FACILITIES CONTRACTS MAIN ENTRANCE REPLACEMENT
121 HUMPHREYS SERVICE BUILDING
ITHACA, NEW YORK 14853-3701
ADDENDUM NO. 1
January 9, 2018
This Addendum contains changes to the requirements of the Contract Documents and Specifications. Such
changes are to be incorporated into the Construction Documents and shall apply to the work with the same
meaning and force as if they had been included in the original document. Wherever this Addendum
modifies a portion of a paragraph of the specifications or a portion of any Drawing, the remainder of the
Paragraph or Drawing shall remain in force.
NOTE: Provisions of all Contract Documents apply.
Item 1. Attached is the Pre-Bid Sign-in Sheet for reference only.
Item 2. Bid Form, Page BF-6
DELETE in its entirety and REPLACE with Revised BF-6R, attached.
Item 3. General Requirements
ADD Section 01 21 00, attached.
Item 4. Section 23 09 00, Paragraph 1.6.A:
ADD the following subparagraph:
8. Provide required wiring to existing DDC panel reportedly located in the sub-basement
Mechanical Room. Approximate distance of 150 feet following areas of open ceilings.
Item 5. Drawing D1.1, Demolition Plan, Notes
ADD Note 1:
The Contractor is to deliver the stone pavers to the Owner’s R5 warehouse at Palm Road for
recycling.
Item 6. Drawing D1.1, Demolition Plan, Notes
ADD
4. The Contractor is to deliver the storefront framing and door system scheduled to be
removed to the Owner’s R5 warehouse at Palm Road for recycling. Prior to delivery the
contractor shall remove and protect from damage the book depository and associated
hardware which is scheduled to be refinished and reinstalled as part of new work.
Olin Library Main Entrance Replacement
Addendum No. 1
January 9, 2017
Page 2
Item 7. RFI Questions and Clarifications
See attached RFI Log (Items 1-6)
Attachments: Prebid Meeting Sign-in Sheet
Bid Form, Page BF-6R
General Requirements 01 21 00
RFI Log (Items 1 -6)
****END OF ADDENDUM****
ADDENDUM NO. 1 BID FORM BF-6R
8. SCHEDULE OF VALUES
a. The undersigned agrees, prior to the award of a construction contract and upon the request of the
Architect or Owner, to submit a complete, itemized and detailed "Schedule of Values" including Alternates
elected, if any, showing the amount allocated to the various trades and subdivisions of the work, aggregating
the total Contract Sum.
b. To facilitate the evaluation of Bids, the undersigned has included in each part of his Bid
the following values for the trades and/or subdivisions of the work as listed below. Values for work
included under Alternate Proposals are excluded. Values relative to General Contractor's costs for General
Conditions are excluded.
Spec
Section Trades and/or Subdivision Value Included in Base Bid
Division 01 General Requirements
Division 02 Selective Demolition
Division 03 Concrete
Division 05 Metals
Division 06 Wood, Plastics, & Composites
Division 07 Thermal & Moisture Protection
Division 08 Openings
Division 09 Finishes
Division 12 Furnishings
Division 22 Plumbing
Division 23 HVAC
Division 26 Electrical
Division 28 Electronic Safety & Security
Division 31 Earthwork
Division 32 Exterior Improvements
Allowance No. 1 $6,000
Total Bid $
CORNELL UNIVERSITY SECTION 01 21 00
Ithaca, New York ALLOWANCES
OLIN LIBRARY ALLOWANCES 01 21 00-1
MAIN ENTRANCE (Addendum No. 1) January 9, 2018
REPLACEMENT
SECTION 01 21 00 ALLOWANCES
1.0 GENERAL
1.1 RELATED DOCUMENTS
A. This Section describes Allowances to be carried in the Base Bid by the Contractor.
B. Drawings and general provisions of the Contract, including General Conditions and other
Division 01 Specification Sections, apply to this Section.
C. The Specification Section containing the pertinent requirements of materials and methods to
achieve the Work described herein. Selected materials and equipment are specified in the
Contract Documents by allowances.
