HomeMy WebLinkAbout1978 Bidsr•
1
Bias or Agricultural Tractor
:mum. Schickel reported that bids were received for supplying one agricultural
tractor as follows: Z/e7/
Dryden Lawn & Recreation Corp.
T & J Simplicity Sales $ Service
$3,740.00 net
$3,159.77 net
Resolution
RESOLVED, That the contract for supplying one agricultural tractor in accordance
with the specifications of January 18, 1978, be awarded to T F J Simplicity
Sales & Service for their low net bid of $3,159.77.
Carried Unanimously
•
2
Bid's. on Equipment
By Comm. Shaw; Seconded by Comm. Ewanicki.
RESOLVED, That the Superintendent be authorized to receive l ids on the
following pieces of equipment;
3 2 1/2,ton cab and chassis
2 2 1/2 -ton dump trucks
1 3/4 -ton pickup
1 1/2 -ton pickup
1 agricultural tractor
1 suburban
1 packer unit
1 compressor
Purchase of Motor Vehicle Equipment
Comm. Shaw reported that bids were received on Monday, March 13, 1978
for the purchase of motor equipment for the Construction and Maintenance
Division,.
Resolution -7/7 7
RESOLVED, That the contract for supplying three 2 1/2 ton cab and chassis
replacing vehicles #179, #285 and #288, in accordance with the specifica-
tions of February 13, 1978, be awarded to Spencer Ford Sales, Inc. for
their low total bid of $22,643.33. •
Carried Unani nouslr
'Bids for Motor Vehicle Equipment
Comm. Shaw reported that bids were received on Monday, March. 6, 1978 for
motor vehicle equipment, including two 2-1/2 ton dump trucks and one
.suburban for the Water and Sewer Division.
Resolution .3/6/7
By Comm. Shaw: Seconded by Comm. Allan
RESOLVED, That the contract for supplying two 2-1/2 ton dump trucks
replacing vehicles #17 and #167, in accordance with the specifications
of February 13, 1978, be awarded to Spencer Ford Sales, Inc. for their
low total bid of $19,006.42.
Carried Unanimously
Contract for Pick-up
By Comm. Shaw: Seconded by Comm. Schickel
RESOLVED, That the contract for supplying one 3/4 ton pick-up replacing
vehicle #6, in accordance with the specifications of February 13 1978,
beawarded to Cayuga Ford, Inc. for their low bid of $6,534.3/9 77
__carried Unanimo% ly
Czrrind Hnanimnlic_l,r
Contract for One Suburban
'By Comm. Shaw: Seconded by Comm. Allan .3,/,/-7)7
RESOLVED, That the contract for supplying one suburban replacing vehicle
#304, in accordance with the specifications dated February 13, 1978, be
awarded to Bill Zakakis Chevrolet, Inc. for their low bid of $5,321.
Carried Unanimously
Purchase of 1/2 ton Pick-up
By Comm. Schickel: Seconded by Comm. Allan
RESOLVED, That the contract for supplying a 1/2 ton pick-up in accordance
• with the specifications of February 13, 1978 be awarded to Cayuga Ford
for their low bid of $4,096. ./� 7,
Carried 'U animous ly
Rehabilitation of 213 S. Plain Street
By Comm. Whispell: Seconded by Comm. Shaw
RESOLVED, That the Superintendent be authorized to receive bids on the re-
habilitation of 213 S. Plain Street in accordance with plans, specifications
and bidding documents prepared by Robert Boehlecke, AIA.
Robert Boehlecke, architect hired by the Ithaca Urban Renewal Agency to draw
up plans and specifications, gave a brief explanation of the project to the
Board,
////7
A vote on the resolution resulted as follows:
Ayes C4) - Cleveland, Shaw, Ewanicki, Allan
Nay (1) - Whispell
Mayor Conley voted Aye.
Carried
Bids for Rehabilitation of 213 S. Plain Street
Comm. Schickel reported. that bids were received for the rehabilitation of 213
S. Plain Street. Architect Boehlecke has recommended the following award:
Resolution Z/r/7/
RESOLVED, That the contract for rehabilitating 213 S. Plain Street in
accordance with the plans and specifications advertised January 17, 1978 be
awarded to McCarthy Builders for their low base bid of $24,990, accepting
alternate #4 (Siding).
Carried Unanimously
•
4
Bids for Bus Shelters
Comm. Cleveland reported that bids were received for supplying 16 bus
shelters in accordance with the specifications, of December 5, 1977 and the
addendum of December 14, 1977, as follows:
1. Community Bus Shelters, Inc. $21,650
2. Handi-Hut, Inc. 23,855
3. Columbia Equipment Company, Inc. 24,633
4. Hires Turner Glass Company 38,000
Community Bus Shelters, Inc. had not received the addendum of December 14,
1977, which provided for wind screens, prior to opening of bidding. Inquiry
indicated that their additional charge for the wind screens would be $2,050,
making a total net bid of $23,700.
Resolution
By Comm, Cleveland: Seconded by Comm. Schickel
RESOLVED, That the contract for supplying 16 bus shelters in accordance with
the specifications dated December 5, 1977 and the addendum of December 14, 1977,
be awarded to Community Bus Shelters, Inc. for their bjd price. of $.23, 700.
