GRADEEXOTHERMIC WELD GROUNDROD CONNECTIONINSPECTION PLATE(STEEL GRATING)REFER TO GROUNDROD DETAIL ## 1/0 - 18" BELOWGRADE (TYPICAL)1 # 1/0 TOCOLD WATER PIPE1 # 1/0 TOSERVICE ENTRANCEGROUND BUS1 # 1/0 TOSERVICE ENTRANCEGROUND BUS# 1/0# 1/02" (MIN)CHROME PLATED STEELESCUTCHEON PLATE WHENPIPING IS EXPOSED TOVIEW4 (MIN) PCF WOOL BATTINSUL PACKED AT 50%COMPRESSIONPIPECAULK (3/8" THICK MIN)FIRE RATED WALLATTACH SLEEVE TO METAL STUDUSING GALVANIZED STEEL STRAPSSCH 40 STEELPIPE SLEEVE1/4"MIN1/2"MINPIPE SLEEVEFIRE RATED WALLPIPEPACK CERAMIC FIBER ORMINERAL WOOL TO RETAINSEALANT MATERIALCAULK ANNULAR SPACEWITH FIRE STOP SEALANTTERMINATE INSULATIONAT WALLCHROME PLATED STEELESCUTCHEON PLATE WHENPIPE SLEEVE IS EXPOSEDTO VIEW (TYP)CAULK ANNULAR SPACEWITH FIRE STOP SEALANTTO A WET DEPTH OF 1"MINIMUM (BOTH SIDES)6"12"12" (MIN.)16" (MAX.)IN PAVEMENTSAWCUT EXISTING PAVEMENTAND PROVIDE JOINT SEALANTON ALL EDGESASPHALT PAVING:1 1/2" TOP COURSE2" BINDER COURSECONCRETE PAVING:MATCH EXISTING DEPTHIN LAWNGRANULARFILL.6" MIN. TOPSOILCLEANFILL, COMPACT IN4" INCREMENTS AT 95%MINIMUM DENSITY.MIN. 4" SAND ON ALL SIDES,CONCRETE ENCASED UNDERPAVEMENTNOTE:REFER TO EARTH MOVING SPECIFICATION SECTION FOR FILL REQUIREMENTS.MAINTAIN A MINIMUM OF 12" SEPARATION BETWEEN DIFFERENT SYSTEMS.REFER TO TURF AND GRASS SPECIFICATION FOR TOP SOIL REQUIREMENTS.CLEAN FILL COMPACTEDEVERY 4"UNDERGROUNDELECTRICAL LINEWARNING TAPE(2) 4" SCHEDULE 80PVC CONDUITSNOTE:DUCT SPACERS SHALL BE SIZED AND CONFIGURED TOMATCH UNDERGROUND RACEWAY CONFIGURATIONSDUCT SPACERS(DEPTH SHALL BE 18" EXCEPT24" REQUIRED UNDER PAVEMENT)....CONDUITFOUNDATION WALLCORE DRILL EXISTINGFOUNDATION WALLWATERPROOFMECHANICALSLEEVE SEALBUILDINGINTERIOR#1/0 GROUNDING ELECTRODECONDUCTOR(3) 3/4" DIA. X 10'COPPER-CLADGROUND RODSWELDEDCONNECTIONS(TYPICAL)NEUTRALBUSGROUNDBUSTO DOMESTIC ANDSPRINKLER WATER PIPES#1/0 GROUNDING ELECTRODECONDUCTORGTO GROUNDBUSBARNOTES:1. BOND OTHER METAL PIPING GROUND TERMINALS TO THE SERVICE GROUNDING ELECTRODE SYSTEM.2. THE GROUNDING ELECTRODE CONDUCTOR SHALL ONLY BE CONNECTED TO GROUNDING ELECTRODES THAT ARE AVAILABLE ON THE PREMISES.3. PROTECT GROUNDING ELECTRODE CONDUCTOR WITH NONMETALLIC RACEWAY WHEN CONDUCTOR PENETRATES FLOOR SLABS AND WALLS.4. ALL GROUNDING ELECTRODE CONDUCTORS, BONDING JUMPERS AND GROUNDING CONDUCTORS SHALL BE COPPER.PANELBOARDNMAIN BONDINGJUMPER400A MCB120/240V1 3WMDP100A MLOEXISTINGPP3-1100A MLOEXISTINGPP2-1100A MLOEXISTINGPP1-160A MLOEXISTINGPANELA100A MLOEXISTINGPPB-3200A MLO120/240V1 3WLPPB1EXISTING COMMON1-1/2" CONDUITEXISTINGDISHROOM60-AMP~~(3) 500KCMIL IN 4" PVCCONDUIT TO NYSEGUTILITY POLEE3E3E3D3E3H3(9) 3-1/2"(9) 3-1/2"(9)500 KCMIL(9)500 KCMIL(27)500 KCMILZ4(9) 3"(9) 3"(9)500 KCMIL-(27)500 KCMILZ3(8) 3-1/2"(8) 3-1/2"(8)350 KCMIL(8)500 KCMIL(24)500 KCMILY4(8) 3"(8) 3"(8)350 KCMIL-(24)500 KCMILY3(7) 3"(7) 3"(7)250 KCMIL(7)350 KCMIL(21)350 KCMILX4(7) 3"(7) 3"(7)250 KCMIL-(21)350 KCMILX3(5) 3-1/2"(5) 3-1/2"(5)#4/0(5)500 KCMIL(15)500 KCMILW4(5) 3"(5) 3"(5)#4/0-(15)500 KCMILW3(4) 3-1/2"(4) 3-1/2"(4)#4/0(4)500 KCMIL(12)500 KCMILV4(4) 3"(4) 3"(4)#4/0-(12)500 KCMILV3(4) 3"(4) 3"(4)#3/0(4)350 KCMIL(12)350 KCMILU4(4) 3"(4) 3"(4)#3/0-(12)350 KCMILU3(3) 3-1/2"(3) 3-1/2"(3)#3/0(3)500 KCMIL(9)500 KCMILT4(3) 3"(3) 3"(3)#3/0-(9)500 KCMILT3(3) 3-1/2"(3) 3"(3)#3/0(6)350 KCMIL(9)350 KCMILS5(3) 3"(3) 3"(3)#3/0(3)350 KCMIL(9)350 KCMILS4(3) 3"(3) 3"(3)#3/0-(9)350 KCMILS3(2) 4"(2) 4"(2)#3/0(4)500 KCMIL(6)500 KCMILR5(2) 3-1/2"(2) 3-1/2"(2)#3/0(2)500 KCMIL(6)500 KCMILR4(2) 3-1/2"(2) 3"(2)#3/0-(6)500 KCMILR3(2) 3-1/2"(2) 3"(2)#2/0(4)350 KCMIL(6)350 KCMILQ5(2) 3"(2) 3"(2)#2/0(2)350 KCMIL(6)350 KCMILQ4(2) 3"(2) 3"(2)#2/0-(6)350 KCMILQ3(2) 3"(2) 3"(2)#1/0(4)250 KCMIL(6)250 KCMILP5(2) 3"(2) 2-1/2"(2)#1/0(2)250 KCMIL(6)250 KCMILP4(2) 2-1/2"(2) 2-1/2"(2)#1/0-(6)250 KCMILP3(2) 3"(2) 2-1/2"(2)#1/0(4)#3/0(6)#3/0N5(2) 2-1/2"(2) 2"(2)#1/0(2)#3/0(6)#3/0N4(2) 2-1/2"(2) 2"(2)#1/0-(6)#3/0N34"4"#1/0(2)500 KCMIL(3)500 KCMILM53-1/2"3-1/2"#1/0(1)500 KCMIL(3)500 KCMILM43-1/2"3"#1/0-(3)500 KCMILM33-1/2"3"#1/0(2)350 KCMIL(3)350 KCMILL53"3"#1/0(1)350 KCMIL(3)350 KCMILL43"3"#1/0-(3)350 KCMILL33"3"#2(2)250 KCMIL(3)250 KCMILK53"2-1/2"#2(1)250 KCMIL(3)250 KCMILK42-1/2"2-1/2"#2-(3)250 KCMILK33"2-1/2"#2(2)#4/0(3)#4/0J52-1/2"2-1/2"#2(1)#4/0(3)#4/0J42-1/2"2"#2-(3)#4/0J33"2-1/2"#4(2)#3/0(3)#3/0H52-1/2"2"#4(1)#3/0(3)#3/0H42-1/2"2"#4-(3)#3/0H32-1/2"2"#4(2)#2/0(3)#2/0G52-1/2"2"#4(1)#2/0(3)#2/0G42"2"#4-(3)#2/0G32-1/2"2"#6(2)#1/0(3)#1/0F52"2"#6(1)#1/0(3)#1/0F42"1-1/2"#6-(3)#1/0F31-1/2"1-1/4"#8(1)#2(3)#2E41-1/4"1-1/4"#8-(3)#2E31-1/2"1-1/4"#8(1)#4(3)#4D41-1/4"1"#8-(3)#4D31-1/4"1"#8(1)#6(3)#6C41"3/4"#8-(3)#6C31"3/4"#10(1)#8(3)#8B43/4"3/4"#10-(3)#8B33/4"1/2"#10(1)#10(3)#10A43/4"1/2"#10-(3)#10A3CONDSIZE(AWG)(AWG)(AWG)IDPVCCONDUITGND.NEUTRAL WIRESPHASE WIRESFEEDER(5) DUPLEX RECEPTACLES (BLACK) WITH BLACK PLASTIC FACEPLATESMOUNTED IN TABLE TRENCH, EQUALLY SPACED ALONG LENGTH OF TRENCH3/4" FLEX CONDUIT WITH(2) #12, (1) #12 GND(3) CONDUCTOR (#12) CORDAND PLUG SET FOR CONNECTIONTO FLOOR BOX.1' - 4"1' - 4"1' - 4"1' - 4"1' - 4"1' - 4"LIBRARY TABLEENGSTATEOFNEWYOR K REENILANOISSEFORPDESNECIL079083KEVINCHARLESTERRYENGSTATEOFNEWYORKREENILANOISSEFORPDESNECIL079083KEVINCHARLESTERRY Date:Drawn By:Drawing Number:Project Number:1ABCDEFGHIJKLMN234567891011121314151617ABCDEFGHIJKLMNTetra Tech Engineers, Architects& Landscape