HomeMy WebLinkAbout1978 Highways Street Lighting & RefuseHIGHWAYS, STREET
LIGHTING -& REFUSE
Comm. Shaw reported that the following
resolutions are offered as the result
of a meeting of the Highway Committee ,and representatives of the=_Elmi.xa_RQad
Merchants Association on Tuesday, January 10;
By Comm. Shaw: Seconded by Comm. Cleveland
1. RESOLVED, That the Common Council be urged to provide for an optional
5 -year payment for curb ase28meig77ad�oTednavdualBoard
pxvperti`esits
regular meeting on December#ctiond/ fronting on Elmira Road.2. RESOLVED, That this Board go on record as recmm ndlng n thaconpo eci.al.
assessment be levied against Elmira Road properties
the cost of the relocation of the utilities distribution facilities.
lan
3. RESOLVED, That this Board go on record as remmending that
the
way wills
for Southwest Parkway be developed so that the
proposed
contain a link to the Elmira Road area.. Carried Unanimously
Upon being asked what the status of negotiations with the merchants on Elmira
Road is, City Attorney Shapiro reported that on Thursday, February 2 he heard
from Attorney McDermott who advised him that he was disappointed with Council'
action on Wednesday night in which the Council confirmed the assessment. He
believed his clients would probably go ahead and authorize him to proceed with
a lawsuit and City Attorney Shapiro did hear in the media coverage on Thursday
that apparently that's what they decided to do, but he hasn't received any
papers on that yet.
Discussion followed on the floor concerning landscapin for/ Elmira Road.
A vote on the resolution resulted as follows: Z /7` 7
Ayes (4) - Shaw, Ewanicki, Allan, Mayor Conley
Nays (1) - Schickel
Carr
Elmira. Road Assessment
City Attorney Shapiro reported that the decision of the judge last Thursday
on the Elmira Road Curb Assessments was adverse to the position of the
city. Mr. Shapiro will be discussing the matter with the Common Council
in Executive Session at the May Common Council meeting to determine what
further action, if any, Council wishes him to take. (7/1)4/7E/
2
Change Orders
By Comm. Ewanicki: Seconded by Comm. Allan
RESOLVED, That change order #1 in the contract of McGuire & Bennett
connection with the Stewart Avenue Retaining Wall in the amount of $1546
for additional demolition work required on a wall, and change order #2in
the amount of $572 for backfilling to bringroadway up to finish rayie, be
approved. This work was unforseen.
Carried Una n mously
Change Order - McGuire & Bennett
By Comm. Shaw: Seconded by Comm. Cleveland
RESOLVED, That a change order from McGuire & Bennett in connection with
.the construction of the Stewart Avenue. retaining wall, which provides for
the replacement of 24 lineal feet of existing wall and footing, be approved
in the amount of $1,500. , L;
Carried Unanimously
Filial bill - McGuire & Bena,.ett
By Comm. Schickel: Seconded by Comm Banfield
RESOLVED, That a final bill from McGuire
in connection with the Stewart Avenue retaining Bennett
twall, beoast aved doi services,
amount of $500. pprovn the
Carried Unanimously
Requisition #2 - McGuire F Bennett
By Comm. Shaw: Seconded by Comm. Ewanicki
RESOLVED, That Requisition #2 of McGuire & Bennett for construction services
in connection with the construction of the Stewart Avenue retaini g wall,
be approved in the amount of $27,273. pv
Carried Unanimously
3
Bill - Engineering Services
By Comm. Shaw: Seconded by Comm. Ewanicki
RESOLVED, That a bill of Barton, Brown, Clyde and Loguidice for engineering
services in connection with modification and improvements to Elmira Road,
be approved in the amount of $4,707.65. %2_, 77
Carried Unanimously
Barton, Brown, Clyde, and Loguidice - Supervision.of Construction
By Comm. Shaw: Seconded by Comm. Schickel z z2 er
RESOLVED, That a bill from Barton, Brown, Clyde, a d Loguidice for super-
vision of construction on Elmira Road, be approved in the amount of $117.55.
Carried Unanimously
Barton, Brown, Clyde & Loguidice - Engineering Services
By Comm. Shaw: Seconded by Comm. Schickel
RESOLVED, That a bill from Barton, Brown, Clyde $ Loguidice for engineering
services in connection with the reconstruction of Elmira R ad be approved
in the amount of $417.56. a 7/7Y
Carried Un nimously
Invoice - Bart.^, Broian, Clyde & Loguidice
By Comm. SchicKel: Seconded by Comm. Allan
RESOLVED, That an invoice of Barton., Brown, Clyde & Loguidice for
engineering services in connection with the improvements to Elmira Road
through April 1, 1978, be approved in the amount of $1,974.57.
/gib7,r Carried Unanimously
!,
Request for Payment --Barton, Brown, 'Clyde .&. Lo'gui:dice
By Comm. Schickel: Seconded by Comm. Allan
RESOLVED, That a bill from Barton, Brown, Clyde F Loguidice, for engi-
neering services in connection with the improvements to Elmira Road,
be approved in the amount of $660.93. O�
// Carried Unanimously
Invoice - Barton, Brown, Clyde ? Loguidice
By Comm. Shaw: Seconded by Comm. Ewanicki
RESOLVED, That an invoice from Barton, Brown, Clyde E1 Loguidice for pro-
fessional services in connection with the landscaping of Elmira Road
be approved in true amount of $1,000. t*/
Carried Unanimously
Invoice - Barton, Brown, Clyde U Loguidice
By Comm. Allan: Seconded by Comm. Ewanicki
RESOLVED, That an invoice from Barton, Brown, Clyde & Loguidice for
engineering services in connection with the modifications and improve-
ments to Elmira Road, be approved in the amount of $1,036.05.
