Loading...
HomeMy WebLinkAbout06-16-15 P&D Board - Project Review Commmittee Meeting AgendaCITY OF ITHACA 108 E. Green St. — 3rd Floor Ithaca, NY 14850-5690 DEPARTMENT OF PLANNING, BUILDING, ZONING, & ECONOMIC DEVELOPMENT JOANN CORNISH, DIRECTOR OF PLANNING & DEVELOPMENT PHYLLISA A. DeSARNO, DEPUTY DIRECTOR FOR ECONOMIC DEVELOPMENT Telephone: Planning & Econ. Development – 607-274-6550 | Community Development/IURA – 607-274- 6559 E-Mail: dgrunder@cityofithaca.org E-Mail: iura@cityofithaca.org Fax: 607-274-6558 Fax: 607-274-6558 TO:City of Ithaca Project Review Committee (Planning &Development Board) FROM:Lisa Nicholas,Senior Planner DATE:June 11,2015 SUBJECT:Agenda for Project Review Committee Meeting:T UESDAY,JUNE 16TH,2015 Meeting scheduled to begin at 9:30 a.m.in the Third Floor Conference Room (behind Common Council Chambers), City Hall,108 E.Green St.,Ithaca.Please call Charles Pyott at 2746550,if you cannot attend or you require additional information. 9:30 Project:Retail/Restaurant Building Location:222 Elmira Rd.(Ithaca Plaza) Applicant:Marx Realty &Improvement Co.,Inc. Anticipated Board Action(s)in June:Update Only No Action Project Description:The applicant proposes to construct a onestory 3,400SF retail building with 49 parking spaces and associated landscaping,walkways,and other site improvements.The 6.1acre project site contains an existing retail mall with 258 parking spaces.The project includes relocation of the existing driveway to align with Fairgrounds Memorial Parkway.The project is in the SW2 Zoning District,which allows a maximum building setback of 34 feet from the curbline.The project requires an Area Variance for the proposed 40’setback.The applicant has proposed a 4’tall architectural wall along a portion of the frontage.This is an Unlisted Action under the City of Ithaca Environmental Quality Review Ordinance and the State Environmental Quality Review Act,and is subject to environmental review. 9:45 Project:Four MultiFamily Dwellings “Pocket Neighborhood” Location:215221 Spencer St. Applicant:Noah Demarest for PPM Homes Anticipated Board Action(s)in June:Declaration of Lead Agency Project Description:The applicant proposes to build a new multifamily “pocket neighborhood”on a hillside site between W.Spencer St.and W.Cayuga St.The project will include four buildings,each of which will be 3 stories tall and contain 3 units (12 units overall).A twelvecar parking area is proposed with access off W Cayuga Street.Site circulation will be organized with a series of landscaped stairs and terraces that connect through the site.The project also includes lighting,retaining walls,and landscaping.This is an Unlisted Action under the City of Ithaca Environmental Quality Review Ordinance and the State Environmental Quality Review Act,and is subject to environmental review. 10:10 Project:Building &Vehicle Display Expansion Location:308318 Elmira Rd. Applicant:Schickel Architecture for Maguire Family Enterprises Anticipated Board Action(s)in June:Public Hearing,Determination of Environmental Significance,& Recommendation to BZA “An Equal Opportunity Employer with a commitment to workforce diversification.” 1 of 3 Project Description:The applicant proposes to construct a 1,100SF addition to the east side of the existing building,reconfigure the vehicle display and associated parking layout,including shifting the existing entrance 65 feet to the northeast,add 20 parking spaces,and install other site improvements including landscaping,lighting,and signage.The applicant is proposing 5%internal landscaping 12%is required. The applicant is requesting to build an architectural wall/fence as an alternative to the requirement in the Southwest Area Design Guidelines that a minimum of 35%of a lot’s street frontage should be occupied by building mass.In accordance with the guidelines,the Planning Board may allow a portion,not to exceed a third of the required 35%building frontage,to be occupied by an integrated architectural wall.The project occupies two tax parcels and requires parcel consolidation,as well as an Area Variance for exceeding the maximum 30 foot front yard setback in the SW2 Zoning District.This is an Unlisted Action under the City of Ithaca Environmental Quality Review Ordinance and the State Environmental Quality Review Act,and is subject to environmental review. 10:30 Project:Two Duplexes (REVISED from previous submission) Location:804 E.State St./M.L.K.,Jr.Blvd. Applicant:Tom Schickel for Demos/Johnny,LLC Anticipated Board Action(s)in June:Public Hearing &Determination of Environmental Significance Project Description:The applicant proposes to construct two duplexes (each with two 3bedroom apartments),a 16space gravel parking area,and associated site improvements.Vehicular access is via the existing driveway on Blair Street.Dedicated pedestrian site access to Blair Street will be provided via an expanded walkway at 120 Blair St.(under the same ownership as the project site).Site preparation will require removal of existing garage,all paving,and fencing on the development site.The project requires consolidation of six existing tax parcels :#83.3 2 (804 E.State St.)containing a duplex;#83.3 3 (112 Blair Street),currently used as a parking lot;#68.8.9,containing the existing garage;#83.3 9 (806 E.State St.), #83.3 8 (808 E.State St.)containing identical existing duplexes,and a 683 SF portion of an impacted vacant lot to the north.The project is in the CR2 Zoning District and is contiguous on its western and northern boundaries to the East Hill Historic District.This is a Type 1 Action under the City of Ithaca Environmental Quality Review Ordinance,and the State Environmental Quality Review Act,and is subject to environmental review. 