Loading...
HomeMy WebLinkAbout05-09-18 Planning and Development Project Review Committee Meeting Agenda“An Equal Opportunity Employer with a commitment to workforce diversification.” 1 of 2 PLANNING & DEVELOPMENT BOARD Project Review & Design Review Committee REVISED NOTICE OF MEETING & AGENDA TO: City of Ithaca Project Review Committee (Planning & Development Board) FROM: Lisa Nicholas, Deputy Director of Planning and Development DATE: Revised May 8, 2018 (Original released May 3) SUBJECT: Agenda for Project Review Committee Meeting: WEDNESDAY, MAY 9TH, 2018 The Project Review Committee Meeting is scheduled to begin at 10:30 a.m. in the Third Floor Conference Room, City Hall, 108 E. Green St. Please call Anya Harris at 274-6550, if you cannot attend or you require additional information. 10:30 Project: Duplex Location: 207-209 First Street Applicant: David Barken for Barken Family Realty LLC. Anticipated Board Action(s) in May: Public Hearing, Determination of Environmental Significance, Recommendation to BZA Project Description: The applicant is proposing to build a duplex and install associated site improvements on the 12,609 SF (.3 acre) project site which comprises two tax parcels each containing one duplex. The project contains communal outdoor spaces including raised garden beds, exterior trash enclosures and walkways. Site development requires the removal of one mature tree. The current large parking area at the rear of 207 First will be converted to greenspace. The project requires two area variances: one for an existing side yard setback deficiency and the other to reduce parking by one space. This has been determined to be a Type II Action under the City of Ithaca Environmental Quality Review Ordinance (“CEQRO”) and the State Environmental Quality Review Act (“SEQRA”). However, because this action has been determined to have potential impacts to the surrounding neighborhood, it is being reviewed as an Unlisted Action. 10:50 Project: GreenStar Cooperative Market Location: 750 & 770 Cascadilla St Applicant: Noah Demarest for The Guthrie Clinic Anticipated Board Action(s) in May: Public Hearing, Determination of Environmental Significance Project Description: The applicant proposes to relocate GreenStar Cooperative Market from its current location at 701 West Buffalo Street to an existing 29,978 SF building on a 2.8 acre project site comprising two tax parcels at 750 & 770 Cascadilla Street. The site is currently occupied by two one-story concrete block structures, covering 37,615 SF and 29,978 SF. There is 17,543 SF of greenspace, and the remainder of the site is paved. The larger of the two buildings will be demolished to make way for a 160+/- car parking area, which will feature new landscaping and stormwater treatment systems. New greenspaces, entry and an outdoor café will be developed around the perimeter of the building. The building will be connected to Cascadilla Street by a new sidewalk along the east edge of the lot, and new sidewalks will be installed along the Cascadilla Street frontage to connect the site with the City sidewalk network. A timber structure along the street edge will incorporate signage and parking lot screening and create a defined street edge. The project in the waterfront Market District (MD). This has been determined to be a CITY OF ITHACA 108 E. Green St. — Third Floor Ithaca, NY 14850-5690 JoAnn Cornish, Director DEPARTMENT OF PLANNING, BUILDING, ZONING, & ECONOMIC DEVELOPMENT Division of Planning & Economic Development Planning & Development – 607-274-6550 Community Development/IURA – 607-274-6565 E-Mail: dgrunder@cityofithaca.org “An Equal Opportunity Employer with a commitment to workforce diversification.” 2 of 2 Type I Action under the City of Ithaca Environmental Quality Review Ordinance (“CEQRO”) §176-4 B.(1)(d) and the State Environmental Quality Review Act (“SEQRA”) § 617.4 (b)(10) and requires environmental review. 11:20 Project: Retail Expansion (3,200 SF) Location: 744 S Meadow St Applicant: James Boglioli for Benderson Development Corp Anticipated Board Action(s) in May: Determination of Environmental Significance, Preliminary & Final Approval Project Description: The applicant is proposing to build a 3,200 SF addition to western end of the existing 17,546 retail space. The project will require the removal of existing dumpster enclosure – which will be relocated to an expanded dumpster area behind the building to the south. The project includes the additions of two parking spaces to the existing lot. This is an Unlisted Action under the City of Ithaca Environmental Quality Review Ordinance and the State Environmental Quality Review Act and requires environmental review. 