Carried Unanimously
4
Snow Removal
Asst. Supt. Dougherty reported that to the best of his
street in the city is passable for emergency vehicles.
0 have one-way traffic and the crews are still ploughing
snow. Operations are concentrated at night at moving snow
being hauled out of Cayuga Street to keep the channel open
knowledge every
Many of the streets
and pushing back the
The slush is
in the Fall Creek
•
area. The crews are trying to start opening up drainage systems, get
crosswalks cleared, improve site distance at corners and are hauling snow
away during the day on a. smaller scale.
Mayor Conley added that the crews had also cleared space in Stewart Park
for parking, cleared the parking lot at Boynton School, and cleared a
portion of Cass Park to hold the towed -away cars which were legally parked
but had to,be moved for the convenience of snow ploughing and removal.
Garbage Pickup
Comm. Whispell asked what the status of the garbage pickup schedule is.
Asst. Supt. Dougherty reported that the program is back on regular schedule
and the garbage which was not picked up last week, when operations were
suspended, will be picked up this week. /2,7'7 P'
Snow Removal
By Comm. Banfield: Seconded by Comm. Schickel 441
RESOLVED, That the City and staff be complimented on the outstanding job
they did on snow removal during the recent snow storm.
Carried Unanimously
•
Emergency Purchase of Salt
Supt. Dingman informed the Board that during the height of the snow season, an
accident occurred at the Cargill Mine which threatened to cut off the city's
salt supply. Mr. Dingman went to International Salt Company and requested
them to deliver salt to the city and that price was slightly in excess of our
bid price and the department purchased $4,381.95 of salt from International.
Resolution 7/
By Comm. Allan: Seconded by Comm. Schickel
RESOLVED, That an emergency existed which did not permit the normal process of
bidding on the purchase of salt, and the Board authorized the Superintendent
to buy salt from the International Salt Company in the amount of $4,381.95.
Carried Unanimously
•
•
Parlor City Construction Company - Reconstruction of Elmira Road
By Comm. Shaw: Seconded by Comm. Schickel
RESOLVED, That Requisition No. 9 from the Parlor City Construction Company
411 for services in connection with the reconstruction of Elmira Rod be
approved in the amount of $43,571.35. 2/2 l/7/'
Carried Unanimously
Parlor City Construction Co. Estimate eA_Nr a)) lc1 7�
By Comm. Shaw: Seconded by Comm. Schickel
RESOLVED, That estimate #10 from Parlor City Construction Co. for con-
struction services in connection with Elmira Road, be approved in the
amount of $42,038.69.
Carried Unanimously
Change Order #8 - Parlor City Construction Company
By Comm. Shaw: Seconded by Comm. Allan
RESOLVED, That change order #8 in the contract of Parlor City
Construction Company for the improvement of Elmira Road which
provides for increased work required by revisions in the electri-
cal code, be approved in the amount of $1,495.
7/ c(77 (
Discussion followed on the floor.
A vote on the resolution resulted as follows:
Carried Unanimously
Invoice - Parlor City Construction Company
By Comm. Shaw: Seconded by Comm. Schickel
RESOLVED, That an invoice from Parlor City Construction Company
for construction work in connection with Elmira Road improve-
ments, be approved in the amount of $74,901.72. The Engineers
have certified that the work is complete in accordance with the
contract and specifications. The total dollar value of the work
done by Parlor City Construction Company is $1,234,194.48. Six
thousand dollars has been retained pending completion of punch
list items.
Discussion followed on the floor.
0[77r
A vote on the resolution resulted as follows:
Carried Unanimously
Bill - Paolangeli Contractor, Inc_.
By Comm. Shaw: Seconded by Comm. Ewanicki ,'/%c/78 -
RESOLVED, That a bill from Paolangeli Contractor, Inc. for one catch
basin in Elmira Road, be approved in the amount of $1,115.
Carried Unanimously
Final payment - Parlor City Construction Company
By Comm. Shaw: Seconded by Comm. Allan
RESOLVED, That a final payment to Parlor City Construction Company for
construction services in connection with the Elmira Road Improvements,
be approved in the amount of $6,000. 911)I7c�
Discussion followed on the floor.
A vote on the resolution resulted as follows:
Carried Unanimously
Letter from Edward J. Moore, Jr.\ 7
Inasmuch as all commissioners had copies of the letter from Mr. Moore,
reading of it was waived, but entered into the minutes as follows:
'February 21, 1978
411 To: Department of Public Works
All members of the Common Council
ZZ/7
Fellow residents:
I am angry, frustrated and perhaps negative at this point:
As a life-long resident of the City of Ithaca, and a -property owner at
204 Lake Ave. and 225 W. Lincoln St., I feel my opinions and observations
should concern you. Additionally, my father served the city for thirty-
four years on the Police Force.
This has been one of the most disagreeable winters I can recall, and I
don't mean weatherwise! It has been a nightmare for motorists and
pedestrians alike, with hazardous experiences a daily fare!
