Loading...
HomeMy WebLinkAboutThurston Hall Bid Set 11.27.18_R1 (3)H-000AJKIT IS A VIOLATION OF THE LAW FOR ANY PERSON, UNLESS ACTINGUNDER THE DIRECTION OF A ENGINEER, TO ALTER THIS DOCUMENTIN ANY WAY. IF ALTERED, THE ALTERING ENGINEER SHALL AFFIX HISSEAL AND THE NOTATION 'ALTERED BY' FOLLOWED BY HISSIGNATURE AND THE DATE OF SUCH ALTERATION, AND A SPECIFICDESCRIPTION OF THE ALTERATION.CORNELL UNIVERSITY THURSTON HALL 3RD AND 4TH FLOOR VAV AND CONTROLS REPLACEMENT CORNELL UNIVERSITY PROJECT #10878 GENERAL NOTES1. PROVIDE ALL MATERIALS, EQUIPMENT, AND LABOR REQUIRED TO INSTALLCOMPLETE AND OPERABLE SYSTEMS AS INDICATED ON THE DRAWINGS, ASSPECIFIED, AND AS REQUIRED BY ALL APPLICABLE CODES AND REGULATIONS.2. CONTRACT DOCUMENT DRAWINGS ARE DIAGRAMMATIC AND ARE INTENDED TOCONVEY SCOPE AND GENERAL ARRANGEMENT ONLY.3. INSTALL ALL EQUIPMENT AND APPURTENANCES IN ACCORDANCE WITHMANUFACTURER'S RECOMMENDATIONS, CONTRACT DOCUMENTS, AND ALLAPPLICABLE CODES AND REGULATIONS.4. ALL PRESSURE TESTS SHALL BE COMPLETED BEFORE ANY PIPE INSULATION ISAPPLIED.5. WHERE TWO OR MORE ITEMS OF THE SAME TYPE OF EQUIPMENT ARE REQUIRED,THE PRODUCT OF ONE MANUFACTURER SHALL BE USED.6. PROVIDE ALL REQUIRED CONTROL WIRING AND CONDUIT, INSTALL INACCORDANCE WITH NATIONAL ELECTRIC CODE, ELECTRICAL CODE OF NEWYORK STATE, AND ALL APPLICABLE CODES AND REGULATIONS.7. COORDINATE ALL EQUIPMENT CONNECTIONS WITH MANUFACTURER'S CERTIFIEDDRAWINGS. COORDINATE AND PROVIDE ALL PIPING TRANSITIONS REQUIRED FORFINAL EQUIPMENT CONNECTIONS TO FURNISHED EQUIPMENT. FIELD VERIFY ANDCOORDINATE ALL PIPING DIMENSIONS BEFORE FABRICATION.8. THE LOCATIONS OF ALL ITEMS SHOWN ON THE DRAWINGS OR CALLED FOR IN THESPECIFICATIONS, THAT ARE NOT DEFINITELY FIXED BY DIMENSIONS, AREAPPROXIMATE ONLY. THE EXACT LOCATIONS NECESSARY TO SECURE THE BESTCONDITIONS AND RESULTS SHALL BE DETERMINED BY THE PROJECT SITECONDITIONS AND SHALL BE VERIFIED BY THE HVAC CONTRACTOR BEFORE BEINGINSTALLED. DO NOT SCALE DRAWINGS.9. ALL MISCELLANEOUS STEEL REQUIRED TO ENSURE PROPER INSTALLATION, AND ASSHOWN IN DETAILS FOR PIPING AND EQUIPMENT (UNLESS OTHERWISE NOTED),SHALL BE FURNISHED AND INSTALLED.10. ALL DUCTWORK AND PIPING SHALL BE SUPPORTED AS SPECIFIED, AND ASREQUIRED TO PROVIDE A VIBRATION FREE INSTALLATION.11. ALL DUCTWORK AND PIPING SUPPORTED FROM STRUCTURE SHALL BECOORDINATED WITH GENERAL CONTRACTOR.12. ALL DUCTWORK AND PIPING WORK SHALL BE COORDINATED WITH ALL OTHERTRADES INVOLVED. OFFSETS IN DUCTWORK AND PIPING AROUND OBSTRUCTIONSSHALL BE PROVIDED AT NO ADDITIONAL COST.13. LOCATIONS AND SIZES OF ALL FLOOR, AND WALL OPENINGS SHALL BECOORDINATED WITH ALL OTHER TRADES.14. ALL OPENINGS IN FIRE WALLS AND FLOORS FOR PIPING AND CONDUIT SHALL BEFIRESTOPPED.15. INSTALL PIPING SO THAT ALL VALVES, AND OTHER APPURTENANCES REQUIRINGSERVICE, ARE ACCESSIBLE.16. INSTALL ALL PIPING WITHOUT FORCING OR SPRINGING.17. ALL PIPING SHALL BE INSTALLED TO CLEAR DOORS AND WINDOWS.18. ALL WORK SHALL CONFORM TO ALL APPLICABLE RULES, REGULATIONS, CODESAND STANDARDS, INCLUDING, BUT NOT LIMITED TO BUILDING CODE OF NEWYORK STATE, NFPA, FEDERAL, STATE, COUNTY, AND CITY ORDINANCES, CODES,LAWS AND REGULATIONS.19. ALL TRADES SHALL APPLY AND PAY FOR ALL NECESSARY PERMITS ANDINSPECTIONS REQUIRED AND SUBMIT COPIES OF PERMITS TO THE ENGINEER BEFOREANY WORK BEGINS.20. ALL UNUSED HOLES THROUGH EXISTING WALLS, AND EXISTING FLOORS SHALL BEPATCHED AND FINISHED TO MATCH EXISTING CONDITIONS.21. PROTECT ALL EXISTING EQUIPMENT, FINISHES, ETC. FROM DAMAGE DURINGCONSTRUCTION.22. CONTRACTOR SHALL VISIT SITE AND VERIFY ALL DIMENSIONS AND EXISTINGCONDITIONS PRIOR TO STARTING ANY WORK. NOTIFY THE ENGINEER IN WRITINGOF ANY DISCREPANCIES. STARTING WORK INDICATES ACCEPTANCE OF EXISTINGCONDITIONS.(10")(10x8)(10x8)EQUIP-#SFDFSMVAVLEGENDSYMBOLDESCRIPTIONABBR.SVD14X1014HWSHWRSYMBOLDESCRIPTIONABBR.POINT OF CONNECTION - NEW TO EXISTING -POINT BETWEEN EXISTING TO REMAIN ANDEXISTING TO BE REMOVED-FLEXIBLE DUCTWORK FLEXFIRE DAMPER FDCOMBINATION FIRE & SMOKE DAMPER FSDSMOKE DAMPER SDVOLUME DAMPER VDACCESS DOOR / ACCESS PANEL AD / APRECTANGULAR DUCT (SIZE IN INCHES) 14x10ROUND DUCT (SIZE IN INCHES)14ØEXISTING ELEMENT TO BE REMOVED -EXISTING FLEXIBLE DUCTWORK -START / STOP S/SSTATUS STVALVE VTEMPERATURE TDAMPER MOTOR DMDIFFERENTIAL PRESSURE DPHUMIDITY SENSOR HSPEED CONTROL SPDCARBON DIOXIDE COANALOG INPUT AIANALOG OUTPUT AODIGITAL INPUT DIDIGITAL OUTPUT DOEND SWITCH ESDEGREES FAHRENHEIT(°F)INCHES INFEET PER MINUTE FPMGALLONS PER MINUTE GPMBRITISH THERMAL UNITS (1000'S) MBHWALL MOUNTED TEMPERATURE SENSOR -EXISTING DUCTWORK TO REMAIN(SINGLE LINE / DOUBLE LINE)APPROXIMATE SIZES SHOWN IN PARENTHESIS-EXISTING PIPING TO REMAINAPPROXIMATE SIZES SHOWN IN PARENTHESIS-EXISTING GRILLE / REGISTER / DIFFUSER TO REMAIN -CHECK VALVE CVBUTTERFLY VALVE BFVBALL VALVE BVPETCOCK / NEEDLE VALVE PCBALANCING VALVE -UNION UMANUAL AIR VENT MVAUTOMATIC AIR VENT AVPIPE UP / PIPE DOWN -TEE UP / TEE DOWN -PIPING (ARROW INDICATES DIRECTION OF FLOW) -HOT WATER SUPPLY HWSHOT WATER RETURN HWRUNLESS NOTED OTHERWISE UNOCONTRACTOR FOR HEATING, VENTILATING & AIR COND. DIV. HVACBUILDING AUTOMATION SYSTEM BMSTOP OF STRUCTURAL STEEL TOSTWO-WAY CONTROL VALVE -STRAINER w/ BLOWOFF -BOTTOM OF STRUCTURAL STEEL BOSFUME HOOD EXHAUST AIR VALVE FEVGENERAL EXHAUST AIR VALVE GEVSUPPLY AIR VALVE SAVAIR CONDITIONING UNIT ACREHEAT COIL RHCFAN COIL UNIT FCUSUPPLY AIR SARETURN AIR RAOUTSIDE AIR OAEXHAUST AIR XATHERMOMETER -THESE ARE STANDARD SYMBOLS AND ABBREVIATIONS AND MAY NOT APPEAR ON THEPROJECT DRAWINGS. HOWEVER, WHEREVER THE SYMBOL OR ABBREVIATION APPEARSON THE PROJECT DRAWINGS, THE ITEM SHALL BE FURNISHED AND INSTALLED.NOTE:DUCT ELBOW UP OR DOWN12x6TURN UPTURN DOWNOBSTRUCTIONDUCT RISE / DROP TO AVOIDDOUBLE LINEARROW INDICATES FLOW DIRECTIONDOUBLE LINEGRILLE REGISTEROR DIFFUSERIN BOTTOM OF DUCTVERTICAL DUCT, 45° ENTRY TYPEDOUBLE LINE(45° ENTRY TYPE)DUAL 90° BRANCHTAKE OFFVDVDVD(MIN)4"DOUBLE LINEstd. length duct sections.TRANSITION: Location of trans. is diagrammatical. Contractor may extendlengthof larger duct to accommodate TAKE OFF90° BRANCHVD1-1/4A)XB45°(MIN)DOUBLE LINE(45° ENTRY TYPE)AxBVDLOW VELOCITY DUCTWORK LEGENDDOUBLE LINEDOUBLE LINEAS SHOWNOPTIONCONTRACTORELEV.PLAN90° BRANCH TAKE-OFF FROMOROR ELBOW WITHTURNING VANESDOUBLE LINELONG RADIUS 90° ELBOWTEST PLUG -LEGEND ANDGENERALNOTESNO SCALEEQUIP-#FWALL MOUNTED FAN CONTROL -EQUIP-#TWALL MOUNTED THERMOSTAT -RISEDROPR D 201202202A203204 205206207238 237236 235 234 233232 231200E200J200CDNUPOPEN TO BELOW200U200TB200Z200TA200S271290L290J275281279277290F290E20040200612006220063272273274278200T200E226227200CADNUP200CC210F210G200SIT IS A VIOLATION OF THE LAW FOR ANY PERSON, UNLESS ACTINGUNDER THE DIRECTION OF A ENGINEER, TO ALTER THIS DOCUMENTIN ANY WAY. IF ALTERED, THE ALTERING ENGINEER SHALL AFFIX HISSEAL AND THE NOTATION 'ALTERED BY' FOLLOWED BY HISSIGNATURE AND THE DATE OF SUCH ALTERATION, AND A SPECIFICDESCRIPTION OF THE ALTERATION.CORNELL UNIVERSITY THURSTON HALL 3RD AND 4TH FLOOR VAV AND CONTROLS REPLACEMENT CORNELL UNIVERSITY PROJECT #108781 2ND FLOOR DEMOLITION PLAN (BASE BID)1/8"=1'-0"DISCONNECT AND REMOVE EXISTING CONVECTOR CONTROL VALVE, ANDPNEUMATIC TUBING.KEYED NOTES:H-100LMH2ND FLOORDEMOLITION PLAN(BASE BID)PROJECT NORTHA. CONTRACTOR SHALL COORDINATE WITH THE OWNER'S REPRESENTATIVE FORALL EXISTING SYSTEM SHUT-DOWNS.B. CONTRACTOR SHALL REMOVE ALL EXISTING INACTIVE PNEUMATICCONTROL TUBING BACK TO SOURCE. PNEUMATIC TUBING SHALL BETERMINATED AS FOLLOWS: COPPER TUBING SHALL BE PROVIDED END CAPAND POLYETHYLENE TUBING SHALL BE PROVIDED WITH A BRASS PLUG. ANYOTHER METHOD OF TERMINATION IS NOT ACCEPTABLE.C.ALTERNATE #1: REMOVE AND REPLACE EXISTING LAB EXHAUST AIRTERMINALS.D.ALTERNATE #2: REMOVE AND REPLACE EXISTING GENERAL EXHAUST AIRTERMINALS.GENERAL DRAWING NOTES:AS NOTED 301A301302303304305306333332331330329327325322321307300E300CADNUP323UP300S300U300T300CB300Z306A300CB300JB300CA300JA311310316300U300S300T326DNUP300E3793773753713004030061300623006330064373(AC)(FC)(FC)(FC)(FC)F(FC-5)SSFTTS(FC-1)(FC-3)(FC-4)(FC-2)(FC)(FC)FS8Ø12Ø10ØVD (FC)12Ø14Ø12Ø16Ø20Ø22Ø24x1412Ø12Ø12Ø12Ø8Ø12x1012x10(VAV-3A)(VAV-3B)(VAV-3C)(VAV-3D)(VAV-3E)(VAV-3F)(VAV-3G)14Ø14Ø12Ø9Ø 9Ø10Ø10Ø(8Ø)8Ø10Ø12Ø12Ø16Ø12Ø20Ø(VAV-3H)TT8Ø 16Ø VDVD (FC-6)12Ø16ØVDVD 12Ø12ØFT20Ø 24Ø 12Ø STVD8Ø8Ø 8ØT TTTT4Ø 4Ø 16ØTVD VD 10x10VDVDVDVDVDVDVDVD VDVDVD VD VD VD VDVD VD VD VD VDVDVDVDVDVDVDVDVDVDVDVDVDVDVDVDVDVDVDVD VDVDVDVDVD VD VD IT IS A VIOLATION OF THE LAW FOR ANY PERSON, UNLESS ACTINGUNDER THE DIRECTION OF A ENGINEER, TO ALTER THIS DOCUMENTIN ANY WAY. IF ALTERED, THE ALTERING ENGINEER SHALL AFFIX HISSEAL AND THE NOTATION 'ALTERED BY' FOLLOWED BY HISSIGNATURE AND THE DATE OF SUCH ALTERATION, AND A SPECIFICDESCRIPTION OF THE ALTERATION.CORNELL UNIVERSITY THURSTON HALL 3RD AND 4TH FLOOR VAV AND CONTROLS REPLACEMENT CORNELL UNIVERSITY PROJECT #108781 3RD FLOOR DEMOLITION PLAN- DUCTWORK (BASE BID)1/8"=1'-0"EXISTING GENERAL EXHAUST AIR TERMINAL UNIT TO REMAIN. DISCONNECT ANDREMOVE EXISTING CONTROLS AND CONTROL WIRING.DISCONNECT AND REMOVE EXISTING SUPPLY AIR TERMINAL UNIT. DISCONNECTAND REMOVE EXISTING CONTROLS.EXISTING FAN COIL UNIT SPEED SWITCH TO REMAIN.EXISTING CONVECTOR TO REMAIN.EXISTING FAN COIL UNIT TO REMAIN.DISCONNECT AND REMOVE EXISTING TEMPERATURE SENSOR AND CONTROLWIRING.EXISTING FINTUBE RADIATION TO REMAIN.DISCONNECT AND REMOVE EXISTING PNEUMATIC THERMOSTAT, AND PNEUMATICCONTROL TUBING.DISCONNECT AND REMOVE EXISTING FUME HOOD CONTROLLER.KEYED NOTES:H-101LMH3RD FLOORDEMOLITION PLAN- DUCTWORK(BASE BID)PROJECT NORTHA. CONTRACTOR SHALL COORDINATE WITH THE OWNER'S REPRESENTATIVE FORALL EXISTING SYSTEM SHUT-DOWNS.B. CONTRACTOR SHALL REMOVE ALL EXISTING INACTIVE PNEUMATICCONTROL TUBING BACK TO SOURCE. PNEUMATIC TUBING SHALL BETERMINATED AS FOLLOWS: COPPER TUBING SHALL BE PROVIDED END CAPAND POLYETHYLENE TUBING SHALL BE PROVIDED WITH A BRASS PLUG. ANYOTHER METHOD OF TERMINATION IS NOT ACCEPTABLE.C.ALTERNATE #1: REMOVE AND REPLACE EXISTING LAB EXHAUST AIRTERMINALS.D.ALTERNATE #2: REMOVE AND REPLACE EXISTING GENERAL EXHAUST AIRTERMINALS.GENERAL DRAWING NOTES:AS NOTED 301A301302303304305306333332331330329327325322321307300E300CADNUP323UP300S300U300T300CB300Z306A300CB300JB300CA300JA311310316300U300S300T326327DNUP300E3813793773753713004030061300623006330064373(AC)(FC)(FC)(FC)(FC)F(FC-5)SSFTTS(FC-1)(FC-3)(FC-4)(FC-2)(FC)(FC)FS8Ø12Ø10ØVD (FC)12Ø14Ø12Ø16Ø20Ø22Ø24x1412Ø12Ø12Ø12Ø8Ø12x1012x10(VAV-3A)(VAV-3B)(VAV-3C)(VAV-3D)(VAV-3E)(VAV-3F)(VAV-3G)14Ø14Ø12Ø9Ø 9Ø10Ø10Ø(8Ø)8Ø10Ø12Ø12Ø16Ø12Ø20Ø(VAV-3H)TT8Ø 16Ø VDVD (FC-6)12Ø16ØVDVD 12Ø12ØFT20Ø 24Ø 12Ø STVD8Ø8Ø 8ØT TTTT4Ø 4Ø 16ØTVD VD 10x10VDVDVDVDVDVDVDVD VDVDVD VD VD VD VDVD VD VD VD VDVDVDVDVDVDVDVDVDVDVDVDVDVDVDVDVDVDVDVD VDVDVDVDVD VD VD1 3RD FLOOR DEMOLITION PLAN- DUCTWORK (ALTERNATE #2)1/8"=1'-0"ALTERNATE #2: DISCONNECT AND REMOVE EXISTING GENERAL EXHAUST VALVECONTROLS AND CONTROLS WIRING.EXISTING CONVECTOR TO REMAIN.EXISTING FAN COIL UNIT TO REMAIN.EXISTING FINTUBE RADIATION TO REMAIN.KEYED NOTES:LMHIT IS A VIOLATION OF THE LAW FOR ANY PERSON, UNLESS ACTINGUNDER THE DIRECTION OF A ENGINEER, TO ALTER THIS DOCUMENTIN ANY WAY. IF ALTERED, THE ALTERING ENGINEER SHALL AFFIX HISSEAL AND THE NOTATION 'ALTERED BY' FOLLOWED BY HISSIGNATURE AND THE DATE OF SUCH ALTERATION, AND A SPECIFICDESCRIPTION OF THE ALTERATION.CORNELL UNIVERSITY THURSTON HALL 3RD AND 4TH