1.2 SUMMARY
A. Definition: An allowance is an amount determined by the Owner or calculated by the
Contractor based on given quantities and stated on the Bid Form.
B. Certain items are specified in the Contract Documents by allowances. Allowances have been
established in lieu of additional requirements and to defer selection of actual materials and
equipment to a later date when direction will be provided to the Contractor. Items covered
by these allowances shall be supplied for such amounts and by such persons as the Owner
may direct. All uses of the allowances will require the prior written approval of the Owner
via a Field Change Authorization.
C. Types of Allowances may include:
1. Lump Sum Allowance
2. Unit Price Allowance
1.3 SELECTION AND PURCHASE
A. At the earliest practical date after award of the Contract, advise the Architect of the date when
final selection and purchase of each product or system described by an allowance must be
completed to avoid delaying the Work. The Contractor shall provide the Owner fourteen (14)
calendar days minimum notification of date.
B. At the Owner’s request, the Contractor shall obtain proposals for each allowance for use in
making final selections. The Contractor shall include recommendations that are relevant to
performing the work.
C. The Contractor shall purchase products and systems selected by the Architect and Owner
from the designated supplier.
CORNELL UNIVERSITY SECTION 01 21 00
Ithaca, New York ALLOWANCES
OLIN LIBRARY ALLOWANCES 01 21 00-2
MAIN ENTRANCE (Addendum No. 1) January 9, 2018
REPLACEMENT
1.4 SUBMITTALS
A. Submit proposals for purchase of products or systems included in allowances, in the form
specified for Change Orders.
B. Submit invoices or delivery slips to show actual quantities of materials delivered to the site
for use in fulfillment of each allowance.
C. Submit time sheets and other documentation to show labor hours and cost for installation of
allowance items that include installation as part of the allowance.
D. Coordinate and process submittals for allowance items in the same manner as for other
portions of the work.
1.5 COORDINATION
A. Coordinate related Work and modify or adjust adjacent Work as necessary to ensure that
Work affected by each accepted allowance is complete and fully integrated into the Project.
B. The Contractor shall include the dollar value of each scheduled allowance number as a
separate line item in the Schedule of Values and identify each allowance with Section number
01 21 00.
C. The Owner shall provide the Contractor with a Field Change Authorization prior to
proceeding with the Work of an allowance.
1.6 LUMP SUM AND UNIT PRICE ALLOWANCES
A. Allowances shall include cost to the Contractor of specific products and materials ordered by
the Owner or selected by the Architect under allowance and shall include applicable taxes,
freight, and delivery to the Project site.
B. Included as part of each allowance are miscellaneous devices, accessory objects or similar
items incidental to or required for a complete installation whether or not mentioned as part of
the allowance.
C. Unless otherwise indicated, Contractor’s cost for receiving and handling at Project site, labor,
installation, overhead and profit, and similar costs related to products and materials ordered
by the Owner or selected by the Architect under allowance shall be included as part of the
Contract Sum and not part of the allowance.
D. Unused Materials: Return unused materials purchased under an allowance to the
manufacturer or supplier for credit to the Owner, after installation has been completed and
accepted.
1. If requested by the Owner, retain and prepare unused materials for storage by the
Owner. Deliver unused material to Owner’s storage space as directed.
CORNELL UNIVERSITY SECTION 01 21 00
Ithaca, New York ALLOWANCES
OLIN LIBRARY ALLOWANCES 01 21 00-3
MAIN ENTRANCE (Addendum No. 1) January 9, 2018
REPLACEMENT
1.7 ADJUSTMENT OF ALLOWANCES
A. Allowance Adjustment: To adjust allowance amounts and scope of work, prepare a Change
Order proposal based on the difference between purchase amount and the allowance,
multiplied by final measurement of work-in-place where applicable. If applicable, include
reasonable allowances for cutting losses, tolerances, mixing wastes, normal product
imperfections, and similar margins.