10:50 Project:Tompkins Financial Headquarters Location:118 &119 E.Seneca St. Applicant:Trowbridge Wolf Michaels,LLP for Tompkins Trust Company Anticipated Board Action(s)in June:Public Hearing &Determination of Environmental Significance Project Description:The applicant proposes to construct a 7story,110,000SF office building as a new corporate headquarters at 118 E.Seneca St.,and to relocate the existing drivethrough teller to the ground floor parking area of 119 E.Seneca Street.The new building will have a groundfloor footprint of approximately 6,600 SF (66’x 100’)and will include retail services,building core,and other amenities related to the building.There will be 2025 parking spaces accommodated on site to the north of the groundfloor footprint and under the building overhang.Each floor plate above the ground floor will be 16,300 SF.The front of the building will be set back several feet from the street line to align with the Hilton Garden Inn.119 E.Seneca Street will include a new 985SF drivethrough teller building.Existing parking and drive aisles will be modified to create a teller window driveup lane,a vacuumactuated driveup teller station,and a throughlane for traffic.In addition to the drive lane associated with the teller stations,a new ATM will be added to the site.Both sites are in the CBD100 Zoning District.This is a Type I Action under the City of Ithaca Environmental Quality Review Ordinance (“CEQRO”),§1764 B.(1)(h)[4]and (n),and the State Environmental Quality Review Act (“SEQRA”),§617.4 (6.)(iv),and is subject to environmental review.It has undergone Design Review. “An Equal Opportunity Employer with a commitment to workforce diversification.” 2 of 3 11:10 Zoning Appeals #2986 Parking &Area Variances:210 Hancock St.(INHS) #2987 Area Variances:105107 E.York St.(J.Sempel) #2988 Parking Variance:506 S.Cayuga St.(T.Amici) 11:20 Adjournment cc:Mayor Svante Myrick &Common Council Dr.Luvelle Brown,Superintendent,ICSD Jay Franklin,Tompkins County Assessment ACCESSING ONLINE DOCUMENTS SitePlan Review &Subdivision ApplicationDocuments (&Related Materials) SitePlan Review applicationdocumentsare accessible electronicallyvia the “Document Center”on the City web site (www.cityofithaca.org/DocumentCenter),under “Planning & Development”>“Site Plan Review Project Applications,”andin therelevant year/month folder.Subdivision application materialscan be similarly located,but in the “Subdivision Applications”folder. ZoningAppeals ZoningAppeals are accessible electronically via the “Document Center”on the City web site (www.cityofithaca.org/DocumentCenter),under “Board of ZoningAppeals”>“Zoning Appeal Applications,”andin the relevantyear’s folder. If you have a disability &would like specific accommodation to participate, please contact the City Clerk at 274 6570 by 12:00 p.m.,the daybefore the meeting. “An Equal Opportunity Employer with a commitment to workforce diversification.” 3 of 3 804EStateStreet6215TreeLawns:120Blair118BlairProposedPedestrianAccessExistingConditions(below): 804EStateStreet6215oratingstonewallatpropertylinebetweend116and118BlairStconditionsofparkingarea 804EStateStreet6215ExistingConditionsalongStateStreet6215 804EStateStreet6215 804EStateStreet6215Deterioratingwalkwayleadingupfromstairsatnewretainingwall 804EStateStreet6215Newretainingwall,stairsandplantings 804EStateStreet6215ViewintositefromBlairStreetaccessdrive808EStateStreetfromsiteinterior Graham Kerslick 4th Ward Alderperson, City of Ithaca gkerslick@cityofithaca.org 607-273-4620 Thursday June 11, 2015 Project: Two Duplexes (5-27-15 REVISED) Location: 804 E. State St./M.L.K., Jr. Blvd. Applicant: Tom Schickel for Demos/Johnny, LLC Members of the Planning & Development Board, Thank you for the time and effort you have already devoted to this project. I would also acknowledge the time and effort that Mr. Ike Nestopoulos has put into meeting with adjoining homeowners as plans for this proposed development have progressed. I urge the Board to continue working with the developer to achieve a project that truly would be a “beautiful and sympathetic addition to East Hill”, as claimed in an earlier submission of this project. Building Design Residents of Orchard Place are not opposed to development in the neighborhood, especially when it replaces an unattractive parking lot. The two duplexes at 107 Cook St are regarded as additions that are truly sympathetic to the surrounding area. Projects in progress at 707 E.Seneca St. and 202 Eddy St. promise to be genuine improvements to the neighborhood. Thank you for your work with developers to achieve these results. Drawings continue to show the proposed modular duplexes to be worryingly similar to units at 806 & 808 E.State St and 108 Blair St., which have minimal architectural detailing and visual interest. I would urge the Board to continue to do whatever it can to improve the external design of the buildings. This would recognize the importance of the viewshed of nearby housing and in particular the adjacent historic district. Pedestrian Pathway Access The revised site plan (5-27-15) shows a proposed pedestrian access pathway at the NE corner of the project around and to the north of 120 Blair St. It would be a significant improvement if a dedicated pedestrian pathway were provided between 108 &116 Blair St. alongside the existing vehicular access (see photo) for the following reasons: 1. Residents of 806 & 808 E.State St. use the existing driveway as the shortest route to the popular bus stops at the corner of College Ave & Mitchell St. Future residents of 804 E.State St will continue to use this route. 2. The proposed pathway around and to the north of 120 Blair St would require the removal of existing trees, vegetation and green space. This would reduce screening and increase the impact of the project on surrounding homes. (see photos) 3. The proposed pathway will be difficult to maintain, especially in the winter. The backyard of 120 Blair St has a significant grade, narrow access and is mostly concealed from Blair St. 4. Following a recent conversation I believe the developer acknowledges the disadvantages of the proposed pathway and the merits of providing dedicated pedestrian access between 108 & 116 Blair St. Thank you for time and consideration. Sincerely, Existing  fence  and  trees  at  120  Blair  St  –  would  need  to  be  removed  for  proposed  pathway       Existing  back  yard  of  120  Blair  St  –  would  need  to  be  paved  for  proposed  pathway       Existing  northside  of  back  yard  of  120  Blair  St  –  significant  slope  to  existing  sidedoor  access   pathway.     