And what problems are causing me to say this? I will list in the order
of importance:
1. Inadequate street plowing
2. Failure to enforce alternate parking
3. Cleaning of sidewalks and public walkways.
Sure, residents of Fall Creek and the high school have suffered from
flooding problems resulting from poor municipal planning that goes into
panic when Fall Creek is high, but forgets all about it the rest of the
year. And I don't want to tie the police to routine ticket writing when
a major concern is the safety of citizens, preventing robberies, etc.
But we do have a right to expect certain services from the City automatical-
ly, without hundreds of calls with individual complaints!
INADEQUATE STRUT PLOWING. FAILURE TO ENFORCE ALTERNATE PARKING.
At the offset, I have been in contact with the DPW and Police Department
a number of times. With the DPI\' it goes back to the removal of leaves.
But I speak first of the snow conditions on Lake Ave. and Monroe Street.
LAKE AVE. has not been properly plowed since the first snow storm. Yes
the plows have covered, the area a number of times but the three blocks
in question have not been plowed back to the curb. Lake Ave. gets a
lot of traffic. Parking is allowed on the even nights only. The street
is passable with one lane of traffic. With the parking arrangement by the
Cayuga St. bridge on Lake Ave., conditions are dangerous and generally
one way..the alternate side does not apply.
MONROE STREET is a real problem: Twice, since January 1, the street has
been impassable due to snow conditions. It has been blocked many times
basically because the street has not been plowed back to the curbs. When
cars are parked on both sides of the road, traffic is blocked or hampered
many times. Inconsiderate drivers parking cars add to the physical
problems. Several cars and trucks have had to pull into our double drive-
way on Monroe Street to retrace their entrance route to get off Monroe
Street including Challenge Industries. As recently as Sunday evening,
Feb. 19th, it was necessary to phone the Police Department to have a car
towed so we could get out our own driveway. 4Z47
The problems on Lake Ave. and especially Monroe Street -are aggravated by
the influx of student housing into what were private homes. In the three •
._
houses next to us there are approximately 15 students, many with cars or
friends with cars. There are other students in the 100 block of Lake •Ave.1
On the ODD nights 11-12 cars jam every inch of parking space on the South i
Side of Monroe Street. Some don't bother to move their cars at all. Twice
in the past month cars have been left on the street without being moved for
over a week. Others park on the wrong side of. the street consistently.
have had to call the Police Department eight times in the past three weeks
about cars parking in front of -the hydrant, -..most recently, this morning.
There -is also a basic problem.- The Police Department states that -the DPW
is- supposed- to call them. when cars block the streets and hamper their -plowing•,,
and - they will -then have them towed away. Apparently the streets are not being,
plowed enough and calls made to have cars moved.
CLEANING OF SIDEWALKS AND PUBLIC WALKWAYS.
I cannot recall a winter when sidewalks have been in such a condition,
Many citizens are doing a fine job; others have abandoned them to the weather.
Pity the poor mailman who daily suffers trying to do his job, our children
going to school or senior citizens just trying to go for a walk.
Many people in our area walk in the streets because of bad walks. The city
has done little to clear humps at corner sidewalks. Even the walk -ways over
the bridges at Hancock, Madison, (not Monroe) and Cayuga St. were not cleared.
until Friday, Feb. l7th..weeks after the last storm! 7� /7/
In last night's Journal, the Police Department informed citizens they can
now get -action -4F THEY COMPLAIN -TO THE -POLICE.- Each summer -the -City sends 11.
an inspector around to examine sidewalks. Isn't it just as important they
do the same in the winter? Why wait for complaints weeks after a storm?
Why not action the next day? In Rochester, by the way, the City plows all
sidewalks!
'Incidentally, I note The Commons has been kept well cleaned and the roads
are fine at Stewart Park and part of Cass Park.
:In closing, I urge the City to consider getting one or two more rotary plows.
Thy clear the snow right to the curb and the snow can be diverted from
'sidewalks and driveways!
Hopefully,
Edward J. Moore, Jr,
204 Lake Avenue
Ithaca, New York 14850"
Resolution
By Comm. Allan: Seconded by Comm. Schickel
RESOLVED, That the letter received from Mr. Moore be referred to the High-
ways, Street Lighting and Refuse Committee.
Carried Unanimously
8
Challenge Industries - Request
Comm. Shaw reported that Challenge Industries has requested that the City
IIIprovide a replacement belt for the conveyor at the glass recycling plant
at a delivered cost of approximately $550. They request that the funds
for this replacement come from the capital revenue sharing funds which were
originally set up for improvements and equipment at the glass recycling
plant. There is a -balance of approximately $5,100 in this account.
By Comm. Shaw: Seconded by Comm. Schickel z7 z'
RESOLVED, That the Superintendent be authorized to purchase and have
delivered for installation by Challenge Industries a replacement belt for the
conveyor unit at the glass recycling plant at an estimated cost of $550, to
be charged against Capital Account H890-132, Glass Recycling.
Carried Unanimously
•
9
•
B. K. Hough, Consulting Engineer
By Comm. Shaw: Seconded by Comm. Allan
RESOLVED, That a final bill from B. K. Hough, Consulting Engineer, for
engineering services in connection with the reconstruction of a retaining
wall on Stewart Avenue be approved in the amount of $745.44.
