HomeMy WebLinkAbout1979 Finance Accounts Capital ImprovementsFinance,Accts.
Capital Imprv.
•
-1 -
Audit
By Comm. Banfield: Seconded by Comm. Ewanicki
RESOLVED, That bills audited. and approved by the Finance Committee as
listed on Abstract No. 1 of the General Fund accounts of the Department
of Public Works, and on Abstract No. 1 of the Water an Se er Division,
be approved for payment.
/ 7
IT IS FURTHER RESOLVED, That bills receivable be a proved and ordered
' rendered.
Carried Unanimously
Audit
By Comm. Banfield: Seconded by Comm. Ewanicki
RESOLVED, That bills audited and approved by the Finance Committee as
listed on Abstract No. 2 of the General Fund accountsof the Department
of Public Works, and on Abstract No. 2 of the Watej an Sewer Division,
be approved for payment.
.2V
IT IS FURTHER RESOLVED, That bills receivable be approved and ordered
rendered.
27
Carried Unanimously
Audit
By Comm. Walker: Seconded by Comm. Schickel
RESOLVED, That bills audited and approved by the Finance Committee as
listed on Abstract No. 3 of the General Fund accounts of the Department
of Public Works, and on Abstract No. 3 of the Water and Sewer Division,
be approved for payment.
IT IS FURTHER RESOLVED, That bills receivable be approved and ordered
rendered.
Carried Unanimously
Audit
By Comm. Walker: Seconded by Comm. Banfield
RESOLVED, That bills audited and approved by the Finance Committee, as
listed on Abstract No. 4 of the General Fund accounts of the Department
of Public Works, and on Abstract No. 4 of the Water and Sewer Division,
be approved for payment.
,J $// 7/
IT IS FURTHER RESOLVED, That bills receivable be approved and ordered
rendered.
Carried Unanimously
' Audit
By Comm. Walker: Seconded by Comm. Schickel
RESOLVED, That bills audited and approved by the Finance Committee as
listed on Abstract No. 5 of the General Fund accounts of the Department
of Public Works, and on Abstract No, 5 of the Water and Sewer Division,
be approved for payment.
3
//y/7/
IT IS FURTHER RESOLVED, That bills receivable be approved and ordered
rendered.
Carried Unanimously
Audit
By Comm. Walker: Seconded by Comm. Cleveland
RESOLVED, That bills audited and approved by the Finance Committee as listed
on Abstract No. 6 of the General Fund accounts of the Department of Public
Works, and on Abstract No.: 6 of the Water and Sewer Division, he approved
for payment. 31?S1f7y
IT IS FURTHER RESOLVED, That bills receivable be approvedand ordered
rendered.
Carried Unanimously
• Audit
By Comm. Walker: Seconded by Comm. Schickel
RESOLVED", That bills audited and approvedby the Finance Committee as
listed on Abstract No. 7 of the General Fund accounts of, theDepart-
i went of Public Works, and on Abstract No. 7 of the Water and .Sewer
' Division, be approved for payment. L1,1lll7��
IT IS FURTHER`RESOLVED, That bills receivable be approved and ordered
rendered.
Carried Unanimously
F Audit
By Comm. Walker: Seconded by Comm. Banfield
RESOLVED, That bills audited and approved by the Finance Committee as
listed on Abstract No. 8 of the General Fund accounts of the Department
of Public Works, and on Abstract No. 8 of the Water and Sewer Division,
be approved for payment. qVi?,
IT IS FURTHER RESOLVED, That bills receivable be approved and ordered
rendered.
Carried Unanimously
Audit
By Cornu. Walker: Seconded by Comm. Allan
RESOLVED, That bills audited and approved by the Finance Committee
as listed on Abstract No. 9 of the General Fund accounts of the
Department of Public Works, and on Abstract No. 9 of the Water and
Sewer Division, be approved for payment; and SIlI% I
BE IT FURTHER RESOLVED, That bills receivable be approved and
ordered rendered.