Existing  pathway  to  entrance  doorway  of  120  Blair  St.                                   Existing  driveway  and  right  of  way  –  to  the  left  of  120  Blair  St.                                 Existing  driveway  access  from  Blair  St.  (between  108  &  116)       Page 1 of 3 City of Ithaca FULL ENVIRONMENTAL ASSESSMENT FORM Part III Project Name:Three Duplexes 804 E.State St./M.L.K.,Jr.Blvd. Date Created:6/1/15 PROJECT DESCRIPTION The applicant proposes to construct two duplexes (each with two 3bedroom apartments),a 16 space gravel parking area,and associated site improvements.Vehicular access is via the existing driveway on Blair Street.Dedicated pedestrian site access to Blair Street will be provided via an expanded walkway at 120 Blair Street (under same ownership as project site).Site preparation will require removal of existing garage,all paving,and fencing on the development site.The project requires consolidation of six existing tax parcels :#83.3 2 (804 E.State St.),containing a duplex; #83.3 3 (112 Blair St.),currently used as a parking lot;#68.8.9,containing the existing garage;#83. 39 (806 E.State St.);#83.38 (808 E.State St.),containing identical existing duplexes;and a 683SF portion of an impacted vacant lot to the north.The project is in the CR2 Zoning District and is contiguous on its western and northern boundaries to the East Hill Historic District.This is a Type 1 Action under the City of Ithaca Environmental Quality Review Ordinance,and the State Environmental Quality Review Act,and is subject to environmental review. IMPACT ON LAND The project will require excavation for building foundations.A geotechnical report has not been done for this project however foundation work done in the recent past for three houses on the property provides adequate information.The applicant anticipates the soil is 23 feet deep underlain with breakable shale which will be removed with a backhoe to the necessary depth. The portion of the site that contains the new buildings is not steeply sloped however,other parts of the site are sloped over 10%.When submitted,the Erosion and Sedimentation Control Plan will be reviewed by the City Stormwater Management Officer. IMPACT ON WATER No impact anticipated. IMPACT ON DRAINAGE The portion of the site that contains the new buildings is not steeply sloped however,other parts of the site are sloped over 10%.When submitted,the Erosion and Sedimentation Control Plan will be reviewed by the City Stormwater Management Officer. No impact anticipated. IMPACT ON AIR The project site is in a residential area however,the construction period is expected to be relatively short,as the buildings are modular. Page 2 of 3 The impacts of airborne dust could have a negative impact during the construction period.The excavation and the preparation of foundations can also create the potential for increased dust and dirt particles in the air.The applicant has agreed to employ the following applicable dust control measures as appropriate: Misting or fog spraying site to minimize dust. Maintaining crushed stone tracking pads at all entrances to the construction site.Re seeding disturbed areas to minimize bare exposed soils. Keeping roads clear of dust and debris. Requiring trucks to be covered. Prohibiting burning of debris on site. No impact anticipated. IMPACT ON PLANTS &ANIMALS No impact anticipated. IMPACT ON AESTHETIC RESOURCES The project is site is contiguous to the East Hill Historic District.The proposed buildings are in the rear of the site though it is unclear how visible they would be from points in the Historic District or the adjacent neighborhood.The applicant has provided a line drawing of the view from the rear yards of 109 and 111 Orchard Place (within the Historic District)to illustrate how the site developments relates to the Historic District. The applicant has taken the following steps to reduce impacts on the Historic District: Reduced the scale of the project from 3 to 2 buildings. Removed the originallyproposed basement level parking which reduced the height of the building by 2 3 feet. Incorporated a vegetative buffer at the northern boundary of the site. Installation of foundation plantings for the duplexes at 806 E.State Street. Purging and painting the currently exposed foundations of the duplexes at 806 E.State Street. The Lead Agency requests (and the applicant has agreed)to the following steps,in addition to those items listed above: Installation of a vegetative buffer along the western boundary contiguous to the Historic District. Installation of landscape establishment plan including temporary irrigation. Submission of details on soil improvements for proposed planting areas,particularly in compacted areas. Replacement of any unhealthy/dying plantings throughout the site. Page 3 of 3 Issues for discussion: Lack of architectural interest. Appearance of site from/along State Street including newly installed retaining wall and plantings. Dumpster and recycling enclosure. IMPACT ON HISTORIC RESOURCES See Impact on Aesthetic Resources above. IMPACT ON OPEN SPACE AREA No impact anticipated. IMPACT ON TRANSPORTATION Issues: Pedestrian circulation safety and comfort of existing and proposed pedestrian amenities. Accommodation for bicycles. IMPACT ON ENERGY No impact anticipated. IMPACT ON NOISE &ODORS The project is in a densely developed area in a residential neighborhood however the construction period is expected to be relatively brief –as the buildings are modular.Construction activities will temporarily produce noise that will affect residents in the immediate area.The Lead Agency requires and the applicant has agreed that noiseproducing construction activities will be limited to MondayFriday from 7:30 a.m.to 7:30 p.m. IMPACT ON PUBLIC HEALTH No impact anticipated. IMPACT ON GROWTH &CHARACTER OF COMMUNITY OR NEIGHBORHOOD No impact anticipated. Prepared by:Lisa Nicholas,AICP,Senior Planner Planning and Development Board Design Review Committee Meeting Tompkins Trust Company Headquarters –118 &119 E.Seneca Street Monday,June 8,2015,3:00 p.m. In attendance:John Schroeder,Jack Elliot,JoAnn Cornish,Lisa Nicholas,Kim Michaels,Steve Hugo The Design Review Committee offered the following