Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutMN-IHA-1984-01-05 ITHACA HOUSING AUTHORITY
800 SOUTH PLAIN STREET
ITHACA, NEW YORK 14850
BOARD OF COMMISSIONERS
REGULAR MONTHLY MEETING
TITUS TOWERS
JANUARY 5, 1984
PRESENT: Morris F. Angell, June S. Protts, Esther C. Frandell, Edward J.
Conley, Margaret L. Clynes, Raymond Melton, Edward W. Austin,
William A. Lange, Jr. , Esq.
Mary Louise Battisti, Executive Director
GUESTS: Claudia Montague, WHCU; Rob Pondiscio, WTKO; Eleanor Hutcheson,
Clifford June - Titus Towers Residents; Joseph David, Geraldine
Fisher, Sharon Fiorille, Sybil Phillips, Karen Rider, Elizabeth
Roscioli, John Sylvester, Jeffrey Tilton, Brian Besemer, Allan
Simon, Earl Brennan, Glenn Gray, Darrell Rhoads, Garfield Ellsworth -
IHA Employees
Chairman Angell called the meeting to order and the roll was called_. All
members answered present. Chairman received letter of resignation- from Com-
missioner Miriam Hutchins, effective January 3, 1984, and welcomed Edward J.
Conley back to the Board. Mr. Conley was appointed by Mayor Gutenberger this
date to fill Ms. Hutchins' unexpired term.
APPROVAL OF December 15, 1983 Minutes:
AYES ABSTENTION
Morris F. Angell Edward J. Conley (not at meeting)
Edward W. Austin
Margaret L. Clynes
Esther C. Frandell
Raymond Melton
June S. Protts
Minutes approved as read.
REPORTS:
Vincent Lukas, OPR - No report.
Titus Towers Tenant Council - No report.
Northside Tenant Council - No report.
Southview Tenant Council - No report.
Attorney - Attorney Lange reported on the Eviction for Cause case, which
appears to be resolved. Other items to be reported on as they appear on
the agenda.
Chairman - No report.
Executive Director - No report.
p
BOARD OF COMMISSIONERS -2- January 5, 1984
OLD BUSINESS:
A. Letter from HUD - Re: Audit for Period 10/1/79 - 9/30/82, resolved.
No discussion.
B. Letter from William A. Lange, Jr. - Re: Proposed Hearing Officers
Attorney Lange explained the reason for the necessity of having a
panel to serve as Hearing Officers. To be discussed in Executive
Session as Mrs. Clynes had a question.
RESOLUTIONS:
LA RESOLUTION X184-1 - IHA Maintenance Employees Association Contract
(Read by Secretary, copy attached to original minutes)
Motion by Edward J. Conley; seconded by Raymond Melton
AYES NAYS
Morris F. Angell None
Edward W. Austin
Margaret L. Clynes
Edward J. Conley
Esther C. Frandeil.
Raymond Melton
June S. Protts
LA RESOLUTION X184-2 - Establishing Positions and Comparability
(Read by Secretary, copy attached to original minutes)
Motion by Edward• J. Conley; seconded by Raymond Melton
AYES NAYS
Morris F. Angell Edward W. Austin
Edward J. Conley June S. Protts
Margaret L. Clynes
Esther C. Frandell
Raymond -Melton
LA RESOLUTION #84-3 - Retainer Agreement for Legal Services between
William A. Lange, Jr. and IHA (Read by Secretary, copy attached to
original minutes)
Motion by Edward J. Conley; seconded by Esther C. Frandell
Mr. Austin questioned the date of the Agreement. Explained by Executive
Director that all contracts go by the Fiscal Year, i.e. October 1 through
September 30. Error noted in date on Contract (November instead of
October) . Mr. Conley moved that the resolution be accepted and that the
date be corrected. Seconded by Esther C. Frandell.
AYES NAYS
Morris F. Angell None
Edward W. Austin
Margaret L. Clynes
Edward J. Conley
Esther C. Frandell
Raymond Melton
June S. Protts
BOARD OF COMMISSIONERS -3- January 5, 1984
LA RESOLUTION 4184-4 - Agreement for Accounting Services between the IHA
and Sciarabba Walker & Company (Read by Secretary; copy attached to
original minutes.)
Motion by Esther Frandell; seconded by Edward Conley
AYES NAYS
Morris F. Angell None
Edward W. Austin
Margaret L. Clynes
Edward J. Conley
Esther C. Frandell
Raymond Melton
June S. Protts
LA RESOLUTION 4184-5 - Operating Budget for Fiscal Year 1983-84
(Read by Secretary; copy attached to original minutes.)
Motion by Esther Frandell; seconded by Edward Conley
AYES NAYS
Morris F. Angell None
Edward W. Austin
Margaret L. Clynes
Edward J. Conley
Esther C. Frandell
Raymond Melton
June S. Protts
COMMUNICATIONS:
A. Letter dated December 15, 1984, from former Mayor Shaw
B. Letter to Chairman and Members of the IHA Board from Executive
Director in reply to Mayor's letter
Mr. Austin commented that it was his impression that discussions
which occur in Executive Session are not for public comment or
notification. Discussion ensued as to procedure for Executive
Session. Mr. Austin continued, that discussion during Executive
Session is confidential information. Executive Director stated that
her letter was not to the public, but to the Chairman and members
of the Board, and was to state her position on certain items that
were either written or verbally stated.
Commissioner Clynes moved to adjourn to go into Executive Session for the pur-
pose of discussing the proposed list of hearing officers. Seconded by Esther
Frandell. Mr. Conley stated that if a resolution is required, the Board would
come out of Executive Session and the public meeting would reconvene.
Open meeting reconvened. Motion by Edward Conley to accept Attorney Lange's
recommendation of the three people to serve on the panel as hearing officers.
Seconded by Raymond Melton.
BOARD OF COMMISSIONERS -4- January 5, 1984
AYES NAYS
Morris F. Angell Margaret L. Clynes
Edward W. Austin
Edward J. Conley
Esther C. Frandell
Raymond Melton
June S. Protts
Commissioner Austin requested information on the duties and responsibilities
of housing commissioners. Executive Director said an order has been sent for
another supply of the Handbook for Commissioners.
As there was no other business, the Chairman asked for a motion to adjourn.
Motion to adjourn by Edward Austin; seconded by Esther C. Frandell. Meeting
adjourned.
Esther C. Frandell, Secretary-Treasurer
(Recorded by Patricia S. Darling)
:1t u:.