FLOOR VAV AND CONTROLS REPLACEMENT CORNELL UNIVERSITY PROJECT #108783RD FLOORDEMOLITION PLAN- DUCTWORK(ALTERNATE #2)PROJECT NORTHA. CONTRACTOR SHALL COORDINATE WITH THE OWNER'S REPRESENTATIVE FORALL EXISTING SYSTEM SHUT-DOWNS.B. CONTRACTOR SHALL REMOVE ALL EXISTING INACTIVE PNEUMATICCONTROL TUBING BACK TO SOURCE. PNEUMATIC TUBING SHALL BETERMINATED AS FOLLOWS: COPPER TUBING SHALL BE PROVIDED END CAPAND POLYETHYLENE TUBING SHALL BE PROVIDED WITH A BRASS PLUG. ANYOTHER METHOD OF TERMINATION IS NOT ACCEPTABLE.C.ALTERNATE #1: REMOVE AND REPLACE EXISTING LAB EXHAUST AIRTERMINALS.D.ALTERNATE #2: REMOVE AND REPLACE EXISTING GENERAL EXHAUST AIRTERMINALS.GENERAL DRAWING NOTES:AS NOTEDH-101.2 301A301302303304305306333332331330329327325322321307300E300CADNUP323UP300S300U300T300CB300Z306A310316300S300T326327DNUP300E3813793773753713004030061300623006330064372373374378(AC)(FC)(FC)(FC)(FC)S(FC)(FC)(1-1/4")(1-1/2")(1-1/4")(5" CWS)(5" CWR)(2" CWS)(2" CWR)(FC)(VAV-3C)(VAV-3E)(VAV-3H)(VAV-3G)(3/4" CWS)(3/4" CWR)(4")(4")(5" HWR)(5" HWR)(5" HWR)(1" HWR)(4" HWR)(4" HWR)(4" HWR)(2" CWS)(2" CWR)(1-1/2" HWR)(2" HWR)(2-1/2" HWR)(2-1/2" CWS)(2-1/2" CWR)(3" CWS)(3" CWR)(4" HWR)(2-1/2" CWS)(2-1/2" CWS)(2" CWS)TSSTTSTTTTTTTTT(FC)(FC-5)(FC-1)(FC-3)(FC-4)(FC-2)(FC-6)IT IS A VIOLATION OF THE LAW FOR ANY PERSON, UNLESS ACTINGUNDER THE DIRECTION OF A ENGINEER, TO ALTER THIS DOCUMENTIN ANY WAY. IF ALTERED, THE ALTERING ENGINEER SHALL AFFIX HISSEAL AND THE NOTATION 'ALTERED BY' FOLLOWED BY HISSIGNATURE AND THE DATE OF SUCH ALTERATION, AND A SPECIFICDESCRIPTION OF THE ALTERATION.CORNELL UNIVERSITY THURSTON HALL 3RD AND 4TH FLOOR VAV AND CONTROLS REPLACEMENT CORNELL UNIVERSITY PROJECT #108781 3RD FLOOR DEMOLITION PLAN - PIPING (BASE BID)1/8"=1'-0"EXISTING FINTUBE RADIATION TO REMAIN.DISCONNECT AND REMOVE EXISTING SUPPLY AIR TERMINAL UNIT AND REHEATCOIL. DISCONNECT AND REMOVE EXISTING CONTROLS.DISCONNECT AND REMOVE EXISTING CONTROL VALVE AND PNEUMATICCONTROL TUBING.EXISTING CONVECTOR TO REMAIN.EXISTING FAN COIL UNIT TO REMAIN.DISCONNECT AND REMOVE EXISTING TEMPERATURE SENSOR, AND CONTROLWIRING.DISCONNECT AND REMOVE EXISTING CONTROL VALVE AND PNEUMATIC TUBINGSERVING FOURTH FLOOR PERIMETER RADIATION.EXISTING AC UNIT TO REMAIN.DISCONNECT AND REMOVE EXISTING THERMOSTAT, AND PNEUMATIC CONTROLTUBING.EXISTING CONTROL VALVE TO REMAIN.DISCONNECT AND REMOVE EXISTING 3/4 " HWS AND 3/4 " HWR PIPING BACK TOPOINT INDICATED.KEYED NOTES:H-102LMH3RD FLOORDEMOLITIONPLAN - PIPING(BASE BID)A. CONTRACTOR SHALL COORDINATE WITH THE OWNER'S REPRESENTATIVE FORALL EXISTING SYSTEM SHUT-DOWNS.B. CONTRACTOR SHALL REMOVE ALL EXISTING INACTIVE PNEUMATICCONTROL TUBING BACK TO SOURCE. PNEUMATIC TUBING SHALL BETERMINATED AS FOLLOWS: COPPER TUBING SHALL BE PROVIDED END CAPAND POLYETHYLENE TUBING SHALL BE PROVIDED WITH A BRASS PLUG. ANYOTHER METHOD OF TERMINATION IS NOT ACCEPTABLE.C.ALTERNATE #1: REMOVE AND REPLACE EXISTING LAB EXHAUST AIRTERMINALS.D.ALTERNATE #2: REMOVE AND REPLACE EXISTING GENERAL EXHAUST AIRTERMINALS.GENERAL DRAWING NOTES:AS NOTEDPROJECT NORTH 400CA401402403404406405407422421420419418417416415400U400S400EUPDN400400T400CB400Z407A400UB414416400S419DNUP400CA400CBSSTSSSSSSSSSSSSSSS16Ø20Ø18ØVDVDVD(VAV-4M) (VAV-4N) (VAV-4L) (VAV-4V) (VAV-4U) (VAV-4T)(VAV-4X)(VAV-4W) (VAV-4Y) (VAV-4Z) (VAV-4A1) (VAV-4B1)(VAV-4C1)(VAV-4D1)(VAV-4E1)(VAV-4F1)(VAV-4H1)(VAV-4G1)(VAV-4I1)(VAV-4O)(VAV-4Q)(VAV-4R)(VAV-4P)(VAV-4A)(VAV-4B)(VAV-4C)(VAV-4D)(VAV-4E)(VAV-4F)(VAV-4G)(VAV-4H) (VAV-4I)(VAV-4J)(VAV-4K)(VAV-4S)18Ø18Ø18Ø16Ø 10Ø 60x3044x3030x2010Ø 22Ø14Ø 24Ø 28Ø12Ø12Ø12Ø48x2420Ø14Ø 10Ø10Ø 10Ø12" UP16Ø20Ø10Ø 10Ø4Ø 12Ø10Ø6Ø 6Ø 12ØT10Ø 10Ø (VAV-13E)(VAV-13S)44x30IT IS A VIOLATION OF THE LAW FOR ANY PERSON, UNLESS ACTINGUNDER THE DIRECTION OF A ENGINEER, TO ALTER THIS DOCUMENTIN ANY WAY. IF ALTERED, THE ALTERING ENGINEER SHALL AFFIX HISSEAL AND THE NOTATION 'ALTERED BY' FOLLOWED BY HISSIGNATURE AND THE DATE OF SUCH ALTERATION, AND A SPECIFICDESCRIPTION OF THE ALTERATION.CORNELL UNIVERSITY THURSTON HALL 3RD AND 4TH FLOOR VAV AND CONTROLS REPLACEMENT CORNELL UNIVERSITY PROJECT #108781 4TH FLOOR DEMOLITION PLAN - DUCTWORK (BASE BID)1/8"=1'-0"H-103LMH4TH FLOORDEMOLITION PLAN- DUCTWORK(BASE BID)EXISTING GENERAL EXHAUST AIR TERMINAL UNIT TO REMAIN. DISCONNECTAND REMOVE EXISTING CONTROLS AND CONTROL WIRING.DISCONNECT AND REMOVE EXISTING SUPPLY AIR TERMINAL UNIT, PREHEATCOIL CONTROLS AND CONTROL WIRING.EXISTING SUPPLY AIR VALVE TO REMAIN. DISCONNECT AND REMOVE EXISTINGCONTROLS AND CONTROL WIRING.EXISTING FUME HOOD EXHAUST AIR VALVE TO REMAIN. DISCONNECT ANDREMOVE EXISTING CONTROLS.EXISTING CONTROL VALVE TO REMAIN.EXISTING CONVECTOR TO REMAIN.DISCONNECT AND REMOVE EXISTING TEMPERATURE SENSOR AND CONTROLWIRING.EXISTING FINTUBE RADIATION TO REMAIN.EXISTING XA GRILLE ABOVE CEILING TO REMAIN.DISCONNECT AND REMOVE EXISTING PNEUMATIC THERMOSTAT, ANDPNEUMATIC CONTROL TUBING.8x8 XA GRILLE IN UNDERSIDE OF 5TH FLOOR DECK TO REMAIN.4Ø XA DUCT OPEN TO LOUNGE 400.KEYED NOTES:A. CONTRACTOR SHALL COORDINATE WITH THE OWNER'S REPRESENTATIVE FORALL EXISTING SYSTEM SHUT-DOWNS.B. CONTRACTOR SHALL REMOVE ALL EXISTING INACTIVE PNEUMATICCONTROL TUBING BACK TO SOURCE. PNEUMATIC TUBING SHALL BETERMINATED AS FOLLOWS: COPPER TUBING SHALL BE PROVIDED END CAPAND POLYETHYLENE TUBING SHALL BE PROVIDED WITH A BRASS PLUG. ANYOTHER METHOD OF TERMINATION IS NOT ACCEPTABLE.C.ALTERNATE #1: REMOVE AND REPLACE EXISTING LAB EXHAUST AIRTERMINALS.D.ALTERNATE #2: REMOVE AND REPLACE EXISTING GENERAL EXHAUST AIRTERMINALS.GENERAL DRAWING NOTES:AS NOTEDPROJECT NORTH 400CA401402403404406405407422421420419418417416415400U400S400EUPDN400400T400CB400Z407A400UB400UA414416400S419DNUP400CA400CBSSTSSSSSSSSSSSSSSS16Ø20Ø18ØVDVDVD(VAV-4M) (VAV-4N) (VAV-4L) (VAV-4V) (VAV-4U) (VAV-4T)(VAV-4X)(VAV-4W) (VAV-4Y) (VAV-4Z) (VAV-4A1) (VAV-4B1) (VAV-4C1)(VAV-4D1)(VAV-4E1)(VAV-4F1)(VAV-4H1)(VAV-4G1)(VAV-4I1)(VAV-4O)(VAV-4Q)(VAV-4R)(VAV-4P)(VAV-4A)(VAV-4B)(VAV-4C)(VAV-4D)(VAV-4E)(VAV-4F) (VAV-4G) (VAV-4H) (VAV-4I)(VAV-4J)(VAV-4K)(VAV-4S)18Ø18Ø18Ø16Ø 10Ø 60x3044x3030x2010Ø 22Ø14Ø 24Ø 28Ø12Ø12Ø12Ø48x2420Ø 14Ø 10Ø10Ø 10Ø12" UP16Ø20Ø10Ø 10Ø4Ø 12Ø10Ø6Ø 6Ø 12ØT10Ø 10Ø (VAV-13E)(VAV-13S)44x301 4TH FLOOR DEMOLITION PLAN - DUCTWORK (ALTERNATE #1)1/8"=1'-0"H-103.1LMHIT IS A VIOLATION OF THE LAW FOR ANY PERSON, UNLESS ACTINGUNDER THE DIRECTION OF A ENGINEER, TO ALTER THIS DOCUMENTIN ANY WAY. IF ALTERED, THE ALTERING ENGINEER SHALL AFFIX HISSEAL AND THE NOTATION 'ALTERED BY' FOLLOWED BY HISSIGNATURE AND THE DATE OF SUCH ALTERATION, AND A SPECIFICDESCRIPTION OF THE ALTERATION.CORNELL UNIVERSITY THURSTON HALL 3RD AND 4TH FLOOR VAV AND CONTROLS REPLACEMENT CORNELL UNIVERSITY PROJECT #108784TH FLOORDEMOLITION PLAN- DUCTWORK(ALTERNATE #1)EXISTING GENERAL EXHAUST AIR TERMINAL UNIT TO REMAIN. DISCONNECTAND REMOVE EXISTING CONTROLS AND CONTROL WIRING.EXISTING SUPPLY AIR VALVE TO REMAIN. DISCONNECT AND REMOVE EXISTINGCONTROLS.EXISTING CONVECTOR TO REMAIN.EXISTING FINTUBE RADIATION TO REMAIN.DISCONNECT ND REMOVE FUME HOOD EXHAUST AIR TERMINAL UNITCONTROLS AND CONTROL WIRING.EXISTING 8x8 XA GRILLE IN UNDERSIDE OF 5TH FLOOR DECK TO REMAIN.EXISTING 4Ø XA DUCT OPEN TO LOUNGE 400.EXISTING XA GRILLE ABOVE CEILING TO REMAIN.EXISTING EXHAUST AIR CONTROL VALVE TO REMAIN.KEYED NOTES:A. CONTRACTOR SHALL COORDINATE WITH THE OWNER'S REPRESENTATIVE FORALL EXISTING SYSTEM SHUT-DOWNS.B. CONTRACTOR SHALL REMOVE ALL EXISTING INACTIVE PNEUMATICCONTROL TUBING BACK TO SOURCE. PNEUMATIC TUBING SHALL BETERMINATED AS FOLLOWS: COPPER TUBING SHALL BE PROVIDED END CAPAND POLYETHYLENE TUBING SHALL BE PROVIDED WITH A BRASS PLUG. ANYOTHER METHOD OF TERMINATION IS NOT ACCEPTABLE.C.ALTERNATE #1: REMOVE AND REPLACE EXISTING LAB EXHAUST AIRTERMINALS.D.ALTERNATE #2: REMOVE AND REPLACE EXISTING GENERAL EXHAUST AIRTERMINALS.GENERAL DRAWING NOTES:AS NOTEDPROJECT NORTH 400CA401402403404406405407422421420419418417416415400U400S400EUPDN400400T400CB400Z407A400UB414416400S419DNUP400CA400CBSSTSSSSSSSSSSSSSSS16Ø20Ø18ØVDVDVD(VAV-4M) (VAV-4N) (VAV-4L) (VAV-4V) (VAV-4U) (VAV-4T)(VAV-4X)(VAV-4W) (VAV-4Y) (VAV-4Z) (VAV-4A1) (VAV-4B1) (VAV-4C1)(VAV-4D1)(VAV-4E1)(VAV-4F1)(VAV-4H1)(VAV-4G1)(VAV-4I1)(VAV-4O)(VAV-4Q)(VAV-4R)(VAV-4P)(VAV-4A)(VAV-4B)(VAV-4C)(VAV-4D)(VAV-4E)(VAV-4F) (VAV-4G) (VAV-4H) (VAV-4I)(VAV-4J)(VAV-4K)(VAV-4S)18Ø18Ø18Ø16Ø 10Ø 60x3044x3030x2010Ø 22Ø14Ø 24Ø 28Ø12Ø12Ø12Ø48x2420Ø 14Ø 10Ø10Ø 10Ø12" UP16Ø20Ø10Ø 10Ø4Ø 12Ø10Ø6Ø 6Ø 12ØT10Ø 10Ø (VAV-13E)(VAV-13S)44x301 4TH FLOOR DEMOLITION PLAN - DUCTWORK (ALTERNATE #2)1/8"=1'-0"H-103.2LMHIT IS A VIOLATION OF THE LAW FOR ANY PERSON, UNLESS ACTINGUNDER THE DIRECTION OF A ENGINEER, TO ALTER THIS DOCUMENTIN ANY WAY. IF ALTERED, THE ALTERING ENGINEER SHALL AFFIX HISSEAL AND THE NOTATION 'ALTERED BY' FOLLOWED BY HISSIGNATURE AND THE DATE OF SUCH ALTERATION, AND A SPECIFICDESCRIPTION OF THE ALTERATION.CORNELL UNIVERSITY THURSTON HALL 3RD AND 4TH FLOOR VAV AND CONTROLS REPLACEMENT CORNELL UNIVERSITY PROJECT #108784TH FLOORDEMOLITION PLAN- DUCTWORK(ALTERNATE #2)EXISTING LAB HOOD EXHAUST AIR TERMINAL UNIT TO REMAIN. DISCONNECTAND REMOVE EXISTING CONTROLS.DISCONNECT AND REMOVE EXISTING THERMOMETER, CONTROL WIRING, ANDPNEUMATIC CONTROL TUBING.EXISTING SUPPLY AIR VALVE TO REMAIN. DISCONNECT AND REMOVE EXISTINGCONTROLS.EXISTING FUME HOOD EXHAUST AIR VALVE TO REMAIN. DISCONNECT ANDREMOVE EXISTING CONTROLS.EXISTING CONTROL VALVE TO REMAIN.EXISTING CONVECTOR TO REMAIN.EXISTING FAN COIL UNIT TO REMAIN.EXISTING 22X22 RA GRILLE ABOVE CEILING TO REMAIN.EXISTING FINTUBE RADIATION TO REMAIN.4Ø RETURN DUCT OPEN TO LOUNGE 400.8X8 RA GRILLE IN UNDERSIDE OF 5TH FLOOR DECK.DISCONNECT AND REMOVE EXISTING GENERAL EXHAUST VALVE ANDCONTROLS.KEYED NOTES:A. CONTRACTOR SHALL COORDINATE WITH THE OWNER'S REPRESENTATIVE FORALL EXISTING SYSTEM SHUT-DOWNS.B. CONTRACTOR SHALL REMOVE ALL EXISTING INACTIVE PNEUMATICCONTROL TUBING BACK TO SOURCE. PNEUMATIC TUBING SHALL BETERMINATED AS FOLLOWS: COPPER TUBING SHALL BE PROVIDED END CAPAND POLYETHYLENE TUBING SHALL BE PROVIDED WITH A BRASS PLUG. ANYOTHER METHOD OF TERMINATION IS NOT ACCEPTABLE.C.ALTERNATE #1: REMOVE AND REPLACE EXISTING LAB EXHAUST AIRTERMINALS.D.ALTERNATE #2: REMOVE AND REPLACE EXISTING GENERAL EXHAUST AIRTERMINALS.GENERAL DRAWING NOTES:AS NOTEDPROJECT NORTH 400CA401402403404406405407422421420419418417416415400U400S400EUPDN400400T400CB400Z407A400UB414400S419DNSSSSSSSSSSSSSSSSSS(VAV-4M)(VAV-4L)(VAV-4X)(VAV-4U) (VAV-4V) (VAV-4Z)(VAV-4A1)(VAV-4D1)(VAV-4F1)(VAV-4H1)(VAV-4Q)(VAV-4O)(VAV-4B)(VAV-4C)(VAV-4F)(VAV-4G)(VAV-4I)(3/4" HWS)(3/4" HWR)(2-1/2" CWR)(2-1/2" CWS)(2" HWS)(1-1/4" HWR)(1-1/4" HWR)(1-1/2" HWR)(1-1/2" HWS)(1-1/2" CWR)(1-1/2" CWS)(2-1/2" CWR)(2-1/2" CWS)(2" HWS)(2" HWR)(1-1/2" HWS)(1-1/4" HWS)(3/4" HWS)(3/4" HWR)(3/4" HWS)(3/4" HWR)(3/4" HWS)(3/4" HWR)(3/4" HWS)(3/4" HWR)(5" CWS)(5" CWR)(2" CWR)(2" CWS)(1-1/4" HWR)(2" HWR)(1-1/2" CWR)(1-1/4" CWS)(2" HWR)(3/4" HWR)(2" HWS)(1-1/2" HWR)(1" HWS)(2" HWR)(VAV-13S)(VAV-13E)IT IS A VIOLATION OF THE LAW FOR ANY PERSON, UNLESS ACTINGUNDER THE DIRECTION OF A ENGINEER, TO ALTER THIS DOCUMENTIN ANY WAY. IF ALTERED, THE ALTERING ENGINEER SHALL AFFIX HISSEAL AND THE NOTATION 'ALTERED BY' FOLLOWED BY HISSIGNATURE AND THE DATE OF SUCH ALTERATION, AND A SPECIFICDESCRIPTION OF THE ALTERATION.CORNELL UNIVERSITY THURSTON HALL 3RD AND 4TH FLOOR VAV AND CONTROLS REPLACEMENT CORNELL UNIVERSITY PROJECT #108781 4TH