Architects, P.C.CLEAR SOLUTIONScomplex worldARCHITECTS & ENGINEERSCornell UniversityIthaca, NYDelta Upsilon Fraternity HouseInterior Renovations6 South Ave08249-17002E-5013/27/2017DetailsJAS/crSCALE 12" = 1'-0"1Typical Grounding DetailsSCALE 12" = 1'-0"4Fire Rated Metal Stud Wall Sleeve DetailSCALE 12" = 1'-0"5Fire Rated CMU Wall Pipe Sleeve DetailSCALE 12" = 1'-0"3Underground Cable and Raceway TrenchDetailSCALE 12" = 1'-0"6Existing Foundation Penetration DetailA. COORDINATE ALL ELECTRICAL WORK AND POWER OUTAGES WITHOWNER AND OTHER TRADES PRIOR TO THE START OF CONSTRUCTION.NO POWER OUTAGES SHALL OCCUR WITHOUT OWNER'S PRIORKNOWLEDGE AND CONSENT.B. REFER TO DRAWING SA FOR STANDARD SYMBOLS ANDABBREVIATIONS.C. WHEN INSTALLING NEW DEVICES IN EXISTING LOCATIONS, REUSEEXISTING CONDUIT/RACEWAY AND BACK BOXES IF IN GOODCONDITION. EXTEND/INSTALL NEW CONDUIT/RACEWAY AS REQUIREDFOR PROPER MOUNTING OF DEVICE. CONCEAL ABOVE CEILINGS ORWITHIN WALLS WHERE POSSIBLE. REFER TO SPECIFICATION SECTION26 05 33.D. CIRCUIT WIRING FOR ALL LIGHTING CIRCUITS SHALL BE IN 1/2" EMTCONDUIT (MIN) OR TYPE MC CABLE CONCEALED ABOVE CEILINGS ANDIN WALLS (REFER TO SPECIFICATION SECTION 26 05 33 FORLOCATIONS WHERE MC CABLE IS ACCEPTABLE). ALL CIRCUITCONDUCTORS SHALL BE #12AWG COPPER (MIN) 90°C THHNTHERMOPLASTIC INSULATION.E. PROPERLY IDENTIFY ALL CIRCUITS AT PANELS AND J-BOXES AND INACCORDANCE WITH PROJECT SPECIFICATIONS.F. PROVIDE ALL ADAPTERS, COUPLINGS AND ASSOCIATED FITTINGSREQUIRED FOR COMPLETE OPERATIONAL SYSTEM.G. UNLESS NOTED ELSEWHERE ON THE CONTRACT DOCUMENTS, THEFOLLOWING LIST REPRESENTS THE TYPICAL MOUNTING HEIGHTS FORTHE DEVICES SHOWN:a. SWITCHES AND PANIC STATIONS...................................48" (TO TOP)b. RECEPTACLES................................................................16"c. COMPUTER RECEPTACLES.............................................16"d. WALL (W) TELEPHONE AND/OR CALL SWITCHES...........48" (TO TOP)e. TELEPHONE OUTLETS (UNLABELED)...............................16"f. VOLUME CONTROLS.........................................................48" (TO TOP)g. TELEVISION OUTLETS......................................................16"h. FIRE ALARM PULL STATIONS...........................................48" (TO TOP)i. FIRE ALARM AUDIO.VISUAL UNITS....................................88"*(OR 6" BELOW CEILING, WHICHEVER IS LOWER)j. POWER PANELS...............................................................72" (TO TOP)k. DISCONNECT SWITCHES.................................................60" (TO TOP)l. MOTOR STARTERS............................................................60" (TO TOP)THE HEIGHTS INDICATED SHALL BE NOMINAL TO THE BOTTOM OF THEBOX UNLESS NOTED OTHERWISE.H. COORDINATE ALL ELECTRICAL WORK WITH OTHER TRADES.I. WIRE EMERGENCY BATTERY PACKS TO UNSWITCHED LIGHTINGCIRCUIT SUPPLYING SPACE SERVED BY EMERGENCY BATTERY PACK.J. WIRE EXIT LIGHTS TO EXISTING EXIT LIGHT CIRCUITS.K. ALL CIRCUIT BREAKERS ADDED TO EXISTING PANELBOARDS SHALL BELISTED/LABELED FOR USE WITH EXISTING PANELBOARDS.General NotesA. ALL ELECTRICAL DEVICES INTERFERING WITH DEMOLITION WORKSHALL BE DISCONNECTED AND REMOVED, UNLESS OTHERWISENOTED. EXISTING CIRCUIT WIRING SHALL BE REMOVED BACK TOSOURCE AND PANEL DIRECTORIES MODIFIED ACCORDINGLY.B. ANY DEVICE INTERFERING WITH DEMOLITION WORK NOT SHOWN ONTHESE DRAWINGS SHALL NOT BE REMOVED WITHOUT WRITTENAUTHORIZATION FROM THE OWNER'S REPRESENTATIVE OR THEENGINEER.C. ALL ELECTRICAL DEMOLITION WORK SHALL BE PROPERLYCOORDINATED WITH ALL OTHER TRADES.D. REFER TO SPECIFICATIONS SECTION 26 05 00 FOR DEMOLITIONREQUIREMENTS.E. PROVIDE FOR THE SAFE HANDLING AND DISPOSAL OF ALL REMOVEDLIGHT FIXTURES AND BALLASTS THAT MAY CONTAIN PCBs(POLYCHLORINATED BIPHENYLS), IN ACCORDANCE WITH ALLAPPLICABLE EPA, OSHA, FEDERAL, STATE, AND LOCAL CODES ANDLAWS. REFER TO SPECIFICATIONS SECTION 26 05 01.F. PROVIDE FOR THE SAFE HANDLING AND DISPOSAL OF ALL REMOVEDFLUORESCENT LIGHT TUBES THAT MAY CONTAIN MERCURY, INACCORDANCE WITH ALL APPLICABLE EPA, OSHA, FEDERAL, STATE,AND LOCAL CODES AND LAWS. REFER TO SPECIFICATIONS SECTION26 05 01.Demolition Work General NotesKey PlanN.T.S.NCornell Facilities Code: 4722SCALE 12" = 1'-0"2Typical Panelboard GroundingRev. No.: Date: Description:NTS7One Line DiagramSCALE 1" = 1'-0"8Library Table Detail
6"
12"
12" (MIN.)
16" (MAX.)
IN PAVEMENT
SAWCUT EXISTING PAVEMENT
AND PROVIDE JOINT SEALANT
ON ALL EDGES
ASPHALT PAVING:
1 1/2" TOP COURSE
2" BINDER COURSE
CONCRETE PAVING:
MATCH EXISTING DEPTH
IN LAWN
GRANULAR
FILL.
6" MIN. TOPSOIL
CLEANFILL, COMPACT IN
4" INCREMENTS AT 95%
MINIMUM DENSITY.
MIN. 4" SAND ON ALL SIDES,
CONCRETE ENCASED UNDER
PAVEMENT
NOTE:
REFER TO EARTH MOVING SPECIFICATION SECTION FOR FILL REQUIREMENTS.
MAINTAIN A MINIMUM OF 12" SEPARATION BETWEEN DIFFERENT SYSTEMS. REFER TO
TURF AND GRASS SPECIFICATION FOR TOP SOIL REQUIREMENTS.
CLEAN FILL COMPACTED
EVERY 4"
UNDERGROUND
ELECTRICAL LINE
WARNING TAPE
(3) 4" SCHEDULE 80
PVC CONDUITS
NOTE:
DUCT SPACERS SHALL BE SIZED AND CONFIGURED TO
MATCH UNDERGROUND RACEWAY CONFIGURATIONS
DUCT SPACERS (DEPTH SHALL BE 18" EXCEPT24" REQUIRED UNDER PAVEMENT)....
12"COMMUNICATION
SPARES; WITH
(3) 1" INNERDUCTS
TETRA TECH
ARCHITECTS & ENGINEERS 1234567ABCDE
Drawing No.:
Rev.:Date:Description:Tetra Tech Engineers, Architects & Landscape Architects, P.C.