.112Jn1 C1tJ t•n!: Huus.ng
I'ro)t•Ct Nu. NYO6-1'O-54-006/007
1983 Field Report
%Work Payment Earned
Contractor Completed Number Amount Todate
Mc Guire 6 Bennett - GC 79 13 $41,089.00 $2,014,221.00
Williams Elec. Constr. - EC 88 13 25,566.86 305,643.60
Nen Bruielly P. 6 H. - HC 88 9 36, 975.10 218, 902.56
ABL Plum. 6 Heat. - PC 74 8 37, 743.20 197, 730.77
Note: ABL retainage 10%, all other primes 5%
Due to the weather, all site work has ceased.
The second floor sheetrock work is completed. GC is ready to do floor and
ceiling followed by painting.
The GC's activity has slowed down. The single story structure is still
behind schedule. Roofing work has progressed to block out the weather.
The unit is totally enclosed. HC is running heating lines and will set
a space heater. This will enable the GC to pour the floor and erect
partitions during the month of January.
Elevator installation is 50% completed.
The HC has completed the baseboard heating on floors 2 through 6. Covers
will be set after the painting is completed. When the ground floor work
is completed, the heating-air conditioning units will be set.
The EC has completed the wiring and panels in the apartment units. The
EC started to install switches and outlets. GC requested this be stopped
to insure good finishing around the boxes by the sheetrock subcontractor.
The PC contractor had 10 men on the job December 23, 1983. Instead of
maintaining a normal crew after tis all out effort, the present crew is
1 supervisor, 1 apprentice plumber and 1 sprinkler fitter. At present,
this is not causing any problems. It is conceivable that delays with
other trades can develop in two weeks.
Res ectfully submitted,
674/4(- C4----
Vincent Lukas, P.E.
January 6, 1984
•
Vf
Titus Towers 11
Senior Citizen Housing
Project No. NY06-PO-54-006/007
_January. 1984 Field Report
%Work Payment Earned
Contractor Completed Number Amount Todate
McGuire & Bennett - GC 81 14 $ 75,528.00 $ 2,089,749.00
Williams El. Constr. - EC 92 14 13,751.30 319,394.90
Ken Brueilly P. & H. - HC 89 10 2,106.87 221,009.43
ABL Plumb. & Heat. - PC 84 9 28,690.14 226,420.91
Note: ABL retainage 10%; all other prime contractors 5%
The finishing touches are beginning on the building.
The GC has made substanial progress on the single story structure. The concrete
floor is in place. The masonry wall enclosing the maintenance area is completed. The
metal studs and sheetrock walls will be constructed the week of February 6.
Sheetrock work is completed on floors 2 thru 6. Finishing is completed on floors
2 thru 5. Prime coat of paint is completed on the 2 and 3 floors. Latex on the span-
crete floors are finished on floors 2 thru 4. Epoxy floors in the handicap units are
being installed.
Elevator work will be completed in the middle of February.
The trash chute and scaffolding have been removed by the GC on January 30, 1984.
The PC can move the hot water storage tank into the Mechanical Room. The GC completed
the concrete piers. PC has made no plans to move the tank todate.
The HC is caught up and had minimum activity during the month. The sheetmetal
subcontractor is behind schedule. The HC is taking care of this matter and there
will be no hold up on the ground floor work.
The EC is on schedule. The work force has been reduced to three electricians.
The work force is able to keep up with the other trades. The fire alarm and TV systems
are currently being completed.
The PC is concentrating on the main floor and work under the slab. Bath tubs are
installed in the sixty units. Other plumbing fixtures are on site and will be installed
when the second coat of paint is applied in the units.
The fire protection system is 95% completed. Work remains in the single story.
Water is in the system in the Six-story building, providing protection in case of a
fire.
Respectfully submitted,
Feb. 3, 1984
tiV VFRED H. THOMAS ASSOCIATES PC TITUS TOWERS TWO
ARCHITECTS + ENGINEERS SENIOR CITIZEN HOUSING
2560 NORTH TRIPHAMMER ROAD .-ITHACA HOUSING AUTHORITY
ITHACA, NEW YORK 14850 ARCHITECT'S PROJECT NO. 1475
Contractors:
MCGUIRE & BENNETT, INC. - GC
KEN BRUIELLY PLB. & HTG. CO. , INC. - HC
WILLIAMS ELECTRICAL CONSTR. , INC. - EC
ABL PLUMBING & HEATING CORP. - PC
PROJECT MEETING REPORT
Report No. : 29
Date January 13, 1984
Attendees G. Ellsworth, Owner N. Smith, GC
V. Lukas, Owner K. Bruielly, HC
J. Loveall , A/E J. Williams, EC
T. Michaud, A/E L. Bellucci , PC
T. Schickel , A/E R. Hveem, PC
Discussion: Meeting called to order at 10:00 A.M. by J. Loveall .
General Construction Work:
1. Construction Progress and tentative schedule for next 2 weeks:
1 story building - Roof flashing was installed the week of January 1,
1984.
- Temporary heat has been provided and all steel has
been fireproofed.
- Low slab adjacent to the existing building to be
poured as soon as the expansion joints come in. Ramp
and high slab to follow. J. Loveall cautioned _GC •
that Proposal Request GC-32 would slightly alter the
limits of the low and high slab, and stated that it-
would be necessary for an early decision to avoid
holding up the slab installation.
- Latex leveling underway in Laundry Room 129.
6 story building - Elevator installation continuing through mid-late
February.
- Installation, taping and finishing of drywall
completed on 3rd floor. 4th floor to be completed by
the end of next week. GC to complete the closing of
chases on the 6th floor next week.
- Priming started in corridors and units on 2nd floor.
Paint to be ordered next week for floors 2 through 6.
- Application of a latex leveling coat under areas of
scheduled VAT has been started in units and work to
continue.
- A test ceiling for units has been approved by
Architect. Work to continue. Sample is in bedroom
of Room T-15 Second Floor.
2. Owner questioned whether the slope of the ramp in Maintenance 115 could
accommodate their tractor-plow. A/E to pursue prior to the pouring of the
slab in that area.
PROJECT MEETING REPORT NO. 29 / Page 1
Heating and Ventilating Work:
1. It was stated that Rumsey should be back on the job soon to avoid falling
behind. HC stated that after next Wednesday, his subcontractor would be
on the job again every day with a 3-man crew. There are fans to be hung
and much duct work to go in, and the temperature control people have work
to do again.
2. Heating lines have been installed in 1-story link.
Electric Work:
1. Meters have been installed and fuses to be in today. EC has numbered
meters.