Carried Una.nzmous.�y
IIP
J
•
Bus Shelters -Central Business District
City Engineer Cox reported the contractor on this project is now ready
for final inspection, after which the shelters can be put into;ope.ra-
tion . //opfl
Pr' 5
Bids for Site Improvements at Hangar Theater _
By Comm. Schickel: Seconded by Comm. Whispell i Zs /7/v
RESOLVED, That thep Superintendent be authorized to receive bids for site
improvements at the Hangar Theater in connection with plans prepared by
41) T. G. Miller and specifications developed by the Engineering Division,
Carried Unanimously
•
Hangar Theater Site Improvements
Comm. Schickel reported that bids were received for site improvements at
the Hangar Theater.
Resolution
By Comm. Schickel: Seconded by Comm. Cleveland
RESOLVED, That because these bids exceed the original appropriation of
$26,100, the bids be referred to the Buildings E Grounds Committee for
review and recommendation.
Discussion followed on the floor.
Commissioners Schickel and Cleveland withdrew the original resolution.
LF)R5-17
Resolution
By Comm. Schickel: Seconded by Comm. Allan
RESOLVED, That the bids be rejected and the City Clerk be directed to I,
return the bid bonds; �(((�j1�
BE IT FURTHER RESOLVED, That Supt. Dingman be authorized to request bids
on site work at the Hangar Theater on a project offered in such a way that
there is some hope of bids coming within the amount of funds recommended.
Carried Unanimously
Bids - Hangar Site Improvements
Comm. Schickel reported that two bids were received for the
Hangar Site Improvements.
Discussion followed on the floor.
Resolution
By Comm. Schickel: Seconded by Cow'''. Ewanicki
RESOLVED, That the contract for construction of the Hangar Theater
Site improvements be awarded to Cortland Paving Company for their
low base bid of $22,685.
Carried Unanimously
6
Medical Equipment Bids
Comm. Schickel reported that bids were received on February 17, 1978 for
medical equipment for the Family Medicine Center.
Resolution /7//
By Comm. Schickel: Seconded by Comm. Shaw
RESOLVED, That the bid of American Hospital Supply be rejected because
it is incomplete.
RESOLVED, That the bid of Paine Hospital Supply be rejected because
several items do not meet specification.
BE IT FURTHER RESOLVED, That the contract for supplying medical equipment
in accordance with the specification of January 31, 1.978 be awarded to
Kelley Surgical Company, the lowest bidder meeting the specification.
In awarding this bid, two each of items 2, 3, 4, 5, 10 and 12 and all of
items 9, 14 and 17 are eliminated so that the ced ontractUprice
is $9,65C.34.
Requisition - Kelly Surgical ComJJ any,.Inc.
By Comm. Schickel: Seconded by Comm. Cleveland
RESOLVED, That requisition from Kelly Surgical Company, Inc. formwork
performed at the Family Medicine Center be approved in the amount of
S72.7/7 $7,426.69. �
Carried Unanimously
7
Family Medicine Center Furniture Bids 2 az.7r
Comm. Schickel reported that bids for the /fu -nitur for
ndaeiFamilY Medicine
e
Center were received on February 17 and an oral i
at this meeting.
1 Family Medicine Center Medical Equipment Bids
Comm. Schickel reported that bids for the medical equipment for the Family
Medicine Center were received on February 17 and an oral recommendation will
be made at this meeting. 2712/7
City Engineer Cox reported that the combined bids on furniture brought the
cost over the budget for the items. With that in mind the architect has
recommended going with the low bidder. The hopsital staff has agreed they
could do without furnishings for what is termed the "employee's lounge," and
would recommend eliminating 1 each of items A, B, D and E, and bring the
total down to $3,702.20 for the low bidder. Mr. Cox recommended awarding
the bid to Benche, Inc. of Syracuse, N.Y. who are willing to place the order
that way
Completion date, according.to Mr. Cox, has been extended to April 21, 1978.
•
Resolution
By Comm. Schickel: Seconded by Comm. Allan
RESOLVED, That the bid for the furniture for the Family Medicine Center be
awarded to Benche, Inc. of Syracuse, N.Y. for the low bid of $3,702.20,
eliminating Items 1 each A, B, D and E.
Carried Unanimously
Regarding bids for medical equipment, Mr. Cox reported that hospital staff
are canvassing the bids, thus a recommendation is not ready for action but
hopefully it will be ready for the next meeting of the Board.
8
•
Bids on Landscaping for Elmira Road
By Comm. Schickel; Seconded by Comm, Ewanicki
RESOLVED, That the Superintendent be authorized to take bids on landscaping
for Elmira Road in accordance with plans and specifications prepared by Barton,
Brown, Clyde $ Loguidice. 2/.c/7.6e
•
•
Bids - Landscaping of Elmira Road
Comm. Shaw reported that bids were received on March 3 for landscaping
of Elmira Road. Village Greenhouse of Trumansburg, the low bidder, has
withdrawn its bid and forfeited its deposit.
Resolution MeA_fc)n 10l1S
By Comm, Shaw: Seconded by Comm. Schickel
RESOLVED, That the contract for planting trees andshrubson Elmira Road
in accordance with the plans and specifications be awarded to Bradley
Landscaping Service for their low total bid of $41,285.53.