3/f/7 r
Discussion followed on the floor.
A vote on the resolution resulted as follows:
•
Carried Unanimously
-10 -
Curb and Gutter Fifth Street North of Hancock
Comm. Shaw reported that monies have been provided in the budget forthe
improvement and surfacing of Fifth Street north of Hancock Street
proper job will require the installation of curb and gutter. The Charter
provides that when curb and gutter are to be constructed as an improvement
on a public highway, the abutting owners shall be assessed for 50 percent
of the cost of construction. The assessment is determined on a front foot
basis. When the Board of Public Works proposes to construct curbs and to
assess a portion of the costs against the. property owner, the Charter
requires that a public hearing be held. 3/2,z/77
•
Resolution
By Comm. Shaw: Seconded by Comm. Schickel
RESOLVED, That a public hearing be held in the Common Council Chambers on
April 12 at 4:00 p.m. on the proposed construction of curb and gutter on
Fifth Street and the proposed assessment of 50 percent of the cost thereof
against abutting property owners.
IT IS FURTHER RESOLVED, That the Clerk be directed to notify abutting
property owners of the proposed construction and assessment, and .further,
to notify them of the time and place of the public hearing.
City Attorney Shapiro commented that he would not recommend going ahead
with any curb assessments without amendment to the Charter prior to action
being taken unless such curb assessments are in connection with an
absolutely new city street.
Commissioners Shaw and Schickel withdrew their motion.
City Attorney Shapiro commented that he would prepare a Local Law and place
it on the Aldermen's desks with the consent of the chairman of the Charter
and Ordinance Committee.
Public Hearing - Construction of Curbs and Gutters
Comm. Shaw reported that at its regular meeting on April 5, the Common
Council adopted a local law providing that 50% of the cost of the construction
of original curb and gutter be charged against abutting property owners. The
City proposes to reconstruct the 200 block of Fifth Street. This reconstruc
tion will require the original construction of curbs and/.or gutters.
0//-,P/71
Resolution Ltl0/7(
By Comm. Shaw: Seconded by Comm. Schickel
IT IS RESOLVED, That a public hearing be held in the Common Council Chambers
on April 26 at 4 p.m. on the proposed construction of curb.arslic gutter in the
200 block of Fifth Street, and the proposed assessment of 50% of the cost
thereof as a charge against abutting. property owners.
IT IS FURTHER RESOLVED, That the City Clerk be directed to notify abutting,
property owners of the proposed construction and assessment and the time and
place of the public hearing.
Carried Unanimously
Construction of Curbs and Gutters - 200 Block of Fifth Street
Mr. Vincent Giordano, 57 Woodcresta Avenue,laddressed
the he Bonardd fonr behalf
. of himself and Agway Petroleum, stating however,a manhole
the
construction of curbs on the 200 block of Fifth Street;
'is needed to remove surface water. <-0/7?/
Public
Public Hearing - Construction of Curbs and Gutters - 200 Block of Fifth St.
Resolution to Open Public Hearing
By Comm. Ewanicki: Seconded by Comm. Schickel
RESOLVED, That the public hearing on construction of curbs and gutters,
200 block of Fifth Street, be opened.
Carried Unanimously
Clerk Rundle reported that the property owners have been notified that the
City Charter requires that when original curb or curb and gutter is built
on the street as an improvement, 50% of the cost of that work will be charged
against abutting property owners on a front -foot basis. The Charter requires
that before the Board actually determines to construct original curb and
gutter, that a public hearing be held. That is the purpose of this hearing.
No one appeared to speak to the hearing. 1(1d -617r
Resolution to Close Public Hearing
By Comm. Ewanicki: Seconded by Comm. Cleveland
RESOLVED, That the public hearing on construction of curbs and gutters,
200 block of Fifth Street, be closed.
Carried Unanimously
By Comm. Schickel: Seconded by Comm. Ewanicci
RESOLVED, That this Board direct the construction of curb and gutter on
Fifth Street in accordance with plans and specifications developed by
the City Engineer, and that 50% of the cost thereof be assessed against
abutting property owners as provided by law.
City Engineer Cox informed the Board that basically the need for curbs ,
and gutters in that particular block is to provide for drainage of the
street and some of the surrounding properties.. A vote on the resolution resulted as follows: 6'4/7 1i
Carried Unanimously
improvements4,5"7V
Supt. Dingman reported that the Department has completed the work
on the Fifth Street repairs and Hancock Street has now been curbed
and paved so that it can be maintained as a City street.
•
Adoption of Curb Assessments and Call for Public Hearing
Comm. Shaw reported that acting on the authorization of the Board of Public
Works on April 26, 1978, the department has caused 728 feet of new curb
and gutter to be constructed in the 200 block of Fifth Street in connection
with the improvement of Fifth Street. Of this 728 feet, 72 feet are
assessable against the city; 656 feet are assessable against abutting
private property frontage. The total cost of the curbing thus installed,
including overhead, is $6,096.29, resulting in a unit cost of $8.37 per
foot, or an assessable cost of $4.19 per foot. The property owners'
frontage and assessment is as follows: IYIY1I11
Agway Petroleum Corp., P.O. Box 4852, Syracuse, N.Y. 13221
Premises at 702 Hancock Street - 326 feet at $1,365.94
V. Giordano Construction Supply Corp., 602 Hancock Street, Tthaca,
Premises at 207/215 Fifth Street - 205 feet at $858.95 N.Y. 14850
Vincent Giordano, 604 Hancock Street, I:thaca,r'N.Y.• 14.850
Premises at 616 Hancock Street - 125 feet at $523.75
Resolution l�l��
By Comm. Shaw: Seconded by Comm. Ewanicki 1
RESOLVED, That the above statement of assessment against respective
property owners for the construction of new curb and gutter at the 200
block of Fifth Street be adopted and that a public hearing meeting the
requirements of Section 5..47, paragraph. 6 of the Ithaca City Charter be
held on January 24, 1979 at 4:00 p.m. in the Common Council Chambers for
the purpose of hearing any interested person in relation thereto.