2. EC mentioned a list of outstanding change orders. A/E to pursue.
Plumbing Work:
1. PC is keeping up with the new schedule.
2. GC alerted PC that water tank can be brought into the building and tested
as soon as elevator installation is complete, which will be in mid-late
February and that fixtures can also be installed by mid-end February.
3. PC must still move his waste line in Community Room 119 before GC pours
the high slab.
4. Owner brought up the question of the need for a hose bibb in both the
Trash Room 105 and Maintenance Room 115. It was also mentioned that the
specified drain for the Maintenance Room 115 does not have a
sand-intercepting basin which Owner felt would be desirable. A/E to
pursue with Owner and PC.
•
Next Job Meeting scheduled for Friday, January 27 , 1984 at 10:00 A.M.
PROJECT MEETING REPORT NO. 29 / Page 2 / End
OJSING
Q Gi ITHACA HOUSING AUTHORITY
U
< 800 SOUTH PLAIN STREET
ITHACA, NEW YORK 14850 607-273-8629
err. 106
MARY LOUISE BATTISTI
EXECUTIVE DIRECTOR
DATE: February 3, 1984
TO: Mary Louise Battisti
Executive Director
FROM: Joseph M. David
Public Housing Manager
SUBJECT: Monthly Report for January, 1984
Vacancies: 503 Hancock Street, Apt. #9 2 bedroom
412 Hector Street, Apt. #8B 3 bedroom
414B South Plain Street 3 bedroom
Tenants tentatively being selected for placement 3
Tenants that were selected and placed 6
Inspections made on prospective tenants (applicants) 4
Inspections made on tenants moving out 3
Inspections made on present tenants 2
Tenants that have been relocated 2
Respectfully submitted,
14.Atjui
1"
Joseph M. David
JMD:br
rnoe
ITHACA HOUSING AUTHORITY
Financial Report
As of December 31 , 1983
Checking Accounts
General Fund $ 4,887.04
Section 8 49,791 .93
$ 54,678.97
Savings Account
Security Deposits 26,264.24
Escrow 1 ,262.88
27,527. 12
Investments
Super Seven CTAP Acct. #02-101-018045 153, 149.46
Super Seven Operating Acct. #04-101-018045 135,795. 14
Certificate of Deposit #31-101-018045 275,000.00
Repurchase Agreement #583023-Dev. 1 ,222,415.09
U. S. Treasury Bills 485,989.66
2,272,349.35*
Accounts Receivable
Current Tenants (19) 995.02
Vacated Tenant Accounts Receivable (2) 15.39
1 ,010.41
$ 2,355,565.85
Accounts Receivable thru December 31 , 1983
Arrears as of 10/31/83 $ 4,634.20
Adjustments made 11/1/83 972.52
Rent roll charges for Nov. & Dec. 1983 71,425.50
Other charges for Nov. & Dec. 1983 994.70
$ 78,026.92
Advance payments from Oct. 1983 8, 170.20
Rent collected during Nov. & Dec. 1983 71 ,418.27
Other charges collected during Nov. & Dec. 1983 1 ,031 .23
Advance payments included in above (8,355.70)
(72,264.00)
Less Vacated TAR written off by Board Resolution #83-18 (4, 144.90)
Less charges to be paid by DSS Vouchers & Security Deposits (607.61)
Total Tenant Accounts Receivable as of December 31 , 1983 $ 1 ,010.41
*$19,254.08 of this amount is modernization funds, $475,896.23 of this amount is oper-
ating funds, $1 ,523,018.06 of this amount is development funds, and $254, 180.98 of this
amount is CTAP funds.
ITHACA HOUSING AUTHORITY
INVESTMENT SUMMARY_
1982- 1983
Balance/
V Purchase Date Amount Maturity Date Int. Rate Days Date Cast
2;rciitcace of Deposit 28-101-018045 08/16/82 185,000,00 09/15/82 9. 15 30 09/15/82
(185,000.00)
,:; rciit:ace of Deposit 26-101-01$045 08/16/82 3,000,098.00 09/ 15/82 9 . 15 30 09/15/82
• r.; market 26-301-018045 09/15/82 (3,000,098.00)100, 00
.. y 0 00 03/16/83 9 .954 182 03/( 83
(100,000.00)
Ce tit:ace of Deposit 27-301-018045 09/15/82 100,000.001* 03/14/83 9.60 180 03/14/83
(100,000.00)
U S . Treas. Notes* 982474 09/15/82 100,000.00 01/13/83 9. 50 120 1/13/83
(100,000.00)
C.ertiitcate of Deposit 28-301-940371 09/15/82 100,000.00 10/15/82 9 .25 30 10/15/82
(100,000.00)
Fe.: . F.,re Cr. Banks/
U. S . Treas. Notes* 982471 09/15/82 2 ,000,000.00 01/13/83 9. 50 120 1/13/83
(2,000,000.00)
U. S . Treas. Notes* 982472 09/15/82 100,000.00 10/15/82 9.25 30 10/15/82
(100,000.00)
u. S . Treas . Notes* 982473 09/15/82 736,760. 38 12/14/82 9,40 90 12/14/82
• 04-101-018045 . (736,760. 38) � * 30 da.
.Ler Seven Account 12/31/83 135,795. 14
& r eh-.ra 1
tut.er Seven Account -Dev. 01 -301 -943605 -0- �` 30 da. int.
6 renewal
Certificate of Deposit 26- 101-018045 12/14/82 260,837.07 04/13/83 8. 15 120 4/13/83
(260,837.07)
. .riey market 27- 101-018045 04/13/83 267,826.07 10/12/83 8.798 182 10/12/83
(267,826.07)
Certificate of Deposit 31 -101-018045 05/18/83 275,000.00 11/18/84 9.25 18 mos.
•
Repurchase Agreement 583023 05/18/83 1 ,222,415.09 05/18/84 8. 10
U.S. Treas. Bills - 10/27/83 485,989.66 06/14/84 9.36 203 das.
Super Seven CTAP Acct. 02-101-018045 10/31/83 153, 149.46 * 30 da. int.
6 renewal
*Super 7 rates change weekly.