Carried Unanimously
—Audit
By Comm. Walker: Seconded by Comm. Banfield
RESOLVED, That bills audited and approved by the Finance Committee
as listed on Abstract No. 10 of the General Fund accounts of the
Department of Public Works, and on Abstract No. 10 of the Water and
Sewer Division, be approved for payment. qa3Py
IT IS FURTHER RESOLVED, That bills receivable be approved and ordered
rendered.
Carried Unanimously
-la -
Audit
By Comm. Walker: Seconded by Comm. Allan
RESOLVED, that bills audited and approved by the Finance Committee
as listed on Abstract No. 11 of the General Fund accounts of the
Department of Public Works, and on Abstract No. 11 of the Water
and Sewer Division, be approved for payment, and �I13'77
BE IT FURTHER RESOLVED, that bills receivable be approved and
ordered rendered.
Carried Unanimously
Audit
By Comm. Cleveland: Seconded by Comm. Ewanicki
RESOLVED, That bills audited and approved by the Finance Com-nittee,
as listed on Abstract No. 12 of the General Fund accounts of the
Department of Public Works, and on Abstract No. 12 of the Water and
Sewer Division, be approved for payment.
IT IS FURTHER RESOLVED, That bills receivable be approved and ordered
rendered.
Carried Unanimously
/. Audit
By Comm.. Walker: Seconded by Couuu. Allan 7l479
RESOLVED, that bills audited and approved by the Finance Committee
as listed on Abstract No. 13 of the General Fund accounts of the
Department of Public Works, and on Abstract No. 13 of the Water and
Sewer Division, be approved for payment.
Carried Unanimously
Audit
By Comm. Walker: Seconded by Comm. Schickel
RESOLVED, That bills audited and approved by the Finance Committees as
listed on Abstracts Nos. 14 and 15 of the General Fund accounts of the
Department of Public Works, and on Abstract Nos. 14 and 15 of the Water
and Sewer Division, be approved for payment. PAM
IT IS FURTHER RESOLVED, That bills receivable be approved/ and ordered
rendered.
Carried Unanimously
Audit •
By Comm. Walker: Seconded by Comm. Cleveland
RESOLVED, That bills audited and approved by the Finance Committee as
listed on Abstract No. 16 of the Water and Sewer Division, be approved
for payment.
2)Ak14-
I.T TS FURTHER RESOLVED, That bills receivable be approved and ordered
rendered.
Audit
Cafried Unanimously
By Comm. Walker: Seconded by Comm. Ewanicki
RESOLVED, That bills audited and approved by the Finance Committee as
listed on Abstract No. 17 of the General Fund accounts of the Depart-
ment of Public Works, and on Abstract No. 17 of the Water and Sewer
Division, be approved for payment.
Vilg17/
IT IS FURTHER RESOLVED, That bills receivable be approved and ordered
rendered.
Carried Unanimously
Audit
By Comm. Walker: Seconded by Comm. Allan
RESOLVED, That bills audited and approved by the Finance Committee as
listed on Abstract No. 18 of th.e General Fund accounts of the Department
of Public Works, and on Abstract No. 18 of the Water and Sewer Division,
be approved for payment.
Lim/7y
IT IS FURTHER RESOLVED, That bills receivable be approved and ordered
rendered.
Carried Unanimously
Audit N o . .C9 /0/1-67
By Comm. Walker: Seconded by Comm. Allan
RESOLVED, That bills audited and approved by the Finance Committee as
listed on Abstract No. 19 of the General Fund accounts of the Department
of Public Works and on Abstract No. 19 of the Water and Sewer Division,
be approved for. payment.
IT IS FURTHER RESOLVED, That bills receivable be approved and ordered
rendered.
Carried Unanimously
Audit No. 20
By Comm. Walker: Seconded by Comm. Cleveland
RESOLVED, That bills audited and. approved by the Finance Committee as
listed on Abstract No. 20 of th.e General Fund accounts of th.e Department
of Public Works and on Abstract No. 20 of the Water and Sewer Division
be approved for payment; /0M/7J
IT TS FURTHER RESOLVED, That bills receivable be approved and ordered
rendered-.