Proj. No.: 08249-17002
Date:04/19/17
Drawn By: JAS/cr
BID-E-04
Cornell University Ithaca, NY
Revised Underground Cable and Raceway Trench Detail
Delta Upsilon Fraternity House 6 South Ave Interior Renovations
MODIFIES DRAWING E-501
SCALE 12" = 1'-0"1
Underground Cable and Raceway Trench
Detail
2ITEM SYMBOL DESCRIPTIONLUMENS WATTAGE TYPELAMPSNAME MODEL OR SERIESMANUFACTURERS (OR EQUAL)LIGHT FIXTURE SCHEDULEUSAI LIGHTING1100 LED201A 1X4 LED LINEAR PENDANTKENALL4758 LED49 MLHA8-48-F-MW-PP-45L35K-DC-1-120-DL3LED4AXO LIGHTLED95E-6-105-0-07-1-3WALL/CEILING LED SPOTLIGHTNOTES2221-B1-S-10-LRTD3-9020-M2-30KS-50-FT-120V-DIML2EXIT LIGHT WITH BATTERY BACKUP( DOUBLE FACED)LED SIMKAR- .6 SLED-B-R-W-SD204" RECESSED LED DOWNLIGHTSCOTTARCHITECTURELIGHTING7600 60 S2121-L60-30K-BN-OA34" DECORATIVE PENDANT LED1363 LED26TRADITIONAL ROUND VANITY LED LITHONIAFMVTRL-24IN-MVOLT-30K-90CRI-BN-EMERGENCY LIGHT LED SIMKAR- 1.6 DLM-W-SR-RC30EMERGENCY LIGHT - REMOTE HEADS LED SIMKAR- 1.6 DLH-R-2-W-WP3161500 LED203" RECESSED LED WALL WASH USAI LIGHTINGB3RWF-20M2-27KH-WH-WH-FT-UNV-D272160 LED27LINEAR LED INDOOR TAPE LIGHT TIVOLITPL-SB-3.0-I-27-C-24 WITH ADUL-240-2-4-24-DWITH MOUNTING CHANNEL INF-C-CHAN-8 AND ENDCAP INF-EC1B 1X4 LED LINEAR WALL MOUNTED KENALL4758 LED49 MLHA8-48-F-MW-PP-45L35K-DC-1-120-DL-CMBENGSTATEOFNEWYOR K REENILANOISSEFORPDESNECIL079083KEVINCHARLESTERRYENGSTATEOFNEWYORKREENILANOISSEFORPDESNECIL079083KEVINCHARLESTERRY Date:Drawn By:Drawing Number:Project Number:1ABCDEFGHIJKLMN234567891011121314151617ABCDEFGHIJKLMNTetra Tech Engineers, Architects& Landscape Architects, P.C.CLEAR SOLUTIONScomplex worldARCHITECTS & ENGINEERSCornell UniversityIthaca, NYDelta Upsilon Fraternity HouseInterior Renovations6 South Ave08249-17002E-5023/27/2017SchedulesJAS/crKey PlanN.T.S.NCornell Facilities Code: 4722Rev. No.: Date: Description:TOTAL CONNECTED LOAD:2.783 kVASUPPLIED FROM:* -GFCI BREAKER ** -SHUNT TRIP BREAKER A B# -PROVIDE BREAKER AS REQUIRED BY PANELBOARDMANUFACTURER FOR TVSSTOTAL CONNECTED LOAD PER PHASE (VA)1550 VA 1225 VA53545152495047484546434441 1 20 A SPARE 0 VA 0 VA SPARE 20 A 1 4239 1 20 A SPARE0 VA 0 VA SPARE 20 A 1 4037 1 20 A SPARE 0 VA 0 VA SPARE 20 A 1 3835 1 20 A SPARE0 VA 0 VA SPARE 20 A 1 3633 1 20 A SPARE 0 VA 0 VA SPARE 20 A 1 3431 1 20 A SPARE0 VA 0 VA SPARE 20 A 1 3229 1 20 A SPARE 0 VA 0 VA SPARE 20 A 1 3027 1 20 A LIGHTING 101A580 VA 300 VA EM/EXIT LIGHTING FIRST FLOOR 20 A 1 2825 1 20 A EM/EXIT LIGHTING BASEMENT 300 VA 1250 VA LIGHTING 101 20 A 1 2623 1 20 A LIGHTING B0022, B0041, B0063 153 VA 192 VA LIGHTING B07, B0042 20 A 1 24210 VA 0 VA22192 30 A DUMBWAITER0 VA 0 VASPARE 20 A 22017 1 20 A FIRE ALARM PANEL 0 VA 0 VA EM SECOND AND THIRD FLOORS 20 A 1 18150 VA 0 VA16132 60 A SPARE0 VA 0 VASPARE 100 A 214110 VA 0 VA1292 100 A EXISTING PANEL PPB30 VA 0 VAEXISTING PANEL A - KITCHEN 60 A 21070 VA 0 VA852 80 A EXISTING THIRD FLOOR PANEL0 VA 0 VANEW PANEL LPPB1 200 A 2630 VA 0 VA412 80 A EXISTING FIRST FLOOR PANEL0 VA 0 VAEXISTING SECOND FLOOR PANEL 80 A 22CKT NO. POLESTRIPAMPSLOAD SERVEDABLOAD SERVEDTRIPAMPSPOLES CKT NO. 120/240VOLTS 1 PHASE 3 WIRE 60 HERTZ 400 AMP BUSSE LABEL 400AMP MAIN (LUGS) OR 400 AMP MAIN BREAKER WITH 400 AMP TRIPLocation: ELEC B0063 SURFACE MOUNTED 10K SYM. A.I.C.... ENCLOSURE TYPE Type 1PANELBOARD: MDPTOTAL CONNECTED LOAD:9.852 kVASUPPLIED FROM:* -GFCI BREAKER ** -SHUNT TRIP BREAKER A B# -PROVIDE BREAKER AS REQUIRED BY PANELBOARDMANUFACTURER FOR TVSSTOTAL CONNECTED LOAD PER PHASE (VA)6028 VA 3824 VA530 VA 0 VA54512 20 A SPARE0 VA 0 VASPARE 20 A 252490 VA 0 VA50472 20 A EXISTING0 VA 0 VAEXISTING 20 A 248450 VA 0 VA46432 20 A EXISTING0 VA 0 VAEXISTING 20 A 24441 1 20 A SPARE 0 VA 0 VA SPARE 20 A 1 4239 1 20 A SPARE0 VA 0 VA SPARE 20 A 1 4037 1 20 A SPARE 0 VA 0 VA SPARE 20 A 1 3835 1 20 A FIREPLACE LOG INSERT 180 VA 2024 VA CUH UNITS 20 A 1 3633 1 20 A CUH UNITS 2024 VA 180 VA FIRE PLACE LOG INSERT 20 A 1 3431 1 20 A DRYER180 VA 180 VA DRYER 20 A 1 3229 1 20 A WASHER 180 VA 180 VA DRYER 20 A 1 3027 1 20 A WASHER180 VA 180 VA WASHER 20 A 1 2825 1 20 A RECEPTS B0063 540 VA 900 VA RECEPTS B07 20 A 1 2623 1 20 A RECEPTS B0022, B0041, B0042 720 VA 180 VA CONTROL POWER B0063 20 A 1 2421 1 20 A EXHAUST FAN B0022 1012 VA 1012 VA CABINET UNIT HEATER B0062 20 A 1 2219 1 20 A EXISTING0 VA 0 VA EXISTING 20 A 1 2017 1 20 A EXISTING 0 VA 0 VA EXISTING 20 A 1 1815 1 20 A EXISTING0 VA 0 VA EXISTING 20 A 1 1613 1 20 A EXISTING 0 VA 0 VA EXISTING 20 A 1 1411 1 20 A COOLER0 VA 0 VA KITCHEN COOLER 20 A 1 129 1 20 A MEAT CUTTER/MIXER 0 VA 0 VA EXISTING RECEPTS 20 A 1 107 1 20 A COOLER0 VA 0 VA EXISTING 20 A 1 85 1 20 A BAR 0 VA 0 VA WALK-IN COOLER 20 A 1 63 1 20 A CONDENSOR ROOM EX FAN 0 VA 0 VA EXISTING BOILER 20 A 1 41 1 20 A SPRINKLER LOW TEMP SENSOR 0 VA 0 VA EXISTING 20 A 1 2CKT NO. POLESTRIPAMPSLOAD SERVEDABLOAD SERVEDTRIPAMPSPOLES CKT NO.120/240VOLTS 1 PHASE 3 WIRE 60 HERTZ 225 AMP BUSSE LABEL225 AMP MAIN (LUGS) OR AMP MAIN BREAKER WITH AMP TRIPLocation: ELEC B0063 SURFACE MOUNTED 10K SYM. A.I.C.... ENCLOSURE TYPE Type 1PANELBOARD: LPPB1TOTAL CONNECTED LOAD:8.100 kVASUPPLIED FROM:* -GFCI BREAKER ** -SHUNT TRIP BREAKER A B# -PROVIDE BREAKER AS REQUIRED BY PANELBOARDMANUFACTURER FOR TVSSTOTAL CONNECTED LOAD PER PHASE (VA)4680 VA 3420 VA29 1 20 A SPARE 0 VA 0 VA SPARE 20 A 1 3027 1 20 A SPARE0 VA 0 VA SPARE 20 A 1 2825 1 20 A RECEPTS 104 1080 VA 1080 VA RECEPTS 104 20 A 1 2623 1 20 A RECEPTS 101A900 VA 1080 VA RECEPTS 104 20 A 1 2421 1 20 A RECEPTS 101A 900 VA 900 VA RECEPTS 101A 20 A 1 2219 1 20 A RECEPTS 101, 102720 VA 720 VA RECEPTS 101 20 A 1 2017 1 20 A EXISTING 0 VA 720 VA RECEPTS 102, 103 20 A 1 1815 1 20 A EXISTING0 VA 0 VA1613 1 20 A EXISTING 0 VA 0 VAEXISTING DISH ROOM PANEL FEEDER 60 A 21411 1 20 A EXISTING0 VA 0 VA EXISTING 20 A 1 129 1 20 A EXISTING 0 VA 0 VA EXISTING 20 A 1 107 1 20 A EXISTING0 VA 0 VA EXISTING 20 A 1 85 1 20 A EXISTING 0 VA 0 VA EXISTING 20 A 1 63 1 20 A EXISTING0 VA 0 VA EXISTING 20 A 1 41 1 20 A EXISTING 0 VA 0 VA EXISTING 20 A 1 2CKT NO. POLESTRIPAMPSLOAD SERVEDABLOAD SERVEDTRIPAMPSPOLES CKT NO.120/240VOLTS 1 PHASE 3 WIRE 60 HERTZ 100 AMP BUSSE LABEL100 AMP MAIN (LUGS) OR AMP MAIN BREAKER WITH AMP TRIPLocation: ELEC 10062 Surface MOUNTED 10K SYM. A.I.C.... ENCLOSURE TYPE Type 1PANELBOARD: PP1-1
