Loading...
HomeMy WebLinkAbout00 combined plans 120 Maple AveCORNELL UNIVERSITY 120 MAPLE AVENUE FACILITIES CONTRACTS BASEMENT SUITE RENOVATION 121 HUMPHREYS SERVICE BUILDING ITHACA, NEW YORK 14853-3701 ADDENDUM NO. 1 April 16, 2018 This Addendum contains changes to the requirements of the Contract Documents and Specifications. Such changes are to be incorporated into the Construction Documents and shall apply to the work with the same meaning and force as if they had been included in the original document. Wherever this Addendum modifies a portion of a paragraph of the specifications or a portion of any Drawing, the remainder of the Paragraph or Drawing shall remain in force. NOTE: Provisions of all Contract Documents apply. GENERAL REQUIREMENTS Item 1. Section 01 51 00 ADD 2.7 DUMPSTER A. A dumpster may be located in parking lot on western side of facility. Southeastern most parking space near lawn and sidewalk to be utilized for dumpster location. Item 2. Section 08 71 00, 3.6 DOOR HARDWARE SCHEDULE, Hardware Set #4 Entrance DELETE in its entirety. REPLACE with Hardware Set #4 Entrance 1½ Pair Butts McKinney TA386NRP 4½ x 4½ 630 1 Rim Exit Device Sargent 8804 x 814-FSW 630 1 Push-Side Closer Sargent 351 Series 689 1 Floor Stop IVES FS444 626 2 EL-CEPT Fillers Don-Jo Door and frame 628 Item 3. Drawing AD-101, Demolition Notes ADD 4. Contractor to remove and dispose of all existing furniture. Item 4. Drawing A-201, D4 South Elevation ADD Reference Tag F4/A501 for enlarged Lintel Elevation, above exterior window W1. 120 Maple Avenue Basement Suite Renovation Addendum No. 1 April 16, 2018 Page 2 Item 5. Drawing A-501 DELETE in its entirety. REPLACE with revised Drawing A-501, attached. Item 4. Drawing E-101 ADD General Note 1 Contractor to terminate, test, and label data lines. Item 5. RFI Questions and Clarifications See attached RFI Log (Item 1) Attachments: Drawing A-501 RFI Log (Item 1) ****END OF ADDENDUM**** PROJECT Date: April 16, 2018 RFI Form RFI/Page/ Response Dwg./Spec./Rep.Section/Design Team Index Number Paragraph/Topic RFI Response 1 Sec 26-09-23 Wattstopper Creston #GL- IPAC-SW8 Please provide clarification on the Wattstopper Creston #GL_IPAC_SW8 lighting control system found in specification section 26 09 23. The specification indicates that I am to provide this panel, however, it is not shown on the electrical floor plans. Is this panel already existing? Or is it something the electrical contractor needs to provide. Provide lighting control as speficied. The lighting control components are NOT existing. 120 Maple Avenue Basement Suite Renovation