Carried Unanimously
=Audit
By Comm. Walker: Seconded by Comm. Cleveland
RESOLVED, That bills audited and approved by the Finance Committee,
as listed on Abstract No. 21 of the`General Fund accounts of the
Department of Public Works and on Abstract No. 21 of the Water and
Sewer Division, be approved for payment.
41077
IT IS FURTHER RESOLVED, That bills receivable_ be approved and ordered
rendered. Carried Unanimously
Audit
By Comm. Walker: Secondedby
and approved evelandthe Finance CommitteeRESOLVED, That bills audited
as listed on Abstract NTks22and on the
AbstractNond22accounts
the Waterand the Department of Public Wo _
Sewer Fund, be approved for payment. #0471
IT IS FURTHER RESOLVED, That bills receivable be approved and ordered
rendered. Carried Unanimously
•
•
-ib-
Audit
By Comm. Walker: Seconded by Comm. Schickel
RESOLVED, That bills audited and approved by the Finance Committee as
listed on Abstract No. 23 of the General Fund accounts of the Depart-
ment of Public Works and on Abstract No. 23 of the Water and Sewer
Fund, be approved for payment. >'41`//1
IT IS FURTHER RESOLVED, That bills receivable be approved and ordered
rendered.
Carried Unanimously
Audit
By Comm. Walker: Seconded by Comm. Maclnnes.
RESOLVED, That bills audited and approved by the Finance Committee, as
listed on Abstract No. 24 of the General Fund accounts of the Department
of Public Works, and. on Abstract No. 24 of the Water and Sewer Division,
be approved for payment. /2 2_ /,7%
IT TS FURTHER RESOLVED, That the Bills Receivable be approved and
ordered rendered. Carried Unanimously
•
•
-2 -
Bill --Donald Spanier Comm. Banfield
By Comm. Walker: Seconded by
through. January- 15,e 1979, be
SOLVED, That a bill from Donald Spanier Associates for services in
•
RE productivity project ��' connection with the p /l'�
approved in the amount of $6,250. a/�//
Discussion followed on the floor.
A vote on the resolution resulted as follows: Carried Unarii7nously.
•
Donald Spanier. Request for Extension of •Time
Cowin. Walker reported that Donald Spanier, productivity consultant,
has requested extension of the time for completion of his pro-
ductivity project to July 13, 1979. A copy of his letter was sent.
to Board members.
Resolution
By Comm. Walker: Seconded by Comm. Cleveland
RESOLVED, that the request of Donald Spanier for an extension of
time be approved.
Carried Unanimously
Bill froni Donald Spanier Associates
By Comm. Walker: Seconded by Comm. Cleveland
RESOLVED, That a bill from Donald Spanier Associates for services
rendered in connection with the Productivity Project through July 12,
1979 be approved in the amount of $4,575
Discussion followed on the floor.
A vote on the resolution resulted as follows:
Carried Unanimously
Request for Payment (Final) - Spanier Associates.
,By Comm. Walker: Seconded by Comm. Cleveland
RESOLVED, That. the Board of Public Works accept the work of Donald
Spanier Associates as completing the requirements of the agreement
'between Spanier and the City of Ithaca for a productivity project and
declare theproject complete. i014\11
'IT IS FURTHER RESOLVED, That a final bill of Spanier Associates in the
amount of $4,300 be approved for payment. Carried Unanimously.
-3-
Recommendations of Mayor 4//r1
Manor Conley infoLuied the Board that he had presented his recommenda-
tions to the Budget and Administration Committee with respect to
tightening the budget gap. In that recommendation are some things
which affect the Board of Public Works. At his request, Supt. Dingman
outlined to the Board how the department will be affected. Mayor
Conley indicated his desire to go over the recommendations of the
Spanier Report with the Board to determine ways and means of cutting
expenses in the department.