CASH DISBURSEMENTS - DECEMBER 1983
Date Check 41 Payee Amount
12/1/83 12754 Mr. William A. Lange Jr. Attorney (Legal Expense) 1,200.00
12/2/83 12755 NYS E & G (Balance of Oct. - Nov. billings) 11,009.48
12756 Ms. Leila Vinson (Security Deposit Refund plus int.) 127.21
12/4/83 12757 U. S. Post Office (Office Supplies) 134.00
12/6/83 12758 K-Mart Discount Store (Pre-K Supplies) 57.07
12759 Mary K. Rogers (N. S.-Christmas Party) 100.00
12760 Mary K. Rogers (Pre-K Snacks/Decemeber) 40.00
12761 Mary K. Rogers (Supplies/After School Program) 40.00
12/8/83 12762 Mary Louise Battisti (11/25/83 thru 12/8/83 Payroll Period) 759.41
12763 Patricia S. Darling (11/25/83 thru 12/8/83 Payroll Period) 201.81
12764 Joseph M. David (11/25/83 thru 12/8/83 Payroll Period) 516.04
12765 Sharon D. Fiorille (11/25/83 thru 12/8/83 Payroll Period) 268. 10
12766 Geraldine J. Fisher (11/25/83 thru 12/8/83 Payroll Period) 226.85
12767 Glenn D. Gray (11/25/83 thru 12/8/83 Payroll Period) 493.87
12768 Sybil S. Phillips (11/25/83 thru 12/8/83 Payroll Period) 446.38
12769 Elizabeth A. Roscioli (11/25/83 thru 12/8/83 Payroll Period) 248.69
12770 Jean R. Sylvestre (11/25/83 thru 12/8/83 Payroll Period) 244. 15
12771 Brian J. Besemer (11/25/83 thru 12/8/83 Payroll Period) 253.25
12772 Earl D. Brennan (11/25/83 thru 12/8/83 Payroll Period) 414.81
12773 Garfield G. Ellsworth (11/25/83 thru 12/8/83 Payroll Period) 479. 12
12774 Ralph M. Koberstine (11/25/83 thru 12/8/83 Payroll Period) 282.01
12775 Darrell A. Rhoads (11/25/83 thru 12/8/83 Payroll Period) 343.48
12776 Allan E. Simon (11/25/83 thru 12/8/83 Payroll Period) 416.24
12777 Jeffrey M. Tilton (11/25/83 thru 12/8/83 Payroll Period) 230.98
12778 Jack E. Allen (11/25/83 thru 12/8/83 Payroll Period) 277.70
12779 Vincent Lukas, P.E. (Dev.-Inspection Costs) 1,080.00
12780 Tompkins Emp. Federal Credit Union (Credit Union Shares/Dec.) 720.00
12781 IHA Maint. Emp. Ass. (Union Dues/Dec.) 25.00
12782 Mary K. Rogers (Contract Payment - NS After School Program) 50.00
12783 Mrs. Marian Tilton (Security Deposit Refund plus interest) 72.92
12784 Tompkins County Dept. of Social Services (Sec.Dep. Ref.) 88.61
12785 Fred H. Thomas Ass. PC (Dev.-A. & E. Fees) 1,065.00
12786 Auto Parts Supply (Maintenance Materials) 31.66
12787 Autosalvage of Ithaca, Inc. (Maintenance Materials) 35.00
12788 Best Plumbing Specialties (Maintenance Materials) 33.28
12789 Cramer's Auto Parts, Inc. (Maintenance Materials) 10.20
12790 The City of Ithaca, Dr. Chamberlain's Off. (Utility Exp.) 1,375. 16
12791 Creed Company (Maintenance Materials) 28. 12
12792 Direct-Page Communications, Inc. (Telephone/Dec.) 74.25
12793 Eagle Envelope Company (Office Supplies) 236.65
12794 Empire Building Supplies, Inc. (Maintenance Materials) 125.27
12795 Energy Materials & Controls, Inc. (Maintenance Materials) 184.61
12796 Exxon Company U.S.A. (Maintenance Materials) 44.85
12797 Finger Lakes Fabricating (Maintenance Materials) 7.28
12798 The Glass Company (Maintenance Materials) 208.76
12799 Hyatt Regency New Brunswick (Staff Training) 340.32
12800 Ithaca Agway Coop. Inc. (Maintenance Materials) 23.07
12801 Ithaca Wholesale Electric Supply, Inc. (Maint. Materials) 422.96
12802 Lustre Line Products (Maintenance Materials) 65. 19
12803 Paul Mancini & Son's Inc. (Extraordinary Maint.-Contract) 276.25
12804 T. G. Miller's Sons Paper Co. (Office Supplies) 146.83
12805 NYSARHO, Inc. (Sundry-membership renewal) 250.00
12806 NYS E. & G. (Bal. of Oct.-Nov. Billings) 6,815.51
12807 NYS Emp. Health Ins. Pending Acct. (Jan. 1984 Premium) 1,712.32
12808 New York Telephone (November Billings) 463.56
12809 Otis Elevator Company (Maintenance Contract) 930.98
12810 Sciarabba Walker & Co. (Accounting Fees) 425.00
12811 The Sherwin-Williams Co. (Maintenance Materials) 279.00
12812 Upstate Tractor Co. (Maintenance Materials) 28.55
CASH DISBURSEMENTS - DECF. 1983 - CON'T
Date Check # Payee Amount
12/8/83 12813 Vasco Brands, Inc. (Maintenance Materials) 277.00
12814 Woolworths (Tenant Serives) 3.98
12815 Xerox Corporation (Sundry-Other) 93.29
12816 Mr. & Mrs. Michael Betancourt (Security Dep. Refund plus Int.)147.48
12/15/83 12817 PHADA Management of Maint. (Travel Expense) 169.00
12818 Tompkins-Seneca-Tioga B.O.C.E.S. (Staff Training) 80.00
12/22/83 12819 Mary Louise Battisti (12/9-22/83 Payroll Period) 759.41
12820 Patricia S. Darling (12/9-22/83 Payroll Period) 201.81
12821 Joseph M. David (12/9-22/83 Payroll Period) 516.04
12822 Sharon D. Fiorille (12/9-22/83 Payroll Period) 268.10
12823 Geraldine J. Fisher (12/9-22/83 Payroll Period) 226.85
12824 Glenn D. Gray (12/9-22/83 Payroll Period) 493.87
12825 Sybil S. Phillips (12/9-22/83 Payroll Period) 446.38
12826 Elizabeth A. Roscioli (12/9-22/83 Payroll Period) 248.69
12827 Jean R. Sylvestre (12/9-22/83 Payroll Period) 244.15
12828 Karen I. Rider (12/9-22/83 Payroll Period) 212.91
12829 Wilcox Building Specialties (Site Improvements-CIAP) 16,655.50
12830 ABL Plumbing & Heating Corp. (Dwelling Struc.-Dev.) 11,181.60
12831 Ken Bruielly Plumbing & Heating,Inc. (Dwell. Struc.-Dev.) 28,998.58
12832 McGuire & Bennett, Inc. (Dwelling Struc.-Dev.) 110,143.00
