HomeMy WebLinkAboutBaker Hall RenovationsCORNELL UNIVERSITY BAKER COMPLEX KITCHEN RENOVATIONS
FACILITIES CONTRACTS
121 HUMPHREYS SERVICE BUILDING
ITHACA, NEW YORK 14853-3701
ADDENDUM NO. 1
January 22, 2019
This Addendum contains changes to the requirements of the Contract Documents and Specifications.
Such changes are to be incorporated into the Construction Documents and shall apply to the work with
the same meaning and force as if they had been included in the original document. Wherever this
Addendum modifies a portion of a paragraph of the specifications or a portion of any Drawing, the
remainder of the Paragraph or Drawing shall remain in force.
NOTE: Provisions of all Contract Documents apply.
Item 1. Attached is the Pre-bid Sign-in Sheet for Contractor’s reference only.
Item 2. Drawing E-101, Detail 3 and 4
DELETE Keyed Note 11 in its entirety.
REPLACE with
Removal of data jacks and associated data cabling back to the IT space are by separate
contract.
Item 3. Drawing E-102
DELETE Keyed Note 11 in its entirety.
REPLACE with
Provide two (2) CAT 6 cables in 1” EMT from the rack in the IT Space to the new data
jack location for vending. IT Space in North Baker is Room G07 (approximately 30 feet
north of the G09 Kitchen north wall). IT Space in South Baker is Room G00JE (on the
other side of the G09 Kitchen north wall). Provide a double gang box with a single gang
plaster ring. Provide cover plate with two jacks. Terminate cabling, test and label.
Coordinate with CIT for activation of circuits.
Item 4. Drawing E-101, Detail 3 and 4
DELETE Keyed Note 1 in its entirety.
REPLACE with
Removal of receptacles and associated circuitry are by a separate contract.
Baker Complex Kitchen Renovations
Addendum No. 01
January 22, 2019
Page 2
Item 5. Drawing E-101, Detail 3 and 4
DELETE Keyed Note 10 in its entirety.
REPLACE with
Removal of receptacles and associated circuitry are by a separate contract.
Item 6. Drawing E-101, Detail 3
DELETE Keyed Note 7 for lighting along the East wall.
REPLACE with
Removal of light fixtures and associated circuitry along East wall are by a separate
contract.
Item 7. Drawing E-101, Detail 4
DELETE Keyed Note 7 for lighting along the East wall and the two round light fixtures
in the kitchen.
REPLACE with
Removal of light fixtures and associated circuitry along East wall and two round light
fixtures in the kitchen are by a separate contract.
Attachments: Pre-bid Sign-in sheet
****END OF ADDENDUM****