FLOOR DEMOLITION PLAN - PIPING (BASE BID)1/8"=1'-0"H-104LMH4TH FLOORDEMOLITION PLAN- PIPING (BASE BID)EXISTING FINTUBE RADIATION TO REMAIN.DISCONNECT AND REMOVE EXISTING SUPPLY AIR TERMINAL UNIT, REHEAT COILAND CONTROLS.EXISTING SUPPLY AIR VALVE TO REMAIN. DISCONNECT AND REMOVE EXISTINGCONTROLS.EXISTING REHEAT COIL TO REMAIN.DISCONNECT AND REMOVE EXISTING CONTROL VALVE AND PNEUMATICCONTROL TUBING.EXISTING CONVECTOR TO REMAIN.DISCONNECT AND REMOVE EXISTING TEMPERATURE SENSOR, CONTROLWIRING, AND PNEUMATIC CONTROL TUBING.DISCONNECT AND REMOVE EXISTING 3/4" HWS AND 3/4" HWR PIPING BACKTO POINT INDICATED.KEYED NOTES:A. CONTRACTOR SHALL COORDINATE WITH THE OWNER'S REPRESENTATIVE FORALL EXISTING SYSTEM SHUT-DOWNS.B. CONTRACTOR SHALL REMOVE ALL EXISTING INACTIVE PNEUMATICCONTROL TUBING BACK TO SOURCE. PNEUMATIC TUBING SHALL BETERMINATED AS FOLLOWS: COPPER TUBING SHALL BE PROVIDED END CAPAND POLYETHYLENE TUBING SHALL BE PROVIDED WITH A BRASS PLUG. ANYOTHER METHOD OF TERMINATION IS NOT ACCEPTABLE.C.ALTERNATE #1: REMOVE AND REPLACE EXISTING LAB EXHAUST AIRTERMINAL.D.ALTERNATE #2: REMOVE AND REPLACE EXISTING GENERAL EXHAUST AIRTERMINAL.GENERAL DRAWING NOTES:AS NOTEDPROJECT NORTH F301A301302303304305306333332331330329327325322321307300E300CADNUP323UP300S300U300T300CB300Z306A310316300S300T326327DNUP300E3813793773753713004030061300623006330064373SSSSSSSSSSSSSS(AC)(FC)(FC)(FC)(FC)(FC-1)(FC-3)(FC-4)(FC-2)(FC)(FC)SVD8ØVDVDVDVD10ØVDVDVDVDVDVDVD VDVDVDVDVDVDVDVDVDVD (FC)12Ø14Ø12Ø16Ø20Ø22Ø24x1412Ø12Ø12Ø12Ø8Ø12x10VDVDVDVDVDVDVDVD12x10VD(VAV-3A)(VAV-3B)(VAV-3D)VAV-3E(VAV-3F)VAV-3G14Ø14Ø12Ø9Ø 9Ø10ØVDVDVDVDVDVDVDVDVD(8Ø)8Ø10Ø12Ø12Ø16Ø12Ø20ØRHC-3GVAV-3CRHC-3CRHC-3EVAV-3HRHC-3HFFF(FC-5)12Ø16ØVDVD(FC-6)12Ø16ØVDVD 12Ø12ØVD VD VDVDIT IS A VIOLATION OF THE LAW FOR ANY PERSON, UNLESS ACTINGUNDER THE DIRECTION OF A ENGINEER, TO ALTER THIS DOCUMENTIN ANY WAY. IF ALTERED, THE ALTERING ENGINEER SHALL AFFIX HISSEAL AND THE NOTATION 'ALTERED BY' FOLLOWED BY HISSIGNATURE AND THE DATE OF SUCH ALTERATION, AND A SPECIFICDESCRIPTION OF THE ALTERATION.CORNELL UNIVERSITY THURSTON HALL 3RD AND 4TH FLOOR VAV AND CONTROLS REPLACEMENT CORNELL UNIVERSITY PROJECT #108781 3RD FLOOR PLAN - DUCTWORK (BASE BID)1/8"=1'-0"H-105LMH3RD FLOOR PLAN- DUCTWORK(BASE BID)PROJECT NORTHA. CONTRACTOR SHALL COORDINATE WITH THE OWNER'S REPRESENTATIVE FORALL EXISTING SYSTEM SHUT-DOWNS.B.ALTERNATE #1: REMOVE AND REPLACE EXISTING LAB EXHAUST AIRTERMINALS.C.ALTERNATE #2: REMOVE AND REPLACE EXISTING GENERAL EXHAUST AIRTERMINALS.GENERAL DRAWING NOTES:EXISTING GENERAL EXHAUST AIR TERMINAL UNIT TO REMAIN. PROVIDE NEWCONTROLLER AND CONTROL WIRING.PROVIDE NEW SUPPLY AIR VALVE, REHEAT COIL CONTROLS AND CONTROLWIRING.EXISTING FAN COIL UNIT SPEED SWITCH TO REMAIN.EXISTING CONVECTOR TO REMAIN.EXISTING FAN COIL UNIT TO REMAIN.PROVIDE NEW TEMPERATURE SENSOR AND CONTROL WIRING.EXISTING FINTUBE RADIATION TO REMAIN.10Ø FUME HOOD XA UP TO 4TH FLOOR. EXHAUST AIR VALVE SERVING THIS FUMEHOOD IS LOCATED ON THE 4TH FLOOR.PROVIDE FUME HOOD CONTROLLER UPGRADE UNDER BASE BID.PROVIDE DDC PANEL.22X22 RA GRILLE WITH DUCT BOOT. REFER TO DETAIL 3/H-900.KEYED NOTES:AS NOTED F301A301302303304305306333332331330329327325322321307300E300CADNUP323UP300S300U300T300CB300Z306A300CB300JB300CA300JA311310316300U300S300T326DNUP300E3793773753713004030061300623006330064373SSSSSSSSSSSSSS(AC)(FC)(FC)(FC)(FC)(FC-1)(FC-3)(FC-4)(FC-2)(FC)(FC)SVD8ØVDVDVDVD10ØVDVDVDVDVD VDVDVDVDVDVDVDVDVDVDVDVD (FC)12Ø14Ø12Ø16Ø20Ø22Ø24x1412Ø12Ø12Ø12Ø8Ø12x10VDVDVDVDVDVDVDVD12x10VDVAV-3AVAV-3BVAV-3D(VAV-3E)VAV-3F(VAV-3G)14Ø14Ø12Ø9Ø 9Ø10ØVDVDVDVDVDVDVDVDVD(8Ø)8Ø10Ø12Ø12Ø16Ø12Ø20Ø(VAV-3C)(VAV-3H)FFF(FC-5)12Ø16Ø VDVD (FC-6)12Ø16ØVDVD 12Ø12ØVD VD VDVD1 3RD FLOOR PLAN - DUCTWORK (ALTERNATE #2)1/8"=1'-0"H-105.2LMHIT IS A VIOLATION OF THE LAW FOR ANY PERSON, UNLESS ACTINGUNDER THE DIRECTION OF A ENGINEER, TO ALTER THIS DOCUMENTIN ANY WAY. IF ALTERED, THE ALTERING ENGINEER SHALL AFFIX HISSEAL AND THE NOTATION 'ALTERED BY' FOLLOWED BY HISSIGNATURE AND THE DATE OF SUCH ALTERATION, AND A SPECIFICDESCRIPTION OF THE ALTERATION.CORNELL UNIVERSITY THURSTON HALL 3RD AND 4TH FLOOR VAV AND CONTROLS REPLACEMENT CORNELL UNIVERSITY PROJECT #108783RD FLOOR PLAN- DUCTWORK(ALTERNATE #2)PROJECT NORTHA. CONTRACTOR SHALL COORDINATE WITH THE OWNER'S REPRESENTATIVE FORALL EXISTING SYSTEM SHUT-DOWNS.B.ALTERNATE #1: REMOVE AND REPLACE EXISTING LAB EXHAUST AIRTERMINALS.C.ALTERNATE #2: REMOVE AND REPLACE EXISTING GENERAL EXHAUST AIRTERMINALS.GENERAL DRAWING NOTES:PROVIDE GENERAL EXHAUST AIR VALVE, CONTROLLER AND CONTROL WIRING.EXISTING FAN COIL UNIT SPEED SWITCH TO REMAIN.PROVIDE NEW CONTROL VALVE AND CONTROL WIRING.EXISTING CONVECTOR TO REMAIN.EXISTING FAN COIL UNIT TO REMAIN.EXISTING FINTUBE RADIATION TO REMAIN.22X22 RA GRILLE WITH DUCT BOOT. REFER TO DETAIL 3/H-900.PROVIDE DDC PANEL.KEYED NOTES:AS NOTED 301A301302303304305306333332331330329327325322321307300E300CADNUP323UP300S300U300T300CB300Z306A300CB300JB300CA300JA311310316300U300S300T326327DNUP300E3813793773753713004030061300623006330064373SSSSSSSSSSSSSSRHC-3C(AC)(FC)(FC)(FC)(FC)(FC)(FC)(FC)(FC)(FC)(FC)(FC)(FC)(1-1/4")(1-1/2")(1-1/4")(5" CWS)(5" CWR)(2" CWS)(2" CWR)(FC)(3/4" CWS)(3/4" CWR)(4")(4")(5" HWR)(5" HWR)(5" HWR)(1" HWR)(4" HWR)(4" HWR)(4" HWR)(2" CWS)(2" CWR)(1-1/2" HWR)(2" HWR)(2-1/2" HWR)(2-1/2" CWS)(2-1/2" CWR)(3" CWS)(3" CWR)(4" HWR)(2-1/2" CWS)(2-1/2" CWS)(2" CWS)RHC-3ERHC-3GRHC-3HIT IS A VIOLATION OF THE LAW FOR ANY PERSON, UNLESS ACTINGUNDER THE DIRECTION OF A ENGINEER, TO ALTER THIS DOCUMENTIN ANY WAY. IF ALTERED, THE ALTERING ENGINEER SHALL AFFIX HISSEAL AND THE NOTATION 'ALTERED BY' FOLLOWED BY HISSIGNATURE AND THE DATE OF SUCH ALTERATION, AND A SPECIFICDESCRIPTION OF THE ALTERATION.CORNELL UNIVERSITY THURSTON HALL 3RD AND 4TH FLOOR VAV AND CONTROLS REPLACEMENT CORNELL UNIVERSITY PROJECT #108781 3RD FLOOR PLAN - PIPING (BASE BID)1/8"=1'-0"H-106LMH3RD FLOOR PLAN- PIPING(BASE BID)A. CONTRACTOR SHALL COORDINATE WITH THE OWNER'S REPRESENTATIVE FORALL EXISTING SYSTEM SHUT-DOWNS.B.ALTERNATE #1: REMOVE AND REPLACE EXISTING LAB EXHAUST AIRTERMINALS.C.ALTERNATE #2: REMOVE AND REPLACE EXISTING GENERAL EXHAUST AIRTERMINALS.GENERAL DRAWING NOTES:EXISTING CONTROL VALVE TO REMAIN.PROVIDE NEW SUPPLY AIR TERMINAL UNIT, REHEAT COIL AND CONTROLS. EXTENDEXISTING BRANCH PIPING TO COIL LOCATION.PROVIDE NEW CONTROL VALVE AND CONTROL WIRING.EXISTING CONVECTOR TO REMAIN.EXISTING FAN COIL UNIT TO REMAIN.PROVIDE NEW TEMPERATURE SENSOR AND CONTROL WIRING.EXISTING FINTUBE RADIATION TO REMAIN.CONNECT 3/4 " HWS AND 3/4 " HWR PIPING TO EXISTING 3/4 " HWS AND 3/4 " HWRPIPING AND EXTEND TO DUCT-MOUNTED REHEAT COIL.KEYED NOTES:AS NOTEDPROJECT NORTH 400CA401402403404406405407422421420419418417416415400U400S400EUPDN400400T400CB400Z407A400UB400UA414416400S419DNUP400CA400CBSSSSSSSSSSSSSSSSSS16Ø20Ø18ØVDVDVDVAV-4M (VAV-4N) VAV-4L VAV-4U (VAV-4T)VAV-4X(VAV-4W)(VAV-4G1)VAV-4Q(VAV-4R)(VAV-4A) (VAV-4I)(VAV-4J)(VAV-4K)(VAV-4S)18Ø18Ø18Ø16Ø 10Ø 60x3044x3030x2010Ø 22Ø14Ø 24Ø 28Ø12Ø12Ø12Ø48x2420Ø 14Ø 10Ø10Ø 12" UPRCH-4M RHC-4LRHC-4UVAV-4VRHC-4V(VAV-4Y)RHC-4ZRHC-4A1VAV-4Z VAV-4A1 (VAV-4B1) (VAV-4C1)VAV-4D1RHC-4D1(VAV-4E1)VAV-4F1RHC-4F1VAV-4H1RHC-4H1(VAV-4P)VAV-4O1RHC-4O1(VAV-4I1)VAV-4B RHC-4BVAV-4CRHC-4C(VAV-4D)VAV-4ERHC-4E(VAV-4F) (VAV-4G) (VAV-4H)10Ø10Ø10Ø4Ø 12Ø10Ø6Ø 6Ø 44x30IT IS A VIOLATION OF THE LAW FOR ANY PERSON, UNLESS ACTINGUNDER THE DIRECTION OF A ENGINEER, TO ALTER THIS DOCUMENTIN ANY WAY. IF ALTERED, THE ALTERING ENGINEER SHALL AFFIX HISSEAL AND THE NOTATION 'ALTERED BY' FOLLOWED BY HISSIGNATURE AND THE DATE OF SUCH ALTERATION, AND A SPECIFICDESCRIPTION OF THE ALTERATION.CORNELL UNIVERSITY THURSTON HALL 3RD AND 4TH FLOOR VAV AND CONTROLS REPLACEMENT CORNELL UNIVERSITY PROJECT #108781 4TH FLOOR PLAN - DUCTWORK (BASE BID)1/8"=1'-0"H-107LMH4TH FLOOR PLAN- DUCTWORK(BASE BID)PROJECT NORTHA. CONTRACTOR SHALL COORDINATE WITH THE OWNER'S REPRESENTATIVE FORALL EXISTING SYSTEM SHUT-DOWNS.B.ALTERNATE #1: REMOVE AND REPLACE EXISTING LAB EXHAUST AIRTERMINALS.C.ALTERNATE #2: REMOVE AND REPLACE EXISTING GENERAL EXHAUST AIRTERMINALS.GENERAL DRAWING NOTES:EXISTING GENERAL EXHAUST AIR TERMINAL UNIT TO REMAIN. PROVIDE NEWCONTROLLER AND CONTROL WIRING.PROVIDE NEW SUPPLY AIR VALVE, REHEAT COIL AND CONTROLS.EXISTING SUPPLY AIR VALVE TO REMAIN.EXISTING FUME HOOD EXHAUST AIR VALVE TO REMAIN.EXISTING FINTUBE RADIATION TO REMAIN.EXISTING CONVECTOR TO REMAIN.EXISTING FUME HOOD EXHAUST TERMINAL TO REMAIN. PROVIDE NEWCONTROLLER AND CONTROL WIRING.PROVIDE NEW TEMPERATURE SENSOR AND CONTROL WIRING.22x22 RA GRILLE WITH DUCT BOOT. REFER TO DETAIL 3/H-900.PROVIDE DDC PANEL.KEYED NOTES:AS NOTED 400CA401402403404406405407422421420419418417416415400U400S400EUPDN400400T400CB400Z407A400UB414416400S419DNUP400CA400CBSSSSSSSSSSSSSSSSSS16Ø20Ø18ØVDVDVD(VAV-4M) (VAV-4N) (VAV-4L) (VAV-4U) (VAV-4T)(VAV-4X)VAV-4WVAV-4G1VAV-4QVAV-4RVAV-4A (VAV-4I)(VAV-4J)VAV-4K(VAV-4S)18Ø18Ø18Ø16Ø 10Ø 60x3044x3030x2010Ø 22Ø14Ø 24Ø 28Ø12Ø12Ø12Ø48x2420Ø 14Ø 10Ø10Ø 12" UP(VAV-4V) (VAV-4Y) (VAV-4Z) (VAV-4A1) (VAV-4B1)VAV-4C1(VAV-4D1)VAV-4E1(VAV-4F1)(VAV-4H1)VAV-4PVAV-4O1VAV-4I1(VAV-4B)(VAV-4C)VAV-4D(VAV-4E)VAV-4F(VAV-4G) VAV-4H 10Ø10Ø10Ø4Ø 12Ø10Ø6Ø 6Ø 44x301 4TH FLOOR PLAN - DUCTWORK (ALTERNATE #1)1/8"=1'-0"H-107.1LMHIT IS A VIOLATION OF THE LAW FOR ANY PERSON, UNLESS ACTINGUNDER THE DIRECTION OF A ENGINEER, TO ALTER THIS DOCUMENTIN ANY WAY. IF ALTERED, THE ALTERING ENGINEER SHALL AFFIX HISSEAL AND THE NOTATION 'ALTERED BY' FOLLOWED BY HISSIGNATURE AND THE DATE OF SUCH ALTERATION, AND A SPECIFICDESCRIPTION OF THE ALTERATION.CORNELL UNIVERSITY THURSTON HALL 3RD AND 4TH FLOOR VAV AND CONTROLS REPLACEMENT CORNELL UNIVERSITY PROJECT #108784TH FLOOR PLAN- DUCTWORK(ALTERNATE #1)PROJECT NORTHA. CONTRACTOR SHALL COORDINATE WITH THE OWNER'S REPRESENTATIVE FORALL EXISTING SYSTEM SHUT-DOWNS.B.ALTERNATE #1: REMOVE AND REPLACE EXISTING LAB EXHAUST AIRTERMINALS.C.ALTERNATE #2: REMOVE AND REPLACE EXISTING GENERAL EXHAUST AIRTERMINALS.GENERAL DRAWING NOTES:NEW GENERAL EXHAUST AIR TERMINAL UNIT TO REMAIN.PROVIDE NEW FUME HOOD EXHAUST AIR TERMINAL UNIT VALVE, CONTROLLERAND CONTROL WIRING.EXISTING SUPPLY AIR VALVE TO REMAIN.EXISTING FUME HOOD EXHAUST AIR VALVE TO REMAIN.EXISTING FINTUBE RADIATION TO REMAIN.EXISTING CONVECTOR TO REMAIN.22X22 RA GRILLE WITH DUCT BOOT. REFER TO DETAIL 3/H-900.PROVIDE DDC PANEL.KEYED NOTES:AS NOTED 400CA401402403404406405407422421420419418417416415400U400S400EUPDN400400T400CB400Z407A400UB414416400S419DNUP400CA400CBSSSSSSSSSSSSSSSSSS16Ø20Ø18ØVDVDVD(VAV-4M) VAV-4N (VAV-4L) (VAV-4U) VAV-4T (VAV-4X)(VAV-4W)(VAV-4G1)(VAV-4Q)(VAV-4R)(VAV-4A) (VAV-4I)(VAV-4J)(VAV-4K)(VAV-4S)18Ø18Ø18Ø16Ø 10Ø 60x3044x3030x2010Ø 22Ø14Ø 24Ø 28Ø12Ø12Ø12Ø48x2420Ø 14Ø 10Ø10Ø 12" UP(VAV-4V) VAV-4Y (VAV-4Z) (VAV-4A1) VAV-4B1 (VAV-4C1) (VAV-4D1)(VAV-4E1)(VAV-4F1)(VAV-4H1)(VAV-4P)(VAV-4O1)VAV-4I1(VAV-4B)(VAV-4C)(VAV-4D)(VAV-4E)(VAV-4F) (VAV-4G) (VAV-4H)10Ø10Ø10Ø4Ø 12Ø10Ø6Ø 6Ø 44x301 4TH FLOOR PLAN - DUCTWORK (ALTERNATE #2)1/8"=1'-0"H-107.2LMHIT IS A VIOLATION OF THE LAW FOR ANY PERSON, UNLESS ACTINGUNDER THE DIRECTION OF A ENGINEER, TO ALTER THIS DOCUMENTIN ANY WAY. IF ALTERED, THE ALTERING ENGINEER SHALL AFFIX HISSEAL AND THE NOTATION 'ALTERED BY' FOLLOWED BY HISSIGNATURE AND THE DATE OF SUCH ALTERATION, AND A SPECIFICDESCRIPTION OF THE ALTERATION.CORNELL UNIVERSITY THURSTON HALL 3RD AND 4TH FLOOR VAV AND CONTROLS REPLACEMENT