ADDENDUM NO. 1
April 16, 2018
This Addendum contains changes to the requirements of the Contract Documents and Specifications.
Such changes are to be incorporated into the Construction Documents and shall apply to the work with
the same meaning and force as if they had been included in the original document. Wherever this
Addendum modifies a portion of a paragraph of the specifications or a portion of any Drawing, the
remainder of the Paragraph or Drawing shall remain in force.
NOTE: Provisions of all Contract Documents apply.
GENERAL REQUIREMENTS
Item 1. Section 01 51 00
ADD
2.7 DUMPSTER
A. A dumpster may be located in parking lot on western side of facility.
Southeastern most parking space near lawn and sidewalk to be utilized
for dumpster location.
Item 2. Section 08 71 00, 3.6 DOOR HARDWARE SCHEDULE, Hardware Set #4 Entrance
DELETE in its entirety.
REPLACE with
Hardware Set #4 Entrance
1½ Pair Butts McKinney TA386NRP 4½ x 4½ 630
1 Rim Exit Device Sargent 8804 x 814-FSW 630
1 Push-Side Closer Sargent 351 Series 689
1 Floor Stop IVES FS444 626
2 EL-CEPT Fillers Don-Jo Door and frame 628
Item 3. Drawing AD-101, Demolition Notes
ADD
4. Contractor to remove and dispose of all existing furniture.
Item 4. Drawing A-201, D4 South Elevation
ADD Reference Tag F4/A501 for enlarged Lintel Elevation, above exterior window W1.
120 Maple Avenue Basement Suite Renovation
Addendum No. 1
April 16, 2018
Page 2
Item 5. Drawing A-501
DELETE in its entirety.
REPLACE with revised Drawing A-501, attached.
Item 4. Drawing E-101
ADD General Note 1
Contractor to terminate, test, and label data lines.
Item 5. RFI Questions and Clarifications
See attached RFI Log (Item 1)
Attachments: Drawing A-501
RFI Log (Item 1)
****END OF ADDENDUM****
PROJECT Date: April 16, 2018
RFI Form
RFI/Page/
Response Dwg./Spec./Rep.Section/Design Team
Index Number Paragraph/Topic RFI Response
1 Sec 26-09-23
Wattstopper
Creston #GL-
IPAC-SW8
Please provide clarification on the Wattstopper Creston
#GL_IPAC_SW8 lighting control system found in
specification section 26 09 23. The specification indicates
that I am to provide this panel, however, it is not shown on
the electrical floor plans. Is this panel already existing? Or is
it something the electrical contractor needs to provide.
Provide lighting control as speficied. The lighting
control components are NOT existing.