12833 Williams Electrical Construction Inc. (Dwell. Struc.-Dev.) 35,118.88
12834 Brian J. Besemer (12/9-22/83 Payroll Period) 240.89
12835 Earl D. Brennan-(12/9-22/83 Payroll Period) 371.44
12836 Garfield G. Ellsworth (12/9-22/83 Payroll Period) 435.96
12837 Ralph M. Koberstine (12/9-22/83 Payroll Period) 280.97
12838 Darrell A. Rhoads (12/9-22/83 Payroll Period) 402.93
12839 Allan E. Simon (12/9-22/83 Payroll Period) 340.16
12840 Jeffrey M. Tilton (12/9-22/83 Payroll Period) 235.98
12841 Jack E. Allen (12/9-22/83 Payroll Period) 303.54
12842 Vincent Lukas P.E. (Dev.-Inspection Costs) 1,200.00
12843 Mary K. Rogers (Contract Payment-NS After School Program) 50.00
12844 Mrs. Mabel B. Rightmire (Security Dep. Refund plus Int.) 137.22
12845 To The Estate of Mary McGuinness (Sec. Dep. Ref. plus int.) 81.47
12846 Ms. Karen Spradlin (Security Deposit Refund plus interest) 117.20
12847 Mr. & Mrs. Vinh Khon Quach (Sec. Dep. Ref. plus interest) 185.66
12848 Empire Building Supplies, Inc. (Gutters & Downspouts) 705.39
12849 Grossman's (Dwelling Structures - 77-MOD) 16.52
12/27/83 12850 Ithaca Housing Authority Petty Cash (Off. Supplies&Maint. Mat.)80.61
12851 Leo J. Roth Corp. (Dwelling Structures - Roofs (76-MOD) 28,094.62
12852 Morris F. Angell (Dev.-Travel) 108.65
12/29/83 12853 Ace Security Control (Maintenance Materials) 5.39
12854 JR's A.M. Auto Repair (Maintenance Contract) 121.16
12855 Bear Electric (Extraordinary Maintenance - Contract) 285.00
12856 Donovan-Luksa Paper Products (Maintenance Materials) 15.00
12857 The Ithaca Journal (Sundry-Other) 28.38
12858 William T. Pritchard, Inc. (Non-Dwell. Equip.-Autos.-CIAP) 10,337.55
12859 Simplex Time Recorder Co. (Maintenance Contract) 1,917.50
12860 Sunmark Industries (Maintenance Materials) 237.64
12861 Vasco Brands, Inc. (Maintenance Materials) 123.20
12862 West Publishing Company, Inc. (Sundry-Other) 5.00
12863 Ithaca Housing Authority Security Deposits (Nov./Deposits) 425.51
CASH DISBURSEMENTS - DECEMBER 1983 - CON'T.
Date Check It Payee Amount
12/30/83 12864 Jean R. Sylvestre (12/23/83 thru 1/5/84 Adv. Payroll Period) 244. 15
12865 Tompkins Count Trust Co. (FWT/Dec. '83) 2,083.20
12866 NYS Income Tax (SWT/Dec. '83) 770. 10
12867 NYS Emp. Retirement System (Retirement for Dec. '83) 484. 15
12868 Tompkins County Sheriff (Employee Garnishments) 234.85
12869 Cayuga County Support Collection Unit (Emp. Garnishments) 20.00
12870 VOID -0-
12871 Cortland County Support Collection Unit (Emp. Garn.) 60.00
12872 Tompkins County Support Collection Unit (Emp. Garn.) 150.00
12873 United Way of Tompkins County (Contributions/Dec. '83) 11.00
$293,921.32
\w/ \./
OVSIN`' 9
it •s• ITHACA HOUSING AUTHORITY
< A 800 SOUTH PLAIN STREET
=
; ITHACA. NEW YORK 14850
r,
607-273-8629
E8r 194
MARY LOUISE BATTISTI
EXECUTIVE DIRECTOR
DATE: February 1, 1984
TO: Mary Louise Battisti
Executive Director
FROM: Sharon D. Fiorille
Section 8 Coordinator
SUBJECT: Section 8 Report for January 1984
Total certificates available on program 94
Total number of certificates issued (not leased) 02
Total number of certificates not issued 00
Certificates issued during this month (not leased) 02
Units under lease 92
Units under lease this month 03
Relocations performed this month of present participants 03
Participation recertifications completed this month 06
Annual inspections completed this month 08
Initial occupancy inspections completed this month 04
Relocation inspections completed this month 02
Total dollar amount of rent subsidy disbursed to landlord participants during
month of January 1984 $15,577.00
Respectfully submitted,
,,,i40AL07, nnLk
Sharon D. Fiorille
/sdf
0111 RI ACH
Date � �_ _ ' Caseworker � /�� ' �� 7 /1'.,_.7L„,/
i. of Clients No. of New Clients Family Elderly Closed Sectionl8
General Service Case Specific Duties
Inquiries re: IHA Services ( 1 Prescreen 7�
Referrals received Review case
Referrals made to other Forms
agencies _
Fill out ;/5
Follow up on referrals
Interpret , _"")
institutional Visits
Client advocate / •
Resource People
Transportation to services
No. of Calls
Accompany client to services
No. of Visits /
/ Informal counseling
.;roup Meetings
Making appointments
Mothers' group
Follow up, including verify
Community group 9 receipt of services i'c7-1i
Tenant Council
Program Enrollment
Workshops 1
(----35
INGi ITHACA HOUSING AUTHORITY
Q A m 800 SOUTH PLAIN STREET
ITHACA, NEW YORK 14850
607-273-8629
&r. 1948
MARY LOUISE BATTISTI
EXECUTIVE DIRECTOR
Date: February 1 , 1984
To: Mary Louise Battisti
Executive Director
Subject: MONTHLY MAINTENANCE REPORT for the months of December 1983 and
January 1984
Total Work Orders completed in December 1983 and January 1984: 250
Titus Towers (162 Units) 124
Northside (70 Units) 89
Southview (26 Units) 33
Overlook Terrace (10 Units) 4
Apartment REHABS completed during the months of December 1983 and January 1984:
410A South Plain Street
109 Titus Towers
510 Titus Towers
609 Titus Towers
1206 Titus Towers
216 2B Third Street
111 Fifth Street
308C Center Street
Special Projects completed during the month of December 1983:
December 1 - 5 Completed the winter maintenance on heating equipment
that commenced November 28, 1983.