CORNELL UNIVERSITY PROJECT #108784TH FLOOR PLAN- DUCTWORK(ALTERNATE #2)PROJECT NORTHA. CONTRACTOR SHALL COORDINATE WITH THE OWNER'S REPRESENTATIVE FORALL EXISTING SYSTEM SHUT-DOWNS.B.ALTERNATE #1: REMOVE AND REPLACE EXISTING LAB EXHAUST AIRTERMINALS.C.ALTERNATE #2: REMOVE AND REPLACE EXISTING GENERAL EXHAUST AIRTERMINALS.GENERAL DRAWING NOTES:PROVIDE GENERAL EXHAUST VALVE, CONTROLLER, AND CONTROL WIRING.EXISTING CONVECTOR TO REMAIN.EXISTING SUPPLY AIR VALVE TO REMAIN.EXISTING FUME HOOD EXHAUST AIR VALVE TO REMAIN.EXISTING FINTUBE RADIATION TO REMAIN.22X22 RA GRILLE WITH DUCT BOOT. REFER TO DETAIL 3/H-900.PROVIDE DDC PANEL.KEYED NOTES:AS NOTED 400CA401402403404406405407422421420419418417416415400U400S400EUPDN400400T400CB400Z407A400UB414400S419DNSSSSSSSSSSSSSSSSSRHC-40RHC-4BRHC-4CRHC-4H1RHC-4F1RHC-4D1RHC-4ERHC-4GRHC-4MRHC-4LRHC-4VRHC-4URHC-4ZRHC-4A1(3/4" HWS)(3/4" HWR)(2-1/2" CWR)(2-1/2" CWS)(2" HWS)(1-1/4" HWR)(1-1/4" HWR)(1-1/2" HWR)(1-1/2" HWS)(1-1/2" CWR)(1-1/2" CWS)(2-1/2" CWR)(2-1/2" CWS)(2" HWS)(2" HWR)(1-1/2" HWS)(1-1/4" HWS)(3/4" HWS)(3/4" HWR)(3/4" HWS)(3/4" HWR)(3/4" HWS)(3/4" HWR)(3/4" HWS)(3/4" HWR)(5" CWS)(5" CWR)(2" CWR)(2" CWS)(1-1/4" HWR)(2" HWR)(1-1/2" CWR)(1-1/4" CWS)(2" HWR)(2" HWS)(1-1/2" HWR)(1" HWS)(2" HWR)RHC-4I1RHC-4I1(VAV-13S)(VAV-13E)IT IS A VIOLATION OF THE LAW FOR ANY PERSON, UNLESS ACTINGUNDER THE DIRECTION OF A ENGINEER, TO ALTER THIS DOCUMENTIN ANY WAY. IF ALTERED, THE ALTERING ENGINEER SHALL AFFIX HISSEAL AND THE NOTATION 'ALTERED BY' FOLLOWED BY HISSIGNATURE AND THE DATE OF SUCH ALTERATION, AND A SPECIFICDESCRIPTION OF THE ALTERATION.CORNELL UNIVERSITY THURSTON HALL 3RD AND 4TH FLOOR VAV AND CONTROLS REPLACEMENT CORNELL UNIVERSITY PROJECT #108781 4TH FLOOR PLAN - PIPING (BASE BID)1/8"=1'-0"H-108LMH4TH FLOOR PLAN- PIPING(BASE BID)A. CONTRACTOR SHALL COORDINATE WITH THE OWNER'S REPRESENTATIVE FORALL EXISTING SYSTEM SHUT-DOWNS.B.ALTERNATE #1: REMOVE AND REPLACE EXISTING LAB EXHAUST AIRTERMINAL.C.ALTERNATE #2: REMOVE AND REPLACE EXISTING GENERAL EXHAUST AIRTERMINAL.GENERAL DRAWING NOTES:EXISTING GENERAL EXHAUST AIR TERMINAL UNIT TO REMAIN.PROVIDE NEW SUPPLY AIR TERMINAL UNIT, REHEAT COIL AND CONTROLS.EXTEND EXISTING BRANCH PIPING TO COIL LOCATION.EXISTING SUPPLY AIR VALVE TO REMAIN.EXISTING FUME HOOD EXHAUST AIR VALVE TO REMAIN.PROVIDE NEW CONTROL VALVE AND CONTROL WIRING.EXISTING CONVECTOR TO REMAIN.EXISTING FAN COIL UNIT TO REMAIN.PROVIDE NEW TEMPERATURE SENSOR AND CONTROL WIRING.EXISTING FINTUBE RADIATION TO REMAIN.EXISTING FUME HOOD EXHAUST AIR TERMINAL UNIT TO REMAIN.RECONNECT 3/4" HWS AND 3/4" HWR PIPING AT POINT INDICATED.CONNECT TO EXISTING HWS AND HWR RISERS.KEYED NOTES:AS NOTEDPROJECT NORTH H-500LMHIT IS A VIOLATION OF THE LAW FOR ANY PERSON, UNLESS ACTINGUNDER THE DIRECTION OF A ENGINEER, TO ALTER THIS DOCUMENTIN ANY WAY. IF ALTERED, THE ALTERING ENGINEER SHALL AFFIX HISSEAL AND THE NOTATION 'ALTERED BY' FOLLOWED BY HISSIGNATURE AND THE DATE OF SUCH ALTERATION, AND A SPECIFICDESCRIPTION OF THE ALTERATION.CORNELL UNIVERSITY THURSTON HALL 3RD AND 4TH FLOOR VAV AND CONTROLS REPLACEMENT CORNELL UNIVERSITY PROJECT #10878SCHEDULES LABORATORY AIRFLOW SCHEDULETHURSTON 305ROOM DIMENSIONSMODE SETPOINTGENERALEXHAUST AIRTERMINALGENERAL EXHAUSTAIR (CFM)FUME HOOD EXHAUSTAIR TERMINALFUME HOODEXHAUST AIR (CFM)SUPPLY AIRTERMINALSUPPLY AIR (CFM)TOTAL ROOMEXHAUST AIR(CFM)ROOMDIFFERENTIAL(CFM)AREA (SF)HEIGHT(FT)440 10OCCUPIED8MAXVAV-3D590-0VAV-3E490 590 -1008MIN590 0 490 590 -100UNOCCUPIED4 MAX295 0 195 295 -1004 MIN295 0 195 295 -100VACANT2VACANCY 150 0 100 150 -50THURSTON 306/307MODEAIRCHANGES/HOURSETPOINTGENERALEXHAUST AIRTERMINALGENERAL EXHAUSTAIR (CFM)FUME HOOD EXHAUSTAIR TERMINALFUME HOODEXHAUST AIR (CFM)SUPPLY AIRTERMINALSUPPLY AIR (CFM)TOTAL ROOMEXHAUST AIR(CFM)ROOMDIFFERENTIAL(CFM)1325 10OCCUPIED8MAXVAV-3F1770-0VAV-3G1670 1770 -1008MIN1770 0 1670 1770 -100UNOCCUPIED4 MAX885 0 785 885 -1004 MIN885 0 785 885 -100VACANT2VACANCY 440 0 390 440 -50THURSTON 333MODE SETPOINTGENERALEXHAUST AIRTERMINALGENERAL EXHAUSTAIR (CFM)FUME HOOD EXHAUSTAIR TERMINALFUME HOODEXHAUST AIR (CFM)SUPPLY AIRTERMINALSUPPLY AIR (CFM)TOTAL ROOMEXHAUST AIR(CFM)ROOMDIFFERENTIAL(CFM)270 10OCCUPIED18MAX-0VAV-4R800VAV-3H700 800 -10018MIN0 800 700 800 -100UNOCCUPIED12 MAX0 520 420 520 -10012 MIN0 520 420 520 -100VACANT4VACANCY 0 190 140 190 -50THURSTON 401MODE SETPOINTGENERALEXHAUST AIRTERMINALGENERAL EXHAUSTAIR (CFM)FUME HOOD EXHAUSTAIR TERMINALFUME HOODEXHAUST AIR (CFM)SUPPLY AIRTERMINALSUPPLY AIR (CFM)TOTAL ROOMEXHAUST AIR(CFM)ROOMDIFFERENTIAL(CFM)460 9OCCUPIED47MAX-0VAV-4A3225VAV-4B3125 3225 -10047MIN0 3225 3125 3225 -100UNOCCUPIED30MAX0 2100 2000 2100 -10030MIN0 2100 2000 2100 -100VACANT6 VACANCY 0 410 360 410 -50THURSTON 402MODE SETPOINTGENERALEXHAUST AIRTERMINALGENERAL EXHAUSTAIR (CFM)FUME HOOD EXHAUSTAIR TERMINALFUME HOODEXHAUST AIR (CFM)SUPPLY AIRTERMINALSUPPLY AIR (CFM)TOTAL ROOMEXHAUST AIR(CFM)ROOMDIFFERENTIAL(CFM)440 9OCCUPIED33MAX-0VAV-4D2150VAV-4C2050 2150 -10033MIN0 2150 2050 2150 -100UNOCCUPIED21 MAX0 1400 1300 1400 -10021 MIN0 1400 1300 1400 -100VACANT5 VACANCY 0 450 400 450 -50THURSTON 403MODE SETPOINTGENERALEXHAUST AIRTERMINALGENERAL EXHAUSTAIR (CFM)FUME HOOD EXHAUSTAIR TERMINALFUME HOODEXHAUST AIR (CFM)SUPPLY AIRTERMINALSUPPLY AIR (CFM)TOTAL ROOMEXHAUST AIR(CFM)ROOMDIFFERENTIAL(CFM)435 9OCCUPIED33MAX-0VAV-4F2150VAV-4E2050 2150 -10033MIN0 2150 2050 2150 -100UNOCCUPIED21 MAX0 1400 1300 1400 -10021 MIN0 1400 1300 1400 -100VACANT5 VACANCY 0 450 400 450 -50THURSTON 404MODE SETPOINTGENERALEXHAUST AIRTERMINALGENERAL EXHAUSTAIR (CFM)FUME HOOD EXHAUSTAIR TERMINALFUME HOODEXHAUST AIR (CFM)SUPPLY AIRTERMINALSUPPLY AIR (CFM)TOTAL ROOMEXHAUST AIR(CFM)ROOMDIFFERENTIAL(CFM)405 9OCCUPIED18MAX-0VAV-4H1075VAV-4G975 1075 -10018MIN0 1075 975 1075 -100UNOCCUPIED12 MAX0 700 600 700 -10012 MIN0 700 600 700 -100VACANT3 VACANCY 0 250 200 250 -50THURSTON 406MODE SETPOINTGENERALEXHAUST AIRTERMINALGENERAL EXHAUSTAIR (CFM)FUME HOOD EXHAUSTAIR TERMINALFUME HOODEXHAUST AIR (CFM)SUPPLY AIRTERMINALSUPPLY AIR (CFM)TOTAL ROOMEXHAUST AIR(CFM)ROOMDIFFERENTIAL(CFM)400 9OCCUPIED36MAX-0EAV-4J/EAV-4S2150VAV-4G2050 2150 -10036MIN0 2150 2050 2150 -100UNOCCUPIED23MAX0 1400 1300 1400 -10023MIN0 1400 1300 1400 -100VACANT4VACANCY 0 230 180 230 -50THURSTON 407MODE SETPOINTGENERALEXHAUST AIRTERMINALGENERAL EXHAUSTAIR (CFM)FUME HOOD EXHAUSTAIR TERMINALFUME HOODEXHAUST AIR (CFM)SUPPLY AIRTERMINALSUPPLY AIR (CFM)TOTAL ROOMEXHAUST AIR(CFM)ROOMDIFFERENTIAL(CFM)1330 9OCCUPIED13MAX-0VAV-4K2650VAV-4L2550 2650 -10013MIN0 2650 2550 2650 -100UNOCCUPIED10MAX0 1900 1800 1900 -10010MIN0 1900 1800 1900 -100VACANT2VACANCY 0 800 750 800 -50AREA (SF)HEIGHT(FT)AREA (SF)HEIGHT(FT)AREA (SF)HEIGHT(FT)AREA (SF)HEIGHT(FT)AREA (SF)HEIGHT(FT)AREA (SF)HEIGHT(FT)AREA (SF)HEIGHT(FT)AREA (SF)HEIGHT(FT)ROOM DIMENSIONSROOM DIMENSIONSROOM DIMENSIONSROOM DIMENSIONSROOM DIMENSIONSROOM DIMENSIONSROOM DIMENSIONSROOM DIMENSIONSAIRCHANGES/HOURAIRCHANGES/HOURAIRCHANGES/HOURAIRCHANGES/HOURAIRCHANGES/HOURAIRCHANGES/HOURAIRCHANGES/HOURAIRCHANGES/HOUR H-501LMHIT IS A VIOLATION OF THE LAW FOR ANY PERSON, UNLESS ACTINGUNDER THE DIRECTION OF A ENGINEER, TO ALTER THIS DOCUMENTIN ANY WAY. IF ALTERED, THE ALTERING ENGINEER SHALL AFFIX HISSEAL AND THE NOTATION 'ALTERED BY' FOLLOWED BY HISSIGNATURE AND THE DATE OF SUCH ALTERATION, AND A SPECIFICDESCRIPTION OF THE ALTERATION.CORNELL UNIVERSITY THURSTON HALL 3RD AND 4TH FLOOR VAV AND CONTROLS REPLACEMENT CORNELL UNIVERSITY PROJECT #10878SCHEDULES LABORATORY AIRFLOW SCHEDULETHURSTON 407AMODE SETPOINTGENERALEXHAUST AIRTERMINALGENERAL EXHAUSTAIR (CFM)FUME HOOD EXHAUSTAIR TERMINALFUME HOODEXHAUST AIR (CFM)SUPPLY AIRTERMINALSUPPLY AIR (CFM)TOTAL ROOMEXHAUST AIR(CFM)ROOMDIFFERENTIAL(CFM)250 9OCCUPIED8MAXVAV-4N300-0VAV-4M300 300 08MIN300 0 300 300 0UNOCCUPIED4 MAX150 0 150 150 04 MIN150 0 150 150 0VACANT2VACANCY 75 0 75 75 0THURSTON 416MODE SETPOINTGENERALEXHAUST AIRTERMINALGENERAL EXHAUSTAIR (CFM)FUME HOOD EXHAUSTAIR TERMINALFUME HOODEXHAUST AIR (CFM)SUPPLY AIRTERMINALSUPPLY AIR (CFM)TOTAL ROOMEXHAUST AIR(CFM)ROOMDIFFERENTIAL(CFM)260 9OCCUPIED8MAXVAV-4T315-0VAV-4U215 315 -1008MIN315 0 215 315 -100UNOCCUPIED5MAX200 0 100 200 -1005MIN200 0 100 200 -100VACANT2VACANCY 100 0 50 100 -50THURSTON 417MODE SETPOINTGENERALEXHAUST AIRTERMINALGENERAL EXHAUSTAIR (CFM)FUME HOOD EXHAUSTAIR TERMINALFUME HOODEXHAUST AIR (CFM)SUPPLY AIRTERMINALSUPPLY AIR (CFM)TOTAL ROOMEXHAUST AIR(CFM)ROOMDIFFERENTIAL(CFM)260 9OCCUPIED32MAX-0VAV-4W1260VAV-4V1160 1260 -10032MIN0 1260 1160 1260 -100UNOCCUPIED10MAX0 390 290 390 -10010MIN0 390 290 390 -100VACANT6 VACANCY 0 200 150 200 -50THURSTON 418MODE SETPOINTGENERALEXHAUST AIRTERMINALGENERAL EXHAUSTAIR (CFM)FUME HOOD EXHAUSTAIR TERMINALFUME HOODEXHAUST AIR (CFM)SUPPLY AIRTERMINALSUPPLY AIR (CFM)TOTAL ROOMEXHAUST AIR(CFM)ROOMDIFFERENTIAL(CFM)260 9OCCUPIED8MAXVAV-4Y315-0VAV-4Z215 315 -1008MIN315 0 215 315 -100UNOCCUPIED5MAX200 0 100 200 -1005MIN200 0 100 200 -100VACANT3 VACANCY 100 0 50 100 -50THURSTON 419MODE SETPOINTGENERALEXHAUST AIRTERMINALGENERAL EXHAUSTAIR (CFM)FUME HOOD EXHAUSTAIR TERMINALFUME HOODEXHAUST AIR (CFM)SUPPLY AIRTERMINALSUPPLY AIR (CFM)TOTAL ROOMEXHAUST AIR(CFM)ROOMDIFFERENTIAL(CFM)260 9OCCUPIED8MAXVAV-4B1315-0VAV-4A1215 315 -1008MIN315 0 215 315 -100UNOCCUPIED5MAX200 0 100 200 -1005MIN200 0 100 200 -100VACANT3 VACANCY 100 0 50 100 -50THURSTON 420MODE SETPOINTGENERALEXHAUST AIRTERMINALGENERAL EXHAUSTAIR (CFM)FUME HOOD EXHAUSTAIR TERMINALFUME HOODEXHAUST AIR (CFM)SUPPLY AIRTERMINALSUPPLY AIR (CFM)TOTAL ROOMEXHAUST AIR(CFM)ROOMDIFFERENTIAL(CFM)260 9OCCUPIED55MAX-0VAV-4C1/VAV-4E12150VAV-4D12050 2150 -10055MIN0 2150 2050 2150 -100UNOCCUPIED15MAX0 585 485 585 -10015MIN0 585 485 585 -100VACANT12VACANCY 0 450 400 450 -50THURSTON 421MODE SETPOINTGENERALEXHAUST AIRTERMINALGENERAL EXHAUSTAIR (CFM)FUME HOOD EXHAUSTAIR TERMINALFUME HOODEXHAUST AIR (CFM)SUPPLY AIRTERMINALSUPPLY AIR (CFM)TOTAL ROOMEXHAUST AIR(CFM)ROOMDIFFERENTIAL(CFM)260 9OCCUPIED28MAX-0VAV-4G11075VAV-4F1975 1075 -10028MIN0 1075 975 1075 -100UNOCCUPIED12 MAX0 450 350 450 -10012 MIN0 450 350 450 -100VACANT5 VACANCY 0 190 140 190 -50THURSTON 422MODE SETPOINTGENERALEXHAUST AIRTERMINALGENERAL EXHAUSTAIR (CFM)FUME HOOD EXHAUSTAIR TERMINALFUME HOODEXHAUST AIR (CFM)SUPPLY AIRTERMINALSUPPLY AIR (CFM)TOTAL ROOMEXHAUST AIR(CFM)ROOMDIFFERENTIAL(CFM)240 8.5OCCUPIED8MAXVAV-4I1175-0VAV-4H1175 175 08MIN175 0 175 175 0UNOCCUPIED4 MAX50 0 50 50 04 MIN50 0 50 50 0VACANT3 VACANCY 50 0 50 50 0BARD 419MODE SETPOINTGENERALEXHAUST AIRTERMINALGENERAL EXHAUSTAIR (CFM)FUME HOOD EXHAUSTAIR TERMINALFUME HOODEXHAUST AIR (CFM)SUPPLY AIRTERMINALSUPPLY AIR (CFM)TOTAL ROOMEXHAUST AIR(CFM)ROOMDIFFERENTIAL(CFM)210 8.5OCCUPIED27MAX-0VAV-4P800VAV-4O700 800 -10027MIN0 800 700 800 -100UNOCCUPIED12 MAX0 360 260 360 -10012 MIN0 360 260 360 -100VACANT5 VACANCY 0 140 90 140 -50ROOM DIMENSIONSAREA (SF)HEIGHT(FT)ROOM DIMENSIONSAREA (SF)HEIGHT(FT)ROOM DIMENSIONSAREA (SF)HEIGHT(FT)ROOM DIMENSIONSAREA (SF)HEIGHT(FT)ROOM DIMENSIONSAREA (SF)HEIGHT(FT)ROOM DIMENSIONSAREA (SF)HEIGHT(FT)ROOM DIMENSIONSAREA (SF)HEIGHT(FT)ROOM DIMENSIONSAREA (SF)HEIGHT(FT)ROOM DIMENSIONSAREA (SF)HEIGHT(FT)AIRCHANGES/HOURAIRCHANGES/HOURAIRCHANGES/HOURAIRCHANGES/HOURAIRCHANGES/HOURAIRCHANGES/HOURAIRCHANGES/HOURAIRCHANGES/HOURAIRCHANGES/HOUR H-502LMHIT IS A VIOLATION OF THE LAW FOR ANY PERSON, UNLESS ACTINGUNDER THE DIRECTION