Loading...
HomeMy WebLinkAboutJohnson Musuem of Art 140307-H-310.pdf 140307-150609-Specs-Bid.pdf 140307-H-307.pdf 140307-H-303.pdf 140307-T-000.pdf 140307-H-100.pdf 140307-H-309.pdf 140307-H-202.pdf 140307-H-305.pdf 140307-H-306.pdf 140307-H-204.pdf 140307-H-302.pdf 140307-H-308.pdf 140307-E-000.pdf 140307-H-304.pdf 140307-H-103.pdf 140307-E-101.pdf 140307-E-100.pdf 140307-H-400.pdf 140307-H-201.pdf 140307-H-102.pdf 140307-H-104.pdf 140307-H-301.pdf 140307-H-200.pdf 140307-H-300.pdf 140307-150609-TOC-Specs.docCORNELL UNIVERSITY - ECI - FY15 DESIGN - JOHNSON ART MUSEUM BID DOCUMENTS - JUNE 9, 2015 M/E REFERENCE 140307 P:\2014\14-0300\140307\Specs\FrontEnd\140307-TOC-Specs-CSI.doc TABLE OF CONTENTS SECTION DESCRIPTION DIVISION 23 - HEATING, VENTILATION AND AIR CONDITIONING 230500 BASIC MECHANICAL REQUIREMENTS 230504 ELECTRIC WIRING 230519 GAUGES AND THERMOMETERS 230523 VALVES 230553 MECHANICAL IDENTIFICATION 230593 TESTING, ADJUSTING AND BALANCING 230710 INSULATION 230923 BUILDING AUTOMATION CONTROL SYSTEM GUIDELINES 232010 PIPING SYSTEMS AND ACCESSORIES 232110 WATER SYSTEMS SPECIALTIES 233100 SHEET METAL AND DUCTWORK ACCESSORIES CONSTRUCTION DIVISION 26 - ELECTRICAL 260500 BASIC ELECTRICAL REQUIREMENTS 260501 BASIC MATERIALS AND METHODS 260526 GROUNDING 262000 ELECTRIC DISTRIBUTION CORNELL UNIVERSITY - ECI - FY15 DESIGN - JOHNSON ART MUSEUM 100% REVIEW - MARCH 20, 2015 M/E REFERENCE 140307 P:\2014\14-0300\140307\Specs\FrontEnd\140307-TOC-Specs-CSI.doc TABLE OF CONTENTS – CONT’D SECTION DESCRIPTION 140307-H-101.pdf 140307-H-000.pdf 140307-H-203.pdf