HomeMy WebLinkAboutBA-04 S1 - THIRD FLOOR FRAMING REVISION-1A
21
(4)2x4 POST EACH
END OF PARALLAM
BEAM
(3)2x4 POST TO BASEMENT
(4) 1.75" x 9.25" MICROLAM 2.0E BEAM. AT EXISTING JOIST,
SHORE, CUT AND ATTACH TO NEW BEAM WITH SIMPSON
LU210R HANGER
SIMPSON HHUS7.25/10
HANGER TYP
(3)2x4 POST TO BASEMENT
(2) 1.75" x 9.25"
MICROLAM 2.0E
EX 2x10 JOIST
HSS 12x4 BELOW EX
JOIST
NOTE: SHORE EXISTING 2x10
JOIST EA SIDE OF NEW
MICROLAM BEAM. EACH
JOIST SHOULD BE SHORED
FOR 300LBS.
DRAWING REFERENCE: N/A
DRAWN BY: KJO
1/8" = 1'-0"
08/02/18
11874
BA-04
S1
Cornell University
118 McGraw Place
Ithaca New York 14850
10732 Phi Gamma Delta
THIRD FLOOR FRAMING REVISION
1/8" = 1'-0"BA-04 S1
1 THIRD FLOOR VESTIBULE - PARTIAL PLAN