OF A ENGINEER, TO ALTER THIS DOCUMENTIN ANY WAY. IF ALTERED, THE ALTERING ENGINEER SHALL AFFIX HISSEAL AND THE NOTATION 'ALTERED BY' FOLLOWED BY HISSIGNATURE AND THE DATE OF SUCH ALTERATION, AND A SPECIFICDESCRIPTION OF THE ALTERATION.CORNELL UNIVERSITY THURSTON HALL 3RD AND 4TH FLOOR VAV AND CONTROLS REPLACEMENT CORNELL UNIVERSITY PROJECT #10878SCHEDULES EXHAUST AIR VALVE SCHEDULEUNIT TAG SERVICE LOCATIONMINIMUM FLOW RATE(CFM)MANUFACTURER'SMINIMUM FLOW RATE(CFM)MAXIMUM FLOW RATE(CFM)MANUFACTURER'SMAXIMUM FLOW RATE(CFM)SIZE (IN)VALVE CONFIGURATIONAPD (IN WG)BASIS OF DESIGN NOTESVAV-3D 305 GENERAL EXHAUST 306150 90 590 105012SINGLE 0.3 PHOENIX ACCELL IIA, B, DVAV-3F306A/306 GENERALEXHAUST306A 440 180 1770 210012DOUBLE0.3PHOENIX ACCELL IIA, B, DVAV-4R333 FUME HOOD EXHAUST 333 190 90 800 105012SINGLE0.3PHOENIX ACCELL IIA, B, CVAV-4A401 FUME HOOD EXHAUST 401 410 360 3225 420012QUAD0.3PHOENIX ACCELL IIA, B, CVAV-4D402 FUME HOOD EXHAUST 402 450 400 2150 280014DOUBLE0.3PHOENIX ACCELL IIA, B, CVAV-4F403 FUME HOOD EXHAUST 403 450 400 2150 280014DOUBLE0.3PHOENIX ACCELL IIA, B, CVAV-4H404 FUME HOOD EXHAUST 404 250 200 1075 140014SINGLE0.3PHOENIX ACCELL IIA, B, CVAV-4K407 FUME HOOD EXHAUST 407 400 400 2650 280014DOUBLE0.3PHOENIX ACCELL IIA, B, CVAV-4N407A GENERAL EXHAUST 4077535 300 5008 SINGLE 0.3 PHOENIX ACCELL IIA, B, DVAV-4B1419 GENERAL EXHAUST422100 35 315 5008 SINGLE 0.3 PHOENIX ACCELL IIA, B, DVAV-4T416 GENERAL EXHAUST 416 100 35 315 5008 SINGLE 0.3 PHOENIX ACCELL IIA, B, DVAV-4W417 FUME HOOD EXHAUST 417 250 200 1260 140014SINGLE0.3PHOENIX ACCELL IIA, B, CVAV-4Y418 GENERAL EXHAUST 418 100 35 315 5008 SINGLE 0.3 PHOENIX ACCELL IIA, B, DVAV-4C1 420 FUME HOOD EXHAUST 420 225 200 1075 140014SINGLE0.3PHOENIX ACCELL IIA, B, CVAV-4E1420 FUME HOOD EXHAUST 420 225 200 1075 140014SINGLE0.3PHOENIX ACCELL IIA, B, CVAV-4G1 421 FUME HOOD EXHAUST421250 200 1075 140014SINGLE0.3PHOENIX ACCELL IIA, B, CVAV-4PBARD 419 FUME HOODEXHAUSTBARD 419 200 200 800 140014SINGLE0.3PHOENIX ACCELL IIA, B, CVAV-4I1422 GENERAL EXHAUST422100 35 275 5008 SINGLE 0.3 PHOENIX ACCELL IIA, B, DVAV-3ACORRIDOR 300CAGENERAL EXHAUST300CA 1075 200 1075 140014SINGLE0.3PHOENIX ACCELL IIA, B, DVAV-3BCORRIDOR 300CAGENERAL EXHAUST300CA 325 35 325 500 8 SINGLE0.3PHOENIX ACCELL IIA, B, DNOTES:A. REFER TO SPECIFICATIONS.B. VALVE SHALL BE PRESSURE INDEPENDENT,LOW-PRESSURE TYPE.C. FUME HOOD EXHAUST VALVE REPLACEDUNDER ALERNATE #1.D. GENERAL EXHAUST VALVE REPLACEDUNDER ALERNATE #2.GRILLE/REGISTER/DIFFUSER SCHEDULEUNIT TAG SERVICE DESCRIPTIONMATERIALFACE SIZE NECK SIZE MOUNTING FINISH ACCESSORIES BASIS OF DESIGN NOTESRA-ARETURN AIRPERFORATEDGRILLE STEEL NOMINAL 24"x24" SEE PLANS SEE PLANSWHITE (STANDARD)-KRUEGER S80HA,BNOTES:A.REFER TOSPECIFICATIONS.B.PROVIDEMANUFACTURER'SMOUNTING FRAMECOMPATIBLE WITHSURFACE IN WHICHOUTLET ISINSTALLED. H-503LMHIT IS A VIOLATION OF THE LAW FOR ANY PERSON, UNLESS ACTINGUNDER THE DIRECTION OF A ENGINEER, TO ALTER THIS DOCUMENTIN ANY WAY. IF ALTERED, THE ALTERING ENGINEER SHALL AFFIX HISSEAL AND THE NOTATION 'ALTERED BY' FOLLOWED BY HISSIGNATURE AND THE DATE OF SUCH ALTERATION, AND A SPECIFICDESCRIPTION OF THE ALTERATION.CORNELL UNIVERSITY THURSTON HALL 3RD AND 4TH FLOOR VAV AND CONTROLS REPLACEMENT CORNELL UNIVERSITY PROJECT #10878SCHEDULES REHEAT COIL SCHEDULEUNIT TAGSUPPLYTERMINALSERVICE LOCATIONFLOW RATE (CFM) CAPACITY (MBH) EDB (F) LDB (F) EWT (F) LWT (F)FLOW RATE(GPM)WPD (FT WG)COIL ROWSCOIL FINS/INFACE AREA (SF)FACE VELOCITY(FPM)APD (IN WC)BASIS OF DESIGN NOTESRHC-3C VAV-3C 3RD FLOOR LAB MUA 300CA 1400 16.160 90.8 180 149.2 1.10.3 1 11 0.9 522.7 0.19 DAIKIN MODEL #5BS1101CA, BRHC-3E VAV-3E 305 30649016.160 90.8 180 149.21.10.3 1 11 0.9 522.7 0.19 DAIKIN MODEL #5BS1101CA, BRHC-3G VAV-3G306A/306306A1670 34.7 60 90.2 180 149.7 2.31.1110 3.1 502.4 0.17 DAIKIN MODEL #5BB1001CA, BRHC-3H VAV-3H 333 333 700 23.160 90.1 180 149.9 1.5 0.9110 1.5 560 0.2 DAIKIN MODEL #5BS1001CA, BRHC-4BVAV-4B401 401 3125 68.360 90 180 150 4.6 5.419 6 520.8 0.17 DAIKIN MODEL #5BB0901CA, BRHC-4C VAV-4C 402 402 2050 46.960 90.9 180 148.6 3 1.71 113.8 546.7 0.27 DAIKIN MODEL #5BB1101CA, BRHC-4EVAV-4E403 403 2050 46.960 90.9 180 148.6 3 1.71 113.8 546.7 0.27 DAIKIN MODEL #5BB1101CA, BRHC-4G VAV-4G 404 404 975 32.360 90.3 180 149.72.11.919 1.8 531.8 0.17 DAIKIN MODEL #5BS0901CA, BRHC-4LVAV-4L407 407 2550 54.960 90.5 180 149.3 3.6 2.51134.2576.5 0.16 DAIKIN MODEL #5BB1301BA, BRHC-4MVAV-4M407A 407 300 9.860 90.1 180 149.9 0.7 0.21 120.6 480 0.18 DAIKIN MODEL #5BS1201CA, BRHC-4O VAV-4O 419422700 26.560 90.3 180 149.7 1.7 1.41 121.5 533.3 0.13 DAIKIN MODEL #5BS1201BA, BRHC-4U VAV-4U 416 416 2157.160 90.1 180 149.9 0.5 0.226 0.4 516 0.14 DAIKIN MODEL #5BS0602BA, BRHC-4VVAV-4V417 417 1160 38.460 90.3 180 149.7 2.5 31 12 2580 0.15 DAIKIN MODEL #5BS1201BA, BRHC-4ZVAV-4Z418 418 2157.160 90.1 180 149.9 0.5 0.226 0.4 516 0.14 DAIKIN MODEL #5BS0602BA, BRHC-4A1VAV-4A1419 419 2157.160 90.1 180 149.9 0.5 0.226 0.4 516 0.14 DAIKIN MODEL #5BS0602BA, BRHC-4D1VAV-4D1420 420 2050 46.960 88.6 180 148.6 3 1.71 113.8 546.7 0.27 DAIKIN MODEL #5BB1101CA, BRHC-4F1VAV-4F1 421 421975 32.360 90.3 180 149.7 2.1 1.919 1.8 531.8 0.17 DAIKIN MODEL #5BS0901CA, BRHC-4H1VAV-4H1 422 4221755.960 90.6 180 149.4 0.4 0.227 0.3 525 0.16 DAIKIN MODEL #5BS0702BA, BRHC-4Q VAV-4Q400CA 400CA 600 19.860 90.3 180 149.7 1.3 0.61131.1533.3 0.14 DAIKIN MODEL #5BS1301BA, BRHC-4XVAV-4X400CA 400CA 600 19.860 90.3 180 149.7 1.3 0.61131.1533.3 0.14 DAIKIN MODEL #5BS1301BA, BNOTES:A. REFER TO SPECIFICATIONS.B. HEAT TRANSFER MEDIUMSHALL BE 100% WATER.SUPPLY AIR VALVE SCHEDULEUNIT TAG SERVICE LOCATIONMINIMUM FLOW RATE(CFM)MANUFACTURER'SMINIMUM FLOW RATE(CFM)MAXIMUM FLOW RATE(CFM)MANUFACTURER'SMAXIMUM FLOW RATE(CFM)SIZE (IN)VALVE CONFIGURATIONAPD (IN WG)BASIS OF DESIGN NOTESVAV-3E 305 306100 50 490 550 10 SINGLE PHOENIX ACCELL IIA, BVAV-3G306A/306306A340 180 1670 210012DOUBLE PHOENIX ACCELL IIA, BVAV-3H 333 333 140 90 700 105012SINGLE PHOENIX ACCELL IIA, BVAV-4B401 401 360 360 3125 420012QUADPHOENIX ACCELL IIA, BVAV-4C 402 402 400 400 2050 280014DOUBLE PHOENIX ACCELL IIA, BVAV-4E403 403 400 400 2050 280014DOUBLE PHOENIX ACCELL IIA, BVAV-4G 404 404 200 200 975 140014SINGLE PHOENIX ACCELL IIA, BVAV-4L407 407 750 400 2550 280014DOUBLE PHOENIX ACCELL IIA, BVAV-4M407A 4077550 300 55010 SINGLE PHOENIX ACCELL IIA, BVAV-4XCORRIDOR 400CA (EAST) CORRIDOR 400CA (EAST)600 90 600 105012SINGLE PHOENIX ACCELL IIA, BVAV-4QCORRIDOR 400CA(WEST)CORRIDOR 400CA(WEST)600 90 600 105012SINGLE PHOENIX ACCELL IIA, BVAV-4O 419422140 90 700 105012SINGLE PHOENIX ACCELL IIA, BVAV-4U 416 416 50 35 215 5008 SINGLE PHOENIX ACCELL IIA, BVAV-4V417 417 200 200 1160 140014SINGLE PHOENIX ACCELL IIA, BVAV-4Z418 418 50 35 215 5008 SINGLE PHOENIX ACCELL IIA, BVAV-4A1419 419 50 35 215 5008 SINGLE PHOENIX ACCELL IIA, BVAV-4D1420 420 400 400 2050 280014DOUBLE PHOENIX ACCELL IIA, BVAV-4F1 421 421200 200 975 140014SINGLE PHOENIX ACCELL IIA, BVAV-4H1 422 42250 351755008 SINGLE PHOENIX ACCELL IIA, BVAV-3C 3RD FLOOR LAB MUA 300CA 1400 180 1400 210012DOUBLE PHOENIX ACCELL IIA, BNOTES:A. REFER TO SPECIFICATIONS.B. VALVE SHALL BE PRESSUREINDEPENDENT, LOW-PRESSURE TYPE. H-504LMHIT IS A VIOLATION OF THE LAW FOR ANY PERSON, UNLESS ACTINGUNDER THE DIRECTION OF A ENGINEER, TO ALTER THIS DOCUMENTIN ANY WAY. IF ALTERED, THE ALTERING ENGINEER SHALL AFFIX HISSEAL AND THE NOTATION 'ALTERED BY' FOLLOWED BY HISSIGNATURE AND THE DATE OF SUCH ALTERATION, AND A SPECIFICDESCRIPTION OF THE ALTERATION.CORNELL UNIVERSITY THURSTON HALL 3RD AND 4TH FLOOR VAV AND CONTROLS REPLACEMENT CORNELL UNIVERSITY PROJECT #10878SCHEDULES CONTROL VALVE SCHEDULEVALVE TAG SERVICE SYSTEM HEAT TRANSFER MEDIUMFLOW RATE (GPM) SIZE (IN)VALVE CVΔP (PSIG)ARRANGEMENT TYPE FAIL POSITION ACTUATOR BASIS OF DESIGN NOTESV-1 RHC-3C HEATING LOOP WATER1.11/20.64 32-WAYMODULATING LAST POSITION 0-10 VDCBELIMO CCV (BRONZE)AV-2RHC-3E HEATING LOOP WATER1.11/20.64 32-WAYMODULATING LAST POSITION 0-10 VDCBELIMO CCV (BRONZE)AV-3 RHC-3G HEATING LOOP WATER2.31/21.33 32-WAYMODULATING LAST POSITION 0-10 VDCBELIMO CCV (BRONZE)AV-4RHC-3H HEATING LOOP WATER1.51/20.87 32-WAYMODULATING LAST POSITION 0-10 VDCBELIMO CCV (BRONZE)AV-5RHC-4B HEATING LOOP WATER4.61/22.66 32-WAYMODULATING LAST POSITION 0-10 VDCBELIMO CCV (BRONZE)AV-6 RHC-4C HEATING LOOP WATER31/21.73 32-WAYMODULATING LAST POSITION 0-10 VDCBELIMO CCV (BRONZE)AV-7RHC-4E HEATING LOOP WATER31/21.73 32-WAYMODULATING LAST POSITION 0-10 VDCBELIMO CCV (BRONZE)AV-8 RHC-4G HEATING LOOP WATER2.11/21.2132-WAYMODULATING LAST POSITION 0-10 VDCBELIMO CCV (BRONZE)AV-9 RHC-4L HEATING LOOP WATER3.61/22.08 32-WAYMODULATING LAST POSITION 0-10 VDCBELIMO CCV (BRONZE)AV-10 RHC-4M HEATING LOOP WATER0.71/20.4 32-WAYMODULATING LAST POSITION 0-10 VDCBELIMO CCV (BRONZE)AV-11 RHC-4O HEATING LOOP WATER1.71/20.98 32-WAYMODULATING LAST POSITION 0-10 VDCBELIMO CCV (BRONZE)AV-12RHC-4U HEATING LOOP WATER0.51/20.29 32-WAYMODULATING LAST POSITION 0-10 VDCBELIMO CCV (BRONZE)AV-13 RHC-4V HEATING LOOP WATER2.51/21.4432-WAYMODULATING LAST POSITION 0-10 VDCBELIMO CCV (BRONZE)AV-14RHC-4Z HEATING LOOP WATER0.51/20.29 32-WAYMODULATING LAST POSITION 0-10 VDCBELIMO CCV (BRONZE)AV-15RHC-4A1 HEATING LOOP WATER0.51/20.29 32-WAYMODULATING LAST POSITION 0-10 VDCBELIMO CCV (BRONZE)AV-16 RHC-4D1 HEATING LOOP WATER31/21.73 32-WAYMODULATING LAST POSITION 0-10 VDCBELIMO CCV (BRONZE)AV-17RHC-4F1 HEATING LOOP WATER2.11/21.2132-WAYMODULATING LAST POSITION 0-10 VDCBELIMO CCV (BRONZE)AV-18 RHC-4H1 HEATING LOOP WATER0.41/20.23 32-WAYMODULATING LAST POSITION 0-10 VDCBELIMO CCV (BRONZE)AV-19RHC-4QHEATING LOOP WATER1.31/20.75 32-WAYMODULATING LAST POSITION 0-10 VDCBELIMO CCV (BRONZE)AV-20 RHC-4X HEATING LOOP WATER1.31/20.75 32-WAYMODULATING LAST POSITION 0-10 VDCBELIMO CCV (BRONZE)AV-21ROOM 307 CONVECTOR WATER1.41/20.81 32-WAYMODULATING LAST POSITION 0-10 VDCBELIMO CCV (BRONZE)AV-22ROOM 407A CONVECTOR WATER1.41/20.81 32-WAYMODULATING LAST POSITION 0-10 VDCBELIMO CCV (BRONZE)AV-23 ROOM 300T CONVECTOR WATER1.31/20.75 32-WAYMODULATING LAST POSITION 0-10 VDCBELIMO CCV (BRONZE)AV-24ROOM 400T CONVECTOR WATER1.31/20.75 32-WAYMODULATING LAST POSITION 0-10 VDCBELIMO CCV (BRONZE)AV-25 ROOM 306A CONVECTOR WATER2.21/21.2732-WAYMODULATING LAST POSITION 0-10 VDCBELIMO CCV (BRONZE)AV-26 ROOM 407 CONVECTOR WATER2.61/21.5 32-WAYMODULATING LAST POSITION 0-10 VDCBELIMO CCV (BRONZE)AV-27 ROOM 407 CONVECTOR WATER2.61/21.5 32-WAYMODULATING LAST POSITION 0-10 VDCBELIMO CCV (BRONZE)AV-28 ROOM 306A CONVECTOR WATER2.21/21.2732-WAYMODULATING LAST POSITION 0-10 VDCBELIMO CCV (BRONZE)AV-29 ROOM 306 CONVECTOR WATER2.21/21.2732-WAYMODULATING LAST POSITION 0-10 VDCBELIMO CCV (BRONZE)AV-30 ROOM 407 CONVECTOR WATER2.61/21.5 32-WAYMODULATING LAST POSITION 0-10 VDCBELIMO CCV (BRONZE)AV-31 ROOM 406 CONVECTOR WATER2.61/21.5 32-WAYMODULATING LAST POSITION 0-10 VDCBELIMO CCV (BRONZE)AV-32 ROOM 305 CONVECTOR WATER2.21/21.2732-WAYMODULATING LAST POSITION 0-10 VDCBELIMO CCV (BRONZE)AV-33 ROOM 304 CONVECTOR WATER2.21/21.2732-WAYMODULATING LAST POSITION 0-10 VDCBELIMO CCV (BRONZE)AV-34 ROOM 404 CONVECTOR WATER2.61/21.5 32-WAYMODULATING LAST POSITION 0-10 VDCBELIMO CCV (BRONZE)AV-35 ROOM 403 CONVECTOR WATER2.61/21.5 32-WAYMODULATING LAST POSITION 0-10 VDCBELIMO CCV (BRONZE)AV-36 ROOM 303 CONVECTOR WATER2.21/21.2732-WAYMODULATING LAST POSITION 0-10 VDCBELIMO CCV (BRONZE)AV-37 ROOM 