Carried Unanimously
Low Bidder - Elmira Road Plantings
Mayor Conley reported that the low bidder for the Elmira Road plantings
withdrew his bid because he felt the water table is too high and he could
not guarantee the trees. According to some of the aldermen, the bidder
was inquiring about the possibility of receiving back his bid bond.
Supt. Dingman confirmed that the low bidder has been notified by the City
that he forfeits his bid bond. He also reported that the bidder has not
requested the Board of Public Works to consider the matter at all.
Alderman Boothroyd reported the bidder could not come before the Board
today because he had to go out of town.
It was decided the Board would wait in the event the person would want:
to come before the Board at its next meeting. y,M/70
David Allen, Village Greenhouse, addressed the Board, requesting the
return of bid security for Elmira Road Landscaping in the amount of
$1,955.88. The Village Greenhouse, low bidder for tree planting on
the project, withdrew their bid due to possible unfavorable growing
conditions for certain trees specified in the specifications..`47%7r
Request of Village Greenhouse for return of bid security for bid on
Elmira Road landscaping
By Comm. Shaw: Seconded by Comm. Schickel
RESOLVED, That the request of Village Greenhouse for return of bid
security for bid on Elmira Road landscaping be denied.
Discussion followed on the floor.
A vote on the resolution resulted as follows:
Ayes (3) - Cleveland, Schickel, Shaw
Nays (2) - Whispell, Ewanicki
Absent (1) - Allan
Carried
•
9
Peri heral Streets
By Comm. Shaw: Seconded by Comm. Schickel
RESOLVED, That the Superintendent be autSorizedtroerecei
l00bids
on the
f
reconstruction of the 100 block of West
South Cayuga Street and the 100 block of North
.Ca`ugaStreet in accordance
,with plans and specifications prepared by rt
ner.147
I
Discussion followed on the floor.
A vote on the resolution resulted as follows:
Carried Unanimously
.Award of Bids - Peripheral Streets
Supt. Dingman explained that as a result of the bidding on the peripheral
streets, V. Giordano Construction Co. submitted the low bid. However, it
was found that the compilation of the bid was in error and the consulting
architect, Mr. Egner, was asked to make recommendation. After correcting
the compilation of the bid, Mr. Giordano was still the lowest bidder. The
architect recommended, subject to the approval of the City Attorney concern-
ing legalities, and subject to a formal letter from Giordano Construction
Company stating he has made these errors and this is the bid he intended
to make, the bid be awarded to Giordano Construction Company for low bid of
$416,323.94. Further, option of an alternate for making sidewalks all
instead of concrete with brick edge should be reserved until next
,brick
,neeting.
Discussion followed on the floor.
Resolution
By Comm. Shaw: Seconded by Comm. Whispell
RESOLVED, That the Board authorize acceptance of the base bid being awarded
to the low bidder, Giordano Construction Company, at the revised figure of
$416,323.94, subject to verification in writing by Giordano Construction
Company of the revised bid and subject to approval of the City Attorney
concerning legalities.
After further discussion, a vote on the resolution resulted as follows:
Ayes (3) - Shaw, Whispell, Allan
Nays C1) - Schickel
rAmiOn tea` \aC14
Carried
rBid - Peripheral Streets
Comm. Schickel reported that two weeks ago the Board voted to .award the
Peripheral Streets contract to Giordano Construction Co. with some re-
vision of his bid. He said that apparently there were other people beside
himself who didn't feel that was a good way to handle it, because there is
a move afoot in the Common Council to direct the Board to rebid the whole
project. Mr. Schickel felt that rebidding it would be -unfair to the other
bidders, especially to the second place bidder, and he felt it very likely
unfair to the taxpayers who are going to pay for the project. He proposed
that the Board award the bid to Giordano Construction for the amount of
his original bid with the item in question, No. 2, brick pavers, to be at
$3.95 per square foot, properly extended, which would raise the total from
$352,000 to $383,776. _n ,'7Y
J
Resolution
By Comm. Schickel: Seconded by Comm. Allan ago.
RESOLVED, That the Board rescinds its action of two weekstand awards the
contract for the Peripheral Street reconstruction to Giordano Construction
for that amount, including the $3.95 per square foot figure for the brick
paving, making a total of $383,776.
City Engineer Cox reminded the Board that no decision has yet been made
to award alternate No. 1 of this contract.
Supt. Dingman commented that the method that Comm. Schickel is proposing
here is, in fact, the method that is set forth in the bidding documents.
Discussion followed on the floor.
A vote on the resolution resulted as follows:
Carried Unanimously
Award of Peripheral Streets Contract
Comm. Shaw reported that at a special meeting of the Board of Public Works
on Wednesday, April 5, this Board rescinded its action of March 22 in which
it awarded the contract for the construction of peripheral streets to
Giordano Construction Company. At this same meeting the Board awarded the
contract to Giordano Construction Company for $383,776 which price was
obtained by extending the unit prices of the Giordano bid in the manner
prescribed by the contract documents.
At a later meeting on April 5, the Common Council, by a 5-4 vote, directed
;the Board of Public Works to reject all of the bids received for the con-
struction of the peripheral streets, and to re -bid the project.