recommendations: For the Headquarters Building: Be more explicit about intention for sustainable building materials,construction practices and building functions.Consider use of photovoltaic glazing.Building should be an example of sustainability in the downtown. Add windows to the stair tower at on the north façade Wrap band of larger paned glass vertically down black brick “column”(same as narrower band of glass)on Seneca Street façade. Inset ground floor columns if possible Vary the massing:Consider enhancing the change in materials on the Seneca Street façade (between limestone and black brick)with changes to the building volumes such that the materials express differing interior spaces. Strengthen the horizontal reference to the DeWitt Building roofline Vary patterning/finishes on exterior veneers (e.g.,progressively rusticated limestone) Enhance entrance –pedestrian entrance should be more powerful/prominent than vehicular entrance Consider green roof and possible balcony or terrace Incorporate architectural language from the north and south facades into the east and west facades to add more interest Coordinate with adjacent property owner to create a space for taller landscaping at north façade –or incorporate a green screen For drivethrough location:Plant a green screen or other landscaping on west wall June 9, 2015 Ms. JoAnn Cornish, Director and Members of the Planning Board Department of Planning and Development City of Ithaca 104 West Green Street Ithaca, N.Y. 14850 RE: Preliminary SPR additional information for Tompkins Financial Headquarters Building and Drive- Through Dear JoAnn and Members of the Planning Board: This letter transmits to you additional materials for the Preliminary Site Development Plan Review for the Tompkins Financial Headquarters Building and adjacent Drive-Through Building. Preliminary SPR for Tompkins Financial Headquarters Building and Drive-Through The proposed project seeks to construct commercial space, parking, site amenities and landscaping in the City of Ithaca. The site consists of approximately 0.833 acres in downtown Ithaca at 118 East Seneca Street, north side between the Hilton Garden Inn and Dewitt Mall (Headquarters Building site) and 113-119 East Seneca Street, south side adjacent to the Seneca Building (drive through site). On behalf of those involved, we look forward to reviewing the project with you and members of the Planning and Development Board at the June 23rd Planning Board meeting. At this meeting, we hope that the following actions can be taken. Public Hearing Environmental Determination Preliminary Site Plan Approval Below please find additional project narrative to supplement the materials submitted on March 31, 2015 and May 15, 2015. Please do not hesitate to call should you have questions or require additional information. Sincerely, Kimberly Michaels Principal Trowbridge Wolf Michaels Landscape Architects LLP 1001 West Seneca Street, Suite 101 Ithaca, New York 14850 ph: 607.277.1400 www.twla.com Contractor Parking during Construction There will be no onsite parking available for contractors during construction. Contractors will utilize public parking for the duration of construction. Pedestrian Access during Construction Safe public sidewalk routes will be maintained during construction. Two lanes of traffic will remain open during construction as well. It is anticipated that concrete traffic barriers will be used to separate pedestrians from street traffic when the pedestrian routes are shifted into the adjacent street. See attached diagram FIG- 01 showing the possible pedestrian circulation rerouting scenarios. Pedestrian Circulation As we move into more detailed design, we will do our best to provide a (9’) functional sidewalk width between street tree planters and the building face and (12’) between the building face and the street curb as requested by the planning board. However, it may not be feasible to fit the necessary building program with these limitations. Site Utilities The project is in need of natural gas service for the proposed building. Based on the current information the civil engineer understands the best solution is a service line from NYSEG's medium pressure main on East Buffalo Street. Since the project lands do not extend to East Buffalo Street, an easement would need to be obtained from one of the adjacent neighboring properties to the north. If the project is not be able to obtain the necessary easement, alternatives solutions would include the following: 1. Service from NYSEG's low pressure main on East Seneca Street, albeit at a reduces level of service. 2. Extension of the medium pressure system within the street rights-of-way from East Buffalo Street to the site on East Seneca Street. Note also that the lack of gas service from the medium pressure system may also preclude the use of a natural gas fired backup generator for the project. Preliminary Geotechnical Subsurface Investigation Findings Soil borings began at the site of the new headquarters building on Thursday, June 4. At this time two borings have been completed to refusal at a depth of approximately 76’, located on the east side of the site. Boring are expected to be complete by June 12, 2015. Boring logs for the completed borings reveal fill to 5’, with loose to very loose sand to a depth of 66’ overlying dense glacial till with shale fragments. Standing groundwater was encountered at approximately 17’. Pile depth is expected to be approximately 75’ below existing grade. These early findings are consistent with expectations for this location, and confirm the engineer’s expectation that the most economical foundation system for this building will be impact driven steel H piles. Pile Driving Operations At this time the structural engineer anticipates preliminary expectation is that the building will be founded on 75 to 100 steel H piles driven to bear in dense glacial till like material at a depth that begins approximately 66’ below existing ground elevation. The general sequence of operations to be followed will consist of site clearing including the demolition of the existing drive-through building, excavation to basement subgrade elevation within the first floor footprint, followed by pile installation. Due to the sandy nature of the existing soils and the close proximity of the building site to Seneca Street and adjacent buildings it will be necessary for the contractor to install temporary excavation support, further discussed below. 