302 CONVECTOR WATER2.21/21.2732-WAYMODULATING LAST POSITION 0-10 VDCBELIMO CCV (BRONZE)AV-38 ROOM 402 CONVECTOR WATER2.61/21.5 32-WAYMODULATING LAST POSITION 0-10 VDCBELIMO CCV (BRONZE)AV-39 ROOM 401 CONVECTOR WATER2.31/21.33 32-WAYMODULATING LAST POSITION 0-10 VDCBELIMO CCV (BRONZE)AV-40 ROOM 301 CONVECTOR WATER1.91/21.132-WAYMODULATING LAST POSITION 0-10 VDCBELIMO CCV (BRONZE)AV-41ROOM 321 CONVECTOR WATER1.71/20.98 32-WAYMODULATING LAST POSITION 0-10 VDCBELIMO CCV (BRONZE)AV-42ROOM 415 CONVECTOR WATER1.91/21.132-WAYMODULATING LAST POSITION 0-10 VDCBELIMO CCV (BRONZE)AV-43 ROOM 416 CONVECTOR WATER21/21.15 32-WAYMODULATING LAST POSITION 0-10 VDCBELIMO CCV (BRONZE)AV-44ROOM 322 CONVECTOR WATER1.71/20.98 32-WAYMODULATING LAST POSITION 0-10 VDCBELIMO CCV (BRONZE)AV-45 ROOM 417 CONVECTOR WATER21/21.15 32-WAYMODULATING LAST POSITION 0-10 VDCBELIMO CCV (BRONZE)AV-46 ROOM 323 CONVECTOR WATER0.91/20.52 32-WAYMODULATING LAST POSITION 0-10 VDCBELIMO CCV (BRONZE)AV-47 ROOM 323 CONVECTOR WATER0.91/20.52 32-WAYMODULATING LAST POSITION 0-10 VDCBELIMO CCV (BRONZE)AV-48 ROOM 325 CONVECTOR WATER0.91/20.52 32-WAYMODULATING LAST POSITION 0-10 VDCBELIMO CCV (BRONZE)AV-49 ROOM 418 CONVECTOR WATER21/21.15 32-WAYMODULATING LAST POSITION 0-10 VDCBELIMO CCV (BRONZE)AV-50 ROOM 419 CONVECTOR WATER21/21.15 32-WAYMODULATING LAST POSITION 0-10 VDCBELIMO CCV (BRONZE)AV-51ROOM 327 CONVECTOR WATER0.91/20.52 32-WAYMODULATING LAST POSITION 0-10 VDCBELIMO CCV (BRONZE)AV-52 ROOM 329 CONVECTOR WATER0.91/20.52 32-WAYMODULATING LAST POSITION 0-10 VDCBELIMO CCV (BRONZE)AV-53 ROOM 329 CONVECTOR WATER0.91/20.52 32-WAYMODULATING LAST POSITION 0-10 VDCBELIMO CCV (BRONZE)AV-54 ROOM 420 CONVECTOR WATER21/21.15 32-WAYMODULATING LAST POSITION 0-10 VDCBELIMO CCV (BRONZE)AV-55ROOM 421 CONVECTOR WATER21/21.15 32-WAYMODULATING LAST POSITION 0-10 VDCBELIMO CCV (BRONZE)AV-56 ROOM 331 CONVECTOR WATER0.91/20.52 32-WAYMODULATING LAST POSITION 0-10 VDCBELIMO CCV (BRONZE)AV-57ROOM 333 CONVECTOR WATER2.11/21.2132-WAYMODULATING LAST POSITION 0-10 VDCBELIMO CCV (BRONZE)AV-58 ROOM 422 CONVECTOR WATER2.21/21.2732-WAYMODULATING LAST POSITION 0-10 VDCBELIMO CCV (BRONZE)AV-59 ROOM 330 CONVECTOR WATER0.91/20.52 32-WAYMODULATING LAST POSITION 0-10 VDCBELIMO CCV (BRONZE)AV-60 ROOM 332 CONVECTOR WATER0.91/20.52 32-WAYMODULATING LAST POSITION 0-10 VDCBELIMO CCV (BRONZE)ANOTES:A. REFER TO SPECIFICATIONS. H-700AJKIT IS A VIOLATION OF THE LAW FOR ANY PERSON, UNLESS ACTINGUNDER THE DIRECTION OF A ENGINEER, TO ALTER THIS DOCUMENTIN ANY WAY. IF ALTERED, THE ALTERING ENGINEER SHALL AFFIX HISSEAL AND THE NOTATION 'ALTERED BY' FOLLOWED BY HISSIGNATURE AND THE DATE OF SUCH ALTERATION, AND A SPECIFICDESCRIPTION OF THE ALTERATION.CORNELL UNIVERSITY THURSTON HALL 3RD AND 4TH FLOOR VAV AND CONTROLS REPLACEMENT CORNELL UNIVERSITY PROJECT #10878CONTROLSCHEMATICSDESCRIPTIONHARDWARE POINTSSYSTEM POINT LISTSOFTWARE POINTSAIDIAODOAVDVSCHEDULETRENDALARMGRAPHICA0VEXISTING PERIMETERRADIATION(WHERE APPLICABLE)AITGENERAL:THE SYSTEM SHALL BE CONTROLLED THROUGH THE EXISTING AUTOMATED LOGIC BUILDING AUTOMATION SYSTEM(BAS).ALL SETPOINTS SHALL BE ADJUSTABLE.LABORATORY AIR EXCHANGE RATES SHALL BE BASED UPON TOTAL EXHAUST AIR (XA) FLOW FROM THE ZONE.THE ZONE SHALL BE CONTROLLED TO AN AIR EXCHANGE RATE. THE BAS SHALL CALCULATE THE REQUIRED AIR FLOWBASED UPON THE ZONE GROSS VOLUME.IN THE EVENT THAT THE ZONE BECOMES OCCUPIED DURING THE SCHEDULED UNOCCUPIED PERIOD, THE ZONEOCCUPIED MODE SHALL BE AUTOMATICALLY ENABLED FOR THE DURATION OF OCCUPANCY (MINIMUM TIME = 30MINUTES). WHEN THE ZONE BECOMES UNOCCUPIED AGAIN DURING THE SCHEDULED UNOCCUPIED PERIOD, THEZONE SHALL AUTOMATICALLY RETURN BACK TO THE UNOCCUPIED MODE.AIR TERMINAL UNIT POSITIONS SHALL BE BASED UPON ZONE OCCUPANCY. UNDER NORMAL CONTROL, ZONEOCCUPANCY SHALL BE DETERMINED VIA ROOM OCCUPANCY SENSORS. IF THE LABORATORY IS VACANT, THE ZONESHALL BE PLACED IN THE VACANT MODE BY THE BAS.SETPOINTS:COOLING TEMPERATURE SETOINTS:OCCUPIED:75°FOCCUPIED SETBACK:78°FUNOCCUPIED:81°FHEATING TEMPERATURE SETOINTS:OCCUPIED:70°FOCCUPIED SETBACK:67°FUNOCCUPIED:64°FLABORATORY FLOW CONTROL:WHEN THE ZONE IS OCCUPIED, THE GENERAL EXHAUST AIR TERMINAL SHALL MODULATE AS REQUIRED RO MAINTAINTHE OCCUPIED AIR EXCHANGE RATE. THE SUPPLY AIR TERMINAL SHALL MODULATE AS REQUIRED TO MAINTAIN THESPECIFIED AIRFLOW DIFFERENTIAL.WHEN THE ZONE IS UNOCCUPIED, THE GENERAL EXHAUST AIR TERMINAL SHALL MODULATE AS REQUIRED TO MAINTAINTHE UNOCCUPIED AIR EXCHANGE RATE. THE SUPPLY AIR TERMINAL SHALL MODULATE AS REQUIRED TO MAINTAIN THESPECIFIED AIRFLOW DIFFERENTIAL.WHEN THE ZONE IS VACANT, THE GENERAL EXHAUST AIR TERMINAL SHALL MODULATE AS REQUIRED TO MAINTAIN THEVACANT AIR EXCHANGE RATE. THE SUPPLY AIR TERMINAL SHALL MODULATE AS REQUIRED TO MAINTAIN THESPECIFIED AIRFLOW DIFFERENTIAL.ZONE HEATING CONTROL:IF THE ZONE IS OCCUPIED DURING THE SCHEDULED OCCUPIED PERIOD AND THE ZONE TEMPERATURE FALLS BELOWTHE OCCUPIED HEATING TEMPERATURE SETPOINT, THE CONVECTOR CONTROL VALVE SHALL MODULATE AS REQUIREDTO THE ZONE TEMPERATURE SETPOINT. IF THE ZONE TEMPERATURE IS NOT AT THE SETPOINT WITH THE CONVECTORCONTROL VALVE FULLY OPEN, THE ZONE REHEAT COIL CONTROL SHALL BE MODULATED AS REQUIRED TO MAINTAINTHE ZONE TEMPERATURE SETPOINT. WHEN ZONE SETPOINT IS ACHIEVED, THE REHEAT COIL CONTROL VALVE SHALL BECLOSED.IF THE ZONE BECOMES UNOCCUPIED DURING THE SCHEDULED OCCUPIED PERIOD, THE OCCUPIED HEATINGSEQUENCE OF OPERATION SHALL BE ENABLED TO MAINTAIN THE ZONE AT THE SETBACK TEMPERATURE.IF THE ZONE BECOMES UNOCCUPIED OR VACANT FOR THE SCHEDULED UNOCCUPIED PERIOD AND THE ZONETEMPERATURE FALLS BELOW THE UNOCCUPIED SETPOINT, THE OCCUPIED HEATING SEQUENCE OF OPERATION SHALLBE ENABLED TO MAINTAIN THE ZONE AT THE UNOCCUPIED TEMPERATURE.ZONE COOLING CONTROL:IF THE ZONE IS OCCUPIED DURING THE SCHEDULED OCCUPIED PERIOD AND THE ZONE TEMPERATURE RISES ABOVE THEOCCUPIED COOLING TEMPERATURE SETPOINT, THE ZONE SHALL BE AT THE MINIMUM AIR EXCHANGE RATE, THEGENERAL EXHAUST AIR TERMINAL SHALL MODULATE OPEN AS REQUIRED TO MAINTAIN THE ZONE TEMPERATURESETPOINT. THE SUPPLY AIR TERMINAL SHALL MODULATE OPEN AS REQUIRED TO MAINTAIN THE REQUIRED EXHAUSTRATE MINUS THE SPECIFIED AIRFLOW DIFFERENTIAL.IF THE ZONE BECOMES UNOCCUPIED DURING THE SCHEDULED OCCUPIED PERIOD, THE OCCUPIED COOLINGSEQUENCE OF OPERATION SHALL BE ENABLED TO MAINTAIN THE ZONE AT THE SETBACK TEMPERATURE.IF THE ZONE BECOMES UNOCCUPIED OR VACANT FOR THE SCHEDULED UNOCCUPIED PERIOD AND THE ZONETEMPERATURE RISES ABOVE THE UNOCCUPIED SETPOINT, THE OCCUPIED COOLING SEQUENCE OF OPERATION SHALLBE ENABLED TO MAINTAIN THE ZONE AT THE UNOCCUPIED TEMPERATURE.1 LABORATORY SUPPLY AIR & GENERAL LAB EXHAUST AIR CONTROL SCHEMATICNO SCALEZONE TEMPERATUREZONE SETPOINT ADJUSTAIRFLOWDAMPERZONE OVERRIDEMIN / MAX AIRFLOW SETPOINTSHEATING SETPOINTHIGH ZONE TEMPERATURELOW ZONE TEMPERATUREHIGH DISCHARGE AIR TEMPERATURELOW DISCGARGE AIR TEMPERATURECOOLING SETPOINTDISCHARGE AIR TEMPERATUREXCONVECTOR CONTROL VALVEHWSHWRREHEAT COIL CONTROL VALVEHWSHWRAOVSCHEDULEAIRFLOW SETPOINTXXXXXXXXXXXXXXXXXXXXXXXXXXXX X XX X XXXXXXXXNO SCALEZONE TEMPERATURESENSORA0DMAIFEXISTINGXATERMINALGENERALLABORATORYEXHAUSTDIOCCZONE OCCUPANCYSENSORAITAIPREHEATCOILSUPPLY AIRVALVE AJKIT IS A VIOLATION OF THE LAW FOR ANY PERSON, UNLESS ACTINGUNDER THE DIRECTION OF A ENGINEER, TO ALTER THIS DOCUMENTIN ANY WAY. IF ALTERED, THE ALTERING ENGINEER SHALL AFFIX HISSEAL AND THE NOTATION 'ALTERED BY' FOLLOWED BY HISSIGNATURE AND THE DATE OF SUCH ALTERATION, AND A SPECIFICDESCRIPTION OF THE ALTERATION.CORNELL UNIVERSITY THURSTON HALL 3RD AND 4TH FLOOR VAV AND CONTROLS REPLACEMENT CORNELL UNIVERSITY PROJECT #10878NO SCALEDESCRIPTIONHARDWARE POINTSSYSTEM POINT LISTSOFTWARE POINTSAIDI AODOAVDVSCHEDULETRENDALARMGRAPHICA0VEXISTING PERIMETERRADIATION(WHERE APPLICABLE)AITGENERAL:THE SYSTEM SHALL BE CONTROLLED THROUGH THE EXISTING AUTOMATED LOGIC BUILDING AUTOMATION SYSTEM(BAS).ALL SETPOINTS SHALL BE ADJUSTABLE.LABORATORY AIR EXCHANGE RATES SHALL BE BASED UPON TOTAL EXHAUST AIR (XA) FLOW FROM THE ZONE.THE ZONE SHALL BE CONTROLLED TO AN AIR EXCHANGE RATE. THE BAS SHALL CALCULATE THE REQUIRED AIR FLOWBASED UPON THE ZONE GROSS VOLUME.IN THE EVENT THAT THE ZONE BECOMES OCCUPIED DURING THE SCHEDULED UNOCCUPIED PERIOD, THE ZONEOCCUPIED MODE SHALL BE AUTOMATICALLY ENABLED FOR THE DURATION OF OCCUPANCY (MINIMUM TIME = 30MINUTES). WHEN THE ZONE BECOMES UNOCCUPIED AGAIN DURING THE SCHEDULED UNOCCUPIED PERIOD, THEZONE SHALL AUTOMATICALLY RETURN BACK TO THE UNOCCUPIED MODE.AIR TERMINAL UNIT POSITIONS SHALL BE BASED UPON ZONE OCCUPANCY. UNDER NORMAL CONTROL, ZONEOCCUPANCY SHALL BE DETERMINED VIA ROOM OCCUPANCY SENSORS. IF THE LABORATORY IS VACANT, THE ZONESHALL BE PLACED IN THE VACANT MODE BY THE BAS.SETPOINTS:COOLING TEMPERATURE SETOINTS:OCCUPIED:75°FOCCUPIED SETBACK:78°FUNOCCUPIED:81°FHEATING TEMPERATURE SETOINTS:OCCUPIED:70°FOCCUPIED SETBACK:67°FUNOCCUPIED:64°FLABORATORY FLOW CONTROL:WHEN THE ZONE IS OCCUPIED, THE FUME HOOD EXHAUST AIR TERMINAL SHALL MODULATE AS REQUIRED ROMAINTAIN THE OCCUPIED AIR EXCHANGE RATE. THE SUPPLY AIR TERMINAL SHALL MODULATE AS REQUIRED TOMAINTAIN THE SPECIFIED AIRFLOW DIFFERENTIAL.WHEN THE ZONE IS UNOCCUPIED, THE FUME HOOD EXHAUST AIR TERMINAL SHALL MODULATE AS REQUIRED TOMAINTAIN THE UNOCCUPIED AIR EXCHANGE RATE. THE SUPPLY AIR TERMINAL SHALL MODULATE AS REQUIRED TOMAINTAIN THE SPECIFIED AIRFLOW DIFFERENTIAL.WHEN THE ZONE IS VACANT, THE FUME HOOD EXHAUST AIR TERMINAL SHALL MODULATE AS REQUIRED TO MAINTAINTHE VACANT AIR EXCHANGE RATE. THE SUPPLY AIR TERMINAL SHALL MODULATE AS REQUIRED TO MAINTAIN THESPECIFIED AIRFLOW DIFFERENTIAL.ZONE HEATING CONTROL:IF THE ZONE IS OCCUPIED DURING THE SCHEDULED OCCUPIED PERIOD AND THE ZONE TEMPERATURE FALLS BELOWTHE OCCUPIED HEATING TEMPERATURE SETPOINT, THE CONVECTOR CONTROL VALVE SHALL MODULATE AS REQUIREDTO THE ZONE TEMPERATURE SETPOINT. IF THE ZONE TEMPERATURE IS NOT AT THE SETPOINT WITH THE CONVECTORCONTROL VALVE FULLY OPEN, THE ZONE REHEAT COIL CONTROL SHALL BE MODULATED AS REQUIRED TO MAINTAINTHE ZONE TEMPERATURE SETPOINT. WHEN ZONE SETPOINT IS ACHIEVED, THE REHEAT COIL CONTROL VALVE SHALL BECLOSED.IF THE ZONE BECOMES UNOCCUPIED DURING THE SCHEDULED OCCUPIED PERIOD, THE OCCUPIED HEATINGSEQUENCE OF OPERATION SHALL BE ENABLED TO MAINTAIN THE ZONE AT THE SETBACK TEMPERATURE.IF THE ZONE BECOMES UNOCCUPIED OR VACANT FOR THE SCHEDULED UNOCCUPIED PERIOD AND THE ZONETEMPERATURE FALLS BELOW THE UNOCCUPIED SETPOINT, THE OCCUPIED HEATING SEQUENCE OF OPERATION SHALLBE ENABLED TO MAINTAIN THE ZONE AT THE UNOCCUPIED TEMPERATURE.ZONE COOLING CONTROL:IF THE ZONE IS OCCUPIED DURING THE SCHEDULED OCCUPIED PERIOD AND THE ZONE TEMPERATURE RISES ABOVE THEOCCUPIED COOLING TEMPERATURE SETPOINT, THE ZONE SHALL BE AT THE MINIMUM AIR EXCHANGE RATE, THE FUMEHOOD EXHAUST AIR TERMINAL SHALL MODULATE OPEN AS REQUIRED TO MAINTAIN THE ZONE TEMPERATURE SETPOINT.THE SUPPLY AIR TERMINAL SHALL MODULATE OPEN AS REQUIRED TO MAINTAIN THE REQUIRED EXHAUST RATE MINUSTHE SPECIFIED AIRFLOW DIFFERENTIAL.IF THE ZONE BECOMES UNOCCUPIED DURING THE SCHEDULED OCCUPIED PERIOD, THE OCCUPIED COOLINGSEQUENCE OF OPERATION SHALL BE ENABLED TO MAINTAIN THE ZONE AT THE SETBACK TEMPERATURE.IF THE ZONE BECOMES UNOCCUPIED OR VACANT FOR THE SCHEDULED UNOCCUPIED PERIOD AND THE ZONETEMPERATURE RISES ABOVE THE UNOCCUPIED SETPOINT, THE OCCUPIED COOLING