Resolution
By Comm. Shaw: Seconded by Comm. Allan
RESOLVED, That the bids received on March 20 for the construction of the
peripheral streets be and are hereby rejected, and the City Clerk is directed'
to so notify the bidders and return their bid security.
ips
,IT IS FURTHER RESOLVED, That the Superintendent be authorized to re -bid the
reconstruction of the peripheral streets (100 block of W. State Street, 100
'block of S. Cayuga Street, and 100 block of N. Cayuga Street) on the same
terms and conditions as the project was originally offered; the said bids
to be returnable on Thursday, May 4, at 3:00 p.m.
A vote on the resolution resulted as follows:
Ayes (5) - Cleveland, Shaw, Whispell, Allan, Ewanicki
Nay (1) - Schickel
Carried
Bids - Peripheral Streets
Comm. Shaw reported that bids were received for the construction of
peripheral streets. The low base bid was $437,246 submitted by V. Giordano
410 Construction and Supply Corporation. The addition of alternate #1 which
provides for all -brick sidewalks would add $96,950, for a total of $534,196.
A letter from Architect Egner recommends the acceptance of the low bid. He
states that all of the unit price projections and totals have been checked
and appear to be accurate. Egner recommends the acceptance of the alternate.
Resolution 31)_th
.By Comm. Shaw: Seconded by Comm.
Allan
RESOLVED, That the contract for constructing peripheral streets, phase I,
in accordance with plans and specifications prepared by Anton Egner
Associates be awarded to V. Giordano Construction and Supply Corporation
for their low base bid of $437,246.
Discussion followed on the floor.
A vote on the resolution resulted as follows:
Ayes (4) - Shaw, Whispell, Allan, Ewanicki
Nays (2) - Cleveland, Schickel
Carried
10
Bids for :lees
Ey Comm. Schickel: Seconded by Comm. Shaw
RESOLVED, That the Superintendent be authorized to request bids for trees
for spring planting on East State Street, East Seneca Street, and East
Buffalo Street, in accordance with a report and plan prepared by the
Shade Tree Advisory Committee under date of March 8, 1977. Sep 77
Carried Unanimou ly
Bids - Street Trees
By Comm. Schickel: Seconded by Comm. Allan
Comm. Schickel reported that bids were received on Monday, April 10, 1978,
for Street Trees. /2/77
Resolution
By Comm. Schickel: Seconded by Comm. Allan
RESOLVED, That the contract for supplying Street Trees in accordance with
the specifications dated March 15, 1978, be awarded to Schichtel's Nursery
for their bid of $2,829.20.
Carried Unanimously
Street Trees for 1978 Planting
By Comm. Banfield: Seconded by Comm. Cleveland r/3pi
RESOLVED, That the Superintendent be authorized to solicit bids for
Street Trees for fall 1978 planting. Carried Unanimously
Bids for fall street tree planting
Comm. Schickel reported that bids were received on Friday, September 22,
1978 for the fall street tree planting list as follows:
1. Schictels Nursery - $6,676.25
2. Samuel Shemin - $2,777.50
The Shemin bid was for items.2, 3 and 5. There are seven items on the
complete specifications.
Resolution
1 By Comm. Schickel: Seconded by Comm. Banfield
RESOLVED, That the contract for supplying street trees in accordance
with the specifications of August 28, 1978, be awarded to Schictels
Nursery for their bid of $6,676.25.
Carried Unanimously
11
Comm. Shaw reported that bids were received for'supplying water:meters-
for 1978 as follows;
• Badger Meter, Inc. - $16,676.22
Hershey Products, Inc. $16,958.84
•
•
Resolution
By Comm.•Shaw; Seconded by Comm. Wh.ispell
RESOLVED, That the contract for supplying water meters in accordance with.
the specifications of February 20, 1978, be awarded to Badger Meter, Inc.
for their low bid totalling $16,676,22,
Carried Unanimously
t\ j
12
Bids on Repairs to Swimming Pool Deck - Cass Park
Mck./Uh "a- )-, 1 007 C6
By Comm. Schickel: Seconded by Comm. Shaw
RESOLVED, That the Superintendent
Park
authorized to receive bids for repairs
® to the swimming pool deck at CassCarried Unanimously
•
Swimming Pool Deck at Cass Park
Comm. Schickel reported that one bid was received for the construction
of the swimming pool deck at Cass Park on April 24, as follows:
1. J. Construction Co. $12,500
Resolution.
By Comm. Schickel: Seconded by Comm. Ewanicki.
RESOLVED, That the contract for construction repairs to the swimming pool
deck at Cass Park in accordance with plans and specifications dated
April 8, 1978, be awarded to 1: J. Construction Company with the following
stipulations:
(1) That the bid be discounted to $12,000.
(2) That no payments be made under this agreement until 1. J. Construction
Company shall have:
(a) filed a performance bond in the full amount of the contract price
as required by the specifications, or
(b) completed the entire work and supplied the department with. a
release of liens for material and satisfactory evidence of
payment for all labor and a one-year detailed written guarantee.