DDDWWWDDDWWWDDDWWWP1002P1003P1005EXG 2" GASTO BOILER RMLOWERBASEMENTB04BEDROOMB01CLOSETB01ACLOSETB01BCLOSETB01CUPPERBASEMENTB0042BEDROOMB02VESTIBULEB0041ROOMB05KITCHENB06STORAGEB06ADRY STORAGEB06BMECHB06CFREZZER-COOLER-STAIRB0003DUMBWAITERB0061CLOSETB02ACLOSETB02BMENS TOILETB0021MENS TOILETB0020MECHANICALB0062ELECB0063RESTROOMB0022SPRINKLERB0060STORAGEB07STAIRB0002FD TOREMAIN3" SANBURIED TOREMAIN (VIF)3" SAN BURIEDTO REMAIN (VIF)SANSANCOMMUNICATIONB03DSTORAGEB03CLAUNDRYB03BMECHANICALB0062STAIRB0002ELECB0063REMOVE 1/2" CW, HW,2" SAN RISER BEHINDWASHING MACHINE3/4" CW, HWTO REMAINREPLACE 3"SAN BURIEDEXG 4" SANBURIED (VIF)EXG 3" SANBURIED (VIF)POCPOCEXG 2" SANBURIED (VIF)3" SAN BURIED2" SAN UPIN WALL2" SAN UPIN WALL3" SAN UPTO WCEXG FLOOR DRAIN2" SAN BURIED3" SAN BURIED3" SAN UP IN STUD WALL,SEE 2/P1013" SAN UP TOCLEANOUTSANSANSANSAN3" W/ "P" TRAP UP TOFLOOR DRAINEXG 2" UP TOCLEANOUTLAUNDRYB07ELECB0063STAIRB0002RESTROOMB0022MECHANICALB0062UPPERBASEMENTB0042CLOSETB01ACLOSETB01BCLOSETB01CVESTIBULEB0041POCPOC2" VENTABOVE CLGEXG 3" VENT ABOVE CLGREPLACE STRAINERON EXG FLOOR DRAINEXGCODPWC1/2" GAS UPTO FIREPLACEABOVELAV1/2" HW, CW, 2" VENTDN IN WALL, SEE 2/P101LAUNDRY TUB1/2" HW, CWABOVE CLGCODP3/4" HW, CW, 2" VENTDN IN WALL, SEE 2/P101EXG 3/4" HW,CW ABOVE CLG3/4" GAS, CONNTO EXGVVVVVVGGGG3" FD1/2" CW, HWDN IN WALL2" V DN,2" SAN DNTHRU FLRPOCEXG 2" GLAUNDRYB07ELECB0063RESTROOMB0022UPPERBASEMENTB0042VESTIBULEB0041MECHANICALB0062DRY STORAGEB06BSTAIRB000211/2" GAS DN IN WALL.PROVIDE STRIKER PLATES1/2"3/4"P1006GREAT HALL102CHAPTERROOM101LIBRARY101ASTUDY ROOM103DINING ROOM104DISH ROOM104ADUMBWAITER10061FOYER10040ELEC10062CLOSET105CLOSET106CLOSET108TERRECE-STAIR10001STAIR10003NORTH DECK-EAST PATIO-1/2" GAS DNTHRU FLOORCHAPTERROOM101LIBRARY101AGAS-FIRED FIREPLACEINSERT. SEE "H" DWGSENGSTATEOFNEWYOR K REENILANOISSEFORPDESNECIL079083KEVINCHARLESTERRYENGSTATEOFNEWYORKREENILANOISSEFORPDESNECIL079083KEVINCHARLESTERRY Date:Drawn By:Drawing Number:Project Number:1ABCDEFGHIJKLMN234567891011121314151617ABCDEFGHIJKLMNTetra Tech Engineers, Architects& Landscape Architects, P.C.CLEAR SOLUTIONScomplex worldARCHITECTS & ENGINEERS6 South AvenueIthaca, NY 14850Delta Upsilon Fraternity HouseInterior Renovations6 South Ave08249-17002P1003/27/2017Floor PlansGPDSCALE 1/8" = 1'-0"1Basement PlanSCALE 1/4" = 1'-0"2Enlarged Basement Demolition PlanSCALE 1/4" = 1'-0"3Enlarged Basement Underslab PlanSCALE 1/4" = 1'-0"5Enlarged Basement PlanSCALE 1/8" = 1'-0"4First Floor PlanSCALE 1/4" = 1'-0"6Enlarged First Floor Plan1. VERIFY ALL PIPING LOCATIONS, SIZES, AND ARRANGEMENTSIN FIELD PRIOR TO BID. NOTIFY ARCHITECT IN WRITING OFANY DISCREPANCIES.2.VERIFY IN FIELD INVERT AND DIRECTION OF FLOW INEXISTING SOIL PIPE WHERE NEW SOIL PIPE IS TO BECONNECTED TO EXISTING SOIL PIPE.3.LEGALLY DISPOSE OF ALL DEMOLITION DEBRIS.4.INCLUDE TRENCHING, CUTTING AND PATCHING OF FLOORS,WALLS AND CEILINGS, INCLUDING CEILING TILE REMOVALAND REPLACEMENT, WHEN REQUIRED FOR PLUMBING WORK.PATCH ABANDONED OPENINGS AND DISTURBED FINISHES TOMATCH EXISTING. TAKE PRECAUTIONS TO PROTECTSTRUCTURAL INTEGRITY OF FLOOR OR WALLS WHENTRENCHING OR CUTTING.5.MATERIALS FOR PLUMBING INSTALLATION SHALL BE NEW,UNLESS SPECIFICALLY NOTED OTHERWISE.6.REFER TO DRAWING NO. P101 FOR FIXTURE ROUGH-INSCHEDULE.7.PROVIDE THROUGH PENETRATION FIRESTOPPING FOR FIRERATED WALLS AND FLOORS. PENETRATIONS THROUGHEXISTING WALLS AND FLOORS ARE CONSIDERED TWO-HOURPARTITIONS UNLESS SPECIFICALLY NOTED OTHERWISE.REFER TO "A" SERIES OR CODE COMPLIANCE DRAWINGSFOR LOCATION OF FIRE RATED WALLS AND FLOORS.8.REMOVAL INDICATED ON P-SERIES DRAWINGS DOES NOTNECESSARILY INDICATE FULL EXTENT OF PROJECT'SDEMOLITION WORK. COORDINATE WORK IDENTIFIED ON ALLOTHER DEMOLITION AND ABATEMENT DRAWINGS PRIOR TOBEGINNING ANY DEMOLITION WORK. COORDINATE EXACTLOCATIONS AND EXTENTS OF DEMOLITION WORK (VIF, TYPALL) WITH APPROPRIATE NEW WORK DRAWINGS PRIOR TOBEGINNING ANY DEMOLITION WORK, TYPICAL. ASBESTOSABATEMENT WILL REQUIRE PRE-ABATEMENT REMOVALS OFSELECT UTILITIES AND MAY REQUIRE INSTALLATION OFNEW OR TEMPORARY SUPPORT METHODS FOR PIPEHANGERS, BRACKETS, ETC. THAT ARE FASTENED TO ACMSURFACES TO BE REMOVED.General NotesKey PlanN.T.S.NCornell Facilities Code: 4722Rev. No.: Date: Description:Plumbing NotesEXISTING HAND HOLE ACCESS DOOR INTO FIRE PLACE SUPPORTSTRUCTURE. USE THIS ACCESS TO ROUTE GAS PIPING UP TO FIREPLACE INSERTS ABOVE.1
3/4" HEADERSIN WALL2"1/2"(3) WASHERWALL BOX2"2"3" SAN UPTHRU FLOOR3" BURIEDLAUNDRY TUB2" BURIED1/2" CW, HW,1 1/2" V IN WALL2" V, 3/4" CW, HW2"CODP3" FDCONT ON 5/P100CONT ON5/P100"P" TRAPEXG 3" VABOVE CLG2" V ABOVE CLG2" V ONIN CHASE1/2" HW, CWON IN CHASEEXG COOP3" BURIEDEXG 3"BURIEDEXG 3" SANBURIEDEXG 3/4" CW,HW AT CLGEXG 3" SANBURIEDEXG FDWCLAVCONT ON5/P100CONT ON5/P10018 GAUGE GALVPIPELOW DENSITY PIPEINSULATIONPIPE HANGERHANGER RODEQEQ12"(MINERAL FIBER)(1/2"-3" ONLY)INSULATION SHIELDNEW FLOOR FINISH TO MATCHEXISTING IN ELEV, MATERIAL,COLOR. REFER TO ARCHDWGS FOR EXTENT OFDEMOLITION AND FINISH WORKBY CONTRACTOR RESPONSIBLEFOR GENERAL WORKEXG CONC SLAB ANDFLOOR FINISHPIPE BEDDING MATERIAL - SEESECTION 31 20 00 "EARTHMOVING" FOR TYPE ANDPLACEMENT REQUIREMENTS3" MINBURIED PIPESAW CUT / REMOVEEXG FLOOR FINISHAND CONCRETE5" SLAB#3 EPOXY COATED DWL X 1'-0" LG@ 24" O.C. CHEMICAL ANCHOR INDRILLED HOLE W/ CHEMICALANCHOR SYSTEM EQUIPMENTSIM TO "HVA SYSTEM" BY HILTIEMBED MIN 1 1/2" (TYP)6" MINTYPE 2 FILLVAPORBARRIERBULB NEW SLAB UNDEREXG SLAB, ENSURENO VOIDS REMAINBELOW EXG SLABCONC FLOORCORE DRILL EXG1/2'' MIN (TYP)EXG FLOORSEALANT (TYP)WITH FIRE STOPCAULK ANNULAR SPACEPIPERISER CLAMP ONFLOOR ABOVE GRADEINSULATION(WHEN SPECIFIED)Plumbing Fixture ScheduleDWGLABELROUGH-IN CONNECTION SIZE (INCHES)SANVENTCWHWACCESSIBLEDESCRIPTIONNOTES:1. REFER TO TOILET ROOM PLANS ON "A" DRAWINGS FOR FIXTURE CENTERLINE DIMENSIONS.2. REFER TO "MOUNTING HEIGHTS - GENERAL ADULT USE, 7TH GRADE" DETAIL ON "A" DRAWINGS FOR ADULT BARRIER FREE FIXTURE MOUNTING HEIGHTS.--FD1/2MEDIUM DUTY, CAST-IRON FLOOR DRAIN WITH 7" DIAMETER NICKEL BRONZE STRAINER, DEEP-SEAL P-TRAP AND TRAP SEAL PRIMER CONNECTION.NOTESWASHERWALL BOX42--LAVYES1 1/21/21 1/21/21, 2WCYES4121, 2-VITREOUS CHINA, FLOOR MOUNTED, ACCESSIBLE, ELONGATED BOWL, FLUSH TANK, SUPPLY AND SEAT.VITREOUS CHINA, WALL MOUNTED WITH SUPPORT, ACCESSIBLE, MANUAL-TYPE TWO-HANDLE MIXING, COMMERCIAL, SOLID BRASS VALVE,SUPPLIES, OFFSET TAILPIECE AND TRAP.---LAUNDRYTUB-21/221/2221/2RECESSED WASHER WALL BOX WITH QUARTER TURN SUPPLY STOPS AND DRAIN CONNECTION.LEG MOUNTED WITH DECK MOUNTED FAUCET, SUPPLIES AND TRAP.ENGSTATEOFNEWYOR K REENILANOISSEFORPDESNECIL079083KEVINCHARLESTERRYENGSTATEOFNEWYORKREENILANOISSEFORPDESNECIL079083KEVINCHARLESTERRY Date:Drawn By:Drawing Number:Project Number:1ABCDEFGHIJKLMN234567891011121314151617ABCDEFGHIJKLMNTetra Tech Engineers, Architects& Landscape Architects, P.C.CLEAR SOLUTIONScomplex worldARCHITECTS & ENGINEERS6 South AvenueIthaca, NY 14850Delta Upsilon Fraternity HouseInterior Renovations6 South Ave08249-17002P1013/27/2017Details and SchedulesGPDNTS2Laundry Room IsometricNTS1Toilet Room IsometricNTS3Insulation Shield DetailNTS4Trenching Below Existing Slab DetailNTS5Existing Floor Penetration DetailPOCPOCPOC1. REFER TO DRAWING NO. P100 FOR GENERAL NOTES.Drawing NotesKey PlanN.T.S.NCornell Facilities Code: 4722Rev. No.: Date: Description:POC