-4-
CapitalProjects 'for 1980
By Comm. Walker: Seconded by Comm. Ewanicki
RESOLVED, That the following list of Capital Projects for 1980 be
approved for submission to the Capital Program Committee:
Elmira Road Utilities Relocation
East State Street Resurfacing
400 Block to City Line
Parking Lot "E"
East Clinton Street Bridge
Strengthening
East Aurora Street Widening
from Morse Chain entrance
to the City Line
This should be reauthorized
for 1980. The total cost is
approximately $200,000.
This is a major resurfacing
project. It should be
planned in 1979. Its con-
struction staged over 1980
and 1981.
Estimated at $50,000 in 1978.
Ready for construction in 1980.
No estimate: Can be designed
in '1979. Constructed in 1980.
No estimate. 1979 design -
1980 construction.
Elm Street Widening and Drainage
from West Village Drive to City
Hector Street Storm Sewer
Maple -Dryden -Ithaca Road,
Oak Avenue, Cornell Street
Intersection Improvement
Floral Avenue Reconstruction
City Hall Parking Lot
Handicapped Access to City
Buildings
Automation of Fall Creek
Pumping Station "B"
(West York Street)
Discussion followed on the floor.
No estimate. 1979 design -
1980 construction.
1979 design - 1980 construction.
1979 design - 1980 construction.
- No estimate. 1980 design - 1981
construction.
- 1980 construction. Approxi-
mately $35,000.
- 1979 design - 1980. construction.
- 1979 construction - $30,000.
5)1(11
A vote on the resolution resulted as
follows:
Carried Unanimously
-5-
Close-out of Capital Account
By Comm. Allan: Seconded by Comm. Schickel 00/9
RESOLVED, That the Common Council be requested to close out Capital
Account #H890-69 1976 Flood Control and return the money in the account
to the Water Fund surplus.
Carried Unanimously
•
•
-6-
Disposal of Vehicles
By Comm. Ewanicki: Seconded by Comm. Walker
RESOLVED, That the Superintendent be authorized t
following vehicles as junk:
Equipment
tT
11
#238 -
#297 -
# 40 -
dispose of
01/2V
sedan transferred from Police Dept.
sedan transferred from Police Dept.
boom truck purchased in 1954
Carried Unanimously
the
in 1978
in 1976
•
•
-7-
1980 Budget
.Comm. Walker reported that he had received
Budget Request for 1980.
Resolution
By Comm. Walker: Seconded by Comm. Ewanicki
RESOLVED, That the Preliminary 1980 Budget Request be referred to the
Finance Committee for review.
Carried Unanimously
a copy of the Superintendent's
9/gM
1980 Public Works Budget
Comm. Walker reported tfiat the Budget & Administration Committee of
the Common Council has scheduled a review of the General. Fund portion
of the Department of Public Works 1980 budget for 7:00 P.M., Tuesday,
December 4, in the Common Council Chambers. Staff members Cox, Lynch
and Dougherty will be present to discuss their respective portions of
the budget. The Finance Committee in particular and all of the Board
members are urged to be present at this meeting to take part in the
discussion of the revised 1980 budget proposals of the department. A
copy of these will be in your hands as soon as they have been compiled
Department of Public Works 1980 Budget Requests )yl��
By Comm. Walker: Seconded by Comm. Schickel 17I
RESOLVED, That a document entitled, "Department of Public Works 1980
Budget Requests, Revised to November 1979" be adopted by this Board
and be recommended to the Common Council for incorporation in the
1980 General Fund.budget. The abo
documents entitled "Summary, Board
ments to the Superintendent's 1980
12, 1979, pages 1 and 2.
ve document is revised by the attached
of Public Works Recommended Adjust -
Budget Requests", dated December
Carried Unanimously
198-0 Budget
Comm. Schickel complimented Conan.
regard to cutting the budget. He
to reconauend to Council that they
budget with. all the other departmen
gal/09
Walker for the job he has done in
also commented that he. would like
share the burden ofbalancing the
is
•
•
-8-
-Bonds for Elmira Road /009
Mayor Conley reported that 9 bids had been received for bonding of the
Elmira Road improvements and the city had been able to borrow the money
at 6.6 percent interest rate because of their excellent credit rating.