Carried Unanimously
tO 6/77
Bids for Food Concession at Stewart Park � � aICO
By Comm. Schickel: Seconded by Comm. Shaw
RESOLVED, That the Superintendent be authorized to advertise for bids for
the food concession at Stewart Park for the 1978 season.
Carried Unanimously
Stewart Park Food Concession
Comm. Schickel reported that one bid was received for the operation of the
Stewart Park food concession which was from Challenge.Industries for
$1,076.90 for the 1978 season. `f" /?%�/
Resolution / /
By Comm. Schickel: Seconded by Comm. Cleveland
RESOLVED, That the contract for operating the food concession at Stewart
Park in accordance with the specifications dated March 24, 1978 be awarded
to Challenge Industries for the 1978 season for their bid of $1,076.90.
Carried Unanimously
Bids on Improvement of Softball Infields - Cass Park l✓lr..(-G-\ a)1 cl-7g
By Comm. Schickel: Seconded by Comm. Whispell
RESOLVED, That the Superintendent be authorized to receive bids on the
improvement of the softball infields in the south portion of Cass Park.
Carried Unanimously
Bids - Cass Park Ball Field
City Engineer Cox reported that bids were received on April 3, 1978
for the reconstruction of softball infields at Cass Park. The two
following bids were received for the work:
Still Meadow Nurseries, Auburn, N.Y.
Cortland Paving Company, Cortland, N.Y.
$18,000.00
$27,897.00
Staff recommended the acceptance of the low bid and award of the contract
to Still Meadow Nurseries for their low bid of $18,000.00.
Resolution
By Comm. Schickel: Seconded by Comm. Allan
RESOLVED, That the bid for reconstruction of three softball infields at
Cass Park be awarded to Still Meadow Nurseries for their low bid of
$18,000.00
Discussion followed on the floor.
A voteon the resolution resulted as follows:
Carried Unanimously
Birds - Small Bus Shelters
By Comm. Allan: Seconded by Comm. Schickel
RESOLVED, That the Superintendent be authorized to advertise for bids
for the erection of small bus shelters.
--//77Y
Carried Unanimously
Comm. Arlan reported that bids were received on July 24th for the erection
of small bus shelters as follows:
(1.) I.J. Construction Company - Lump sum bid - $16,600
(2) Solvay Consultants Management Team, Inc. - Lump sum bid -$21,400
Resolution
By Comm. Allan: Seconded by Comm. Ewanicki
RESOLVED, That the bid for the erection of small bus shelters be awarded
to I.J. Construction.Company for their low bid of $16,600 pending
approval of the Urban Mass Transit Authority.
Discussion followed on the floor.
A vote on the resolution resulted as follows:
•
•
Carried Unanimously
Bids - Restrooms, Cass Park and Hangar Theater
By Comm. Schickel: Seconded by Comm. Allan
RESOLVED, That the plans forthe restrooms at Cass Park and the Hangar
411, Theater, which are presently in the Engineer's office for review by the
staff and management of Hangar Theater, be offered for bid by Supt.
'Dingman.
0/7ff
Carried Unanimously
Bids . - Restrooms at Hangar Theater
Comm. Schickel reported that three bids were received for the construction
of the restrooms at the Hangar Theater as follows:
1. V. Giordano Construction and Supply Corporation $41,000
2. I. J. Construction Company - $44,250
3. McPherson Builders, Inc. - $36,698 g/Z/! ii
While these bids exceed the authorization of $34,385, there -is a total in
'the Hangar Theater Improvement Account of approximately $58,000. Hangar
Theater representative Niederkorn has indicated that the restroom improve-
ments are more important than the parking area. Bids for the parking areas
were received and reported earlier this year. These also exceeded the
funds available at that time.
'Resolution
.By Comm. Schickel: Seconded.by Comm. Allan
RESOLVED, That the contract for construction of restrooms at the Hangar
Theater be awarded to McPherson Builders, Inc. for their low -bid of
$36,698, and
BE IT FURTHER RESOLVED, That Change Order No. 1 in the contract for
!construction of the restrooms at the Hangar Theater be approved in the
deduct amount of $4,225.
'Discussion followed on the floor.
A vote on the resolution resulted as follows:
•
Carried Unanimously
-17-
Bids. on Motor Vehicle Equipment
Comm. Shaw reported that bids on motor vehicle equipment were received on
April 10. 7/ /!%//7/
• Resolution `
By Comm. Shaw: Seconded by Comm. Schickel
RESOLVED, That subject to the provisions of funds by the Common Council,
the following contracts will be awarded:
1. One new Model 140G Caterpillar Motor Grader in accordance with speci-
fications dated March 29, 1978 to Syracuse Supply Company for its low
net bid of $74,844.
2. One 18 hp Concrete Saw in accordance with the specifications dated
March 29, 1978, to the Seneca. Supply & Equipment Company for their
low net bid of $3,324.
3. One new Heil 20 cu yd. Mark IV Refuse Packer unit mounted in accordance
with the specifications dated March 29, 1978, to Bec Truck Equipment, Inc.
for their low net bid of $11,480.