SEQUENCE OF OPERATION SHALLBE ENABLED TO MAINTAIN THE ZONE AT THE UNOCCUPIED TEMPERATURE.1 LABORATORY SUPPLY AIR & FUME HOOD EXHAUST AIR CONTROL SCHEMATICNO SCALEZONE TEMPERATUREZONE SETPOINT ADJUSTAIRFLOWDAMPERZONE OVERRIDEMIN / MAX AIRFLOW SETPOINTSHEATING SETPOINTHIGH ZONE TEMPERATURELOW ZONE TEMPERATUREHIGH DISCHARGE AIR TEMPERATURELOW DISCGARGE AIR TEMPERATURECOOLING SETPOINTDISCHARGE AIR TEMPERATUREXCONVECTOR CONTROL VALVEHWSHWRREHEAT COIL CONTROL VALVEHWSHWRAOVSCHEDULEAIRFLOW SETPOINTXXXXXXXXXXXXXXXXXXXXXXXXXXXX X XX X XXXXXXXXZONE TEMPERATURESENSORA0DMAIFEXISTINGXATERMINALFUMEHOODEXHAUSTDIOCCZONE OCCUPANCYSENSORFUME HOODCONTROLLEREXISTINGFUME HOODAITAIPREHEATCOILSUPPLY AIRVALVEH-701CONTROLSCHEMATICS IT IS A VIOLATION OF THE LAW FOR ANY PERSON, UNLESS ACTINGUNDER THE DIRECTION OF A ENGINEER, TO ALTER THIS DOCUMENTIN ANY WAY. IF ALTERED, THE ALTERING ENGINEER SHALL AFFIX HISSEAL AND THE NOTATION 'ALTERED BY' FOLLOWED BY HISSIGNATURE AND THE DATE OF SUCH ALTERATION, AND A SPECIFICDESCRIPTION OF THE ALTERATION.CORNELL UNIVERSITY THURSTON HALL 3RD AND 4TH FLOOR VAV AND CONTROLS REPLACEMENT CORNELL UNIVERSITY PROJECT #10878DESCRIPTIONHARDWARE POINTSSYSTEM POINT LISTSOFTWARE POINTSAIDIAODOAVDVSCHEDULETRENDALARMGRAPHICA0VEXISTING PERIMETERRADIATION(WHERE APPLICABLE)AITGENERAL:THE SYSTEM SHALL BE CONTROLLED THROUGH THE EXISTING AUTOMATED LOGIC BUILDING AUTOMATION SYSTEM(BAS).ALL SETPOINTS SHALL BE ADJUSTABLE.LABORATORY AIR EXCHANGE RATES SHALL BE BASED UPON TOTAL EXHAUST AIR (XA) FLOW FROM THE ZONE.THE ZONE SHALL BE CONTROLLED TO AN AIR EXCHANGE RATE. THE BAS SHALL CALCULATE THE REQUIRED AIR FLOWBASED UPON THE ZONE GROSS VOLUME.IN THE EVENT THAT THE ZONE BECOMES OCCUPIED DURING THE SCHEDULED UNOCCUPIED PERIOD, THE ZONEOCCUPIED MODE SHALL BE AUTOMATICALLY ENABLED FOR THE DURATION OF OCCUPANCY (MINIMUM TIME = 30MINUTES). WHEN THE ZONE BECOMES UNOCCUPIED AGAIN DURING THE SCHEDULED UNOCCUPIED PERIOD, THEZONE SHALL AUTOMATICALLY RETURN BACK TO THE UNOCCUPIED MODE.AIR TERMINAL UNIT POSITIONS SHALL BE BASED UPON ZONE OCCUPANCY. UNDER NORMAL CONTROL, ZONEOCCUPANCY SHALL BE DETERMINED VIA ROOM OCCUPANCY SENSORS. IF THE LABORATORY IS VACANT, THE ZONESHALL BE PLACED IN THE VACANT MODE BY THE BAS.SETPOINTS:COOLING TEMPERATURE SETOINTS:OCCUPIED:75°FOCCUPIED SETBACK:78°FUNOCCUPIED:81°FHEATING TEMPERATURE SETOINTS:OCCUPIED:70°FOCCUPIED SETBACK:67°FUNOCCUPIED:64°FLABORATORY FLOW CONTROL:WHEN THE ZONE IS OCCUPIED, THE GENERAL EXHAUST AIR TERMINAL SHALL MODULATE AS REQUIRED RO MAINTAINTHE OCCUPIED AIR EXCHANGE RATE. THE SUPPLY AIR TERMINAL SHALL MODULATE AS REQUIRED TO MAINTAIN THESPECIFIED AIRFLOW DIFFERENTIAL.WHEN THE ZONE IS UNOCCUPIED, THE GENERAL EXHAUST AIR TERMINAL SHALL MODULATE AS REQUIRED TO MAINTAINTHE UNOCCUPIED AIR EXCHANGE RATE. THE SUPPLY AIR TERMINAL SHALL MODULATE AS REQUIRED TO MAINTAIN THESPECIFIED AIRFLOW DIFFERENTIAL.WHEN THE ZONE IS VACANT, THE GENERAL EXHAUST AIR TERMINAL SHALL MODULATE AS REQUIRED TO MAINTAIN THEVACANT AIR EXCHANGE RATE. THE SUPPLY AIR TERMINAL SHALL MODULATE AS REQUIRED TO MAINTAIN THESPECIFIED AIRFLOW DIFFERENTIAL.ZONE HEATING CONTROL:IF THE ZONE IS OCCUPIED DURING THE SCHEDULED OCCUPIED PERIOD AND THE ZONE TEMPERATURE FALLS BELOWTHE OCCUPIED HEATING TEMPERATURE SETPOINT, THE CONVECTOR CONTROL VALVE SHALL MODULATE AS REQUIREDTO THE ZONE TEMPERATURE SETPOINT. IF THE ZONE TEMPERATURE IS NOT AT THE SETPOINT WITH THE CONVECTORCONTROL VALVE FULLY OPEN, THE ZONE REHEAT COIL CONTROL SHALL BE MODULATED AS REQUIRED TO MAINTAINTHE ZONE TEMPERATURE SETPOINT. WHEN ZONE SETPOINT IS ACHIEVED, THE REHEAT COIL CONTROL VALVE SHALL BECLOSED.IF THE ZONE BECOMES UNOCCUPIED DURING THE SCHEDULED OCCUPIED PERIOD, THE OCCUPIED HEATINGSEQUENCE OF OPERATION SHALL BE ENABLED TO MAINTAIN THE ZONE AT THE SETBACK TEMPERATURE.IF THE ZONE BECOMES UNOCCUPIED OR VACANT FOR THE SCHEDULED UNOCCUPIED PERIOD AND THE ZONETEMPERATURE FALLS BELOW THE UNOCCUPIED SETPOINT, THE OCCUPIED HEATING SEQUENCE OF OPERATION SHALLBE ENABLED TO MAINTAIN THE ZONE AT THE UNOCCUPIED TEMPERATURE.ZONE COOLING CONTROL:IF THE ZONE IS OCCUPIED DURING THE SCHEDULED OCCUPIED PERIOD AND THE ZONE TEMPERATURE RISES ABOVE THEOCCUPIED COOLING TEMPERATURE SETPOINT, THE ZONE SHALL BE AT THE MINIMUM AIR EXCHANGE RATE, THEGENERAL EXHAUST AIR TERMINAL SHALL MODULATE OPEN AS REQUIRED TO MAINTAIN THE ZONE TEMPERATURESETPOINT. THE SUPPLY AIR TERMINAL SHALL MODULATE OPEN AS REQUIRED TO MAINTAIN THE REQUIRED EXHAUSTRATE MINUS THE SPECIFIED AIRFLOW DIFFERENTIAL.IF THE ZONE BECOMES UNOCCUPIED DURING THE SCHEDULED OCCUPIED PERIOD, THE OCCUPIED COOLINGSEQUENCE OF OPERATION SHALL BE ENABLED TO MAINTAIN THE ZONE AT THE SETBACK TEMPERATURE.IF THE ZONE BECOMES UNOCCUPIED OR VACANT FOR THE SCHEDULED UNOCCUPIED PERIOD AND THE ZONETEMPERATURE RISES ABOVE THE UNOCCUPIED SETPOINT, THE OCCUPIED COOLING SEQUENCE OF OPERATION SHALLBE ENABLED TO MAINTAIN THE ZONE AT THE UNOCCUPIED TEMPERATURE.1 LABORATORY SUPPLY AIR & FUME HOOD EXHAUST AIR CONTROL SCHEMATICNO SCALEZONE TEMPERATUREZONE SETPOINT ADJUSTAIRFLOWDAMPERZONE OVERRIDEMIN / MAX AIRFLOW SETPOINTSHEATING SETPOINTHIGH ZONE TEMPERATURELOW ZONE TEMPERATUREHIGH DISCHARGE AIR TEMPERATURELOW DISCGARGE AIR TEMPERATURECOOLING SETPOINTDISCHARGE AIR TEMPERATUREXCONVECTOR CONTROL VALVEHWSHWRREHEAT COIL CONTROL VALVEHWSHWRAOVSCHEDULEAIRFLOW SETPOINTXXXXXXXXXXXXXXXXXXXXXXXXXXXX X XX X XXXXXXXXZONE TEMPERATURESENSORA0DMAIFEXISTINGXATERMINALFUMEHOODEXHAUSTDIOCCZONE OCCUPANCYSENSORFUME HOODCONTROLLEREXISTINGFUME HOODA0DMAIFEXISTINGXATERMINALFUMEHOODEXHAUSTFUME HOODCONTROLLEREXISTINGFUME HOODAITAIPREHEATCOILSUPPLY AIRVALVEAJKNO SCALEH-702CONTROLSCHEMATICS IT IS A VIOLATION OF THE LAW FOR ANY PERSON, UNLESS ACTINGUNDER THE DIRECTION OF A ENGINEER, TO ALTER THIS DOCUMENTIN ANY WAY. IF ALTERED, THE ALTERING ENGINEER SHALL AFFIX HISSEAL AND THE NOTATION 'ALTERED BY' FOLLOWED BY HISSIGNATURE AND THE DATE OF SUCH ALTERATION, AND A SPECIFICDESCRIPTION OF THE ALTERATION.CORNELL UNIVERSITY THURSTON HALL 3RD AND 4TH FLOOR VAV AND CONTROLS REPLACEMENT CORNELL UNIVERSITY PROJECT #10878DESCRIPTIONHARDWARE POINTSSYSTEM POINT LISTSOFTWARE POINTSAIDIAODOAVDVSCHEDULETRENDALARMGRAPHICAITA0DMAIPSATERMINALAITGENERAL:THE SYSTEM SHALL BE CONTROLLED THROUGH THE EXISTING AUTOMATED LOGIC BUILDING AUTOMATION SYSTEM(BAS).ALL SETPOINTS SHALL BE ADJUSTABLE.IN THE EVENT THAT THE ZONE BECOMES OCCUPIED DURING THE SCHEDULED UNOCCUPIED PERIOD, THE ZONEOCCUPIED MODE SHALL BE AUTOMATICALLY ENABLED FOR THE DURATION OF OCCUPANCY (MINIMUM TIME = 30MINUTES). WHEN THE ZONE BECOMES UNOCCUPIED AGAIN DURING THE SCHEDULED UNOCCUPIED PERIOD, THEZONE SHALL AUTOMATICALLY RETURN BACK TO THE UNOCCUPIED MODE.SETPOINTS:COOLING TEMPERATURE SETOINTS:OCCUPIED:75°FOCCUPIED SETBACK:78°FUNOCCUPIED:81°FHEATING TEMPERATURE SETOINTS:OCCUPIED:70°FOCCUPIED SETBACK:67°FUNOCCUPIED:64°FZONE HEATING CONTROL:IF THE ZONE IS OCCUPIED DURING THE SCHEDULED OCCUPIED PERIOD AND THE ZONE TEMPERATURE FALLS BELOWTHE OCCUPIED HEATING TEMPERATURE SETPOINT, THE SUPPLY AIR TERMINAL SHALL MODULATE AS REQUIRED TO THEHEATING AIRFLOW SETPOINT (MINIMUM). IF THE ZONE TEMPERATURE IS NOT AT THE SETPOINT THE ZONE REHEAT COILCONTROL SHALL BE MODULATED AS REQUIRED TO MAINTAIN THE ZONE TEMPERATURE SETPOINT. WHEN ZONESETPOINT IS ACHIEVED, THE REHEAT COIL CONTROL VALVE SHALL BE CLOSED.IF THE ZONE BECOMES UNOCCUPIED DURING THE SCHEDULED OCCUPIED PERIOD, THE OCCUPIED HEATINGSEQUENCE OF OPERATION SHALL BE ENABLED TO MAINTAIN THE ZONE AT THE SETBACK TEMPERATURE.IF THE ZONE BECOMES UNOCCUPIED OR VACANT FOR THE SCHEDULED UNOCCUPIED PERIOD AND THE ZONETEMPERATURE FALLS BELOW THE UNOCCUPIED SETPOINT, THE OCCUPIED HEATING SEQUENCE OF OPERATION SHALLBE ENABLED TO MAINTAIN THE ZONE AT THE UNOCCUPIED TEMPERATURE.ZONE COOLING CONTROL:IF THE ZONE IS OCCUPIED DURING THE SCHEDULED OCCUPIED PERIOD AND THE ZONE TEMPERATURE RISES ABOVE THEOCCUPIED COOLING TEMPERATURE SETPOINT, THE SUPPLY AIR TERMINAL SHALL MODULATE OPEN TO THE ZONETEMPERATURE SETPOINT (MAXIMUM).IF THE ZONE BECOMES UNOCCUPIED DURING THE SCHEDULED OCCUPIED PERIOD, THE OCCUPIED COOLINGSEQUENCE OF OPERATION SHALL BE ENABLED TO MAINTAIN THE ZONE AT THE SETBACK TEMPERATURE.IF THE ZONE BECOMES UNOCCUPIED OR VACANT FOR THE SCHEDULED UNOCCUPIED PERIOD AND THE ZONETEMPERATURE RISES ABOVE THE UNOCCUPIED SETPOINT, THE OCCUPIED COOLING SEQUENCE OF OPERATION SHALLBE ENABLED TO MAINTAIN THE ZONE AT THE UNOCCUPIED TEMPERATURE.1 CORRIDOR SUPPLY AIR CONTROL SCHEMATICNO SCALEZONE TEMPERATUREZONE SETPOINT ADJUSTAIRFLOWDAMPERZONE OVERRIDEMIN / MAX AIRFLOW SETPOINTSHEATING SETPOINTHIGH ZONE TEMPERATURELOW ZONE TEMPERATUREHIGH DISCHARGE AIR TEMPERATURELOW DISCGARGE AIR TEMPERATURECOOLING SETPOINTDISCHARGE AIR TEMPERATUREXCONVECTOR CONTROL VALVEREHEAT COIL CONTROL VALVEHWSHWRAOVSCHEDULEAIRFLOW SETPOINTXXXXXXXXXXXXXXXXXXXXXXXXXXXX X XX X XXXXXXXXZONE TEMPERATURESENSORDIOCCZONE OCCUPANCYSENSORAJKNO SCALEH-703CONTROLSCHEMATICS AJKIT IS A VIOLATION OF THE LAW FOR ANY PERSON, UNLESS ACTINGUNDER THE DIRECTION OF A ENGINEER, TO ALTER THIS DOCUMENTIN ANY WAY. IF ALTERED, THE ALTERING ENGINEER SHALL AFFIX HISSEAL AND THE NOTATION 'ALTERED BY' FOLLOWED BY HISSIGNATURE AND THE DATE OF SUCH ALTERATION, AND A SPECIFICDESCRIPTION OF THE ALTERATION.CORNELL UNIVERSITY THURSTON HALL 3RD AND 4TH FLOOR VAV AND CONTROLS REPLACEMENT CORNELL UNIVERSITY PROJECT #10878NO SCALEDESCRIPTIONHARDWARE POINTSSYSTEM POINT LISTSOFTWARE POINTSAIDIAODOAVDVSCHEDULETRENDALARMGRAPHICAITGENERAL:THE SYSTEM SHALL BE CONTROLLED THROUGH THE EXISTING AUTOMATED LOGIC BUILDING AUTOMATION SYSTEM(BAS).ALL SETPOINTS SHALL BE ADJUSTABLE.LABORATORY AIR EXCHANGE RATES SHALL BE BASED UPON TOTAL EXHAUST AIR (XA) FLOW FROM THE ZONE.THE ZONE SHALL BE CONTROLLED TO AN AIR EXCHANGE RATE. THE BAS SHALL CALCULATE THE REQUIRED AIR FLOWBASED UPON THE ZONE GROSS VOLUME.IN THE EVENT THAT THE ZONE BECOMES OCCUPIED DURING THE SCHEDULED UNOCCUPIED PERIOD, THE ZONEOCCUPIED MODE SHALL BE AUTOMATICALLY ENABLED FOR THE DURATION OF OCCUPANCY (MINIMUM TIME = 30MINUTES). WHEN THE ZONE BECOMES UNOCCUPIED AGAIN DURING THE SCHEDULED UNOCCUPIED PERIOD, THEZONE SHALL AUTOMATICALLY RETURN BACK TO THE UNOCCUPIED MODE.AIR TERMINAL UNIT POSITIONS SHALL BE BASED UPON ZONE OCCUPANCY. UNDER NORMAL CONTROL, ZONEOCCUPANCY SHALL BE DETERMINED VIA ROOM OCCUPANCY SENSORS. IF THE LABORATORY IS VACANT, THE ZONESHALL BE PLACED IN THE VACANT MODE BY THE BAS.SETPOINTS:COOLING TEMPERATURE SETOINTS:OCCUPIED:75°FOCCUPIED SETBACK:78°FUNOCCUPIED:81°FHEATING TEMPERATURE SETOINTS:OCCUPIED:70°FOCCUPIED SETBACK:67°FUNOCCUPIED:64°FLABORATORY FLOW CONTROL:WHEN THE ZONE IS OCCUPIED, THE GENERAL EXHAUST AIR TERMINAL SHALL MODULATE AS REQUIRED RO MAINTAINTHE OCCUPIED AIR EXCHANGE RATE. THE SUPPLY AIR TERMINAL SHALL MODULATE AS REQUIRED TO MAINTAIN THESPECIFIED AIRFLOW DIFFERENTIAL.WHEN THE ZONE IS UNOCCUPIED, THE GENERAL EXHAUST AIR TERMINAL SHALL MODULATE AS REQUIRED TO MAINTAINTHE UNOCCUPIED AIR EXCHANGE RATE. THE SUPPLY AIR TERMINAL SHALL MODULATE AS REQUIRED TO MAINTAIN THESPECIFIED AIRFLOW DIFFERENTIAL.WHEN THE ZONE IS VACANT, THE GENERAL EXHAUST AIR TERMINAL SHALL MODULATE AS REQUIRED TO MAINTAIN THEVACANT AIR EXCHANGE RATE. THE SUPPLY AIR TERMINAL SHALL MODULATE AS REQUIRED TO MAINTAIN THESPECIFIED AIRFLOW DIFFERENTIAL.ZONE HEATING CONTROL:IF THE ZONE IS OCCUPIED DURING THE SCHEDULED OCCUPIED