Transfer of Funds
By
By Comm. Walker: Seconded by Comm. Maclnnes
RESOLVED, That the Common Council be requested to transfer $3,500 from
Line 230 of Account No. A5120 to Line 250 of Account No. A3311. The
purpose of the transfer is to provide additional funds for the purchase
of a line painter. Funds being transferred are part of those originally
provided for the purchase of a crew cab pickup truck which purchase will
now be deferred to be considered in the 1980 budget.
Carried Unanimously
•
-10-
Letter from Albert G. Morgan /0%'f/7y
Mayor Conley acknowledged receipt of a letter from Albert G. Morgan
concerning the recommendations of the Spanier Report. Because copies
of the letter had been distributed to the Board members, it was decided
to deal with it later in the agenda when reviewing the Spanier Report.
—Superintendent's Recommendations with Respect to Productivity Report,
Budget "and Staffing for 1980
By Comm. Walker: Seconded by Comm. Allan
RESOLVED, That the Superintendent's ''Comments and Recommendations on
the Productivity Project" dated October 24, 1979, conducted for the
Board of Public Works by Spanier Associates in 1978 and 1979, be adopted
tentatively as the basis for departmental budgeting for 1980;
IT IS FURTHER RESOLVED, That reductions in staff in the various divisions
of the department be accomplished by the action of retirement and,
tranfer;
IT IS FURTHER RESOLVED, That the interim and final status reports of the
Spanier project be filed with the City Clerk and made a matter of
public record.
Addendum 't'o Resolution
In order to monitor the implementation of the recommendation regarding
the•Spanier Report, the Board requests the following reporting procedure
be followed by the Department staff:
1. Division Heads will prepare concise bi-monthly reports that compare:
a, Work outlined in the Spanier report for that eight-week period,
b. Work planned by the division for the same period,
c. Work achieved in that time, including the number of overtime
hours needed for it.
/v,/ (77
The Board requests that these reports be submitted to the Commissioners,
in writing, no later than two weeks after the end of the eight --week
period in question. It is the intention of the Board to work with the
Superintendent and Division Heads toward the establishment of fair and more
accurate measures of accomplishment in the department.
2. Division Heads will prepare brief quarterly reports on their success
in implementing the revised departmental work rules and foreman -duties
policy. The rules and policies referred to are those distributed to
foremen and Division Heads on September 21, 1978, and to workers on
October 4, 1978. The quarterly reports should contain clear explanations
of any difficulties encountered in, as well as progress toward, the full
implementation of these work practices. The reports are to be submitted
as above, within two weeks of the end of the quarter. "
The Board further asks that the first bi-monthly report be due on March
15, 1980, and the first quarterly report on April 15, 1980. The Board
feels that; having these reports in hand by the required date is
necessary for it to properly conduct its business, and will interpret
failure to submit adequate reports as constituting insubordination.
It is the intended policy of this board to effect planned reductions in
staffing through transfer and attrition wherever at all possible.. The
Board supports the Superintendent in this regard, and urges the coopera-
tion of the unions involved to carry out this policy. Further, the
Board urges that the reductions be achieved in the first six months of the
coming year, as proof of the serious cooperation of all parties involved.
Finally, since the Board has been engaged in an examination of the
productivity of the Department for -the past eighteen months, it asks
Common Council to view its recommendations as to how and where tax dollars
can be saved with due consideration.
Discussion followed on the floor.
X01) -I-71
Alderman Bordoni objected to copies of the complete resolution not being
attached to the agenda.
Asst. to Supt. Dougherty asked to go on record as opposing the recom-
mendations for staffing his division by both Supt. Dingman and Mr. Spanier
Mayor. Conley referred to a letter from Albert Morgan, opposing recom-
mendations made concerning his division.