Carried Unanimously
•.
•
-11-
Elmira Road - Planning & Curb Placement of Pole
Atty. Wesley McDermott appeared on behalf of Mr. & Mrs. Sam Kramer and
Mr. Mose Norman of Elmira Road to ask the Board to take a look at a problem
they have and anticipate becoming worse in the event that the plans- are not
changed with respect to the planning and curb placement of one particular
light pole on their property. In addition, he said there is a problem with
parking places in front of both places, replacement of storm sewer and
the Kramer drive to the rear of the building, and settling around the man
hole at the rear.
Discussion followed on the floor. HPY7
�/
Resolution
By Comm. Shaw: Seconded by Comm. Allan
RESOLVED, the request of Atty McDermott to look at problems of Kramer and
Norman on Elmira Road be referred to the Highways, Street Lighting and
Refuse Committee.
After further discussion, a vote on the resolution resulted as follows:
Carried Unanimously
-12 -
Spring Cleanup Week
By Comm. Shaw: Seconded by Comm. Schickel
RESOLVED, That the week of May 15 thorugh May 19 be designated as "Spring
Cleanup Week" during which time the City will pick up those items of
householdrrefuse which are not normally accepted in the regular weekly
trash pickups.
((-70-77r
IT IS FURTHER RESOLVED, That the Superintendent be authorized to promulgate
regulations concerning the kinds and amounts of household refuse that will
be picked up during this special week.
Carried Unanimously
Clean-up week
Supt. Dingman announced that Spring clean-up week would occur May 15
through 19, and that special regulations have been set forth for that.
The pick-up will occur on the regular pick-up days.
Letter re. garbage pickup
6/0/7, -
Alderman Boothroyd reported that he had received a letter fru.: P
Dipasquale regarding the Department not picking up trash in front of
his house on the trash pickup day. He disagrees with the department's
policy. Alderman Boothroyd requested the department to make an exception
and have the trash picked up. /Z)j/7i
Disco.,.
r Followed on the floor.
Resolution
By Comm. Shaw: Seconded by Co.,,.::. Schickel
RESOLVED, the letter from R. Dipasquale re. garbage pickup be referred
to Highways, Street Lighting and Refuse Committee,
Carried Unanimously
Spring pickup week
Supt. Dingman reported on the results of the Spring pickup week:
The Department handled 180 loads of material over a period of 7
working days which resulted in the cost being 20% higher than
budgeted for. He said that not only were the man hours greater
than planned, but trucking costs were greater. The foreman in-
dicated to him that additional time was used because materials
were improperly placed, or improperly prepared for collection.
Supt. Dingman called attention to the Regulations for the
Placing of Household Refuse for Pickup Week which will be used
for the Fall pickup week, saying they represent considerable
tightening up of the rules. 6//y/7r
•
•
-12a-
Fall Pickup Week
By Comm. Shaw: Seconded by Comm. Schickel
RESOLVED, That the week of October 16 through October 20 be designated
as "Fall Pickup Week," during which week a separate pickup will be made
of items of household refuse not normally collected in the regular
weekly trash pickup.
IT IS FURTHER RESOLVED, That'the attached regulations for 'Special
Household Refuse Pickup' promulgated by the Superintendent be approved.
qPV7K
Discussion followed on the floor.
A vote on the resolution resulted as follows:
Carried Unanimously
Thanksgiving Day Schedule P/?? 7S/
Supt. Dingman reported that -the Department of Public Works will be
open for business on Friday, November 24, 1978; refuse collection will
be 1 day late. /
•
Subdivision Plans of Cornell University - Old Fairgrounds Property
City Engineer Cox read a letter dated 3/27/78, addressed to Mayor Conley from
John Bentkowski, Manager of real estate for Cornell University, in which he
briefly describes the subdivision plans of Cornell University on the Old
Fairgrounds property, and asked that the letter be brought to the attention of
the Board of Public Works.
Discussion followed on the floor.
•
q47/
•
•
14
Final payment to Wheaton Sheet Metal Shop, Inc.