Carried Unanimously
•
Bids - Construction of sidewalks
Comm. Schickel reported that bids were received for the con-
struction of sidewalks for the City's 1978 sidewalk program as
shown on the attached sheet. 6//y/7r
Resolution
By Comm. Schickel: Seconded by Comm. Allan
RESOLVED, That the contract for constructing city sidewalks
in accordance with the specifications of May 15, be awarded to
Paolengeli Contractor, Inc. for the unit prices shown in their
bid.
Discussion followed on the floor.
A vote on the resolution resulted as fo1`lows:
Carried Unanimously
Bids - Planing of East Buffalo Street
By Comm. Shaw: Seconded by Comm. Schickel
RESOLVED, That the Superintendent be authorized to solicit bids
for the planing of East Buffalo Street hill between North Aurora
Street and Stewart Avenue. 67/c/77/
Carried Unanimously
Award of Bids - Planing of E. Buffalo Street
Comm. Schickel reported that three bids were received for the planing of
East Buffalo Street hill. They were as follows:
Frederico Equipment Company
Pro -Grid, Inc.
Hull -Hazard, Inc.
$15,660
23,760
24,630
Resolution
RESOLVED, That the contract for the planing of East Buffalo Street, in
accordance with the specifications of June 13, 1978, be awarded to
Frederico Equipment Company for their low bid of $15,660.
Carried Unanimously
-29-
Bids - Construction Materials
Comm. Shaw reported that bids were received for supplying con-
struction materials for the 1978 construction season.
Res01ofin,
By Comm. Shaw: Seconded by Comm. Schickel
RESOLVED, That the contract for supplying Transit MiX Concrete
in accordance with the specifications of May 15, 1978, be awarded
to University Sand Gravel for the unit prices shown in their
bid; and 05/77i
IT IS FURTHER RESOLVED, That the contract for supplying Storm
Drain Pipe. Metal in accordance
Metalwith
ProducPsspecifications
forotheMay
unit
15, 1978, be awarded to Lane
prices shown in their bid; and
IT IS FURTHER RESOLVED, That the contract for supplying Asphalt
Concrete in accordance with the specifications of May 15, 1978,
be awarded to the General Crushed Stone Company for the unit
prices shown in their bid; and
IT IS FURTHER RESOLVED,
That the contract for supplying Medium
Curing Asphalt and Asphalt 9781sbenawarded toin aCortland Asphalt
nce with the
specifications of May 15, 1,
for the unit prices shown in their bid.
Discussion
followed on the floor. 6//`f/7�
A vote on the resolution resulted as follows:
Carried Unanimously
Award of Bid - Supplying of Crushed Limestone
Comm. Schickel reported that one bid was received for supplying crushed
limestone from Cayuga Crushed Stone, Inc. as follows.:
Size lA
Size 1 and 2
$3.60 per ton at the supplyer's plant
017/75'
4.70 per ton delivered in Ithaca
$2.90 per ton at the plant
4.00 per ton delivered in Ithaca
Resolution
By Comm. Schickel: Seconded by Comm. Cleveland
RESOLVED, That the contract. for supplying crushed limestone, in
accordance with the specifications of May 15, 1978, be awarded to Cayuga
Crushed Stone, Inc. Carried Unanimously
•
-21-
Nr p -around at S- ate Street an eneca ay � b -)7S
By Comm. Shaw: Seconded by Comm. Ewanicki Phase II.
RESOLVED,That the Superintendent be authorized detoareceivnd e aidsayfor the
i eonst
411
reconstruction of the Wrap-around at State Carried Unanimously
City Engineer
Cox detailed Phase II for the information of the Board.
Phase II - Wrap Around - Mancini & Sons
Comm. Shaw reported that only one (1) bid had been received for
the Phase II widening of the Tuning Fork Wrap -Around.
Resolution 3110
By Comm. Shaw: Seconded by Comm. Schickel
RESOLVED, That the contract for constructing Phase II Widening
of the Tuning Fork Wrap -Around in accordance with the specifi-
cations of July 21, 1978, be awarded to Mancini & Sons for their
base bid of $8,770.
Carried Unanimously
Requisition #1 - Paul Mancini & Sons
By Comm. Shaw: Seconded by Comm. Schickel o Ji/f 2g
1 RESOLVED, That requisition #1 from Paul Mancini G Sons for construction
of the Green. Street Wrap-around, Phase II, be approved in the amount of
$6,903.
Carried Unanimously
-22 -
Bids for Salt for ce ontrol
By_Comm. Allan: Seconded by Comm. Cleveland ?la -3I7
RESOLVED, That the Superintendent be authorized to receive bids on
September 22 at 11 a.m. for Salt for Ice Control.
Carried Unanimously
Bids for Salt for Ice Control
Comm. Shaw reported that bids were received for salt for ice control
for the 1978-1979 season as follows:
1. International Salt Company
Delivered - $19.65 per ton
14.40 per ton mine pick-up at Retsof, N.Y.
2. Cargill, Inc.
Delivered - $18.30 per ton
15.00 per ton mine pick-up at Lansing, N.Y.
The specifications call for a twenty-eight cents per ton mile truck
charge to be used in evaluating the mine pick-up bids. With this
correction, the Cargill bid becomes low on both items.
Resolution
By Comm. Shaw: Seconded by Comm. Allan
RESOLVED, That the contract for supplying bulk rock salt for ice control
in the 1978-1979 season be awarded to Cargill, Inc. of Lansing, N.Y. for
their low bid of $18.30 per ton delivered, and $15.00 per ton mine pick-
up.
