Loading...
HomeMy WebLinkAboutBA-04 S1 - THIRD FLOOR FRAMING REVISION-1A 21 (4)2x4 POST EACH END OF PARALLAM BEAM (3)2x4 POST TO BASEMENT (4) 1.75" x 9.25" MICROLAM 2.0E BEAM. AT EXISTING JOIST, SHORE, CUT AND ATTACH TO NEW BEAM WITH SIMPSON LU210R HANGER SIMPSON HHUS7.25/10 HANGER TYP (3)2x4 POST TO BASEMENT (2) 1.75" x 9.25" MICROLAM 2.0E EX 2x10 JOIST HSS 12x4 BELOW EX JOIST NOTE: SHORE EXISTING 2x10 JOIST EA SIDE OF NEW MICROLAM BEAM. EACH JOIST SHOULD BE SHORED FOR 300LBS. DRAWING REFERENCE: N/A DRAWN BY: KJO 1/8" = 1'-0" 08/02/18 11874 BA-04 S1 Cornell University 118 McGraw Place Ithaca New York 14850 10732 Phi Gamma Delta THIRD FLOOR FRAMING REVISION 1/8" = 1'-0"BA-04 S1 1 THIRD FLOOR VESTIBULE - PARTIAL PLAN