HomeMy WebLinkAboutPost Bid Bulletin - Carpenter Hall B05 - Value Engineering Items (2)CORNELL UNIVERSITY CARPENTER HALL B05 FACILITIES CONTRACTS SYSTEMS ENGINEERING LAB 121 HUMPHREYS SERVICE BUILDING CODE COMPLIANCE ITHACA, NEW YORK 14853-3701 POST BID BULLETIN NO. 1 MAY 6, 2019 This Post Bid Bulletin contains changes to the requirements of the Contract Documents and Specifications. Such changes are to be incorporated into the Construction Documents and shall apply to the work with the same meaning and force as if they had been included in the original document. Wherever this Post Bid Bulletin modifies a portion of a paragraph of the specifications or a portion of any Drawing, the remainder of the Paragraph or Drawing shall remain in force. NOTE: Provisions of all Contract Documents apply. Thank you for your recent bid for the above referenced project. All bids received exceeded the Owner’s Construction Budget and we must explore other options for this project. Please email the responses to Facilities Contracts (FacilitiesContracts@cornell.edu) no later than 4:00PM on May 14, 2019 to aid Cornell in its review and approval process. 1. Deduct Alternate 01 - Finish Plywood and Aluminum Reveals Cost Deduction $___________________ DELETE all finish plywood and aluminum reveals on the interior side (walls and ceiling) of the room MECH WORKSHOP B05H. REPLACE with standard 1/2” gypsum wall/ceiling board, and paint. Affected Specifications: 061000, 062000 Affected Drawings: 1/A2.03, Room Finish Schedule A2.03, 1/A3.07, 2/A3.07, 3/A3.07, 4/A3.07, 5/A3.07, 6/A3.07,7/A3.07 2. Deduct Alternate 02 - Fire-rated Glass and Framing Systems Cost Deduction $___________________ DELETE the Fire-rated glass and framing system at Door #011. REPLACE with 1hr-rated hollow metal frame, 45min-rated, HM Door (door type elevation to remain the same), and ‘Firelite Plus’ 45min.-rated Fire-Rated, Safety-Rated Glass Ceramic glazing (thickness as required to achieve required rating). Paint HM Frame and Door. Revise Door Hardware - Set #07 to include: Hinges, Exit Device, Closer, Silencers, Wall Stop. Frame/Mullion configuration and dimensions (interior elevation) to remain the same. Affected Specifications: 081113, 084123, 087101, 087102, 088000 Affected Drawings: 1/A2.02, 3/A3.05 3. Deduct Alternate 03 - Luxury Vinyl Tile Flooring Cost Deduction $___________________ DELETE Luxury Vinyl Tile (LVT) flooring in room LOUNGE B05F. Affected Specifications: 096500 Affected Drawings: 1/A2.03, Room Finish Schedule A2.03 4. Deduct Alternate 04 - Mural Painting Cost Deduction $___________________ DELETE decorative mural wall painting of south wall of room SYSTEMS ENGINEERING LAB B05 and north wall of room LOUNGE B05F. REPLACE with paint type “PNT-1” (solid color). Affected Specifications: none Affected Drawings: 3/A2.03, 3/A303, 1/A3.04, 2/A3.04 5. Deduct Alternate 05 - Casework/Countertop Cost Deduction $___________________ DELETE Casework/Countertop at East wall of room LOUNGE B05F. REPLACE with wall paint. Affected Specifications: 064100 Affected Drawings: 1/A2.01, 1/A2.02, 1/A2.03, 2/A3.03, 7/A3.04 6. Deduct Alternate 06 - Strip/Re-seal Existing Concrete Floor Cost Deduction $___________________ DELETE the requirement to strip and re-seal the entire existing concrete floor surface within the Work Area. REPLACE with strip and prep concrete floor only in areas to receive new floor painting, following paint manufacturer’s recommendations. Affected Specifications: 033511 Affected Drawings: 1/A2.03, Room Finish Schedule/A2.03 7. Deduct Alternate 07 - AISC Certification Cost Deduction $___________________ DELETE requirements for steel Fabricator to be AISC–certified. Affected Specifications: 051000 Affected Drawings: none. 8. Deduct Alternate 08 - VAV Diffusers & Controls Cost Deduction $___________________ DELETE the scope of work revised and/or added in Addendum No. 01 – Item 01. REPLACE with original scope of work from the originally-issued Drawing M5.01, dated 03/05/2019. Affected Specifications: none. Affected Drawings: M5.01 9. Deduct Alternate 08 - Storm Drainage & Associated Piping, Fittings, & Accessories Cost Deduction $___________________ DELETE the scope of work to include all excavations, sub-grade piping, fitting, and connections associated with storm drainage from two new area drains in the lower landing of the new Exterior Stair areaway, and base slab of the Exhaust areaway. REPLACE with alternate design indicated on the attached Sketch Drawing(s) numbered: SK- M3, SK-M4. Affected Specifications: none. Affected Drawings: M1.01, M2.01 ****END OF POST BID BULLETIN**** IN THE SPACES ABOVE, PROVIDE ALTERNATE COSTS FOR THE ABOVE STATED MODIFICATIONS. Company Signature Printed Name and Title Date