By Comm. Schickel: Seconded by Comm. Ewanicki
RESOLVED, That a final payment to Wheaton Sheet Metal Shop, Inc. for
construction services in connection with the maintenance garage be
approved in the amount of $1,856.80. ,
Carried Unanimously
Letter re. guardrail
Alderman Boothroyd informed the Board he had received a letter from a
concerned citizen named William Jones, who lives on Klinewoods Road, in
regard to the guardrail along the gorge side of that road being in bad
411
condition and requested the condition be corrected. 3/if%
•
•
•
Route 96 development
City Engineer Cox reported that the committee appointed by Mayor
Conley to work with the NYS Department of Transportation to
arrive at alternatives which could be pursued for the 96 question
has been meeting all year with the NYSDOT, the most recent meet-
ing being with the Tompkins County Planning Board which held an
open forum. The Tompkins County Board of Planning have a
resolution which they propose to take up at their next meeting
which basically asks the Common Council to consider their views
which are mainly concerned with provision of access to the
hospital for emergency vehicles. Mr. Cox said the committee will
very shortly be reporting to the Common Council some recommenda-
tions which hopefully will be passed along to the NYSDOT to
pursue to design hearing stage. 6//Or
•
•
•
•
•
Renaming of Elmira Road Gl/7/7/
Mayor Conley reported that the Elmira Road merchants wish to
change the name of Elmira Road and asked the procedure for doing
this. The Board indicated that they will listen to proposals.
Mayor Onley reported receiving a certified letter from Frederick
J. Rolfe, 358 Bostwick Road, together with a check in the amount
of $2.50 as a donation toward pavement repair of -Five Mile Drive
which is in bad condition. The letter and check were turned
over to City Clerk Rundle for disposition. 0007e
•
•
•
•
Bradley Landscape Service bill7j/x
By Comm. Shaw: Seconded by Comm. Allan
RESOLVED, That a request for payment from Bradley Landscape
Service, for landscaping in connection with
Elmira
Road,85e
(
approved in the amount of $31,583.43. Pres
completion and provides for loo retainage.) Carried Unanimously
Final payment - Bradley Landscaping Services
By Comm. Shaw: Seconded by Comm. Allan 1.1R1
� 1�
RESOLVED, That a final payment to Bradley Landscaj5ing Services in
connection with landscaping on the Elmira Road, be approved in the
amount of $9,702.10.
Carried Unanimously
-20 -
Letter from Nancy Woolf re. Floral Avenue street repair
By Comm. Schickel: Seconded by Comm. Allan
RESOLVED, That the letter from Nancy Woolf (copies of which were dis-
tributed to each Commissioner) who complains that Floral Avenue is not
scheduled for other than day-to-day patching, be referred to the
Superintendent for answer.
Carried Unanimously
•
•
-21-
Shoulder Condition - Elmira Road
Attorney Dirk Gailbraith, 308 N. Tioga Street, appeared on behalf of
John Knapp, owner of.Pudgies Pizza and the Car Wash next to it on Elmira
Road, concerning potholes and condition of the road shoulder on Elmira
Road. He said he has written a letter to the City Clerk's office,
advising of the defect in the highway, and has talked briefly to City
Attorney Shapiro about a possible solution. Mr. Knapp would like the
City of Ithaca to pave this area. 0E(77(
Mr. Dingman commented that he informed Mr. Knapp that the City of Ithaca
does not maintain the drive approaches of private, residential or
commercial businesses; that it is the responsibility of the private
property owner.
Discussion followed on the floor.
City Attorney Shapiro commented thathe would like the opportunity to
investigate the matter before the next meeting of the Board.
Resolution
By Comm. Allan: Seconded by Comm. Cleveland
RESOLVED, That the matter of the condition of road shoulders on Elmira
Road be referred to the Parking, Traffic and Transit Committee, pending
the feedback from the City Attorney, with power to
t
ad
raUnanimously
•
Bills—Peripheral Streets
By Comm. Shaw: Seconded by Comm. Schickel 111d7(1
7(
RESOLVED, That bills of the Water and Sewer Department for services in
connection with the reconstruction of the peripheral streets be approved
in. the total amount of $477.82. Carried Unanimously
Invoice #1 - V. Giordano Construction & Supply Corp.
By Comm. Shaw: Seconded by Comm. Allan
RESOLVED, That Invoice #1 from the V. Giordano Construction & Supply
Corp. for the Peripheral Streets project be approved in the amount of
$50,977.22. V0.1
Carried Unanimously
Payment Requisition #2 - V. Giordano Construction & Supply Co. yi
By Comm. Shaw: Seconded by Comm. Schickel 11
RESOLVED, That payment requisition #2 from V. Giordano Construction and
Supply Company for construction services on the peripheral streets project
through August 22, be approved in the amount of $107,845.72.
Carried Unanimously
Payment Requisition #3 - V. Giordano Construction & Supply Co.
By Comm. Shaw: Seconded by Comm. Schickel 9113J7Y
RESOLVED, That payment requisition #3 from V. Giordano Construction and
Supply Company for construction services on the peripheral streets project
through August 31, be approved in the amount of $31,568.39.
Carried Unanimously
Requisition #4 - Giordano Construction Company
By Comm. Shaw: Seconded by Comm. Cleveland 407V
RESOLVED, That requisition #4 from Giordano Construction Company for
services in connection with the peripheral streets project, be approved
in the amount of $145,615.65.
Carried Unanimously
'Change Order #1 - V. Giordano Construction Company 7,617y
By Comm. Allan: Seconded by Comm. Ewanicki
RESOLVED, That Change Order #1 in the contract of V. Giordano Construction
Company for construction of the peripheral streets, which_provides for the
installation of 1 1/2" PVC pipe for a traffic signal duct, be approved in
the amount of add $1,160 net.
Carried Unanimously
Change Order #3 - V. Giordano Construction Company
By Comm. Allan: Seconded by Comm. Ewanicki ?*I7r
RESOLVED, That Change Order #3 in the contract of V. Giordano Construction
Company for construction of the peripheral streets, which provides for
changes in the unit price of four vaults, be approved in the amount of
deduct $660 net.