2 of 4 Pile driving is expected to progress relatively quickly due the loose sandy nature of the overlying soils. The structural engineer expects a total duration of three to four weeks from commencement of pile driving until completion. To minimize the disturbance to local area residents, planning board standards for hours of operation for any pile driving related operations of 7:30 am to 7:30 pm will be strictly adhered to. Adjacent Building Protection Plan Adjacent buildings and other existing site development such as the sidewalk and Seneca Street will be protected from damage from construction operations utilizing support for excavation and a structured program of vibration monitoring. Support for excavation will consist of temporary retaining wall structures to prevent undermining of soils adjacent to the foundation excavation and to allow workers safe access within the excavation. Either steel sheet piles or steel soldier piles with wood lagging will be utilized by the contractor for support for excavation. Vibration monitoring and other aspects of the pile driving protection and monitoring plan will be required for temporary support for excavation piling work. The following limits are anticipated to be specified for construction induced vibration. PPV** Action Review Level 0.2 in/sec Modify Construction Activities Alert Level 0.3 in/sec Stop Work and Perform Structural Stability Assessment ** PPV = Peak Particle Velocity, typically measured at ground level recording the vibration amplitude along the ground surface in the vertical direction. A trial pile or other trial method of inducing vibration will be executed with vibration monitoring equipment in place. Vibration monitoring during construction of the index pile will also provide this information. Should it be determined that the recommended vibration levels are exceeded, alternatives to impact driven piles will be explored. Please note that the above discussion pertains to maximum recommended vibration levels to prevent damage to adjacent buildings. Even at the lower recommended levels, vibration will be noticed by adjacent building occupants, and could be found to be a disturbance. Trip Generation See attached letter from SRF Associates Building Elevations & Renderings See attached images 3 of 4 June 8, 2015 HOLT Architects, P.C. 217 N. Aurora Street Ithaca, NY 14850 Attn: Mr. Nathan Brown RE: Proposed Tompkins Financial Corporation Headquarters, City of Ithaca, NY Trip Generation Assessment Dear Mr. Brown, We have performed a trip generation assessment related to the proposed Tompkins Financial Corporation Headquarters located at 118 and 119 East Seneca Street in the City of Ithaca. The results of the analysis are described below. The two addresses, 118 and 119 East Seneca Street, currently house portions of the Tompkins Financial Corporation offices and a local bank branch with two drive-through lanes and a drive-up ATM. The proposed project will relocate the bank branch from the north side of Seneca Street to the south side of Seneca Street. The bank branch facility will not change significantly and no changes in trip generation are anticipated as a result of the relocation. In addition, since East Seneca Street is one-way westbound, there are no real changes in travel patterns anticipated aside from the turn directions at the driveways. The site modifications will result in significant improvements in the number, width and location of curb cuts as well. The existing branch building on the north side of East Seneca Street will be replaced with a seven (7) building that will consolidate and house the Corporate Headquarters for Tompkins Financial Corporation. Currently these offices are scattered within adjacent buildings. Given the proximity of the existing, albeit scattered, office spaces, no additional vehicular traffic is anticipated as a result of the consolidation. However, the new offices are expected to bring 20 employees to the downtown offices that were previously working at locations outside of the downtown area. While these employees will result in additional trips to the downtown area, they can be expected to add a mix of vehicular, pedestrian, bicycle and transit trips. The net result will be a negligible impact to te roadway network. Reviewing agencies – including the New York State Department of Transportation (NYSDOT) – use a guideline in determining whether a project warrants the preparation of 3495 Winton Place Building E, Suite 110 Rochester, NY 14623 phone 585.272.4660 fax 585.272.4662 Re: Proposed Tompkins Financial Corporation Headquarters, City of Ithaca, NY June 8, 2015 Trip Generation Letter Page 2 of 2 a traffic assessment report. The applicable guideline is that if a proposed project is projected to add 100 vehicles per hour (vph) or more to an intersection, then that intersection should be studied for potential traffic impacts. The additional 20 employees at the site are not expected to generate more than 100 vph, therefore, a traffic assessment is not required. If you have any questions or are in need of additional information, please do not hesitate to contact our office. Very truly yours, SRF & Associates Amy C. Dake, P.E., PTOE Senior Traffic Engineer S:\Projects\2015\35031 Tompkin Financial Headquarters, Ithaca\TFHQ Draft Trip Gen 06-08-15.docx EXISTINGADJACENTPARKINGHILTONGARDENINNEXISTINGADJACENTPARKINGSTAIRSERVICE113-119EASTSENECA(TompkinsFinancial)121 EASTSENECASENECABUILDING(TompkinsFinancial )111EASTSENECA130-132EASTSTATEST.134-136EASTSTATEST.138-140EASTSTATEST.126-128EASTSTATE124EASTSTATEST.122EASTSTATEST.120 EASTSTATEST.NEW HEADQUARTERSBUILDING 1ST FLOORDRIVE LANEDRIVE LANEPEDESTRIAN ROUTECONSTRUCTION FENCECONCRETE BARRIERPARALLEL PARKINGEAST SENECASTREETEXISTINGADJACENTPARKINGHILTONGARDENINNEXISTINGADJACENTPARKINGSTAIRSERVICE113-119EASTSENECA(TompkinsFinancial)121 EASTSENECASENECABUILDING(TompkinsFinancial )111EASTSENECA130-132EASTSTATEST.134-136EASTSTATEST.138-140EASTSTATEST.126-128EASTSTATE124EASTSTATEST.122EASTSTATEST.120 EASTSTATEST.NEW HEADQUARTERSBUILDING 1ST FLOORDRIVE LANEDRIVE LANECONSTRUCTION FENCECONCRETE BARRIERPEDESTRIAN ROUTEEAST SENECASTREETEXISTINGADJACENTPARKINGHILTONGARDENINNEXISTINGADJACENTPARKINGSTAIRSERVICE113-119EASTSENECA(TompkinsFinancial)121 EASTSENECASENECABUILDING(TompkinsFinancial )111EASTSENECA130-132EASTSTATEST.134-136EASTSTATEST.138-140EASTSTATEST.126-128EASTSTATE124EASTSTATEST.122EASTSTATEST.120 EASTSTATEST.NEW HEADQUARTERSBUILDING 1ST FLOORDRIVE LANEDRIVE LANEPEDESTRIAN ROUTECONSTRUCTION FENCECONCRETE BARRIERPARALLEL PARKINGEAST SENECASTREETFile: T:\PROJECTS\TTC Seneca\ACAD\ARCHIVE_OLD VERSIONS\14038 TTC PED ACCESS SITE DIAGRAMS.dwg Plot Date: 6/10/2015 FIG-01 DATE:PROJECT:OTHER:DRAWN BY:ABCDEFGABCDEFG1234567891012345678910ArchitecturePlanningInterior Design217 North Aurora StreetIthaca NY 14850p 607.273.7600 f 607.273.0475JVB, JLF8 JUNE 2015ITHACA, NEW YORK TOMPKINS TRUST COMPANY SENECA STREET HEADQUARTERS & DRIVE THRU FACILITY 1001 W. Seneca St., Ste. 101 Ithaca, NY 14850607-277-1400 Fax 607-277-6092Scale: 1" = 20'Scale: 1" = 20'Scale: 1" = 20'PEDESTRIANCONSTRUCTIONROUTEDIAGRAM June 8, 2015 HOLT Architects, P.C. 217 N. Aurora Street Ithaca, NY 14850 Attn: Mr. Nathan Brown RE: Proposed Tompkins Financial Corporation Headquarters, City of Ithaca, NY Trip Generation Assessment Dear Mr. Brown, We have performed a trip generation assessment related to the proposed Tompkins Financial Corporation Headquarters located at 118 and 119 East Seneca Street in the City of Ithaca. The results of the analysis are described below. The two addresses, 118 and 119 East Seneca Street, currently house portions of the Tompkins Financial Corporation offices and a local bank branch with two drive-through lanes and a drive-up ATM. The proposed project will relocate the bank branch from the north side of Seneca Street to the south side of Seneca Street. The bank branch facility will not change significantly and no changes in trip generation are anticipated as a result of the relocation. In addition, since East Seneca Street is one-way westbound, there are no real changes in travel patterns anticipated aside from the turn directions at the driveways. The site modifications will result in significant improvements in the number, width and location of curb cuts as well. The existing branch building on the north side of East Seneca Street will be replaced with a seven (7) building that will consolidate and house the Corporate Headquarters for Tompkins Financial Corporation. Currently these offices are scattered within adjacent buildings. Given the proximity of the existing, albeit scattered, office spaces, no additional vehicular traffic is anticipated as a result of the consolidation. However, the new offices are expected to bring 20 employees to the downtown offices that were previously working at locations outside of the downtown area. While these employees will result in additional trips to the downtown area, they can be expected to add a mix of vehicular, pedestrian, bicycle and transit trips. The net result will be a negligible impact to te roadway network. Reviewing agencies – including the New York State Department of Transportation (NYSDOT) – use a guideline in determining whether a project warrants the preparation of 3495 Winton Place Building E, Suite 110 Rochester, NY 14623 phone 585.272.4660 fax 585.272.4662 Re: Proposed Tompkins Financial Corporation Headquarters, City of Ithaca, NY June 8, 2015 Trip Generation Letter Page 2 of 2 a traffic assessment report. The applicable guideline is that if a proposed project is projected to add 100 vehicles per hour (vph) or more to an intersection, then that intersection should be studied for potential traffic impacts. The additional 20 employees at the site are not expected to generate more than 100 vph, therefore, a traffic assessment is not required. If you have any questions or are in need of additional information, please do not hesitate to contact our office. Very truly yours, SRF & Associates Amy C. Dake, P.E., PTOE Senior Traffic Engineer S:\Projects\2015\35031 Tompkin Financial Headquarters, Ithaca\TFHQ Draft Trip Gen 06-08-15.docx 9 June ETB STREET ELEVATIONS 9 June EB STREET CORNER PERSPECTIVES VIEW FROM SENECA STREET LOOKING WEST VIEW FROM SENECA STREET LOOKING EAST VIEW FROM BUFFALO STREET LOOKING EAST VIEW FROM BUFFALO STREET LOOKING WEST 9 JuneEBHEADQUARTERSPERSPECTIVE 9 JuneEBDRIVE THRUPERSPECTIVE Page 1 of 7 City of Ithaca FULL ENVIRONMENTAL ASSESSMENT FORM (FEAF)Part III Project Name:Tompkins Financial Headquarters,118 &119 E.Seneca St. Date Created:5/14/15 |Revised by Planning &Development Board:5/26/15 |By Staff:6/8/15 PROJECT DESCRIPTION The applicant proposes to construct a seven (7)story,110,000SF office building as a new corporate headquarters at 118 E.Seneca St.,and to relocate the existing drivethrough teller to the ground floor parking area of 119 E.Seneca Street.The new building will have a groundfloor footprint of approximately 6,600 SF (66’x 100’)and will include retail services,building core,and other amenities related to the building.There will be 2025 parking spaces accommodated on site to the north of the groundfloor footprint and under the building overhang.Each floor plate above the ground floor will be 16,300 SF.The front of the building will be set back several feet from the street line to align with the Hilton Garden Inn.119 E.Seneca Street will include a new 985 SF drive through teller building.Existing parking and drive aisles will be modified to create a teller window driveup lane,a vacuumactuated driveup teller station,and a throughlane for traffic.In addition to the drive lane associated with the teller stations,a new ATM will be added to the site.Both sites are in the CBD100 Zoning District.This is a Type I Action under the City of Ithaca Environmental Quality Review Ordinance (“CEQRO”),§1764 B.(1)(h)[4]and (n),and the State Environmental Quality Review Act (“SEQRA”),§617.4 (6.)