11:35 Project: Hilton Canopy Hotel Location: 115 Seneca Way Applicant: Whitham Planning and Design on behalf of Baywood Hotels Anticipated Board Action(s) in May: Cosideration of Project Changes and Site Plan Conditions Project Description: This project, the construction of a seven story hotel with 131 guest rooms, was approved on February 23, 2016. The applicant has submitted materials to satisfy conditions and is also requesting minor project changes. 11:50 Project: Signage- Tompkins Financial (Updated materials attached.) Location: 118 E. Seneca St Applicant: Tompkins Trust Company Anticipated Board Action(s) in May: Approval of Signage Project Description: This project was approved on 12-22-15. The applicant has submitted the proposed signage package for Baord review and approval. The proposal requires variances because it exceeded the allowable area (see varainces below). 12:10 Zoning Appeals:  #3094, 318-320 W Seneca St, Area Variance  #3095, 417 E. Lincoln St., Area Variance  #3096, 207-209 First St, Area Variance  #3097, 202 E Tompkins St, Area Variance  #3098, 118 E Seneca St, Sign Variance (Updated materials attached.) 12:30 Agenda Review for 05-22-18 12:35 Adjournment cc: Mayor Svante Myrick & Common Council Dr. Luvelle Brown, Superintendent, ICSD Jay Franklin, Tompkins County Assessment If you have a disability & would like specific accommodations to participate, please contact the City Clerk at 274-6570 by 12:00 p.m., no later than 2 days (not including weekends and holidays) before the meeting. Out of consideration for the health of other individuals, please try to refrain from using perfume/cologne and other scented personal care products at City of Ithaca meetings. Thank you for your cooperation and understanding. EXTERIOR SIGNAGE » NORTH ELEVATION BUILDING TOP SIGN » NORTH A.H. BAKERUPDATED BY: 01-24-18 SHOP & CONSTRUCTION DRAWINGS ITHACA SIGN WORKS 101 E. STATE STREET #136 ITHACA, NY 14850 PHONE: (607) 269-5428 AHB 01-17-18 THESE DRAWINGS CONTAIN INFORMATION DEEMED PROPRIETARY TO ITHACA SIGN WORKS, AND ARE TO BE USED ONLY FOR THE PURPOSE FOR WHICH THEY ARE SUBMITTED. THEY SHALL NOT BE COPIED IN WHOLE OR IN PART WITHOUT THE EXPRESS WRITTEN PERMISSION FIRST OBTAINED FROM ITHACA SIGN WORKS. TOMPKINS HQ (118 E. Seneca St.) TOMPKINS GREG E. WILDER COMPANY: CONTACT NAME: EXTERIOR SIGNAGE / NORTH ELEVATION BUILDING TOP SIGN » Lighted Dimensional Letters • “TOMPKINS FINANCIAL” + LOGO • 677.825” wide x 53.625“ tall x 3” depth • Low Voltage LED - illuminated faces and subtle white halo against wall • Stainless mounting hardware DATE DRAWN: ***Revised Drawing***DATE ARTWORK AUDITED BY*NORTH ELEVATION gl 5/2/2018 APPEAL # 3097 202 EAST TOMPKINS STREET Appeal of Bettsie Park for an Area Variance from Section 325-8, Column 11, Front Yard and Column 12, Other Front Yard requirements of zoning ordinance. The applicant proposes to reconfigure the interior of the two-family dwelling and demolish a one story addition on the rear of the building located at 202 E. Lincoln Street. As part of the proposal, the applicant proposes to construct a second story roofed entry deck, associated stairs, and landings for access to the second floor apartment. The property, located at 202 E. Lincoln, is on a corner lot and the entry stairs and landings will align with the existing façade along Utica Street. According to the zoning ordinance, corner lots must have front yards on both street-facing sides. The address side of the parcel is considered the Front Yard and the additional front is considered the Other Front Yard. The other front yard along Utica Street has an existing deficiency and constructing the entry, stairs, and landings exacerbates this deficiency. Currently, the building is 1’-6” from the other front yard property line and measures approximately 43 feet in length. With the landing and stairs, the length of the building footprint will increase to 53’, exacerbating the other front yard deficiency by an additional 8 feet in length. In the R2b zone, the ordinance requires a 10’ front yard setback. There is also an existing deficiency in the front yard facing Tompkins Street that will not be exacerbated by the proposal. The property is located in an R-2b residential use district in which the proposed use is permitted. However, Section 325-38 requires that an area variance be granted before a building permit is issued. CITY OF ITHACA Board of Zoning Appeals ― Notice of Appeal LEGENDTax ParcelsCity Owned PropertyHistoric DistrictAll Historic PropertiesCommonsFeaturesPolyBenchBernie Milton PavilionFire LaneFountainPlanterPlaygroundTree PitTrolley CircleParking Lots and GaragesBuildingsRailroadParcelBorderParkImpervious SurfacesPaved Walk or Surface or Private RoadPaved ParkingPaved Roadway or Public RoadUnpaved Drive or Walk or SurfaceWaterway2,5605/3/20181:Feet426.62Printed: