HomeMy WebLinkAboutPBB 2-Carpenter B05_5-10-2019CORNELL UNIVERSITY CARPENTER HALL B05 FACILITIES CONTRACTS SYSTEMS ENGINEERING LAB 121 HUMPHREYS SERVICE BUILDING CODE COMPLIANCE ITHACA, NEW YORK 14853-3701 POST BID BULLETIN NO. 2 MAY 10, 2019 This Post Bid Bulletin contains changes to the requirements of the Contract Documents and Specifications. Such changes are to be incorporated into the Construction Documents and shall apply to the work with the same meaning and force as if they had been included in the original document. Wherever this Post Bid Bulletin modifies a portion of a paragraph of the specifications or a portion of any Drawing, the remainder of the Paragraph or Drawing shall remain in force. NOTE: Provisions of all Contract Documents apply. Thank you for your recent bid for the above referenced project. All bids received exceeded the Owner’s Construction Budget and we must explore other options for this project. This Post Bid Bulletin supersedes Post Bid Bulletin No. 1 in its entirety. Please email the responses to Facilities Contracts (FacilitiesContracts@cornell.edu) no later than 2:00PM on May 15, 2019 to aid Cornell in its review and approval process. 1. Finish Plywood and Aluminum Reveals DELETE all finish plywood and aluminum reveals on the interior side (walls and ceiling) of the room MECH WORKSHOP B05H. REPLACE with standard 1/2” gypsum wall/ceiling board, and paint. Affected Specifications: 061000, 062000 Affected Drawings: 1/A2.03, Room Finish Schedule A2.03, 1/A3.07, 2/A3.07, 3/A3.07, 4/A3.07, 5/A3.07, 6/A3.07,7/A3.07 2. Fire-rated Glass and Framing Systems DELETE the Fire-rated glass and framing system at Door #011. REPLACE with 1hr-rated hollow metal frame, 45min-rated, HM Door (door type elevation to remain the same), and ‘Firelite Plus’ 45min.-rated Fire-Rated, Safety-Rated Glass Ceramic glazing (thickness as required to achieve required rating). Paint HM Frame and Door. Revise Door Hardware - Set #07 to include: Hinges, Exit Device, Closer, Silencers, Wall Stop. Frame/Mullion configuration and dimensions (interior elevation) to remain the same. Affected Specifications: 081113, 084123, 087101, 087102, 088000 Affected Drawings: 1/A2.02, 3/A3.05 Carpenter Hall B05 Systems Engineering Lab Code Compliance Post Bid Bulletin No. 2 May 10, 2019 Page 2 3. Luxury Vinyl Tile Flooring DELETE Luxury Vinyl Tile (LVT) flooring in room LOUNGE B05F. Affected Specifications: 096500 Affected Drawings: 1/A2.03, Room Finish Schedule A2.03 4. Mural Painting DELETE decorative mural wall painting of south wall of room SYSTEMS ENGINEERING LAB B05 and north wall of room LOUNGE B05F. REPLACE with paint type “PNT-1” (solid color). Affected Specifications: none Affected Drawings: 3/A2.03, 3/A303, 1/A3.04, 2/A3.04 5. Casework/Countertop DELETE Casework/Countertop at East wall of room LOUNGE B05F. REPLACE with wall paint. Affected Specifications: 064100 Affected Drawings: 1/A2.01, 1/A2.02, 1/A2.03, 2/A3.03, 7/A3.04 6. Strip/Re-seal Existing Concrete Floor DELETE the requirement to strip and re-seal the entire existing concrete floor surface within the Work Area. REPLACE with strip and prep concrete floor only in areas to receive new floor painting, following paint manufacturer’s recommendations. Affected Specifications: 033511 Affected Drawings: 1/A2.03, Room Finish Schedule/A2.03 7. AISC Certification DELETE requirements for steel Fabricator to be AISC–certified. Affected Specifications: 051000 Affected Drawings: none. Carpenter Hall B05 Systems Engineering Lab Code Compliance Post Bid Bulletin No. 2 May 10, 2019 Page 3 8. VAV Diffusers & Controls DELETE the scope of work revised and/or added in Addendum No. 1 – Item 1. REPLACE with original scope of work from the originally-issued Drawing M5.01, dated 03/05/2019. Affected Specifications: none. Affected Drawings: M5.01 9. Storm Drainage & Associated Piping, Fittings, & Accessories DELETE the scope of work to include excavations, sub-grade piping, fitting, and connections associated with storm drainage from two new area drains in the lower landing of the new Exterior Stair areaway, and base slab of the Exhaust areaway. REPLACE with alternate design indicated on the attached Sketch Drawing(s) numbered: SK-M3, SK-M4. Affected Specifications: none. Affected Drawings: M1.01, M2.01 10. Substitutions a. The Base Bid is predicated on compliance with the Drawings and Specifications without substitutions. b. The Bidder may offer substitutions for any item noted in the Specifications, with the exception of Form of Contract, General Conditions and General Requirements - Division 1, by listing in the space below the proposed substitution, together with the amount to be deducted from the Base Bid if the substitution is accepted. c. The Owner reserves the right to accept or reject any proposed substitution. d. The sum stated includes any modifications of work or additional work that may be required by reason of acceptance of substitution. Substitute materials must be approved and accepted by the Owner in writing before same may be used in lieu of those named in the Specifications. Item and Specification Description of Reference Deduction from Base Bid Substitution Section & Page No. Labor Material Carpenter Hall B05 Systems Engineering Lab Code Compliance Post Bid Bulletin No. 2 May 10, 2019 Page 4 11. RFI Questions and Clarifications See attached RFI Log (Items 1-2) Attachments: RFI Log (Items 1-2) ****END OF POST BID BULLETIN**** REVISED BASE BID $ IN THE SPACE ABOVE, PROVIDE A REVISED BASE BID FOR THE ABOVE STATED MODIFICATIONS. Company Signature Printed Name and Title PROJECT: Carpenter Hall B05 Systems Engineering Lab Code Compliance Date: May 10, 2019 RFI Form RFI/Page/ Response Dwg./Spec./Rep.Section/Design Team Index Number Paragraph/Topic RFI Response 1 Please clarify the Quantity of VAV Terminals. Register and Grille Schedule RB & RC calls for 11 VAV Terminals (M201 and M401) M5.01 Base Bid - Shows 4 VAV Terminals M5.01 REV 1 - Shows 10 VAV Terminals Are we putting in 4 VAV Terminals and changing other from VAV to Convential? If so which ones? See Post Bid Bulletin No. 2, Item 8. Current scope should be for four (4) VAV boxes only. 2 In reference to the Storm drainage & Associated piping, fittings, & Accessories deduct there is no specification on pipe to be used for the discharge of the Liberty drain basin. Can some on please clarify what material they would like used for the discharge piping on this new system. Provide Type L copper.