Loading...
HomeMy WebLinkAbouts1021 FOUNDATION DRAIN, SEE C103 AND A501 2 REBUILD PORCH STEPS TO MATCH EXIST STEP FOOTING DOWN AS REQ'D TO MATCH B/EXIST FOOTING REBUILD FOUNDATION WALLS WHERE REMOVED REBUILT PORCH FRAMING (TYP) TOP PAINTED TONGUE AND GROOVE PORCH BOARD TO MATCH EXISTING (TYP) 3 SEE L301 FOR ELEVATIONS OF EXIST FIN FLR CONCRETE PIER AND FOOTINGS NEW PORCH FRAMING BEARING ON NEW PIER 7x11,875 WOLMANIZED TJ PARALLAM AT EA INTERIOR GIRDER (TYP) 5.25x9.5 WOLMANIZED TJ PARALLAM AT EA DOUBLE GIRDER (TYP) 4 3A 3'-2" / / S301 FIRST FLOOR - Phase 3 Rebuilt 1/8" = 1'-0" 3'-2" 5 GALV L6x4x5/16 (LLV) (TYP OF TWO) ALUMINUM GRATING (TYP) AT 3 AREAWAYS. SEE ARCH DRAWINGS. REBUILD AREAWAY (TYP OF THREE) PROVIDE CONTROL JOINTS WHERE SHOWN NEW CONCRETE RAMP. SEE C1/A503 FOR GEOMETRY. STEP FOOTING DOWN AS REQ'D TO MATCH B/EXIST FOOTING REBUILD PORCH STEPS TO MATCH EXIST REBUILD PORCH FRAMING WITH PRESSURE TREATED NO.1/N0.2 2x10 SPRUCE - PINE -FIR JOISTS AT 16" OC OR EQUIVALENT 6 7 NAILING SCHEDULE LOCATION REQUIREMENTS JOIST TO GIRDER 3-8d COMMON, TOE NAIL JOIST TO SILL 3-8d COMMON, TOE NAIL JOIST TO RIM JOIST 3-16d COMMON, END NAIL BLOCKING TO JOIST 2-8d COMMON EA END, TOE NAIL TONGUE AND GROOVE DECKING TO JOIST 2-8d COMMON, FACE NAIL 8 9 10 RYAN BIGGS CLARK DAVIS 4592 JORDAN ROAD SKANEATELES FALLS, NY 13153 p 315.685,4732 f 315.685.4753 www.ryanbiggs.com E U 0 0 c 0 0 0 U a) is 0 • • 0 CO 0 LL C to N 0- _1_0= E U (0 a) 2 criP 0) a (/) E o0 haca, New York 14850 DATE: 14 December 2018 PROJECT: 1711 E D C B OTHER: DRAWN BY: Author PHASE 3 REBUILT PLAN S102 A 1 2 4 5 6 7 8 10