HomeMy WebLinkAboutPBB 2-Carpenter B05_5-10-2019CORNELL UNIVERSITY CARPENTER HALL B05
FACILITIES CONTRACTS SYSTEMS ENGINEERING LAB
121 HUMPHREYS SERVICE BUILDING CODE COMPLIANCE
ITHACA, NEW YORK 14853-3701
POST BID BULLETIN NO. 2
MAY 10, 2019
This Post Bid Bulletin contains changes to the requirements of the Contract Documents and
Specifications. Such changes are to be incorporated into the Construction Documents and shall apply to
the work with the same meaning and force as if they had been included in the original document.
Wherever this Post Bid Bulletin modifies a portion of a paragraph of the specifications or a portion of
any Drawing, the remainder of the Paragraph or Drawing shall remain in force.
NOTE: Provisions of all Contract Documents apply.
Thank you for your recent bid for the above referenced project. All bids received exceeded the Owner’s
Construction Budget and we must explore other options for this project.
This Post Bid Bulletin supersedes Post Bid Bulletin No. 1 in its entirety.
Please email the responses to Facilities Contracts (FacilitiesContracts@cornell.edu) no later than
2:00PM on May 15, 2019 to aid Cornell in its review and approval process.
1. Finish Plywood and Aluminum Reveals
DELETE all finish plywood and aluminum reveals on the interior side (walls and ceiling) of the
room MECH WORKSHOP B05H.
REPLACE with standard 1/2” gypsum wall/ceiling board, and paint.
Affected Specifications: 061000, 062000
Affected Drawings: 1/A2.03, Room Finish Schedule A2.03, 1/A3.07, 2/A3.07, 3/A3.07, 4/A3.07,
5/A3.07, 6/A3.07,7/A3.07
2. Fire-rated Glass and Framing Systems
DELETE the Fire-rated glass and framing system at Door #011.
REPLACE with 1hr-rated hollow metal frame, 45min-rated, HM Door (door type elevation to
remain the same), and ‘Firelite Plus’ 45min.-rated Fire-Rated, Safety-Rated Glass Ceramic glazing
(thickness as required to achieve required rating). Paint HM Frame and Door. Revise Door Hardware
- Set #07 to include: Hinges, Exit Device, Closer, Silencers, Wall Stop. Frame/Mullion configuration
and dimensions (interior elevation) to remain the same.
Affected Specifications: 081113, 084123, 087101, 087102, 088000
Affected Drawings: 1/A2.02, 3/A3.05
Carpenter Hall B05 Systems Engineering Lab Code Compliance
Post Bid Bulletin No. 2
May 10, 2019
Page 2
3. Luxury Vinyl Tile Flooring
DELETE Luxury Vinyl Tile (LVT) flooring in room LOUNGE B05F.
Affected Specifications: 096500
Affected Drawings: 1/A2.03, Room Finish Schedule A2.03
4. Mural Painting
DELETE decorative mural wall painting of south wall of room SYSTEMS ENGINEERING LAB
B05 and north wall of room LOUNGE B05F.
REPLACE with paint type “PNT-1” (solid color).
Affected Specifications: none
Affected Drawings: 3/A2.03, 3/A303, 1/A3.04, 2/A3.04
5. Casework/Countertop
DELETE Casework/Countertop at East wall of room LOUNGE B05F.
REPLACE with wall paint.
Affected Specifications: 064100
Affected Drawings: 1/A2.01, 1/A2.02, 1/A2.03, 2/A3.03, 7/A3.04
6. Strip/Re-seal Existing Concrete Floor
DELETE the requirement to strip and re-seal the entire existing concrete floor surface within the
Work Area.
REPLACE with strip and prep concrete floor only in areas to receive new floor painting, following
paint manufacturer’s recommendations.
Affected Specifications: 033511
Affected Drawings: 1/A2.03, Room Finish Schedule/A2.03
7. AISC Certification
DELETE requirements for steel Fabricator to be AISC–certified.
Affected Specifications: 051000
Affected Drawings: none.
Carpenter Hall B05 Systems Engineering Lab Code Compliance
Post Bid Bulletin No. 2
May 10, 2019
Page 3
8. VAV Diffusers & Controls
DELETE the scope of work revised and/or added in Addendum No. 1 – Item 1.
REPLACE with original scope of work from the originally-issued Drawing M5.01, dated
03/05/2019.
Affected Specifications: none.
Affected Drawings: M5.01
9. Storm Drainage & Associated Piping, Fittings, & Accessories
DELETE the scope of work to include excavations, sub-grade piping, fitting, and connections
associated with storm drainage from two new area drains in the lower landing of the new Exterior
Stair areaway, and base slab of the Exhaust areaway.
REPLACE with alternate design indicated on the attached Sketch Drawing(s) numbered: SK-M3,
SK-M4.
Affected Specifications: none.
Affected Drawings: M1.01, M2.01
10. Substitutions
a. The Base Bid is predicated on compliance with the Drawings and Specifications without
substitutions.
b. The Bidder may offer substitutions for any item noted in the Specifications, with the
exception of Form of Contract, General Conditions and General Requirements - Division 1, by listing in
the space below the proposed substitution, together with the amount to be deducted from the Base Bid if
the substitution is accepted.
c. The Owner reserves the right to accept or reject any proposed substitution.
d. The sum stated includes any modifications of work or additional work that may be
required by reason of acceptance of substitution. Substitute materials must be approved and accepted by
the Owner in writing before same may be used in lieu of those named in the Specifications.
Item and Specification
Description of Reference Deduction from Base Bid
Substitution Section & Page No. Labor Material
Carpenter Hall B05 Systems Engineering Lab Code Compliance
Post Bid Bulletin No. 2
May 10, 2019
Page 4
11. RFI Questions and Clarifications
See attached RFI Log (Items 1-2)
Attachments: RFI Log (Items 1-2)
****END OF POST BID BULLETIN****
REVISED BASE BID $
IN THE SPACE ABOVE, PROVIDE A REVISED BASE BID FOR THE ABOVE STATED
MODIFICATIONS.
Company
Signature
Printed Name and Title
PROJECT: Carpenter Hall B05 Systems Engineering Lab Code Compliance Date: May 10, 2019
RFI Form
RFI/Page/
Response Dwg./Spec./Rep.Section/Design Team
Index Number Paragraph/Topic RFI Response
1
Please clarify the Quantity of VAV Terminals. Register and
Grille Schedule RB & RC calls for 11 VAV Terminals (M201
and M401)
M5.01 Base Bid - Shows 4 VAV Terminals
M5.01 REV 1 - Shows 10 VAV Terminals
Are we putting in 4 VAV Terminals and changing other from
VAV to Convential? If so which ones?
See Post Bid Bulletin No. 2, Item 8. Current scope
should be for four (4) VAV boxes only.
2
In reference to the Storm drainage & Associated piping,
fittings, & Accessories deduct there is no specification on
pipe to be used for the discharge of the Liberty drain basin.
Can some on please clarify what material they would like
used for the discharge piping on this new system.
Provide Type L copper.