Projects 54-1 , 54-2, 54-4, 54-5
December 7 Removed fencing and the air conditioner unit located
outside of Titus Towers.
Project 54-1
No special projects to report for the month of January 1984.
This in addition to on-going, day-to-day and preventative maintenance.
Respectfully submitted,
Garfield G. Ellsworth
Maintenance Supervisor
3.
irms0 \w/
t`„i//.. �\?//J ITE-In E�..st u ,v 1,6 d .6 ,, g3 I :-.LLs..Y l Y
(r �. \p
J y _
t : 1 _� COO SOUTH I'!. ,I t c -[_T
\ `i ITHACA, N' W YE e< r - .50
-\\ ..---"�Y 607 273-i ';29
t - "6
i•-1,4',-(Y I_C:LUVSt=EA1TI$TI
F:.x.c-,".It`::LT- CYOR
DATE: February 9, 1984
i0: Mary Louise Battisti
Executive Director
FROM: Glenn D. Gray
SUBJECT: MODERNIZATION COORDINATOR'S REPORT _ January 1984
1. Installation of electrical appliance circuits by Madison-Aagaard
Electrical Contractors at Northside Apartments is now complete.
Architect's inspection is scheduled for February 9, 1984. Equip-
ment submittals for Intercom System and Television Monitor at Titus
Tower I have been approved by Architect. Installation is expected
to commence as soon as materials arrive.
2. A purchase order has been issued to Eljo Products Inc. of Pennsauken,
New Jersey in the amount of $2,592.00 for 108 sets of magnetic weath-
erstripping stop sets and bottom sweeps for exterior doors at North-
side. Delivery is expected in early February. Installation will
be done by Force Labor.
3. A purchase order has been issued to Cayuga- Electric Supply Company
for 500 circline type florescent light fixtures at $13.75 each.
Installation will be done by Force Labor.
4. A low bid in the amount of $6,476.00 has been received from Sabia
Construction Company of Windsor, Vermont for the removal of the
existing waste compactor in Titus Tower I and installation of an
IDC Model XM-40 compactor. Award is contingent upon satisfactory
completion of the HUD Previous Participation process and check of
the Debarred List.
5. The Dodge one ton Crew Cab Pickup was delivered on December 15,
1983. It is now in service and performing satisfactorily. The
Chevrolet S-10 four wheel drive pickup with plow is scheduled for
delivery on February 6, 1984.
6. Interior Sliding Storm Window installation at Titus Tower I is com-
plete with the exception of one window which was damaged by the
installers and had to be replaced. This window will be installed
when crew returns to complete punchlist in early February. During
installation, a large number of floor tile in the hallways were
scraped and gouged by the installation crew's improper handling
of the windows. A tile repair expert and a representative of the
subcontractor's insurance company have both inspected the damage
at this date, and Summit Modular has assured the Housing Authority
that this matter will be resolved in a satisfactory manner.
-2-
7. The Time Clock and Night Setback controls for Titus Tower I have
been installed, calibrated and debugged. The system is on-line
and performance is satisfactory.
8. Requests for Proposals for a Mini-Computer, including specifications
for hardware, software, and system maintenance service have been
forwarded to several systems companies. Award of this contract will
be made through the competitive negotiation process, to allow for
the proper tailoring of the system at the best price.
Respectfully Su��tted,
n
G enn D. GrkV de
Modernization Coodinator
GDG: kir
SANFORD. PAPWORTH 8c TRESPASZ
ATTORNEYS AND COUNSELORS
1 300 STATE TOWER BUILDING
lOfl SOUTH WARREN STREET RECEIVED JAN3 01984
SYRACUSE. NEW YORK 13202
SAMUEL C. SANFORD TEL.(3151422-2390
JOHN T.PAPWORTH
THEODORE A.TRESPASZ January 13, 1984
DAVID 5.KIMPEL
PAMELA J.FIELD'
'ALSO ADMITTED TO ARIZONA BAR
Mary Louise Battisti, Director
Ithaca Housing Authority
800 South Plain Street
Ithaca, New York 14850
Dear Mary Louise:
I have this day contacted the Surety and informed them that we have
finalized the matter with regard to the roofing problems . I am
including herewith an original and two copies of the final Stipu-
lation of Settlement which must be executed by you on behalf of the
Authority. It is my understanding that the Board has previously
passed a resolution allowing you to take this action, however, if
this is not the case let me know and I shall happily appear before
the Board to explain this document and its import.
I want to take this opportunity to say that it has been a pleasure
working with you and the Ithaca Housing Authority and to also state
emphatically that of all the Housing Authorities that I represent
and have done work for around the state, I feel that your operation
is the most efficient, due in no small part to your efforts. I
know how difficult running an Authority is and how time consuming
the job of director can be, and I just want to let you know that I
think you are doing a hell of a job. I look forward to working with
you in the future should the situation so arise.
My best wishes to you and your staff in the New Year.
Since ly,
ohn T. Papworth
JTP/vc
Enclosures
P 't/(y r��Tyi._ 7 c?,te(c Fr' 0/'a c� 0-40 ,'/a bGr1 70
CI Z c a/!c-( ! (Shcr// SC C l,2 i/ tf cJr: 777cd- 7c 47 0/7
T
`''
MEMORANDUM OF UNDERSTANDING
WHEREAS, the Ithaca Housing Authority (hereinafter the "Authority") and
The Etna Casualty and Surety Company (hereinafter "Surety") have come
to various terms as a result of protracted negotiations resulting from
the default of D and V Development Company, Inc. , (hereinafter "D and V")
in reference to the roofing contract on Northside and Southfield Apartments
(hereinafter the "Project") , and
WHEREAS, the parties are desirous of putting these terms in written form,
NOW, THEREFORE, the parties hereto hereby agree as follows:
1 . That there is currently being held in escrow by the Authority the
sum of $31 ,439. 12, which sum represents the reLlaining contract
balance after previous payment to D and V the sum of $73,291 .99
of the original contract price of $104,258 as amended by change
order.
2. The Ithaca Housing Authority shall pay to Leo J. Roth Corp. upon
completion of their contract the sum of $33,445 in full payment of
the completion of the D and V contract pursuant to a Memorandum of
Understanding dated August 11 , 1983.