Carried Unanimously
-23-
Bids for Construction of Tall Creek Sub -drainage System
Comm. Cleveland reported that bids for the construction of the Fall Creek
Sub -drainage System were received on October 6.
Resolution 10,n)'
By Comm. Cleveland: Seconded by Comm. Schickel •
RESOLVED, That the contract for constructing Fall Creek Subdrainage
System in accordance with plans and specifications prepared by Erdman &
Anthony, and on which bids were received October 6, 1978, be awarded to
Finger Lakes Construction Company for their low bid of $184,822.90.
Discussion followed on the floor.
A vote on the resolution resulted as follows:
•
Carried Unanimously
-24-
Bids
Comm. Allan reported that bids were received on October 23,
1978, for ductile iron water pipe for use in connection with
the proposed effluent line to Fall Creek. The bids are as
follows:
Clow Corporation, bidding on 2,200 feet of 16
inch pipe - $15.89 per ft.
U.S. Pipe and Foundry Company, bidding on the same -
$14.60 per ft.
- Amsted Industries (Griffin Pipe Products) bidding
iald-/
on the same - $14.38 per ft.
Resolution
By Comm. Allan: Seconded by Comm. Ban.field
RESOLVED, that the contract for supplying 2,200 feet of 16
inch ductile cast iron pipe in accordance with the specifica-
tions of October 19, 1978, be awarded to Amsted Industries for
their low bid of $14.38 per foot.
•
Carried Unanimously
-25-
Bicfor Chemical—Requirements
'By Comm. Ewanicki: Seconded by Comm. Cleveland 8'ghl
RESOLVED, That the Superintendent be authorized to receive bids for
chemical requirements for water and sewage treatment for the year 1979.
Carried Unanimously
Contract for su •1 ing Chemical Requirements
By Comm. Shaw: Seconded by Comm. Schickelthe annual Chemical Require -
RESOLVED, That the contract for supplying
ments for water and sewage treatment iasaccordanCe with � e specifica-
tions of November 6, 1978, be awarded() la�l%
Hydrated Lime to Warner Company
Ferric Chloride to Ashland Chemical Company
Primary Coagulant to American Cyanamid Company
Coagulant Aid to American Cyanamid Company
Filter Aid to O'Brien Industries
Potassium Permanganate to Scobell Chemical
Liquid Chlorine to Nyclor, Inc
$63.85 per
8.10 per
8.05 per
55.96 per
89.50 per
Company. 96.50 per
10.89 per
Carried Unanimously
ton
cwt.
Tb.
lb.
cwt.
cwt.
MINUTES:
By Co11uu. Banfield: Seconded by Couuii. Schickel
RESOLVED, That the Minutes of the meeting of November 22, 1978, are
corrected to show that the awards for supplying chemicals for water
and sewage treatment are as follows:
0.1°11X
Hydrated Lime to Warner Company $ 63.85 per ton
Ferric Chloride to Ashland Chemical Company $ 8.10 per cwt.
Primary Coagulant to American Cyanamid Company $0.0805 per lb.
Coagulant Aid to American Cyanamid Company $0.5596 per lb.
Filter Aid to O'Brien Industries$0.895 per lb.
Potassium Permanganate to Scobell Chemical Company $ 96.50 per cwt.
Liquid Chlorine to Nyclor, Inc $ 10.89 per cwt.
and be approved as recorded by the City Clerk.
Carried
Unanimously
Bids for Water Pipe Fittings and Valves
By Comm. Ewanicki: Seconded by Comm. Shaw /l/X)75'
RESOLVED, That the Superintendent be authorized to receive bids for water
pipe fittings and valves in connection with the Fall Creek effluent line.
Carried Unanimously
Bids for Water Pipe Valves an Fittings
Comm. Shaw reported that bids were received on November 13, 1978 for
Water Pipe Valves and Fittings to be used in connection with. the
construction of the Fall Creek. sewage effluent line, as follows:
Robert D. Spence, Inc. bidding on 10 items of fittings ..- . $ 7,374.10
Blair Supply Corp. bidding on 10 items of fittings,— , ,t, 8,837.00
and on 4 items of valves 7,848.00
Russell Pipe $ Foundry. Co. bidding on 10 items of fittings- ,8,617.70
Jones Water SuPP y� 1 Inc. bidding on 10 items of fittings , 8,836.70
U.S. Pipe $ Foundry Co. bidding on 10 items of fittings. 11,251.21
LeValley McLeod bidding on 10 items of fittings, 8,796.28
and on 4 items of valves 8,334.17
Haverstick Co. bidding on 10 items of fittings, 8,909.00
and on 2 items of valves. 2,587.00
Resolution /112,fr/ l
By Comm. Shaw: Seconded by Comm. Schickel
RESOLVED, That the contract for supplying items of fittings for the Fall
Creek sewage effluent line in accordance with the specifications of
October 31, 1978, be awarded to Robert D. Spence, Inc. for his low bid
of $7,374.10.