Asst. Supt. Hannan :commented .that he was opposed to destruction of the
city's construction capabilities as a means of cutting the payroll, and
that cutbacks by means of attritioncannot be done in the immediate future.
A vote on the resolution resulted as follows:
Carried Unanimously
Mayor Conley voted Aye also.
A copy of the Comments and Recommendations on the Productivity Project
is attached to the Minute Book,
Superintendent of Public Works
Supt. Dingman reported that he had prepared a "Proposed 1980 Complement
of Employees" (under date of November 6, 1979) which is based on the
productivity report and his recommendations which the Board adopted
on October 24. This complement calls for a reduction of nine full-
time positions from the presently employed 163 in the entire depart-
ment. As he has said on previous occasions, it is not his intention
to propose lay-offs, but rather to refrain from hiring additional
personnel anywhere in the department until they have reduced the
forces to the 154 scheduled in this document.
Supt.. Dingman recommended that the Board adopt the "Proposed 1980
Complement of Employees"(dated November 6, 1979) as the basis for
budgeting and staffing of the department.
::Dis.cussion -followed .on the_f.ioor
Resolutionk14/1
By Comm. Ewanicki: Seconded by Comm. Allan
RESOLVED, r:JThat--the. "Proposed :1980 :C ft emen:t. sof Employees" be' tabled'°
_until the next meeting of the Board. .
Carried Unanimously
•
-10a -
Roster of Employees
By Comm. Walker: Seconded by Comm. Schickel
RESOLVED, That the attached roster of calls Proposeda1980
.Complement of Employees" datedDecember 10,
total of 153 emplo ees, be approved.
IT IS FURTHER RECOMMENDED, That the staffing of the General Fund
employees on the roster be reduced
can bethe
accomplishedauthorized leinlcompliance
nuary.
1, 1980, or as soon .thereafter
with Civil Service law and/or labor contracts.
Discussion followed on the floor.
A vote on the resolution resulted as follows:
Caried Unanimously
Mayor Conley also voted Aye on the resolution.
•
•
-11-
Superintendent's Report
Freeze on Purchases ;4011
Supt. Dingman reported that the Comilion Council, at its December 7
meeting, apparently confirmed the action of Acting Mayor Gutenberger
in freezing the purchase of any new equipment that had been budgeted
for 1979. Consequently, any items of equipment which were budgeted
by the department for 1979 and have not been bought, will not be
purchased.
Audit 1
Spanier Associates - bill for Productivity Project 2
Budget -Mayor's recommendations presented to B/A Committee 3
Funds for automation West York St. Pumping Station (See W/S - pg. 6)
Capital Projects for 1980 approved for submission to Capital Program Committee 4
Establishment Capital Project -West York St. Pumping Station (See W/S - pg. 6)
Parking Study - Removal of Meters - Financia), Aspects (downtown)
(See Parking/Traffic - pg. 10)
Establishment Capital Project -Improvement E.Clinton St. Bridge (See C/B - pg.5)
Stewart Park Duck Pond -Establishment Capital Project - Increase to capital
(See Parks - pg 2)
Capital Account - Closeout - 1976 Flood Control 5
Transfer of Funds -Amendment to Bus Operation Equipment List (See Transit-pg.6)
Cayuga Sertoma Club -Cass Park -Bill for services at baseball tournament,
Discussion for recommendation of City policy on fee charges for
services and outside events (See Parks - pg. 14)
Authorization to dispose of vehicles as junk 6
1980 Budget - Requests referred for review .7
GIAC Fire Repairs -Establishment Capital Project request (See B&G pg. 19)
Bonding Elmira Rd. - Bids received -good credit rating 8
Transfer of funds - to provide funds for purchase of line painter 9
Spanier Productivity Report -Supt. recommendations re Budget & Staffing and
BPW Resolution for bi-monthly reports and quarterly reports 10
Supt.DPW recomendations for adoption "Proposed 1980 Complement of Employees" 1V
Freeze on Purchases budgeted for 1979 11
Possible lay-off personnel DPW - part-time employee (See Personnel pg. 10-11)