(iv),and is subject to environmental review.The project has undergone Design Review. IMPACT ON LAND The project sites are both existing developed sites in the downtown core.At 119 E.Seneca Street, site development will require the demolition and removal of most paving,5 trees,associated landscaping,and a portion of the City sidewalk and curbcut.At 118 E.State Street,site development will require removal of all paving,29 trees and associated landscaping,all buildings and other structures,as well as the existing City sidewalk and granite curbing.A pile foundation is anticipated.Foundation preparation will require excavation of approximately 4,500 CY of materials. A geotechnical study is underway.According to the applicant,soil borings began at the site of the new headquarters building on Thursday,June 4,2015 and should be completed by June 12,2015. As of June 8,2015,two borings had been completed to refusal at a depth of approximately 76’, located on the east side of the site.Boring logs for the completed borings reveal fill to 5’,with loose to very loose sand to a depth of 66’overlying dense glacial till with shale fragments.Standing groundwater was encountered at approximately 17’. Based on this information,the structural engineer anticipates the building will be founded on 75 100 steel H piles,driven to bear in dense glacial tilllike material at a depth that begins approximately 66’below existing ground elevation. The sequence of foundation construction will be as follows:site clearing,including the demolition of the existing drivethrough building;excavation to basement subgrade elevation within the first floor footprint;and pile installation.Due to the sandy nature of the existing soils and the close proximity of the building site to Seneca Street and adjacent buildings,installation of temporary excavation support will be required (discussed below). Page 2 of 7 Pile driving is expected to progress relatively quickly due to the loose sandy nature of the overlying soils.The structural engineer expects a total duration of three to four weeks from commencement of pile driving until completion. To minimize the disturbance to local area residents,the project sponsor will limit hours of operation for any pile driving to Monday through Friday from 7:30 a.m.to 7:30 p.m. The project sponsor proposes to protect adjacent buildings and other existing site development such as the sidewalk and Seneca Street through the use of temporary excavation support and a structured program of vibration monitoring.Excavation support will consist of temporary retaining wall structures in order to prevent undermining of soils adjacent to the foundation excavation and to allow workers safe access within the excavation.Either steelsheet piles or steelsoldier piles with wood lagging will be used by the contractor for support for excavation.Vibration monitoring and other aspects of the pile driving protection and monitoring plan will be required for temporary support for excavation piling work. The project sponsor anticipates the following limits will be specified for construction induced vibration.INSERT HOW THIS WILL BE MONITORED FOR THE BUILDING PERMIT. PPV**Action Review Level0.2 in./sec.Modify Construction Activities Alert Level0.3 in./sec.Stop Work and Perform Structural Stability Assessment **PPV =Peak Particle Velocity,typically measured at ground level recording the vibration amplitude along the ground surface in the vertical direction. The project sponsor intents to conduct a trial pile or other trial method of inducing vibration with vibrationmonitoring equipment in place.Vibration monitoring during construction of the index pile will also provide this information.Alternatives to impactdriven piles will be explored,determined by whether the recommended vibration levels are exceeded. The Lead Agency understands the above discussion pertains only to maximum recommended vibration levels to prevent damage to adjacent buildings.Any vibrations,including those at lower thanrecommended levels,will be noticeable to adjacent building occupants,and likely be considered a disturbance.However,this impact is temporary,unavoidable,and will be mitigated through the limit of construction hours. IMPACT ON WATER No impact anticipated. IMPACT ON DRAINAGE The two sites combined have a total of 80%pavement or buildings,and 20%landscaping or gravel. The proposed conditions over both sites are 95%pavement or buildings,and 5%landscaping. Under review by City Storm Water Pollution Prevention Management Officer. Page 3 of 7 IMPACT ON AIR The project site is in a densely populated area.Construction of the 7story building is projected to last 1418 months and will likely be concurrent with several other construction projects in the downtown area. The cumulative impacts of airborne dust could have a negative impact during the construction period.The excavation and the preparation of foundations can also create the potential for increased dust and dirt particles in the air.The applicant has agreed to employ the following applicable dustcontrol measures as appropriate: Misting or fog spraying site to minimize dust. Maintaining crushed stone tracking pads at all entrances to the construction site.Re seeding disturbed areas to minimize bare exposed soils. Keeping roads clear of dust and debris. Requiring trucks to be covered. Prohibiting burning of debris on site. No impact anticipated. IMPACT ON PLANTS &ANIMALS Site development requires removal of 39 trees and associated landscaping.Both sites currently have a combined total of 20%landscaping.After construction,landscaping will be 5%of the sites. No impact anticipated. IMPACT ON AESTHETIC RESOURCES The project site is located in the city’s retail,tourism,and entertainment center.At approximately 104’and seven stories,the building will be visible from portions of the Commons,State Street, Seneca Street,and East Hill,and will be visible from points within the Ithaca Downtown National Register Historic District,the DeWitt Park Local Historic District,and possibly the East Hill Local Historic District. The applicant has provided streetlevel elevations showing the proposed Headquarters Building as well as the Hilton Garden Inn and the DeWitt Building from both Seneca and Buffalo Streets,and visualizations from the following