Loading...
HomeMy WebLinkAbout1979 Bridges Creeks Storm DrainageBridges ,Creeks, Stnr. m nra i nava -1- •Requisition #2 - Finger Lakes Construction Company By Comm. Ewanicki: Seconded by Comm. Allan RESOLVED, That requisition #2 of Finger Lakes Construction Company for construction services in connection with the Fall Creek subdrainage system, be approved in the amount of $75,031.92. Discussion followed on the floor. / 72,//7 A vote on the resolution resulted as follows: • Carried Unanimously Bill --Finger Lakes Construction Company By Comm. Banfield: Seconded by Comm._ Schickel_.f_.__.._____._.___. RESOLVED, That bill #3 from Finger Lakes Construction Company in connection with subsurface drainage system along Fall C eek, in the • �� amount of $27,109.46, be approved. � Carried Unanimously Requisition #4 --Finger Lakes Construction Co. By Comm. Banfield: Seconded by Comm. Ewanicki RESOLVED, That Requisition #4 in the contract of Finge Lakes Construction Company for Fall Creek subdrainage, be approved in the amount of $16,778.84. Carried Unanimously Bill Finger Lakes Construction Company By Comm. Banfield: Seconded by Comm. Schickel 61A3/7(/ RESOLVED, That a final bill for the retainage due the Finger Lakes Construction Company in connection with the Fall Creek drainage system project be approved in the amount of $3,000. Carried Unanimously Change Order Tl --Finger Lakes Construction Co. j Ry- Comm. Banfield: Ch : SeOCrderd#1 in the contract of m. Allan )Finlg er Lakes Construction RESOLVED, That Change r Company for field construction changes in the Fall Creek subdrainage system, be approved in the amount°of add $10,282.77. These changes are shown on the attached sheet. Carried Unanimously • • -2- Invoice--Erdman, Anthony Associates By Comm. Banfield: Seconded by Comm. Ewanicki. RESOLVED, That an invoice from Erdman, Anthony Associates services in connection with the Fall Creek subdrai.n, beta amount of $1,506.17. Carried Urfa for professional proved in the nimoc usly Bill--Modjeski & Masters Comm. Allan By Comm. Banfield: Seconded by RESOLVED, That a bill from Modjeski & Masters for engineering services 0 in connection with the design and specification for th. A bang Street Bridge, be approved in the amount of $3,454.00. •2 /yy! pp Carrie Dnanimously -4- Shopping Carts in Creeks Comm. Cleveland proposed that the Common Council be requested to draft some foLul of legislation that would require the supermarkets to assume responsibility for taking the shopping carts out of the creeks or for reimbursing the City for cleaning the creeks of the shopping carts. ////1, Alderman Bordoni agreed to refer the recommendation to the Council. 4110 -5 - East Clinton Street Bridge By Comm. Allan: Seconded by Comm. Ewanicki RESOLVED, That the Common Council be requested to establish a capital fund for the improvement of the East Clinton Street Bridge over Six Mile Creek in the amount of $12,000. Discussion followed on the floor. A vote on the resolution resulted as follows: 0/77 Carried Unanimously Agreement with Modjeski & Masters - Professional Services By Comm. Allan: Seconded by Cc3m] . Ewanicki V3k7RESOLVED, That contingent on the above action by the Common Cocil, the Superintendent be authorized to enter into an agreement with Modjeski & Masters for professional services for the design of the rehabilitation of the East Clinton Street Bridge over Six Mile Creek; the terms of the agreement to be materially the same as covered in the June 11, 1979 letter from Modjeski & Masters to the Superintendent. Carried Unanimously —Bill from Modjeski & Masters J� ) 7q By Comm. Macinnes: Seconded by Coutut. Ewanicki I RESOLVED, That a bill. from Modjeski & Masters for engineering services.; in the preparation of plans and specifications for the rehabilitation of the East Clinton Street Bridge over Six Mile Creek be approved in the amount of $4,089.54. Carried Unanimously Drainage Area Alderman Bordoni reported on the problem of drainage in the low area between Elmira and Spencer Roads, and also on the poor condition of the railroad bed on the upper side of the road. Discussion followed on the floor. • • i* 9 -7- Approach to Foot Bridge=-Cascadilla Creek at Adams Street A derman Bordoni called attention to the approaches to the foot bridge at Adams Street over Cascadilla Creek, commenting that the elderly have a problem using the bridge because of the steepness and the absence of a handrail. In addition, children have been jumping their bicycles from the bridge, creating a safety problem. He suggested that the Board study the possibility of erecting an L-shaped handrail on the approaches to the bridge to aid the elderly, and prevent the children from jumping their bicycles. Discussion followed on the floor. Resolution By Coll'. Walker; Seconded by Comm. RESOLVED, that the item of concern bridge at Adams Street be referred • Cleveland over the approaches to the foot to the Creeks and Bridges Committee. Carried Unanimously Finger Lakes Constr. - request for payment - Fall Creek subdrainage system 1 Erdman, Anthony Associates - request for payment - Fall Creek subdrain 2 Modjeski & Masters - request for payment - Albany Street Bridge 3 Cleaning creeks of Shopping Carts - Request for legislation 4 E. Clinton St. Bridge - Establishment Capital Project and Agreement with Modjeski & masters for rehabilitation of Bridge; -Request for payment 5 Drainage problems - Elmira Rd./Spencer Rd. area Adams St. - Concern re approaches to Foot Bridge & erection of handrail • 6 7