Carried Unanimously
4110 Change Order #2 - V. Giordano Construction Company
By Comm. Allan: Seconded by Comm. Ewanicki 81,51-�
RESOLVED, That Change Order #2 in the contract of V. Giordano Construction
Company for construction of the peripheral streets, which provides for
removing and replacing an existing stair curb in the basement of Williams
L Shoe Store, be approved in the amount of add $268.47.
Carried Unanimously
Change Order #4 - V. Giordano Construction $ Supply Co.'
By Comm. Shaw: Seconded by Comm. Allan
RESOLVED, That change order #4 in the contract of V. Giordano Construction
and Supply Company for the peripheral streets project which provided for
further modifications to the vault numbered #SC2 (Fane Building), be
approved in the amount of $9,972.94. g113)7T
Discussion followed on the floor.
A vote on the resolution resulted as follows:
Carried Unanimously
Payment Application - V. Giordano Construction Co. JI�� ��
By Comm. Shaw: Seconded by Comm. Ewanicki
RESOLVED,That payment application #5 from V. Giordano onstruction Co.
for construction services in connection with peripheral streets be approved
in the amount of $70,486.
Carried Unanimously
Request for Payment --V. Giordano Supply Company �13I��
By Cowin. Schickel: Seconded by Counu. Allan I
RESOLVED, that a bill from V. Giordano Supply Company for tree
grates to be used in Phase II of the peripheral streets program, be
approved in the amount of $4,556.20.
Carried Unanimously
Water f Sewer Division bills - Peripheral Streets Project
By Comm. Schickel: Seconded by Comm. Banfield 0-7/2Y
RESOLVED, That bills dated September 13 from the Water F Sewer Division
for work performed in connection with the peripheral streets project,
and amounting to a total of $1,206.46, be approved.
Carried Unanimously
Peripheral Streets Project
City Engineer Cox reported that the peripheral streets were reopened
October 10, 1973, There are a few remaining items such as cleanup to
be completed. It is anticipated that planting may start next week.
The street lighting is to be completed by the New York State Electric
and Gas Corp. Mr. Cox said.the project was completed within the al.otted
time; however, the final tally of cost of the project has not been /o////4
received.
Change Order --Giordano Construction Company
By Comm. Schickel: Seconded by Collin'. Banfield 431-$
RESOLVED, that change order #6 in the contract of Giordano Construc-
tion Company for construction of peripheral streets which provides for
repairs to building foundations as required, be approved in the addi-
tional amount of $1,320.58.
Carried Unanimously
Change Order --Giordano Construction Company
By Comm. Schickel: Seconded by Comm. Allan Ibl►3l']8
RESOLVED, that change order #7 in the contract of Giordano Construc-
tion Company for the construction of peripheral streets which provides
for the installation of three floor drain covers in alleyways, be
approved in the additional amount of $105.00.
Carried Unanimously
Change Order --Giordano Construction Company I dI3I%g
By Collo'. Schickel: Seconded by Conlin. Banfield
RESOLVED, that change order #8 in the contract of Giordano Construc-
tion Company for the construction of peripheral streets which provides
for change in a vault, be approved in the amount of deduct $210.00.
Carried Unanimously
Change Order #5 - Peripheral Street project
By Comm. Shaw: Seconded by Comm. Ewanicki /4'O
RESOLVED, That change order #5 in the contract of V. Giordano Construction
and Supply Corp. for the construction of peripheral streets, Phase I,
which provides for the addition of three plants and the substitution of 13
other plants, be approved in the additional amount of $583.50, making an
adjusted contract sum of $448,570.91.
Carried Unanimously
Bike Racks for Peripheral treets
Comm. Banfield reported that the Common Council, at its last regular
meeting, directed the Board of Public Works to add bike racks to the
peripheral streets project. The Planning Department has now proposed
a design for the bike racks and is working out locations. It is too
late to install these before sidewalks are poured, but the design is
such that they can be installed subsequently, and will probably be done
as an extra under the present contract or by separate contractor.
-226 -
Agreements on Peripheral Street Vaults
By Couiui. Schickel: Seconded by Comm. Ewanicki
WHEREAS, the City of Ithaca has heretofore permitted the use of
certain sub -surface portions of the street right-of-way as below -
ground vaults by certain abutting property owners or their pre-
decessors on the streets adjacent to the Ithaca Commons, and
WHEREAS, to maintain the use of said vaults it was necessary to make
improvements to the structure of said vaults during the course of
the "Peripheral Streets Project" construction, and
WHEREAS, the Common Council of the City of Ithaca has passed a
resolution giving the abutting property owners the right to either
abandon their vaults or not, abandonment to be at city expense except
for service relocation, and reconstruction to be at property owner's
expense,
NOW, THEREFORE, BE IT RESOLVED., that the Mayor be authorized to
execute the agreements to these terms with the property owners along
the Phase I streets of the peripheral streets project, as follows:
Salvatore Pirro
Anthony J. Leonardo
Mrs. Benjamin Natali
Jason Fane
Mrs. Marilyn W. Ryan
Cayuga Apartments, Inc.
