HomeMy WebLinkAboutADD 1_4-4-18CORNELL UNIVERSITY PHI GAMMA DELTA (118 MCGRAW PLACE)
FACILITIES CONTRACTS THE OAKS 21 RENOVATIONS – PROJECT 1
121 HUMPHREYS SERVICE BUILDING
ITHACA, NEW YORK 14853-3701
ADDENDUM NO. 1
April 4, 2018
This Addendum contains changes to the requirements of the Contract Documents and Specifications.
Such changes are to be incorporated into the Construction Documents and shall apply to the work with
the same meaning and force as if they had been included in the original document. Wherever this
Addendum modifies a portion of a paragraph of the specifications or a portion of any Drawing, the
remainder of the Paragraph or Drawing shall remain in force.
NOTE: Provisions of all Contract Documents apply.
GENERAL REQUIREMENTS
Item 1. Section 01 14 00 – WORK RESTRICTIONS, 1.5, Item C
ADD
1. Cornell Transportation does not manage the Phi Gamma Delta parking lot. No fee will
be required for parking on site. It is expected that contractor parking be kept to a
minimum to allow for students who live in the facility over the summer to park there.
Students have first right to lot.
Item 2. Section 01 14 00 – WORK RESTRICTIONS, 1.11, A. 2.
DELETE Thursday, Friday June 7-8, 2018 Reunion guest arrivals- no work outside
fence; no demo or utility work inside fence
REPLACE with “Thursday, Friday June 7-8, 2018 Reunion guest arrivals – No major
deliveries should take place and no
exterior or utility work.
PHI GAMMA DELTA (118 MCGRAW PLACE)
THE OAKS 21 RENOVATIONS – PROJECT 1
ADDENDUM NO. 1
April 4, 2018
Page 2
TECHNICAL SPECIFICATIONS
Item 3. Section 08 71 00, Item 3.6 DOOR HARDWARE SCHEDULE
DELETE in its entirety.
REPLACE with
QTY ITEM MFR MODEL SIZE FIN
Hardware Set #1 Room Door
1½ Pair Butts McKinney TA2714 4½ x 4½ US10
1 Mortise Lockset Sargent 60-8225 x LNL 10
1 Wall Stop IVES WS401CVX 612
3 Silencers IVES SR64
Hardware Set #2 Fire Door
1½ Pair Butts McKinney TA2714 4½ x 4½ US10
1 Mortise Exit Device Sargent 12-8815 x ETL 10
1 Pull Side Closer Sargent 351 Series 695
1 Magnetic Wall Holder Sargent 1561 689
3 Silencers IVES SR64
Item 4. Section 21 13 13 – WET-PIPE SPRINKLER SYSTEM, Item 3.7
ADD
E. Schedule water leak test with Cornell Environmental, Health and Safety.
DRAWINGS
Item 5. Drawing C102 – UTILITY PLAN
DELETE Note RE-FEED ELECTRIC AND TELECOMM TO BUILDING
REPLACE with RE-FEED ELECTRIC TO BUILDING
Item 6. Drawing A251 – INTERIOR ELEVATIONS, A3 - Stair G0005 North Elevation
DELETE note Replace treads and risers with hardwood, stained
REPLACE with Replace treads and risers with hardwood treads and risers in fully housed
stringers with all treads and riser dimensions uniform within 1/8”.
PHI GAMMA DELTA (118 MCGRAW PLACE)
THE OAKS 21 RENOVATIONS – PROJECT 1
ADDENDUM NO. 1
April 4, 2018
Page 3
Item 7. Drawing ED100 - GROUND FLOOR DEMOLITION PLAN – ELECTRICAL, Keyed
Demolition
ADD to Note ED8
Contractor shall schedule daily fire alarm shutdown with CU EH&S Customer Service. Fire
alarm devices shall be temporarily supported and activated each day prior to Contractor
departure from project area.
Item 8. Drawing E101 - FIRST AND SECOND FLOOR PLANS – ELECTRICAL, General Notes
ADD
B. Testing of all new and relocated fire alarm notification devices shall be coordinated
with CU EH&S and Ithaca Fire Department.
Item 9. RFI Questions and Clarifications
See attached RFI Log ((Items 1-2)
Attachment: RFI Log (Items 1-2)
****END OF ADDENDUM****
PROJECT:Date: April 4, 2018
RFI Form
RFI/Page/
Response Dwg./Spec./Rep.Section/Design Team
Index Number Paragraph/Topic RFI Response
1
Is there a fee to park at the facility?See Addendum No. 1, Item 1.
2
Can you clarify stand down dates around reunion weekend?See Addendum No. 1, Item 2.
Phi Gamma Delta (118 McGraw Place)
The Oaks 21 Renovations - Project 1