Carried Unanimously
Resolution 10-477
By Comm. Shaw: Seconded by Comm. Cleveland
RESOLVED, That the contract for supplying 4 items of valves for the
Fall Creek sewage effluent line in accordance with the specifications
of October 31, 1978, be awarded to Blair Supply Corp. for their low bid
of $7,848.00.
Carried Unanimously
•
—Bids for De -Icing Chemical Spreader
Comm. Shaw reported that two bids were received for supplying one de-
icing Chemical Spreader as follows:
BEC Truck Equipment Corporation
Tarrant Manufacturing Company
$8,165..00
8,299.00
pl.?-9/7Y
Resolution
By Comm. Shaw: Seconded by Comm.. Schickel
RESOLVED, That the contract for supplying one de-icing Chemical Spreader
in accordance with. the specification of November 11, 1978, be awarded to
BEC Truck Equipment Corporation for their low bid of $8,165.00.
Carried Unanimously
•
Bids for floodlighting Cass Park ballfields Il07g
By Comm. Schickel: Seconded by Comm. Shaw- -
RESOLVED, That the Superintendent be authorized to solicit bids for
materials and equipment for floodlighting the Cass Park ballfields.
Discussion followed on the floor. Supt, Dingman explained that the bids
would not be awarded until the Council has appropriated funds.
A vote on the resolution resulted as follows;
Carried Unanimously
Receipt of Bids-- Equipment for floodlighting ballfields at Cass Park
Comm. Schickel reported that one bid was received on Monday, December 18th,
for supplying electrical equipment for floodlighting ballfields at Cass
Park from CayugaElectricCompany for $39,579.35.
Resolution 1 )>i )iii
By Comm. Schickel. Seconded by Comm. Ewanicki
RESOLVED, That subject to the provision of funds for the Cass Park ball
field floodlighting, the contract for supplying electrical equipment for
floodlighting the ball fields at Cass Park in accordance with the speci-
fications of November 17, 1978 be awarded to Cayuga Electric Company for
their bid of $39,579.35.
Carried Unanimously
Receipt of Bids - Poles and fixtures for floodlighting ballfields at Cass
Park
Comm. Schickel reported that one bid was received on Thursday, December 21,
1978, for supplying southern pine poles and fixtures for floodlighting
ballfields at Cass Park, from Koppers Company for $12,586.25.
Resolution j4 7I7r
By Comm. Schickel: Seconded by Comm. Ewanicki
RESOLVED, That subject to the provision of funds for the Cass Park ball -
fields floodlighting, the contract for supplying southern pine poles and
fixtures for floodlighting ballfields at Cass Park, be awarded to Koppers
Company for their bid of $12,586.25.
Carried Unanimously
-29-
Bids - Air Compressor
Colum. Shaw reported that two bids were received for supplying a 175
CFM Air Compressor, as follows:
1. Seneca Supply and Equipment Company, bidding on
an Ingersoll Rand Model P185WJD...$8,949 net
2 State Equipment Company bidding on a Sullair
Model 185DPQ... $8, 293 net. JAI I311$
Resolution
By Comm. Shaw: Seconded by Comm. Ewanicki
RESOLVED, that the contract for providing one 1978 Model 175 CFM
portable Air Compressor in accordance with the specifications of
November 30, 1978, be awarded to State Equipment Company for their
net bid of $8,293.
Carried Unanimously
•
•
-30-
Receipt of Bids Door repair at Southside Community Center
Comm. S'chickel reported that two bids were received for the repair of
doors and hardware at the Southside Center as follows;
McGuire and Bennett, Inc. -- $7,029_
McPherson Builders, Inc. - $8,565
Resolution
By Comm, Schickel: Seconded by Comm. Shaw
RESOLVED, That the contract for door repairs at the Southside Center in
accordance with.the specifications of December 6, 1978, be referred to
the Buildings and Grounds Committee with power to act.
Carried Unanimously
•
Agricultural Tractor
Automotive Equipment
213 S. Plain St. Rehabilitation
Bus Shelters (1977 specs)
Hangar Theater Site improvements
Family Medicine Center, ;Medical Equipment
Family Medicine Center, Furniture
1
2
3
4
5
6
Landscaping of Elmira Road 7
8
Peripheral Streets 9 - 9a
Street Trees 10
Water Meters 11
Swimming Pool Deck - Cass Park 12
Food Concession - Stewart Park 13
Improvements to ballfields - Cass Park 14
Small bus shelters 15
"Hangar Theater" Restroom at Cass Park 16
Motor Vehicle Equipment - Motor Grader, Concrete Saw, Refuse Packer 17
Sidewalks 18
E. Buffalo St. planing 19
Transit Mix Concrete 20
Storm Drain Pipe - Metal 20
Asphalt Concrete & Medium Curing Asphalt and Asphalt Emulsion 20
.Crushed Limestone 20
Wrap-around State St. & Seneca Way, Phase II 21
Salt for Ice Control 22
Fall Creek Sub -drainage System 23
Ductile Cast iron pipe for effluent line to Fall Creek 24
Chemical Requirements 25
Water Pipe Fittings and Valves 26
De -Icing Chemical Spreader 27
Floodlighting Cass Park ballfields - Materials and equipment 28
175 CFM Air Compressor 29
Southside Community Center - Door Repairs 30