HomeMy WebLinkAboutADD 1_4-4-18CORNELL UNIVERSITY PHI GAMMA DELTA (118 MCGRAW PLACE) FACILITIES CONTRACTS THE OAKS 21 RENOVATIONS – PROJECT 1 121 HUMPHREYS SERVICE BUILDING ITHACA, NEW YORK 14853-3701 ADDENDUM NO. 1 April 4, 2018 This Addendum contains changes to the requirements of the Contract Documents and Specifications. Such changes are to be incorporated into the Construction Documents and shall apply to the work with the same meaning and force as if they had been included in the original document. Wherever this Addendum modifies a portion of a paragraph of the specifications or a portion of any Drawing, the remainder of the Paragraph or Drawing shall remain in force. NOTE: Provisions of all Contract Documents apply. GENERAL REQUIREMENTS Item 1. Section 01 14 00 – WORK RESTRICTIONS, 1.5, Item C ADD 1. Cornell Transportation does not manage the Phi Gamma Delta parking lot. No fee will be required for parking on site. It is expected that contractor parking be kept to a minimum to allow for students who live in the facility over the summer to park there. Students have first right to lot. Item 2. Section 01 14 00 – WORK RESTRICTIONS, 1.11, A. 2. DELETE Thursday, Friday June 7-8, 2018 Reunion guest arrivals- no work outside fence; no demo or utility work inside fence REPLACE with “Thursday, Friday June 7-8, 2018 Reunion guest arrivals – No major deliveries should take place and no exterior or utility work. PHI GAMMA DELTA (118 MCGRAW PLACE) THE OAKS 21 RENOVATIONS – PROJECT 1 ADDENDUM NO. 1 April 4, 2018 Page 2 TECHNICAL SPECIFICATIONS Item 3. Section 08 71 00, Item 3.6 DOOR HARDWARE SCHEDULE DELETE in its entirety. REPLACE with QTY ITEM MFR MODEL SIZE FIN Hardware Set #1 Room Door 1½ Pair Butts McKinney TA2714 4½ x 4½ US10 1 Mortise Lockset Sargent 60-8225 x LNL 10 1 Wall Stop IVES WS401CVX 612 3 Silencers IVES SR64 Hardware Set #2 Fire Door 1½ Pair Butts McKinney TA2714 4½ x 4½ US10 1 Mortise Exit Device Sargent 12-8815 x ETL 10 1 Pull Side Closer Sargent 351 Series 695 1 Magnetic Wall Holder Sargent 1561 689 3 Silencers IVES SR64 Item 4. Section 21 13 13 – WET-PIPE SPRINKLER SYSTEM, Item 3.7 ADD E. Schedule water leak test with Cornell Environmental, Health and Safety. DRAWINGS Item 5. Drawing C102 – UTILITY PLAN DELETE Note RE-FEED ELECTRIC AND TELECOMM TO BUILDING REPLACE with RE-FEED ELECTRIC TO BUILDING Item 6. Drawing A251 – INTERIOR ELEVATIONS, A3 - Stair G0005 North Elevation DELETE note Replace treads and risers with hardwood, stained REPLACE with Replace treads and risers with hardwood treads and risers in fully housed stringers with all treads and riser dimensions uniform within 1/8”. PHI GAMMA DELTA (118 MCGRAW PLACE) THE OAKS 21 RENOVATIONS – PROJECT 1 ADDENDUM NO. 1 April 4, 2018 Page 3 Item 7. Drawing ED100 - GROUND FLOOR DEMOLITION PLAN – ELECTRICAL, Keyed Demolition ADD to Note ED8 Contractor shall schedule daily fire alarm shutdown with CU EH&S Customer Service. Fire alarm devices shall be temporarily supported and activated each day prior to Contractor departure from project area. Item 8. Drawing E101 - FIRST AND SECOND FLOOR PLANS – ELECTRICAL, General Notes ADD B. Testing of all new and relocated fire alarm notification devices shall be coordinated with CU EH&S and Ithaca Fire Department. Item 9. RFI Questions and Clarifications See attached RFI Log ((Items 1-2) Attachment: RFI Log (Items 1-2) ****END OF ADDENDUM**** PROJECT:Date: April 4, 2018 RFI Form RFI/Page/ Response Dwg./Spec./Rep.Section/Design Team Index Number Paragraph/Topic RFI Response 1 Is there a fee to park at the facility?See Addendum No. 1, Item 1. 2 Can you clarify stand down dates around reunion weekend?See Addendum No. 1, Item 2. Phi Gamma Delta (118 McGraw Place) The Oaks 21 Renovations - Project 1