DDDWWWDDDWWWCLOSETB01ACLOSETB01BCLOSETB01CMECHANICALB0062COMMUNICATIONB03DSTORAGEB03CLAUNDRYB03BUPPERBASEMENTB0042STAIRB0002REMOVE UPRIGHTSPKR HEADREMOVE PENDANTSPKR HEAD2" SPKR TOREMAINELECB031" SPKR TOREMAINREMOVE 1" SPKRBACK TO MAIN1" SPKR TOREMAIN1" SPKR TOREMAIN1" SPKR TOREMAINUPRIGHT SPKRHEAD TO REMAINFP1002FP1003LOWERBASEMENTB04BEDROOMB01CLOSETB01ACLOSETB01BCLOSETB01CUPPERBASEMENTB0042BEDROOMB02VESTIBULEB0041ROOMB05KITCHENB06STORAGEB06ADRY STORAGEB06BMECHB06CFREZZER-COOLER-STAIRB0003DUMBWAITERB0061CLOSETB02ACLOSETB02BMENS TOILETB0021MENS TOILETB0020MECHANICALB0062ELECB0063RESTROOMB0022LAUNDRYB07SPRINKLERB0060STORAGEB07STAIRB0002COMMUNICATIONB03DUPPERBASEMENTB0042LAUNDRYB07ELECB0063RESTROOMB0022VESTIBULEB0041MECHANICALB0062STAIRB0002CLOSETB01CCLOSETB01BCLOSETB01APOCPOCSPKREXG 1"SPKR1"11EXG 1"EXG 2"SPKR11"1"ENGSTATEOFNEWYOR K REENILANOISSEFORPDESNECIL079083KEVINCHARLESTERRYENGSTATEOFNEWYORKREENILANOISSEFORPDESNECIL079083KEVINCHARLESTERRY Date:Drawn By:Drawing Number:Project Number:1ABCDEFGHIJKLMN234567891011121314151617ABCDEFGHIJKLMNTetra Tech Engineers, Architects& Landscape Architects, P.C.CLEAR SOLUTIONScomplex worldARCHITECTS & ENGINEERS6 South AvenueIthaca, NY 14850Delta Upsilon Fraternity HouseInterior Renovations6 South Ave08249-17002FP1003/27/2017Fire Protection Plans and DetailsGPDSCALE 1/4" = 1'-0"2Enlarged Basement Fire Protection Demolition PlanSCALE 1/8" = 1'-0"1Basement Fire Protection PlanSCALE 1/4" = 1'-0"3Enlarged Basement Fire Protection Plan1. VERIFY ALL PIPING LOCATIONS, SIZES, AND ARRANGEMENTS INFIELD PRIOR TO BID. NOTIFY ARCHITECT IN WRITING OF ANYDISCREPANCIES.2.SPRINKLER HEAD LAYOUTS ARE DIAGRAMMATIC ONLY. SYSTEMDESIGN IS DELEGATED TO THE CONTRACTOR. REFER TOSPECIFICATION SECTION 21 13 16 - DRY SPRINKLER SYSTEM.3.DESIGN SPRINKLER SYSTEM AS A LIGHT HAZARD OCCUPANCYHAZARD CLASSIFICATION.4.INCLUDE TRENCHING, CUTTING AND PATCHING OF FLOORS,WALLS AND CEILINGS, INCLUDING CEILING TILE REMOVAL ANDREPLACEMENT, WHEN REQUIRED FOR PLUMBING WORK. PATCHABANDONED OPENINGS AND DISTURBED FINISHES TO MATCHEXISTING. TAKE PRECAUTIONS TO PROTECT STRUCTURALINTEGRITY OF FLOOR OR WALLS WHEN TRENCHING ORCUTTING.5.MATERIALS FOR SPRINKLER INSTALLATION SHALL BE NEW,UNLESS SPECIFICALLY NOTED OTHERWISE.6.PROVIDE THROUGH PENETRATION FIRESTOPPING FOR FIRERATED WALLS AND FLOORS. PENETRATIONS THROUGHEXISTING WALLS AND FLOORS ARE CONSIDERED TWO-HOURPARTITIONS UNLESS SPECIFICALLY NOTED OTHERWISE. REFERTO "A" SERIES OR CODE COMPLIANCE DRAWINGS FOR LOCATIONOF FIRE RATED WALLS AND FLOORS.7.REMOVAL INDICATED ON FP-SERIES DRAWINGS DOES NOTNECESSARILY INDICATE FULL EXTENT OF PROJECT'S DEMOLITIONWORK. COORDINATE WORK IDENTIFIED ON ALL OTHERDEMOLITION AND ABATEMENT DRAWINGS PRIOR TO BEGINNINGANY DEMOLITION WORK. COORDINATE EXACT LOCATIONS ANDEXTENTS OF DEMOLITION WORK (VIF, TYP ALL) WITHAPPROPRIATE NEW WORK DRAWINGS PRIOR TO BEGINNING ANYDEMOLITION WORK, TYPICAL. ASBESTOS ABATEMENT WILLREQUIRE PRE-ABATEMENT REMOVALS OF SELECT UTILITIES ANDMAY REQUIRE INSTALLATION OF NEW OR TEMPORARY SUPPORTMETHODS FOR PIPE HANGERS, BRACKETS, ETC. THAT AREFASTENED TO ACM SURFACES TO BE REMOVED.General NotesKey PlanN.T.S.NCornell Facilities Code: 4722Rev. No.: Date: Description:Plumbing NotesUPRIGHT PENDANT DRY SPRINKLER HEAD.1
CORNELL UNIVERSITY DELTA UPSILON FRATERNITY HOUSE
FACILITIES CONTRACTS INTERIOR RENOVATIONS – PHASE 1
121 HUMPHREYS SERVICE BUILDING
ITHACA, NEW YORK 14853-3701
ADDENDUM NO. 2
April 20, 2017
This Addendum contains changes to the requirements of the Contract Documents and Specifications.
Such changes are to be incorporated into the Construction Documents and shall apply to the work with
the same meaning and force as if they had been included in the original document. Wherever this
Addendum modifies a portion of a paragraph of the specifications or a portion of any Drawing, the
remainder of the Paragraph or Drawing shall remain in force.
NOTE: Provisions of all Contract Documents apply.
TECHNICAL SPECIFICATIONS
Item 1. Section 09 64 00, Paragraph 2.2.B.2
DELETE in its entirety.
REPLACE with
2. Finish – Coat Formulation: Formulated for semi-gloss finish indicated and multicoat
application.
a. Type: Water-Based Finishes.
Item 2. Section 09 64 00, Paragraph 2.2.B.3.a. and b.
DELETE in their entirety.
REPLACE with
a. Sealer: As recommended by finish manufacturer for specified finish.
b. Finish: BonaKemi USA, Inc; Bona Traffic HD, Commercial Semi-Gloss
DRAWINGS
Item 3. Drawing A-100
REVISE Plan 1 as shown on revised Drawing BID-A100, attached
Item 4. Drawing A-101, Keyed Selective Demolition Notes, Note 11
DELETE in its entirety.
REPLACE with
11. SAW CUT AND REMOVE PORTION OF EXISTING SEATING SURFACE.
PREPARE EXPOSED EDGE FOR WOOD TRIM, SEE DETAIL 2/A111.
Delta Upsilon Fraternity House Interior Renovations – Phase 1
Addendum No. 02
04/20/17
Page 2
Item 5. Drawing A121
DELETE drawing note, Plan 1, reading “REPAIR JOINT AT SOFFIT, SEE PHOTO
REFERENCE”
REPLACE with
REPAIR JOINT AT SOFFIT, SEE 20/A180
Item 6. Drawing A170
DELETE drawing note, Detail 2 which reads “PROVIDE FULL FINISHED SIDE
SUPPORT PANELS SIMILAR TO INTERMEDIATE PANELS – TYP BOTH SIDES
REPLACE with
FINISHED SIDE SUPPORT PANELS SIMILAR TO INTERMEDIATE PANELS –
TYP BOTH SIDES. BY CASEWORK MANUFACTURER.
DELETE all instances of the word “PROVIDE” at Details 3, 4, 6, 7, 8, 9, 10, 11, and 12.
ADD to GENERAL NOTES FOR CABINETS; note to read as follows:
DETAILS 6, 7, 8, 9, 10, 11, AND 12 ARE SHOWN FOR REFERENCE AND
CLARITY. CUSTOM WOOD WORK TO BE FURNISHED BY OWNER AND
INSTALLED BY CONTRACTOR.
REVISE Detail 10
DELETE Trestle Tables – Side Elevation
REPLACE with
Trestle Table – Side Elevation
REVISE Detail 12
DELETE Trestle Tables – End Section
REPLACE with
Trestle Table – End Section
Delta Upsilon Fraternity House Interior Renovations – Phase 1
Addendum No. 02
04/20/17
Page 3
Item 7. Drawing A180
ADD Detail 20 as shown on revised drawing BID-A180, attached.
CHANGE Details 6, 7, 9, and 10
Scale to read as follows: “NTS”
Item 8. Drawing M-103
REPLACE Plan 1 as show on revised drawing BID-M-01, attached.
Item 9. Drawing E-105, Plan 1
Refer to Library 101A; ADD note for rectangular table centered in room to read as follows:
“TRESTLE TABLE BY OWNER, SEE A170”
Item 10. Drawing E-100, Plan 2
REPLACE drawing Plan 2 with the revised drawing BID-E-02, attached.
Item 11. Drawing E-101, Keyed Note 3 and 6
DELETE in their entirety.
REPLACE with
3. DISCONNECT AND REMOVE EXISTING CEILING LIGHT FIXTURE. RETAIN
WIRING FOR CONNECTION TO NEW LIGHT FIXTURES. MODIFY/EXTEND
WIRING AS REQUIRED.
6. REMOVE EXISTING EMERGENCY BATTERY LIGHT. RETAIN WIRING FOR
REUSE WITH NEW FIXTURE. MODIFY/EXTEND WIRING AS REQUIRED.
Item 12. Drawing E-103
DELETE Plan 2, Partial Site Plan Note
PROVIDE (2) 4” SCHEDULE 80 PVC CONDUITS (1) ACTIVE-(3) 500 KCMIL (1)
SPARE WITH PULL STRING
REPLACE with
PROVIDE (3) 4” SCHEDULE 80 PVC CONDUITS (1) ACTIVE WITH (3) 500 KCMIL
CONDUCTORS, (1) SPARE WITH PULL STRING, (1) SPARE WITH (3) 1” HDPE
CORREGATED INNERDUCTS WITH PULL STRINGS. REFER TO DETAIL 3/E-501.
