Loading...
HomeMy WebLinkAboutAddendum 2 2019-05-01 CORNELL UNIVERSITY STUDENT AND CAMPUS LIFE FACILITIES CONTRACTS MULTIPLE DEFICIENCIES CODE REMEDIATION 121 HUMPHREYS SERVICE BUILDING PHASE 1A ITHACA, NEW YORK 14853-3701 CLARA DICKSON ADDENDUM NO. 2 May 1, 2019 This Addendum contains changes to the requirements of the Contract Documents and Specifications. Such changes are to be incorporated into the Construction Documents and shall apply to the work with the same meaning and force as if they had been included in the original document. Wherever this Addendum modifies a portion of a paragraph of the specifications or a portion of any Drawing, the remainder of the Paragraph or Drawing shall remain in force. NOTE: Provisions of all Contract Documents apply. Item 1. Delete requirements from Item 5 of Addendum#1. All interior railing work shall be painted either in the field or in the shop at the Contractor’s discretion. ****END OF ADDENDUM****