Loading...
HomeMy WebLinkAboutBA-01 S1 R1 - 1-S100 AND 2-S100 REVISIONA 21 3 S102 3 1/2" x 5 1/4" PARALLAM COLUMN HSS 12x2 STRINGER (4) 2x10 BEAM (4) 2x4 POST EA END OF BEAM T/FLOOR (714'-0"±) T/FLOOR (707'-4 3/4"±) 16' - 4 5/8" ± (2) 2x4 EA SIDE OF DOOR IN BASEMENT (3) 2x4 POST UNDER BEAMS FROM 2ND DOWN TO 1ST FLOOR (2) 2x10 BEAM IN 1ST FLOOR (3) 2x4 POST 2ND FLOOR TO BASEMENT A 21 HSS12X2X5/16 MC12X50MC12X50 MC12X50(719'-10 1/2") (719'-10 1/2")(719'-10 1/2")(719'-10 1/2")6 S100 HSS12x2x5/16 STRINGER HSS12x2x5/16 STRINGER (KINKED) 5 S100 5 S100 S100 4 2x10 AT 16"OC INFILL W/ 3/4" SHEATHING 5 1/4" x 9 1/4" PARALLAM 3 S1023 1/2"x 5 1/4" PARALLAM COLUMN OPEN OPEN (3)2x4 POST EACH END OF PARALLAM BEAM 9 9 9 10 5 10 3 5 S100 4 (3)2x4 POST TO BASEMENT 9 5 1/4"x 9 1/4" PARALLAM ATTACH TO FACE OF EXISTING (2)2x10 HEADER WITH 1/2" Ø LAG SCREWS TOP AND BOTTOM AT 16" OC. AT EXISTING JOIST, SHORE, CUT AND ATTACH TO NEW BEAM WITH SIMPSON LU210R HANGER 9SIMPSON HHUS5.50/10 HANGER TYP 9 1 BA-01 S4 (3)2x4 POST TO BASEMENT 2x10 SISTERED TO EXIST (2) 2x10 JOIST DRAWING REFERENCE: 1/S100 DRAWN BY: KJO 1/8" = 1'-0" 06/06/18 11874 BA-01 S1 R1 Cornell University 118 McGraw Place Ithaca New York 14850 10732 Phi Gamma Delta 1/S100 AND 2/S100 REVISION 1/8" = 1'-0"BA-01 S1 R1 1 FIRST FLOOR VESTIBULE - PARTIAL PLAN 1/8" = 1'-0"BA-01 S1 R1 2 SECOND FLOOR VESTIBULE - PARTIAL PLAN