3. The Surety, in satisfaction of any and all claims against Performance
Bond Number 45 SB 073908 BCA agrees to pay to the Ithaca Housing
Authority the sum of $15,369.53, which sum represents:
a. $2,005.88--representing the difference between the contract
balance held by Ithaca Housing Authority ($31,439. 12) and
the amount due to Leo J. Roth Corp. ($33,445) ;
b. $3,000.00--representing attorney's fees incurred by the
Authority;
c. $5,863.65--representing architectural fees incurred by the
Authority;
d. $4,500.00--representing the escrow account as described in
Paragraph 4 of this Memorandum of Understanding.
4. ESCROW ACCOUNT - The Surety and the Ithaca Housing Authority agree that
the sum of $4,500 will be held by the Authority in an interest-bearing
account (earning not less than v.5% interest per annum) for a period
of not more than twenty-four (24) months from the date of this
Agreement. This Escrow Account will be maintained for this period
for the sole benefit of the Ithaca Housing Authority and may be used,
in the Authority's sole discretion, to correct and repair any defects
which may arise in workmanship on the project during the twenty-four
month period. This Escrow Account will not be used and does not
guarantee any defect in materials used on the described Project as the
Authority has separate warrant:.es and guarantees from the manufacturer
of the roofing materials.
•
The Authority agrees that in the event no defects are discovered
during the twenty-four (24) month period, it will pay over to
The Etna Casualty and Surety Company the entire balance of said
Escrow Account including accrued interest.
5. All monies due hereunder shall be paid within thirty (30) days of
execution of this Agreement.
6. This Memorandum represents the entire Agreement of the parties and
shall not be changed except by written amendment to this Memorandum.
7. This Memorandum represents a full and complete settlement and
release of any and all claims between The Etna Casualty and Surety
Company and the Ithaca Housing Authority arising out of The Etna's
Bond Number 45 SB 073908 BCA.
ITHACA HOUSING AUTHORITY
BY: /pez 2,E.-. c
THE ETNA CASUALTY AND SURETY COMPANY
BY: ; -/,(7- 4)• /1.1
v, S. t',^.
. ' ' !.,/ ..,./� ,0ITI ,
(,c(t
\�0 EI VSE D �AN1 21,984
CITY OF ITHACA
1 DB EAST GPEEN STREET
ITHACA, NEW YORK 14850
OFFICE OF TELEPHONE 272-1713
MAYOR CODE 607
January 9, 1984
Ms. Mary Louise Battisti
Executive Director
Ithaca Housing Authority
800 South Plain Street
Ithaca, New York 14850
Dear Mary Louise: •
Thank you for your check in the amount of $22,476.30 for in lieu of taxes for
F.I. 9/30/83. I have turned the said check over to Joe Spano today for deposit.
I am sure that the next two years (at least) will produce a much smoother, coopera-
tive working relationship between the City and the Ithaca Housing Authority!
Thanks again, and I'll be in touch.
Sincerely,
( -.4Z - 7-
.
John C. Gutenberger
Mayor
MA1 TH['v'J F. `.' ;IUGR •.1
.. V .L- 7'1 7 18'
y'-TCOMMITTEE ON APPROPRIATIONS
S UBC RJRA T!fF5
Congress,Y of the United t�itcz yA=A-• 1iEE
AG RIC UIf t,4f RJRA;Cf Vf:OPMCNT NNN TF°tiaCE A.0 h.H:(IrY
AND RELATED AGINCIFS
ITHACA NEW 11850
F ORE,GN OP(RATIONS lune of Representation 150717731788
SELECT COMMITTEE ON CHILDREN, uFI
YOUTH AND FAMILIES 2Uashington, D.C. 2015KINcsTON IcE292 FAIR Si R(ET
WASHINGTON OFFICE KINGSTON NEW YORK 17101
2335 RAYBURN NOUSE OFFICE BUILDING 19141331-4166
WASHINGTON DC 70515 January 4, 1984
17021225 8335
Ms. Mary Louise BattistiE CE !J JA NZ
-:yc4
Executive Director
Ithaca Housing Authority
800 South Plain Street
Ithaca, New York 14850
Dear Mary Louise:
I thought that you might be interested in some major
changes which have been made in a number of federally funded
programs which may affect your community. These changes,
which result from the Housing and Urban-Rural Recovery Act
of 1983, affect such programs as Community Development Block
Grants (CDBG) , Urban Development Action Grants (UDAG) , and
various housing assistance programs. There are also several
new programs in which you may be interested.
Enclosed is a summary of the most significant of these
changes and new programs. I hope you find it to be of some
use.
If you have any questions, please feel free to contact
my office.
Best regards.
Sin y
Matthew F. McHugh
MFM/djc
Enclosure
�� �/ �►RECEI4'ED JNt2 0i^S4
HIGHLIGHTS OF THE HOUSING AND URbAN-RURAL RECOVERY ACT OF 1983
The Housing and Urban-Rural Recovery Act of I383 makes some
significant additions to the programs of the Departrent of Housing and
Urban Development, and rakes changes in some existing programs. Following
are highlights of these new programs and program chanjes.
COi:. BITY AND :-1(: i,::°,i1 LEVE! ° MEN
COMMUNITY DEVELOPpi[N1 FLOCK GRANT (CCS:7G;• PROGRAM
-- Reauthorized for three yc. es--FY 1934 , 85, !, 86.
-- Funded in each year at 53.458 billion.
-- All cities defined as Metropolitan (over 50,000
population, or central city of a Metropolitan
Sta':.istical Area) in FY 196 will retain the
c'esigeation for 1984 and 1935 and their CDBG
entit rent.
-- Benefit to low- ano moderate-income persons
is clarified in tee Act as the nrirary objective
oT the CDBG progrm,r.
* Over a period of up to tree ;ears, each state
and unit of general local government receiving
funds must certify that not less than 51
percent are used for that purpose.
-- Submfssons to NUE must include a description of
ho„ f,.rds v-are used in previous years.
-- Grantees ,.1.ust ria' e a plea:
* tn rr;inieize displacement of low- and moderate-
income persc.,s, and p: ,ide assistance to those
c:sp iacd.
a _•rt`. "ice that a - tical plan has teen
e ,•ei:»ed i0e:iti fy.He local .elopmeet and
iso c. n ni e't and ^ ie ctive, and,
• n _ , .;_.mac firtn2- fair housing.
- Citize s :I;u t nue reasoiiablc: access to local records
• eeewinq Fa. t. • grant ', unu_ ; performance
reports e.'ale tiny accompl;sh gents ieLsed on stated
oi.'jectv.es, , e ouets of furoc'e use;; to benefit low-
..'rl'd moderate-income (.trans.