Delta Upsilon Fraternity House Interior Renovations – Phase 1
Addendum No. 02
04/20/17
Page 4
Item 13. Drawing E-105
REVISE Plan 1 drawing as show on revised Drawing BID-E-03, attached.
Item 14. Drawing E-501
REVISE Detail 3 as show on revised Drawing BID-E-04, attached.
Item 15. Drawing BID-E-01:
DELETE Drawing BID-E-01(issued in Addendum No. 1) in its entirety.
REPLACE with revised Drawing BID-E-05, attached.
Attachments:
BID-A100 Partial Basement Floor Demolition Plan
BID-A180 Great Hall Soffit Joint
BID-M-01 Revised Partial First Floor Plan
BID-E-02 Basement Power Plan-Demolition
BID-E-03 Partial First Floor Power Plan
BID-E-04 Revised Underground Cable and Raceway Trench Detail
BID-E-05 Partial Lighting Plan and Fixture Schedule – Casement Lighting
****END OF ADDENDUM****
UP
CLOSET
B01A
CLOSET
B01B
CLOSET
B01C
STAIR
B0002
COMMUNICATION
B03D
STORAGE
B03C
LAUNDRY
B03B
12
2
2
4
4 2
1
4
4
2
2
5"3' - 8"
13
3
9
9
9 9
14
14 14
13
ELEC
B03
PROVIDE LINTEL
PER LINTEL
SCHEDULE
13
14
149
EXG TO
REMAIN
9 14
2
2
TETRA TECH
ARCHITECTS & ENGINEERS
Drawing No.:
Rev.:Date:Tetra Tech Engineers, Architects & Landscape Architects, P.C.
Proj. No.: 08249-17002
Date:04/20/17
Drawn By: KRG
BID-A100
6 South Avenue Ithaca, NY 14850
Partial Basement Floor Demolition Plan
Delta Upsilon Fraternity House Interior Renovations - Phase I
SCALE 3/16" = 1'-0"1 Partial Basement Floor Demolition Plan
DRAWING PARTIALLY SUPERCEEDS 1/A100
2
2
TETRA TECH
ARCHITECTS & ENGINEERS
Drawing No.:
Rev.:Date:Tetra Tech Engineers, Architects & Landscape Architects, P.C.
Proj. No.: 08249-17002
Date:04/13/17
Drawn By: Author
BID-A180
6 South Avenue Ithaca, NY 14850
Great Hall Soffit Joint
Delta Upsilon Fraternity House Interior Renovations - Phase I
NTS20Great Hall Soffit Joint
REPAIR JOINT AT SOFFIT,
TYPICAL FULL LENGTH
TSRUN 3/4" HWS & HWR PIPES THROUGH
EXISTING COLUMN CASING
PENETRATIONS
MENDOTA FIREPLACE INSERT FV44i.
SEE 2/M-501.
FT-1
PR-2
LIBRARY
101A 3/4" HWR DN
THROUGH FLOOR,
WITHIN FIN TUBE
ENCLOSURE
3/4" HWS DN
THROUGH FLOOR,
WITHIN FIN TUBE
ENCLOSURE
TETRA TECH
ARCHITECTS & ENGINEERS
Drawing No.:
Rev.:Date:Tetra Tech Engineers, Architects & Landscape Architects, P.C.
Proj. No.: 08249-17002
Date:04/19/17
Drawn By: GPD
BID-M-01
Cornell University Ithaca, NY
Revised Partial First Floor Plan
Delta Upsilon Fraternity House 6 South Ave Interior Renovations
SCALE 1/4" = 1'-0"1 Partial Revised First Floor Plan
Drawing Issued by Bid Addendum No. 2
RFACPRPHONE DEMARK
PHONE
DATA
RACK 2
VIDEO
SPLITERS
FIBER
OPTIC
MAIN
DISTRIBUTION
PANEL
CIRCUIT
BREAKER
TYPICAL OF 4
SHALL BE REMOVED
UTILITY
METER
M
2 1
3
5
3
3
4
4
6
6
3
3
3
3
WIREMOLD
7
7
7
8
TETRA TECH
ARCHITECTS & ENGINEERS 1234567ABCDE
Drawing No.:
Rev.:Date:Description:Tetra Tech Engineers, Architects & Landscape Architects, P.C.
Proj. No.: 08249-17002
Date:04/19/17
Drawn By: JAS/cr
BID-E-02
Cornell University Ithaca, NY
Basement Power Plan-Demolition
Delta Upsilon Fraternity House 6 South Ave Interior Renovations
SCALE 1/4" = 1'-0"1 Basement Enlarged Demolition Plan BID 02
Keyed Notes
8 REMOVE EXISTING SERVICE ENTRANCE
CONDUCTORS, CONDUIT, WEATHERHEAD,
MAST AND OVERHEAD CONDUCTORS AFTER
NEW ELECTRIC SERVICE HAS BEEN
INSPECTED AND ACTIVATED.
MODIFIES DRAWING E-100
H
H
H
HCOFF FCM
CM
CO
CO CO TSJ
CHAPTER
ROOM
101
STAIR
10003
LIBRARY
101A
E
E
E
E
E
WP
E
E
E
USB
USB
USBSURFACE RACEWAY
USB
USB
USB
USB
FLUSH MOUNTED FLOOR BOX
WITH 2-DUPLEX RECEPTACLES
USB
USB
USB
USB
USB
USB
1ELECTRIC CONNECTION
FOR LOG SET INSERTS
5
3
4
5
2
8
SURFACE RACEWAY
48"
48"
USB
USB
USB
USB
14
10
USB
R
12
12
11
11
13
LPPB1- 33 LPPB1- 36
LPPB1- 36
LPPB1- 33
PP1-1- 19
PP1-1- 19
PP1-1- 20
LPPB1- 34
LPPB1- 35
PP1-1- 21 PP1-1- 22
PP1-1- 23
9 8 9
16
15
TETRA TECH
ARCHITECTS & ENGINEERS 1234567ABCDE
Drawing No.:
Rev.:Date:Description:Tetra Tech Engineers, Architects & Landscape Architects, P.C.
Proj. No.: 08249-17002
Date:04/19/17
Drawn By: JAS/cr
BID-E-03
Cornell University Ithaca, NY
Partial First Floor Power Plan
Delta Upsilon Fraternity House 6 South Ave Interior Renovations
SCALE 3/16" = 1'-0"1 Partial Floor Power Plan BID 03
Keyed Notes
1 PROVIDE A SINGLE 120V, 20-AMP CIRCUIT TO
GAS LOG SETS.
PROVIDE TAMPER RESISTANT, DUPLEX
RECEPTACLE WITH (2) USB CHARGING PORTS
MOUNTED IN SURFACE METAL RACEWAY,
PAINTED
TO MATCH WALL.
PROVIDE CARBON MONOXIDE DETECTOR WITH
SOUNDER BASE. CONNECT TO FIRE ALARM
SYSTEM. PROVIDE ALL WIRING AND
PROGRAMMING REQUIRED.
PROVIDE TV OUTLET. CONNECT TO TV
SPLITTERS IN ELECTRICAL ROOM IN
BASEMENT.
5
6
PROVIDE DUPLEX RECEPTACLE AND DATA
OUTLET IN SURFACE RACEWAY. MOUNT
INSIDE BASE CABINET. COORDINATE WITH
CABINET SUPPLIER. SURFACE RACEWAY AND
OUTLETS TO BE AT 6" A.F.F.
8
PROVIDE POWER CONNECTION FOR LIGHTS
INSIDE THE CASEWORK.
9
PROVIDE TAMPER RESISTANT, DUPLEX
RECEPTACLE WITH (2) USB CHARGING PORTS,
MOUNTED IN SURFACE METAL RACEWAY
FASTENED UNDER WINDOW SEATING, PAINTED
TO MATCH SURFACE.
10
AFTER NEW CABINET HEATER IS INSTALLED,
CONNECT EXISTING POWER CONDUCTORS.
EXTEND/MODIFY CONDUCTORS AS REQUIRED.
11
DISCONNECT CABINET HEATER POWER FOR
TEMPORARY REMOVAL. RECONNECT ONCE
RE-INSTALLED. EXTEND/MODIFY
CONDUCTORS AS REQUIRED.
12
REPLACE EXISTING RECEPTACLE WITH
DUPLEX RECEPTACLE WITH (2) USB CHARGING
PORTS.
13
PROVIDE LEGRAND WIREMOLD EVOLUTION
FLOOR BOX EFB45S WITH (2) DUPLEX
RECEPTACLES AND (2) DATA OUTLETS,
COMPLETE WITH DEVICE PLATES. PROVIDE
WITH FLUSH STYLE COVER WITH FLOOR
INSERT, EFB45CTBK.
14
ALL NEW RECEPTACLES SHALL BE FED FROM
ARC-FAULT CIRCUIT
BREAKER.
7
PROVIDE DATA OUTLET IN SURFACE METAL
RACEWAY PAINTED TO MATCH WALL.
4
PROVIDE TAMPER RESISTANT, DUPLEX
RECEPTACLE WITH (2) USB CHARGING PORTS
MOUNTED IN SURFACE BOX, FED FROM
BASEMENT.
3
2
REFER TO DETAIL 8/E501 FOR WIRING IN
LIBRARY TABLE.
15
USE WIREMOLD 800 THIS LOCATION.
CAREFULLY BEND TO MATCH RADIUS.
16
MODIFIES DRAWING E-105
6"
12"
12" (MIN.)
16" (MAX.)
IN PAVEMENT
SAWCUT EXISTING PAVEMENT
AND PROVIDE JOINT SEALANT
ON ALL EDGES
ASPHALT PAVING:
1 1/2" TOP COURSE
2" BINDER COURSE
CONCRETE PAVING:
MATCH EXISTING DEPTH
IN LAWN
GRANULAR
FILL.
6" MIN. TOPSOIL
CLEANFILL, COMPACT IN
4" INCREMENTS AT 95%
MINIMUM DENSITY.
MIN. 4" SAND ON ALL SIDES,
CONCRETE ENCASED UNDER
PAVEMENT
NOTE:
REFER TO EARTH MOVING SPECIFICATION SECTION FOR FILL REQUIREMENTS.
MAINTAIN A MINIMUM OF 12" SEPARATION BETWEEN DIFFERENT SYSTEMS. REFER TO
TURF AND GRASS SPECIFICATION FOR TOP SOIL REQUIREMENTS.
