Re: Carpenter Hall B05 Systems Engineering Lab Code Compliance
Dear Rob,
On behalf of my Client, Cornell University, I am writing to inform you of the Work plan for sub-grade drainage
at the excavation for the new exterior egress stair, from the Systems Engineering Lab B05 space in the
basement level of Carpenter Hall.
This past week, the contractor performed an exploratory excavation to reveal a) the existing footer drain pipe
indicated on Record Drawings for the building, b) the existing building foundation and footings, and c) the
existing soil conditions in the area of the Work.
The existing footer drain was shown to be damaged, and not at a suitable elevation to work with our new area
rain at the lower concrete landing of the new stair. Given this new information, the plan will be revised to
instead create our own, self-contained drainage solution for the area of Work, by installing new piping that will
lead below the existing interior basement floor slab, and a new sump pit and pump(s) and new piping will be
included to eject any water that collects to tie-in to existing overhead storm drain piping at Meeting Room 06,
on the same basement level. I have included drawing documentation of this design change, for your record.
This change to the Scope of Work will remove any need to excavate beyond what is required to build the new
exterior egress stair, and therefore will not affect egress from the first level of the building to the exterior
courtyard.
Regarding other structural/geotech concerns you have raised in your review of this project, my consulting
structural engineer shall be issuing a separate letter to you to address those concerns.
Thank you.
Best Regards,
Corey A. Layton, RA LEED AP
Founding Partner
DN....36"x18"36"x18"16"ø14"ø36"x18"PROVIDE FLOOR DRAIN. CONNECT TO NEW DRAIN PIPINGMeeting Room 03B05DMeeting Room 02B05CMeeting Room 01B05BMech WorkshopB05HSystems EngineeringLabB05Meeting Room 06B05J4" FOOTER DRAIN (E)L-212"x6"14"ø8"øG-A 300 CFMPROVIDE VD (TYP)36"x18"2 1/2" CHWS2 1/2" CHWR2 1/2" CHWR2 1/2" CHWS10"øSSSSS10"ø2" PUMPED DRAIN DISCHARGE4" UNDERGROUND PIPING. PROVIDE WALL SLEEVES AT ALL WALL PENETRATIONSDRAIN BASIN WITH DUPLEX SUMP PUMPS. PROVIDE 208/1 POWER TO CONTROL PANEL AND PUMPS.2" PUMPED DRAIN DISCHARGE1SK-M42SK-M44" FOOTER DRAIN (E)NEW 4" FOOTER DRAIN ROUTE AROUND NEW STAIRScaleProject numberDateDrawn byChecked by49 Court Street, Metrocenter, P.O. Box 1980Binghamton, New York 13902P: 607.723.9421 F: 607.723.4979www.mjinc.comMcFarland Johnson 1/8" = 1'-0"5/1/2019 1:41:20 PMSK-M3Stair/Areaway Drain Piping Plan18.007Cornell UniversityCarpenter Hall B05 Systems Engineering LabCode Compliance05.01.2019MRMPPNo. Description Date
Floor - Level 00-13' - 0"Floor - Level 010' - 0"2" PUMPED DISCHARGE ROUTE TIGHT TO WALL4" DRAIN LINE. ROUTE UNDER EXISTING FOUNDATION GRADE BEAM PROVIDE CONCRETE PIT FOR DRAIN BASIN.PROVIDE 1/4" DIAMOND PLATE COVER FLUSH WITH FLOORDRAIN BASIN WITH DUPLEX PUMPSPROVIDE WALL SLEEVE4' - 0"2SK-M4OFFSET PIPEFloor - Level 010"Floor - Level 00-13' - 0"JFloor - Level 010' - 0"JJ1SK-M44' - 0"2" PUMPED DISCHARGEMANIFOLD DUPLEX PUMP DISCHARGEDRAIN BASIN, BASED ON LIBERTY PUMPS, 1100 SERIES, DUPLEX PUMP SYSTEM. BASIN SHALL BE 30" DIA. AND 36" TALL, 110 GAL CAPACITY. MOTOR SHALL BE 208/1, 1 HP, BASED ON MODEL LE102M. MOUNT ON WALL ADJACENT TO SUMP PIT. PROVIDE WITH CONTROL PANEL. CONTROLLER SHALL ALTERNATE LEAD/LAG PUMP OPERATION, HAVE A MINIMUM OF 3 FLOAT INPUT/OUTPUT SWITCHED AND EQUIPPED WITH HIGH WATER ALARM.5' - 0"ScaleProject numberDateDrawn byChecked by49 Court Street, Metrocenter, P.O. Box 1980Binghamton, New York 13902P: 607.723.9421 F: 607.723.4979www.mjinc.comMcFarland Johnson 1/4" = 1'-0"5/1/2019 1:41:21 PMSK-M4Stair Drain Basin Sections18.007Cornell UniversityCarpenter Hall B05 Systems Engineering LabCode Compliance05.01.2019MRMPPNo. Description Date