-- Cit-_'ens rue„ '.)E_' given the cppe. Eunity f comment on
su stantial cur„n ,e; proposed in t:ie 'ncai program.
-- No a sessments are allowed egainst lower income
persons for ;eojeets undertaken ,,.i th CDLG and local •
funds unless paid for with CDBG funds.
-- Moderate income residents may not he assessed unless
local CUBO fun,:; are insufficient.
11
• r
-e-
UP, -
- Recut 'rorizc d for t'nr:,r, year:.--'Y 19:34, :35.
-- Funded `. 01 yPar t S440
-- Eligibility criteria ;; expanded.a;ic<_ed.. rir rc
r:,ppropri:,c to inriu c ii:r?_;v;:1oymeny _ job lag.
or labor sum;; areai na toil.
-- Small cities which had eligibility i:. FY 1933, but
lost it, will remain eligible until the criteria
are revised.
- Commvnities will prc'p,rc _ nri ghorhood impact
ana {yS 2 s vnd make it iiv i laui? to any person or
or organization in a neighborhood where UDi;G
project is propoaed.
URW4 HOiE,S?FADING. PROD AM
-- Ie utrori 7.crd for FY 1924 .s 35
-- Funded at $12 :pillion in 1934. SG r„inion in 1935.
-- The Lrequired. occupancy is i rcreas,rd from three
to five years before 7 ho;Ile /�e.3denreceives fen
simple title to the property.
-- Tim re limit are increased for completing repairs
to the hoes?eaded property.
-- New eligibility _ ..:1 }4rd` t rgei the program to
r t. inco ;n £r;ns.
-- Demonstration prccra musin i multifamily Dro `?rties
will be undertaken:
a U ino 11ropertir's held by O, one dam%onstration
eq
will require that ?.t least r
L 75 percent of the
r ehabi?i'fa r,d propertie;' resident. be of (ow-
and moderate-income.
`et ie
Another '3!.:".1;;7i`t'".i 3i::t:ti will aside .�SI million
'�
in 1984 and 19;:5 for locally-owned ::4uitif roily
propert i .
•
a � �
-3-
RENTAL REHABILITATION AND DEVELOPMENT GRANT PROGRAM
The program is designed to provide additional housing for lower income
people. The bill authorizes $615 million for FY '84 and FY '85 -- $150
million for Rental Rehab for both years and $200 million in 1984 and $115
million in 1985 for Development grants (new construction and substantial
rehabilitation) .
These grants cannot be used to rehabilitate or develop property if
low income tenants will be forced out of their homes and replaced by higher
income people. Units cannot be converted to condominiums or cooperatives
for at least 10 years in the case of rental rehab and 20 years in the case
of new construction development.
The grant amount cannot be more than 50;0 of the total cost of
rehabilitating or developing the building.
RENTAL REHABILITATION GRANTS
-- Will be distributed on a formula basis and allocated to
cities, urban counties and states. These units of
government must apply to HUD for the money.
-- Can be used only in neighborhoods where the median income
does not exceed 80 percent of the median income for the area.
-- Can be used only for essential improvements.
-- The Secretary must assure that large families benefit
from an equitable share of the funds.
-- Buildings occupied by very low income persons in
substandard units will receive priority.
DEVELOPMENT GRANTS
-- Must be used in communities with a severe shortage of rental
housing. The Secretary will create eligibility requirements
by which the cities will compete for funds.
-- For twenty years, at least 20 percent of the units must be
occupied by tenants with incomes below 80 percent of the
area 's median income.
-- Selection factors for grantees will include: severe shortage
of decent rental housing, availability of public-private
funding, maximum use of units for the least cost to the
Federal government.
-- Rents will not exceed 30 percent of the adjusted income
of a family with income equal to 50 percent of the median
income of the area.
-- States may administer the program for cities under 50,000
population or they may administer their own rehab or
development programs.
-- The Davis-Bacon Act applies to building with 12 or more
units.
8
.
-4-
ASSISTED
ASSISTED HOUSING PROGRAMS
-- The total new budget authority i V9 .0 Killion, enough
to provide an oddiclional 100, 00 assisted housing units.
-- The amounts are r.;ns i tin with f ,i,ds already appropriated
and include:
* $1.289 billion for ,50,; public housing units , including
2,500 for ?na .;n
* 51 .926 billion to r_ !Him - ' ;sidles in connection
with 1G ,0
* S1 . 55
* $L' g housing
.L17 _;l t ion -for - � . _ '_CtlOt", � ._� iStlrt
certificates ; arid
* $540 million for 7,500 Section ? Moderate rehab units.
* 51 .603 bi , lioi. 0i 2', more Se-Aion Er , sting
certificates .
* In addidtion, an Experim; :.tai 'voucher program is included,
totalling $242 million for assistance to an additional
15,000 families.
-- Authorizes a voucher demonstration program which represents
a start in establishing more efficient programs for lower
income households . The subsidy is based upon a payment
standard rather than a Fair ''arLet Rent, thus providing a
"shopping incentive" , Whi_`h is not present under existing
•
programs.
-- The 30 percent rent-to-income ratio for tenants in assisted
housing is retained. however, changes in allowed income
adjustments should substantially reduce tenant rents . The
adjustments are:
* $480 for ;minors, disabled or handicapped family members ,
or full-time students :
* $400 for elderly f:
* Medical expenses ip of 3 percent of income, for
elderly fa lies :
• Child Hca , _ ark co enable a family member
to 401' f urtht-r i. ner education.
-- Under the r.utnorisat i nn Fill , the special needs of certain
lower income household? ;:re recognized.
▪ Families raying mor, than 50 percent of income for rent
would nave oriori t, or occupancy of assisted housing.
* Permits assistance under Section 8 existing and moderate
rehab programs for elderly families who elect to live in
shared housing which not only meets their housing needs
but also reduces their costs of housing.
* Authorizes the Secretary to carry out a demonstration
progra',i en the feasinility of using public housing
facilitics for ch lei care services for lower income
families.
-5-
* Demonstration to improve standards of housing
for lower incon,_} households. Authorizes grants
to local rverrr .,:nts Tor varic;tis types of housing
services , incllidipo, r,:.v. Autrc,rizes $10
million for FY 194; :1 lli; n for FY 1985.
The 5eci ioi _ .r c rj r.c;:;r"ar,� is repealed,
except fOr ; uncs ;irorr;.;t d prior or to JJou:iry 1, 1984,
and except for fu ids used in c_nnecticn with Section
202 housing for the elderly and handi caed.
•
•