CLEAN FILL COMPACTED
EVERY 4"
UNDERGROUND
ELECTRICAL LINE
WARNING TAPE
(3) 4" SCHEDULE 80
PVC CONDUITS
NOTE:
DUCT SPACERS SHALL BE SIZED AND CONFIGURED TO
MATCH UNDERGROUND RACEWAY CONFIGURATIONS
DUCT SPACERS (DEPTH SHALL BE 18" EXCEPT24" REQUIRED UNDER PAVEMENT)....
12"COMMUNICATION
SPARES; WITH
(3) 1" INNERDUCTS
TETRA TECH
ARCHITECTS & ENGINEERS 1234567ABCDE
Drawing No.:
Rev.:Date:Description:Tetra Tech Engineers, Architects & Landscape Architects, P.C.
Proj. No.: 08249-17002
Date:04/19/17
Drawn By: JAS/cr
BID-E-04
Cornell University Ithaca, NY
Revised Underground Cable and Raceway Trench Detail
Delta Upsilon Fraternity House 6 South Ave Interior Renovations
MODIFIES DRAWING E-501
SCALE 12" = 1'-0"1
Underground Cable and Raceway Trench
Detail
33J
33STAIR
10003
CHAPTER
ROOM
101
LIBRARY
101A
3A
4
4
4
20 31
2 2
2
2
2
2
2
5
3
3
30
30
1
2
4
5
5
6
7
D
D
DDD
22
6 6
6
6
6
6 6
22
22
6
7
MDP- 26
MDP- 27
MDP- 27
MDP- 27
13
12
13
11
D
TYPICAL
OF 9
FIXTURES
D
D
3D DDMDP- 26
MDP- 27
7
7
7
7
12TYPICAL
OF 4
FIXTURES
ITEM SYMBOL DESCRIPTION LUMENS WATTAGE TYPE
LAMPS
NAME MODEL OR SERIES
MANUFACTURERS (OR EQUAL)
LIGHT FIXTURE SCHEDULE
NOTES
7 220-
862 LED20LED STRIP LIGHT PHILIPS 523-000027-83
CABINET
MANUFACTURER
TO PROVIDE. FINAL
WIRING BY CONTRACTOR.
QTY
13
TETRA TECH
ARCHITECTS & ENGINEERS 1234567ABCDE
Drawing No.:
Rev.:Date:Description:Tetra Tech Engineers, Architects & Landscape Architects, P.C.
Proj. No.: 08249-17002
Date:04/19/17
Drawn By: JAS/cr
BID-E-05
Cornell University Ithaca, NY
Partial Lighting Plan and Fixture Schedule - Casement Lighting
Delta Upsilon Fraternity House 6 South Ave Interior Renovations
MODIFIES DRAWINGS E-103 AND E-502.
Keyed Notes
11 PROVIDE ROUGH-IN BOX FOR FUTURE TYPE 6
FIXTURE ABOVE CEILING.
12 REFER TO REVISED LIGHT FIXTURE
SCHEDULE FOR SIZE AND NUMBER OF TYPE
7 LIGHT FIXTURES. CABINET
MANUFACTURER TO PROVIDE TYPE 7
FIXTURES. FINAL WIRING CONNECTIONS BY
CONTRACTOR.
13 PROVIDE REVERSE-PHASE CONTROL
DIMMER COMPATABLE WITH FIXTURES
SUPPLIED FOR THE CUSTOM CABINETS.
SCALE 1/8" = 1'-0"1 Library/Chapter Room - Casement Lighting
SCALE 6" = 1'-0"2 Light Fixture Schedule Rev. 2
CORNELL UNIVERSITY DELTA UPSILON FRATERNITY HOUSE
FACILITIES CONTRACTS INTERIOR RENOVATIONS -PHASE 1
121 HUMPHREYS SERVICE BUILDING
ITHACA, NEW YORK 14853-3701
ADDENDUM NO. 1
April 17, 2017
This Addendum contains changes to the requirements of the Contract Documents and Specifications. Such
changes are to be incorporated into the Construction Documents and shall apply to the work with the same
meaning and force as if they had been included in the original document. Wherever this Addendum
modifies a portion of a paragraph of the specifications or a portion of any Drawing, the remainder of the
Paragraph or Drawing shall remain in force.
NOTE: Provisions of all Contract Documents apply.
Item 1. A second site visit has been scheduled for:
Thursday, April 20, 2017 at 9:00AM – Contractors to meet at 65 South Avenue
BID FORM
Item 2. Bid Form, Page BF-2
REPLACE BF-2 with REVISED BF-2R, attached.
GENERAL REQUIREMENTS
Item 3. Section 01 11 00, 1.1, A.3.g.
DELETE in its entirety.
Item 4. ADD Section 01 23 00 – ALTERNATES, attached.
TECHNICAL SPECIFICATIONS
Item 5. Section 09 01 60.91 – FLOORING RESTORATION
DELETE in its entirety.
Item 6. Section 09 72 00 – WALL COVERINGS
DELETE in its entirety.
Delta Upsilon Fraternity House Interior Renovations – Phase I
Addendum No. 1
April 17, 2017
Page 2
DRAWINGS
Item 7. Drawing A110, Keyed Plan Notes, Notes 2, 6 and 9
DELETE Note 2, 6 and 9 in their entirety.
REPLACE with
2. PROVIDE GLASS LITE IN EXISTING WOOD FRAME WINDOWS. GLASS TYPE
TO BE HS. MATCH EXISTING ADJACENT PROFILE AND GLAZING PUTTY
PROFILE. REFER TO ELEVATIONS. PAINT EXTERIOR OF WOOD WINDOWS
AND FRAMES TO MATCH EXISTING ADJACENT WINDOWS, INTERIOR AND
EXTERIOR WINDOWS, VIF WHERE INTERIOR WINDOWS REMAIN.
6. GAS FIREPLACE INSERT, REFER TO MECHANICAL AND PLUMBING
DRAWINGS. PROVIDE 4” SOLID CMU BASE TO SUPPORT GAS FIREPLACE
INSERT. PROVIDE MANUFACTURER’S CUSTOM METAL SURROUND TO
COVER CMU AND OTHER MASONRY WITHIN MANTEL FRAME.
9. PROVIDE WOOD STAIR TREADS AND RISERS TO MATCH WOOD FLOORING
INSTALLED IN GREAT HALL. MATCH EXISTING LAYOUT, PROFILES AND
CONSTRUCTION.
Item 8. Drawings A111, Keyed Plan Notes, Notes 2, 6 and 9
DELETE Notes 2, 6 and 9 in their entirety.
REPLACE with
2. PROVIDE GLASS LITE IN EXISTING WOOD FRAME WINDOWS. GLASS TYPE
TO BE HS. MATCH EXISTING ADJACENT PROFILE AND GLAZING PUTTY
PROFILE. REFER TO ELEVATIONS. PAINT EXTERIOR OF WOOD WINDOWS
AND FRAMES TO MATCH EXISTING ADJACENT WINDOWS, INTERIOR AND
EXTERIOR WINDOWS, VIF WHERE INTERIOR WINDOWS REMAIN.
6. GAS FIREPLACE INSERT, REFER TO MECHANICAL AND PLUMBING
DRAWINGS. PROVIDE 4” SOLID CMU BASE TO SUPPORT GAS FIREPLACE
INSERT. PROVIDE MANUFACTURER’S CUSTOM METAL SURROUND TO
COVER CMU AND OTHER MASONRY WITHIN MANTEL FRAME.
9. PROVIDE WOOD STAIR TREADS AND RISERS TO MATCH WOOD FLOORING
INSTALLED IN GREAT HALL. MATCH EXISTING LAYOUT, PROFILES AND
CONSTRUCTION.
Delta Upsilon Fraternity House Interior Renovations – Phase I
Addendum No. 1
April 17, 2017
Page 3
Item 9. Drawing A111
DELETE Keyed Plan Note No. 2 at Library 101A east exterior wall.
ADD note in same location to read
PAINT EXTERIOR OF EXG WOOD WINDOWS AND FRAMES TO MATCH EXG
ADJACENT WINDOWS, TYP.
DELETE note at Great Hall 102 that reads:
THICK LINE INDICATES AREA OF FULL WALL VINYL WALL COVERING, TYP.
REPLACE with
THICK L INE INDICATES AREA OF FULL WALL VINYL WALL COVERING,
TYP. VINYL WALL COVERING BY OTHERS.
Item 10. Drawing A120
In Restroom B0022, DELETE ceiling symbol height 7’ 0” REPLACE with 7’-6”.
In Laundry B07, DELETE dimension string indicating west soffit depth 2’ 6-5/8” REPLACE
with 2’-6”.
Item 11. Drawing A160, Door Schedule
DELETE top line of Door Schedule with no Room Number or Door Number indicated in its
entirety.
Item 12. Drawing A170, Detail 5
DELETE
PROVIDE INOPERABLE PANELS TO MATCH DOOR 102/1 TO FIT EXISTING
OPENINGS, VIF
REPLACE with
PROVIDE FIXED PANELS TO MATCH DOOR 102/1 TO FIT EXISTING OPENINGS,
VIF
Delta Upsilon Fraternity House Interior Renovations – Phase I
Addendum No. 1
April 17, 2017
Page 4
Item 13. Drawing M-103, Detail 1
DELETE note at Chapter Room 101 fireplace on east wall
MENDOTA FIREPLACE INSERT FV33i
REPLACE with
MENDOTA FIREPLACE INSERT FV44i, SEE 2/M-501
Item 14. Drawing E103, Detail 1
Sketch BID-E-01 – ADDS Keyed Notes 11, 12 and 13, attached.
Item 15. Drawing E-104, Keyed Note 8
DELETE in its entirety.
REPLACE with
CAP SPARE CONDUIT AT 12” A.F.G. AT BOTH NYSEG UTILITY POLE AND
BUILDING. PROVIDE PULL STRING IN EACH EMPTY CONDUIT OR RACEWAY.
Item 16. Drawing E-502, LIGHT FIXTURE SCHEDULE
Sketch BID-E-01 - REVISED Lighting Schedule Item No. 7, attached.
Item 17. Attached is the Pre-Bid Sign-in Sheet for reference only.