1. Include installation costs in purchase amount only where indicated as part of the
allowance.
2. Prepare explanation and documentation to substantiate distribution of overhead costs
and other margins claimed.
3. Submit substantiation of a change in scope of work, if any, claimed in Change Order
related to unit-cost allowance.
4. Owner reserves the right to establish the quantity of work-in-place by independent
quantity survey, measure, or count.
B. Submit claims for increased costs because of a change in scope or nature of the allowance
described in the Contract Documents, whether for the purchase order amount or Contractor’s
handling, labor, installation, or overhead and profit. Submit claims in accordance with
General Conditions – Changes in Work within twenty-one (21) days of receipt of Field
Change Authorization authorizing work to proceed. The Owner will reject claims submitted
later than twenty-one (21) days after such authorization.
1. Do not include Contractor’s or subcontractor’s indirect expenses in the Change Order
cost amount unless it is clearly shown that the nature or extent of work has changed
from what could have been foreseen from information in the Contract Documents.
2. No change to Contractor’s indirect expenses is permitted for selection of higher or lower
priced materials or systems of the same scope and nature as originally indicated.
1.8 SCHEDULE OF ALLOWANCES
A. ALLOWANCE NO. 1:
Repair and/or restore existing wood framed glazing as specified in 08 01 52.93.
2.0 PRODUCTS – NOT USED
3.0 EXECUTION
3.1 EXAMINATION
A. Examine products covered by an allowance promptly on delivery for damage or defects.
Return damaged or defective products to manufacturer for replacement.
CORNELL UNIVERSITY SECTION 01 21 00
Ithaca, New York ALLOWANCES
OLIN LIBRARY ALLOWANCES 01 21 00-4
MAIN ENTRANCE (Addendum No. 1) January 9, 2018
REPLACEMENT
3.2 PREPARATION
A. Coordinate materials and their installation for each allowance with related materials and
installations to ensure that each allowance item is completely integrated and interfaced with
related work.
3.3 SCHEDULE OF ALLOWANCES
A. Allowance No. 1
Allowance: Include the sum of Six Thousand Dollars ($6,000) for repair and/or restore
existing wood framed glazing as specified in Division Openings, Section 08 01 52.93.
***END OF SECTION 01 21 00***
PROJECT: Olin Library Main Entrance Replacement Date: January 9, 2018
RFI Form
RFI/Page/
Response Dwg./Spec./Rep.Section/Design Team
Index Number Paragraph/Topic RFI Response
1 General When is the actual start of construction.
Construction of the temporary entrance may begin in
April, date to be determined by Owner. However,
construction/demo of the main entrance is not to start
until after Commencement. Contractor to comply
with General Requirements Section 01 14 00-6,
Stand Down Dates.
2 Spec 08 42 13 Paragraph 2.4, B.
Door manufacturer substitutions accepted?Doors must be as specified in Specification 08 42 13,
Aluminum Framed Storefronts, no substitutions
accepted.
3 Spec 07 52 16 Paragraph 1.1, A.
Will the Contractor be required to remove the existing
membrane?
Project scope does not include removal of the
existing membrane. The Contractor shall protect the
existing membrane during installation of the new
membrane as specified in Specification
Section 07 52 16.
4 01 35 29 Paragraph 1.3, C Is Contractor responsible for abatement work?
Abatement of asbestos containing glazing compound
will be executed by Owner as specified in General
Requirements 01 35 29-2, 1.3.C. Coordination
between General Contractor and Abatement
Contractor will be required.
5 08 01 52.93 Clarify the restoration of historic windows.
See Addendum No. 1, Item 3. Scope of work
specified
in 08 01 52.93 may require some removal of existing
materials and replacement or repairs, if needed, to
existing wood framed glazing. There are unknown
conditions until selective demolition occurs.
6 05 03 73
Clarify the restoration of the existing exterior light housing.The existing exterior light housing enclosure is to
remain. The existing metal is to be restored by an
approved restoration specialist as specified in
Specification 05 03 73.