Myron Stanton
Richard J. & Carolyn Boronkay
Oliver Weinsheimer
Ronald M. Lewis
William Baldini
)A\'
134 West State Street
101 West State Street
107 North Cayuga Street
101 East State Street
108-112 West State Street
102 West State Street
105 West State Street
124 South Cayuga Street
121 South Cayuga Street
106 South CayugaStreet
102 East State Street
BE IT FURTHER RESOLVED, that the Mayor be authorized to execute
similar agreements with those owners along the streets of Phase II
of the peripheral streets project as soon as such agreements can be
formulated.
Carried Unanimously
•
•
-23-
1.
Bill - Frederico Equipment Company
By Comm. Allan: Seconded by Comm. Ewanicki gra r
RESOLVED, That a bill from Frederico Equipment Company for cold milling
of Buffalo Street be approved in the amount of $15,689.
Carried Unanimously
•
•
-24-
Alderman Meyer read the following letters to the Boar
"August 16, 1978
Ms. Nancy Meyer
Ithaca City Council
214 Cascadilla Drive
Ms. Ethel Nichols
Ithaca City Council
109 Llenroc Ct.
Dear Ms. Meyer and Nichols,
Early in the spring the City's Department of Public Works dug up part
of Orchard Place to repair a sewer line. Two weeks ago the DPW dug up
the entire length of our street to install a new sewer line and a new
fire hydrant at the lower end of Orchard Place.
While we are appreciative of these new city services, a new problem and
liability for us has been created which we ask that you bring to the
attention of the DPW so they can correct it.
After the spring excavation, the DPW spot -paved the large hole they had
dug. This patch has subsequently settled and is now a large depression.
The new excavation which runs the length of the street will be spot -paved
also. We suspect this will settle and become a large gutter. The heavy
equipment used in both excavations have rendered extraordinary wear upon
the street creating a number of gauged -out areas.
As you know, the street is a private way and its maintenance is our
responsibility which we are in no way attempting to shirk, But the
condition of the street, due to the recent excavations, represents a
potential hazardous passage for all vehicles including public ones such
as fire, police and sanitation. Additionally, we had created a basket-
ball play area at the lower end of the dead end street for the children.
The spot -paving and pot holes in this play area has effectively nullified
its potential.
We ask you to have the DPW return the street surface to its former
condition by paving it so that we can accordingly resume our responsi-
bility of maintaining Orchard Place.
Thank you.
Sincerely,
Sean Killeen
President
Orchard Place Association"
0 I \ /. /0)
-25-
Declaration of Emergency Situation
Comm. Shaw reported that a cracked crank shaft resulted in failure of the
engine of packer #59. Because immediate repairs were necessary to get
this truck back into service on the refuse collection routes, insufficient
time was available for the normal process of bidding. Normal bidding in
this instance would not produce any meaningful price competition, therefore
Resolution 7/017/7/
By Comm. Shaw: Seconded by Comm. Schickel
RESOLVED, That this Board declare that an emergency exists and authorize
the department to purchase one re -built engine for packer #59 from Cayuga
Ford for $3,200 without the usual formality of bidding.
Carried Unanimously
•
•
Elmira Rd. Merchants — their recommendations on assessments & Southwest Parkway 1
McGuire & Bennett - change orders & payments - Stewart Ave. landslide 2
Barton, Brown, Clyde & Loguidice billy - Elmira Road 3
Snow removal report; garbage pickup report 4
Emergency purchase of salt 5
Parlor City - request for payment - Elmira Road 6
Complaint re snow removal efforts, etc. - Edward Moore Jr. 7
Challenge Industries requests replacement belt - glass recycling 8
Request for purchase of Grader (see Finance, page 8)
Stewart Avenue retaining wall - Request for payment B. K. Hough 9
Curb & gutter - Fifth Street; public hearing scheduled 10
Kramer/Norman - Problems - Elmira Road 11
Spring Cleanup Week designated & (Complaints) - 1 0018 12,
Subdivision Plans - Cornell Univ. - Old Fairgrounds Property 13
Charter Revision -Curb Assessments (See City Attorney - pg. 1)
Peripheral St. Contract -(See bids - page 9)
Wheaton Sheet Metal Shop - Maintenance garage - final payment 14
Wm. Jones - Klinewoods Rd. - Request guardrail condition be corrected 15
Pao'langeli Contractor - payment - Elmira Road 6
'To. Co. Firemen's Assoc. request use of Wood St. (see B & G pg. 16)
Route 96 - report on development 16
Elmira Road - renaming considered 17
Five Mile Drive - donation received toward repair of pavement 18
Bradley Landscaping - payment - Elmira Road landscaping 19
Nancy Woolf - Floral Ave. street repair complaint 20
Elmira Road - Condition road shoulders - Maintenance Responsibility City vs.
Private business 21
'Peripheral St. project - Payment requestsn- Water/Sewer; V. Giordano; 22-22a
Frederico Equip. Co. - bill - Coldmilling Buffalo St. 23
Peripheral Sts. - Addition of bike racks 22:-b'
Mr. Killen - Orchard Place - Letter requesting street be paved (See Bridges- 24
pg. 10)
Fall Pickup Week designated; - Thanksgiving day schedule 12a
Emergency request to purchase re -built engine for Packer #59 25
Peripheral Streets - Execution Vault agreements authorized 22-c
Request for upgrading lighting on Commons by DIBA (See Parking & Traffic - pg. 26)