Item 18. RFI Questions and Clarifications
See attached RFI Log (Item 1)
Attachments: Bid Form BF-2R
General Requirements 01 23 00 - ALTERNATES
BID-E-01 – Partial Plan and Light Fixture Schedule
Pre-bid Sign-in Sheet
RFI Log (Item 1)
****END OF ADDENDUM****
BID FORM ADDENDUM NO. 1 BF-2R
1. ALTERNATE PROPOSAL
a. The undersigned, if awarded the Contract, proposes to perform work in addition to or in
place of the scope of the work shown and specified herein as associated with the Base Bid in accordance
with the following Alternate Proposals, which amounts are to be added or deducted to the amount of the
Base Bid as indicated for the Alternates specified in Division 1 of the Specifications.
b. If the Bidder desires to indicate that the acceptance of any Alternate or Alternates will
result neither in an addition to nor a deduction from the value of the work, he shall enter the phrase "No
Change" in response to such Alternate or Alternates.
c. It is understood that the Owner reserves the right to accept or reject any or all of the
following Alternate Proposals within twenty-one (21) calendar days following the award of a construction
contract or such other time as may be agreed to by the Owner and Contractor.
Alternate No. Description
ADD DEDUCT
ONE Provide gas fireplaces at Rooms 101 and $ $
101A.
TWO Provide finishes and plumbing fixtures $ $
at new toiler Rom B0022.
CORNELL UNIVERSITY SECTION 01 23 00
Ithaca, New York ALTERNATES
DELTA UPSILON ALTERNATES 01 23 00-1
IMPROVEMENTS - PHASE 1 (ADDENDUM NO. 1) April 17, 2017
SECTION 01 23 00 ALTERNATES
1.0 GENERAL
1.1 RELATED DOCUMENTS
A. This Section describes the changes to be made under each Alternative.
B. The Specification Section containing the pertinent requirements of materials and methods
to achieve the Work described herein.
1.2 DESCRIPTION OF REQUIREMENTS
A. Definition: An alternate is an amount proposed by Bidders and stated on the Bid Form for
certain items that may be added to or deducted from the Base Bid amount if the Owner
decides to accept a corresponding change in either the amount of construction to be
completed, or in the product, materials, equipment, systems or installation methods
described in the Contract Documents. Alternates shall include all overhead, profit and
other expenses, including bond costs, in connection therewith.
B. Coordination: Coordinate related Work and modify or adjust adjacent Work as necessary
to ensure that Work affected by each accepted alternate is complete and fully integrated
into the Project.
C. Notification: Immediately following Contract award, prepare and distribute to each party
involved, notification of the status of each alternate. Indicate whether alternates have been
accepted, rejected or deferred for consideration at a later date. Include a complete
description of negotiated modifications to alternates.
D. Schedule: A "Schedule of Alternates" is included at the end of this Section. Include as part
of each alternate, miscellaneous devices, accessory objects or similar items incidental to or
required for a complete installation whether or not mentioned as part of the alternate.
1.3 SCHEDULE OF ALTERNATES
A. ALTERNATE NO. 1
Provide gas fireplaces at Rooms 101 and 101A. Provide all noted repairs and modifications
to existing masonry fireplaces and chimneys.
Base Bid Work: Provide new gas lines and electrical conduit with pull strings for fire
places and wall-mounted controls at Rooms 101 and 101A. Repair / refinish any disturbed
finishes required to install gas line and conduit. Provide cover plates at future controls
locations. Provide CO / fire detection modifications as noted at Rooms 101 and 101A.
CORNELL UNIVERSITY SECTION 01 23 00
Ithaca, New York ALTERNATES
DELTA UPSILON ALTERNATES 01 23 00-2
IMPROVEMENTS - PHASE 1 (ADDENDUM NO. 1) April 17, 2017
B. ALTERNATE NO. 2
Provide finishes and plumbing fixtures at new toilet Room B0022. Provide ceramic tile,
plumbing fixtures and accessories.
Base Bid Work: Provide new wall studs, partitions and drywall and/or tile backerboard.
Provide all electrical conduit, switch(es), light fixture and fan at toilet Room B0022.
Provide new door and hardware. Stub out and cap all new plumbing and waste lines in
preparation for installation of future fixtures.
2.0 PRODUCTS – NOT USED
3.0 EXECUTION – NOT USED
***END OF SECTION 01 23 00**
33J
33STAIR
10003
CHAPTER
ROOM
101
LIBRARY
101A
3A
4
4
4
20 31
2 2
2
2
2
2
2
5
3
3
30
30
1
2
4
5
5
6
7
D
D
DDD
22
6 6
6
6
6
6 6
22
22
6
7
MDP- 26
MDP- 27
MDP- 27
MDP- 27
13
12
13
11
D
TYPICAL
D
D
3D DDMDP- 26
MDP- 27
7
7
7
7
ITEM SYMBOL DESCRIPTION LUMENS WATTAGE TYPE
LAMPS
NAME MODEL OR SERIES
MANUFACTURERS (OR EQUAL)
LIGHT FIXTURE SCHEDULE
NOTES
7 220-
862 LED20LED STRIP LIGHT PHILIPS 523-000027-83
DELIVER TO CABINET
SUPPLIER FOR
INSTALLATION.
EC TO MAKE FINAL
CONNECTIONS.
TETRA TECH
ARCHITECTS & ENGINEERS 1234567ABCDE
Drawing No.:
Rev.:Date:Description:Tetra Tech Engineers, Architects & Landscape Architects, P.C.
Proj. No.: 08249-17002
Date:04/14/17
Drawn By: JAS/cr
BID-E-01
Cornell University Ithaca, NY
Partial Plan and Partial Light Fixture Schedule
Delta Upsilon Fraternity House 6 South Ave Interior Renovations
SCALE 1/8" = 1'-0"1 Library/Chapter Room
Keyed Notes
11 PROVIDE ROUGH-IN BOX FOR FUTURE TYPE
6 FIXTURE ABOVE CCEILING.
12 REFER TO REVISED LIGHT FIXTURE
SCHEDULE FOR SIZE AND NUMBER OF TYPE
7 LIGHT FIXTURES. PROVIDE TO CUSTOM
CABINET SUPPLIER FOR INSTALLATION.
FINAL WIRING AND CONNECTIONS BY EC.
13 PROVIDE REVERSE-PHASE CONTROL
DIMMER COMPATABLE WITH FIXTURES
SUPPLIED FOR THE CUSTOM CABINETS.
MODIFIES DRAWINGS E-103 AND E-502.
SCALE 6" = 1'-0"2 Light Fixture Schedule Rev
Delta Upsilon Fraternity House Interior Renovations - Phase 1 Date: April 17, 2017
RFI Log
RFI/Page/
Response Dwg./Spec./Rep.Section/Design Team
Index Number Paragraph/Topic RFI Response
1 09 01 60.91 Flooring
Restroation
From everything see(n) on the drawings, all the wood flooring
is new in Room’s 101 & 102 and Room 103 just gets wood
flooring turned over for it. Can you please clarify as to what
flooring gets refinished.
See Addendum No. 1, Item 5. No locations of wood
floor refinishing are required.
BID FORM ADDENDUM NO. 1 BF-2R
1. ALTERNATE PROPOSAL
a. The undersigned, if awarded the Contract, proposes to perform work in addition to or in
place of the scope of the work shown and specified herein as associated with the Base Bid in accordance
with the following Alternate Proposals, which amounts are to be added or deducted to the amount of the
Base Bid as indicated for the Alternates specified in Division 1 of the Specifications.
b. If the Bidder desires to indicate that the acceptance of any Alternate or Alternates will
result neither in an addition to nor a deduction from the value of the work, he shall enter the phrase "No
Change" in response to such Alternate or Alternates.
c. It is understood that the Owner reserves the right to accept or reject any or all of the
following Alternate Proposals within twenty-one (21) calendar days following the award of a construction
contract or such other time as may be agreed to by the Owner and Contractor.
Alternate No. Description
ADD DEDUCT
ONE Provide gas fireplaces at Rooms 101 and $ $
101A.
TWO Provide finishes and plumbing fixtures $ $
at new toiler Rom B0022.
CORNELL UNIVERSITY SECTION 01 23 00
Ithaca, New York ALTERNATES
DELTA UPSILON ALTERNATES 01 23 00-1
IMPROVEMENTS - PHASE 1 (ADDENDUM NO. 1) April 17, 2017
SECTION 01 23 00 ALTERNATES
1.0 GENERAL
1.1 RELATED DOCUMENTS
A. This Section describes the changes to be made under each Alternative.
B. The Specification Section containing the pertinent requirements of materials and methods
to achieve the Work described herein.
1.2 DESCRIPTION OF REQUIREMENTS
A. Definition: An alternate is an amount proposed by Bidders and stated on the Bid Form for
certain items that may be added to or deducted from the Base Bid amount if the Owner
decides to accept a corresponding change in either the amount of construction to be
completed, or in the product, materials, equipment, systems or installation methods
described in the Contract Documents. Alternates shall include all overhead, profit and
other expenses, including bond costs, in connection therewith.
B. Coordination: Coordinate related Work and modify or adjust adjacent Work as necessary
to ensure that Work affected by each accepted alternate is complete and fully integrated
into the Project.
C. Notification: Immediately following Contract award, prepare and distribute to each party
involved, notification of the status of each alternate. Indicate whether alternates have been
accepted, rejected or deferred for consideration at a later date. Include a complete
description of negotiated modifications to alternates.
D. Schedule: A "Schedule of Alternates" is included at the end of this Section. Include as part
of each alternate, miscellaneous devices, accessory objects or similar items incidental to or
required for a complete installation whether or not mentioned as part of the alternate.
1.3 SCHEDULE OF ALTERNATES
A. ALTERNATE NO. 1
Provide gas fireplaces at Rooms 101 and 101A. Provide all noted repairs and modifications
to existing masonry fireplaces and chimneys.
Base Bid Work: Provide new gas lines and electrical conduit with pull strings for fire
places and wall-mounted controls at Rooms 101 and 101A. Repair / refinish any disturbed
finishes required to install gas line and conduit. Provide cover plates at future controls
locations. Provide CO / fire detection modifications as noted at Rooms 101 and 101A.
CORNELL UNIVERSITY SECTION 01 23 00
Ithaca, New York ALTERNATES
DELTA UPSILON ALTERNATES 01 23 00-2
IMPROVEMENTS - PHASE 1 (ADDENDUM NO. 1) April 17, 2017
B. ALTERNATE NO. 2
Provide finishes and plumbing fixtures at new toilet Room B0022. Provide ceramic tile,
plumbing fixtures and accessories.
Base Bid Work: Provide new wall studs, partitions and drywall and/or tile backerboard.
Provide all electrical conduit, switch(es), light fixture and fan at toilet Room B0022.
Provide new door and hardware. Stub out and cap all new plumbing and waste lines in
preparation for installation of future fixtures.
2.0 PRODUCTS – NOT USED
3.0 EXECUTION – NOT USED
***END OF SECTION 01 23 00**