PERIOD AND THE ZONE TEMPERATURE FALLS BELOWTHE OCCUPIED HEATING TEMPERATURE SETPOINT, THE CONVECTOR CONTROL VALVE SHALL MODULATE AS REQUIREDTO THE ZONE TEMPERATURE SETPOINT. IF THE ZONE TEMPERATURE IS NOT AT THE SETPOINT WITH THE CONVECTORCONTROL VALVE FULLY OPEN, THE ZONE REHEAT COIL CONTROL SHALL BE MODULATED AS REQUIRED TO MAINTAINTHE ZONE TEMPERATURE SETPOINT. WHEN ZONE SETPOINT IS ACHIEVED, THE REHEAT COIL CONTROL VALVE SHALL BECLOSED.IF THE ZONE BECOMES UNOCCUPIED DURING THE SCHEDULED OCCUPIED PERIOD, THE OCCUPIED HEATINGSEQUENCE OF OPERATION SHALL BE ENABLED TO MAINTAIN THE ZONE AT THE SETBACK TEMPERATURE.IF THE ZONE BECOMES UNOCCUPIED OR VACANT FOR THE SCHEDULED UNOCCUPIED PERIOD AND THE ZONETEMPERATURE FALLS BELOW THE UNOCCUPIED SETPOINT, THE OCCUPIED HEATING SEQUENCE OF OPERATION SHALLBE ENABLED TO MAINTAIN THE ZONE AT THE UNOCCUPIED TEMPERATURE.ZONE COOLING CONTROL:IF THE ZONE IS OCCUPIED DURING THE SCHEDULED OCCUPIED PERIOD AND THE ZONE TEMPERATURE RISES ABOVE THEOCCUPIED COOLING TEMPERATURE SETPOINT, THE ZONE SHALL BE AT THE MINIMUM AIR EXCHANGE RATE, THEGENERAL EXHAUST AIR TERMINAL SHALL MODULATE OPEN AS REQUIRED TO MAINTAIN THE ZONE TEMPERATURESETPOINT. THE SUPPLY AIR TERMINAL SHALL MODULATE OPEN AS REQUIRED TO MAINTAIN THE REQUIRED EXHAUSTRATE MINUS THE SPECIFIED AIRFLOW DIFFERENTIAL.IF THE ZONE BECOMES UNOCCUPIED DURING THE SCHEDULED OCCUPIED PERIOD, THE OCCUPIED COOLINGSEQUENCE OF OPERATION SHALL BE ENABLED TO MAINTAIN THE ZONE AT THE SETBACK TEMPERATURE.IF THE ZONE BECOMES UNOCCUPIED OR VACANT FOR THE SCHEDULED UNOCCUPIED PERIOD AND THE ZONETEMPERATURE RISES ABOVE THE UNOCCUPIED SETPOINT, THE OCCUPIED COOLING SEQUENCE OF OPERATION SHALLBE ENABLED TO MAINTAIN THE ZONE AT THE UNOCCUPIED TEMPERATURE.1 CONSTANT VOLUME SUPPLY AIR & GENERAL LAB EXHAUST AIR CONTROL SCHEMATICNO SCALEZONE TEMPERATUREZONE SETPOINT ADJUSTAIRFLOWDAMPERZONE OVERRIDEMIN / MAX AIRFLOW SETPOINTSHEATING SETPOINTHIGH ZONE TEMPERATURELOW ZONE TEMPERATUREHIGH DISCHARGE AIR TEMPERATURELOW DISCGARGE AIR TEMPERATURECOOLING SETPOINTDISCHARGE AIR TEMPERATUREXCONVECTOR CONTROL VALVEREHEAT COIL CONTROL VALVEHWSHWRAOVSCHEDULEAIRFLOW SETPOINTXXXXXXXXXXXXXXXXXXXXXXXXXXXX X XX X XXXXXXXXZONE TEMPERATURESENSORA0DMAIFEXISTINGXATERMINALGENERALLABORATORYEXHAUSTDIOCCZONE OCCUPANCYSENSORA0DMAIFEXISTINGXATERMINALGENERALLABORATORYEXHAUSTAITAIPREHEATCOILSUPPLY AIRVALVEH-704CONTROLSCHEMATICS AJKIT IS A VIOLATION OF THE LAW FOR ANY PERSON, UNLESS ACTINGUNDER THE DIRECTION OF A ENGINEER, TO ALTER THIS DOCUMENTIN ANY WAY. IF ALTERED, THE ALTERING ENGINEER SHALL AFFIX HISSEAL AND THE NOTATION 'ALTERED BY' FOLLOWED BY HISSIGNATURE AND THE DATE OF SUCH ALTERATION, AND A SPECIFICDESCRIPTION OF THE ALTERATION.CORNELL UNIVERSITY THURSTON HALL 3RD AND 4TH FLOOR VAV AND CONTROLS REPLACEMENT CORNELL UNIVERSITY PROJECT #10878NO SCALEDESCRIPTIONHARDWARE POINTSSYSTEM POINT LISTSOFTWARE POINTSAIDIAODOAVDVSCHEDULETRENDALARMGRAPHICA0VEXISTING PERIMETERRADIATION(WHERE APPLICABLE)AITAIPAITGENERAL:THE SYSTEM SHALL BE CONTROLLED THROUGH THE EXISTING AUTOMATED LOGIC BUILDING AUTOMATION SYSTEM(BAS).ALL SETPOINTS SHALL BE ADJUSTABLE.LABORATORY AIR EXCHANGE RATES SHALL BE BASED UPON TOTAL EXHAUST AIR (XA) FLOW FROM THE ZONE.THE ZONE SHALL BE CONTROLLED TO AN AIR EXCHANGE RATE. THE BAS SHALL CALCULATE THE REQUIRED AIR FLOWBASED UPON THE ZONE GROSS VOLUME.IN THE EVENT THAT THE ZONE BECOMES OCCUPIED DURING THE SCHEDULED UNOCCUPIED PERIOD, THE ZONEOCCUPIED MODE SHALL BE AUTOMATICALLY ENABLED FOR THE DURATION OF OCCUPANCY (MINIMUM TIME = 30MINUTES). WHEN THE ZONE BECOMES UNOCCUPIED AGAIN DURING THE SCHEDULED UNOCCUPIED PERIOD, THEZONE SHALL AUTOMATICALLY RETURN BACK TO THE UNOCCUPIED MODE.AIR TERMINAL UNIT POSITIONS SHALL BE BASED UPON ZONE OCCUPANCY. UNDER NORMAL CONTROL, ZONEOCCUPANCY SHALL BE DETERMINED VIA ROOM OCCUPANCY SENSORS. IF THE LABORATORY IS VACANT, THE ZONESHALL BE PLACED IN THE VACANT MODE BY THE BAS.SETPOINTS:COOLING TEMPERATURE SETOINTS:OCCUPIED:75°FOCCUPIED SETBACK:78°FUNOCCUPIED:81°FHEATING TEMPERATURE SETOINTS:OCCUPIED:70°FOCCUPIED SETBACK:67°FUNOCCUPIED:64°FLABORATORY FLOW CONTROL:WHEN THE ZONE IS OCCUPIED, THE GENERAL EXHAUST AIR TERMINAL SHALL MODULATE AS REQUIRED RO MAINTAINTHE OCCUPIED AIR EXCHANGE RATE. THE SUPPLY AIR TERMINAL SHALL MODULATE AS REQUIRED TO MAINTAIN THESPECIFIED AIRFLOW DIFFERENTIAL.WHEN THE ZONE IS UNOCCUPIED, THE GENERAL EXHAUST AIR TERMINAL SHALL MODULATE AS REQUIRED TO MAINTAINTHE UNOCCUPIED AIR EXCHANGE RATE. THE SUPPLY AIR TERMINAL SHALL MODULATE AS REQUIRED TO MAINTAIN THESPECIFIED AIRFLOW DIFFERENTIAL.WHEN THE ZONE IS VACANT, THE GENERAL EXHAUST AIR TERMINAL SHALL MODULATE AS REQUIRED TO MAINTAIN THEVACANT AIR EXCHANGE RATE. THE SUPPLY AIR TERMINAL SHALL MODULATE AS REQUIRED TO MAINTAIN THESPECIFIED AIRFLOW DIFFERENTIAL.ZONE HEATING CONTROL:IF THE ZONE IS OCCUPIED DURING THE SCHEDULED OCCUPIED PERIOD AND THE ZONE TEMPERATURE FALLS BELOWTHE OCCUPIED HEATING TEMPERATURE SETPOINT, THE CONVECTOR CONTROL VALVE SHALL MODULATE AS REQUIREDTO THE ZONE TEMPERATURE SETPOINT. IF THE ZONE TEMPERATURE IS NOT AT THE SETPOINT WITH THE CONVECTORCONTROL VALVE FULLY OPEN, THE ZONE REHEAT COIL CONTROL SHALL BE MODULATED AS REQUIRED TO MAINTAINTHE ZONE TEMPERATURE SETPOINT. WHEN ZONE SETPOINT IS ACHIEVED, THE REHEAT COIL CONTROL VALVE SHALL BECLOSED.IF THE ZONE BECOMES UNOCCUPIED DURING THE SCHEDULED OCCUPIED PERIOD, THE OCCUPIED HEATINGSEQUENCE OF OPERATION SHALL BE ENABLED TO MAINTAIN THE ZONE AT THE SETBACK TEMPERATURE.IF THE ZONE BECOMES UNOCCUPIED OR VACANT FOR THE SCHEDULED UNOCCUPIED PERIOD AND THE ZONETEMPERATURE FALLS BELOW THE UNOCCUPIED SETPOINT, THE OCCUPIED HEATING SEQUENCE OF OPERATION SHALLBE ENABLED TO MAINTAIN THE ZONE AT THE UNOCCUPIED TEMPERATURE.ZONE COOLING CONTROL:IF THE ZONE IS OCCUPIED DURING THE SCHEDULED OCCUPIED PERIOD AND THE ZONE TEMPERATURE RISES ABOVE THEOCCUPIED COOLING TEMPERATURE SETPOINT, THE ZONE SHALL BE AT THE MINIMUM AIR EXCHANGE RATE, THEGENERAL EXHAUST AIR TERMINAL SHALL MODULATE OPEN AS REQUIRED TO MAINTAIN THE ZONE TEMPERATURESETPOINT. THE SUPPLY AIR TERMINAL SHALL MODULATE OPEN AS REQUIRED TO MAINTAIN THE REQUIRED EXHAUSTRATE MINUS THE SPECIFIED AIRFLOW DIFFERENTIAL.IF THE ZONE BECOMES UNOCCUPIED DURING THE SCHEDULED OCCUPIED PERIOD, THE OCCUPIED COOLINGSEQUENCE OF OPERATION SHALL BE ENABLED TO MAINTAIN THE ZONE AT THE SETBACK TEMPERATURE.IF THE ZONE BECOMES UNOCCUPIED OR VACANT FOR THE SCHEDULED UNOCCUPIED PERIOD AND THE ZONETEMPERATURE RISES ABOVE THE UNOCCUPIED SETPOINT, THE OCCUPIED COOLING SEQUENCE OF OPERATION SHALLBE ENABLED TO MAINTAIN THE ZONE AT THE UNOCCUPIED TEMPERATURE.2 LABORATORY SUPPLY AIR & FUME HOOD EXHAUST AIR CONTROL SCHEMATICNO SCALEZONE TEMPERATUREZONE SETPOINT ADJUSTAIRFLOWDAMPERZONE OVERRIDEMIN / MAX AIRFLOW SETPOINTSHEATING SETPOINTHIGH ZONE TEMPERATURELOW ZONE TEMPERATUREHIGH DISCHARGE AIR TEMPERATURELOW DISCGARGE AIR TEMPERATURECOOLING SETPOINTDISCHARGE AIR TEMPERATUREXCONVECTOR CONTROL VALVEHWSHWRREHEAT COIL CONTROL VALVEHWSHWRAOVSCHEDULEAIRFLOW SETPOINTXXXXXXXXXXXXXXXXXXXXXXXXXXXX X XX X XXXXXXXXZONE TEMPERATURESENSOREXISTINGXA VALVEFUMEHOODEXHAUSTDIOCCZONE OCCUPANCYSENSORFUME HOODCONTROLLEREXISTINGFUME HOODSASH POSITIONSENSORREHEATCOILAIPEXISTINGXA VALVEFUMEHOODEXHAUSTFUME HOODCONTROLLEREXISTINGFUME HOODSASH POSITIONSENSORSUPPLY AIRVALVEAIPH-705CONTROLSCHEMATICS AJKIT IS A VIOLATION OF THE LAW FOR ANY PERSON, UNLESS ACTINGUNDER THE DIRECTION OF A ENGINEER, TO ALTER THIS DOCUMENTIN ANY WAY. IF ALTERED, THE ALTERING ENGINEER SHALL AFFIX HISSEAL AND THE NOTATION 'ALTERED BY' FOLLOWED BY HISSIGNATURE AND THE DATE OF SUCH ALTERATION, AND A SPECIFICDESCRIPTION OF THE ALTERATION.CORNELL UNIVERSITY THURSTON HALL 3RD AND 4TH FLOOR VAV AND CONTROLS REPLACEMENT CORNELL UNIVERSITY PROJECT #10878NO SCALE1 HANGER ROD ATTACHMENT DETAILNO SCALEAIR FLOW (SA / OA)AIR FLOW (SA / OA)45 DEG.ANGLEBRANCH DUCTAIR FLOW (XA)R = WDAMPERVOLUMEWBRANCH DUCTAIR FLOW (XA)VOLUMEDAMPER6" MIN.SQUARE ELBOWW/ TURNING VANES90 DEG. ELBOWOPTIONCONTRACTORRADIUS ELBOWWR = WW7 DUCT DETAILSNO SCALE5 HANGER ROD ATTACHMENT DETAILNO SCALEEXISTING FLOOR ASSEMBLYSTRUCTURE STEEL ALL-THREAD RODS WITH CONCRETEEXPANSION ANCHOR.CONCRETE EXPANSIONANCHOR6 HEATING COIL DETAIL PIPING SCHEMATICNO SCALEHWSTEST PLUG (PETERSONEQUIPMENT CO. - PETE'S PLUG II)MODULATING, 2-WAYCONTROL VALVE3/4" DRAIN w/ HOSEEND CONNECTIONHEATING COILUNION (TYP.)STRAINERBALL VALVE (TYP.)MVHWRBALANCINGVALVE (TYP.)ECCENTRICREDUCER (TYP.)FLOOR DECKINGASSEMBLYSUPPORT DEVICES SHALLNOT BE CONNECTED TOMETAL DECKINGBOTTOM FLANGE MOUNTED "C" CLAMP WITH SET SCREW, LOCKNUT ANDRETAINING STRAP. (FOR USE ON BEAMS ONLY)TOP FLANGE MOUNTED "C" CLAMP WITH SET SCREW AND LOCK NUT.STEEL PLATE WASHER WITH DOUBLE NUT.CONCENTRIC BEAM CLAMP WITH THREADED, WELDED EYEROD. USE WITHJOISTS AND BEAMS.CHANNEL SPANNING BETWEEN BEAMS AND / OR JOISTS IN DECKING FLUTE.SECURE TO BEAMS.BEAMJOISTKEYED NOTES:12345125432 REHEAT COIL MOUNTING DETAILNO SCALE1/8" NEOPRENE GASKET,FULL PERIMETERDUCT ACCESS DOOR22-1/2° MAXIMUMNUT AND BOLT,FULL PERIMETERDUCT FLANGECOIL FLANGESLOPE COIL AS REQUIRED3/8" THREADED ROD15° MAXIMUMFLOWAIRCOIL1"-1/4"x1/4"x1/8" ANGLE (MIN)PROVIDE WASHER AND LEVELINGNUT ON BOTTOM, WASHER ANDLOCKING NUT ON TOP3/8" THREADED ROD, EACHSIDE, FRONT AND BACKDUCT SIZE ASSHOWN ON PLANSDUCT ACCESSDOOR4 PIPE HANGER DETAIL - INSULATED PIPINGNO SCALECROSS BOLTSTANDARD CLEVIS HANGERHANGER RODPIPE INSULATIONREFER TO PLANS FORPIPE SIZESINSULATION SHIELDH-900DETAILS3 RETURN GRILLE AIR DUCTWORK ASSEMBLYNO SCALEDUCT SIZE PER PLANSCEILING PLENUMELEVATIONCEILINGTRANSFER AIR GRILLEEXISTING RA GRILLEABOVE CEILING 267619249138306322321307300E86278DNUP274323300S180300U300T20180300CB24300Z714306A174377133375498371963300404330061830062563006311300646372533738374LPP-3EJHPP-3BLPP-3DLPP-3D1382472582581137400CA407417416415400U134419400S400E86UPDN959400185400T172400CB22400Z250407ALPP-4AHPP-4CLPP-4AJLPP-4AIT IS A VIOLATION OF THE LAW FOR ANY PERSON, UNLESS ACTINGUNDER THE DIRECTION OF A ENGINEER, TO ALTER THIS DOCUMENTIN ANY WAY. IF ALTERED, THE ALTERING ENGINEER SHALL AFFIX HISSEAL AND THE NOTATION 'ALTERED BY' FOLLOWED BY HISSIGNATURE AND THE DATE OF SUCH ALTERATION, AND A SPECIFICDESCRIPTION OF THE ALTERATION.CORNELL UNIVERSITY THURSTON HALL 3RD AND 4TH FLOOR VAV AND CONTROLS REPLACEMENT CORNELL UNIVERSITY PROJECT #108781 3RD FLOOR PARTIAL PLAN1/8"=1'-0"E-100BWM3RD & 4THFLOOR PARTIALPLANSPROJECT NORTHAS NOTEDPROVIDE 120 VOLT CIRCUIT, 2#12,1#12 GND., IN 1/2" CONDUIT FROM EXISTINGSPARE CIRCUIT BREAKER IN PANEL LPP-3D TO SERVE DDC CONTROL PANEL.COORDINATE WORK WITH OTHER TRADES.PROVIDE 120 VOLT CIRCUIT, 2#12,1# 12 GND., IN 1/2" CONDUIT FROM EXISTINGSPARE CIRCUIT BREAKER IN PANEL LPP-4A TO SERVE DDC CONTROL PANEL.COORDINATE WORK WITH OTHER TRADES.KEYED NOTES:2 4TH FLOOR PARTIAL PLAN1/8"=1'-0"SYMBOLDESCRIPTIONABBR.LEGENDLLPELECTRICAL PANELBOARD -JJUNCTION BOX -HOMERUN TO ELECTRICAL PANEL. PROVIDE 2#12, 1#12 GND.,IN 1/2" CONDUIT TO 20A/1P CIRCUIT BREAKER TO PANELINDICATED.CONSTRUCTION WORK -EXISTING TO REMAIN -KEYED NOTE REFERENCE:REFERS TO CORRESPONDING NUMBERON RESPECTIVE DRAWING OR DETAIL-THESE ARE STANDARD SYMBOLS AND ABBREVIATIONS AND MAY NOT APPEAR ON THEPROJECT DRAWINGS. HOWEVER, WHEREVER THE SYMBOL OR ABBREVIATION APPEARSON THE PROJECT DRAWINGS, THE ITEM SHALL BE FURNISHED AND INSTALLED.NOTE:LLP