points:looking west from Cayuga;looking east from Aurora;and looking across the street from the opposite side of Seneca Street. More information on building materials is needed (keyed colored elevations)to be provided during Site Plan Review. More information on rooftop mechanicals is needed.Mechanical housing should be shown on all renderings and elevations.Applicant to submit a rooftop plan.Materials for screening should be specified.This information can be provided during Site Plan Review. Also see Impact on Historic Resources. Page 4 of 7 No impact anticipated. IMPACT ON HISTORIC RESOURCES The Lead Agency sought a recommendation from Bryan McCracken,City Historic Preservation Planner,regarding and potential impacts of the project to the adjacent historic districts.In a memo dated May 20,2015,from McCracken to the Planning Board,he offered the following: The proposed exterior cladding materials and fenestration of the new Tompkins Financial Headquarters Building at 118 East Seneca Street are compatible with,and complementary to,the DeWitt Park Historic District and will contextually integrate the new building into its environment. Stone and brick are used extensively throughout the district and are the predominant materials used in the DeWitt Building,which has a rusticated stone first story and brick upper stories,and 119 120 E.Buffalo Street,which is largely brick.With respect to the broader context of Seneca Street and the Ithaca Downtown Historic District,the proposed use of stone and brick cladding is also compatible and complementary.Several programmatically similar buildings located across from the project site on Seneca Street have similar façade treatments as those proposed for the new building.These buildings are located in the National Register Ithaca Downtown Historic District and include 108 110 and 114 118 N.Tioga and 121 E.Seneca (located outside of district but eligible for designation).The fenestration of the proposed new building has a similar solid and pierced pattern as the DeWitt Building and others within the surrounding neighborhood,and is compatible with the Dewitt Park Historic District. I understand that plans for the building are in the preliminary stages and more work with will be done to refine the design.As this work continues,I would encourage the designers to consider the size,scale and proportion,and massing of the Tompkins Financial Headquarters Building as it relates to that of the DeWitt Building,the double house at 119 121 E.Buffalo and the other buildings within the DeWitt Park Historic District.While urban in character,the DeWitt Park Historic District provides a visual transition from the density of the urban core to the south and the residential character of the neighborhoods to the north.To the preserve this quality,the visual impact of the building’s seven story height could be reduced through the incorporation of step backs,alternate cladding materials on the uppermost stories or other design features.A large scale vegetative buffer along the west and north property lines would also help reduce the overall visual impact of the development on the historic district.These considerations will ensure that the new building will not substantially impact the district’s historic spatial relationships and aesthetic quality. The treatment of the upper four stories of the mixed use development at the northwest corner of Tioga and Seneca Streets,currently the Hilton Garden Inn,is a good example of how visual weight can be reduced through the use of design features.These stories were stepped back and an alternate cladding material used to visually minimize the size,scale and massing of the upper floors,which preserved the historic spatial relationships and aesthetic significance that characterize the DeWitt Park Historic District.One specific example is the fourth story cornice,which was designed to align with the primary roofline of the DeWitt Building.This relationship respects the prominence of the historic building and preserves the historic proportional relationship between the buildings on E. Seneca Street and those on E.Buffalo Street.The incorporation of similar design features in the Tompkins Financial Headquarters Building will ensure that its size,scale and massing are compatible with DeWitt Park Historic District. Page 5 of 7 The Lead Agency had also requested the applicant consider providing enhanced landscaping on the north side of the buildingpossibly in coordination with the adjacent property owner,as well as on the west façade of the drivethrough building. The applicant has further developed the building façades.The revised design addressed the above referenced concerns through a varied use of materials specifically limestone on the bottom six floors and black brick on the seventh floor as well as a black brick ‘column’that descends to the ground plane and wraps around the west façade. The Design Review Committee reviewed the project on 6/8/15 and offered the following recommendations. For headquarters building: Add windows to the stairtower on the north façade. Wrap band of largerpaned glass vertically down black brick ‘column’(same as narrower band of glass)on Seneca Street façade. Inset ground floor columns,if possible. Vary the massing:Consider enhancing the change in materials on the Seneca Street façade (between limestone and black brick)with changes to the building volumes such that the materials express differing interior spaces. Strengthen the horizontal reference to the DeWitt Building roofline. Vary patterning/finishes on exterior veneers (e.g.,progressively rusticated limestone) Enhance entrance pedestrian entrance should be more powerful/prominent than vehicular entrance. Consider green roof and possible balcony or terrace. Incorporate architectural language from the north and south façades into the east and west façades to add more interest. Coordinate with adjacent property owner to create a space for taller landscaping at north façade or incorporate a green screen. For drivethrough location: Plant a green screen or other landscaping on west wall. Also See Impact on Aesthetic Resources. No impact anticipated. IMPACT ON OPEN SPACE AREA No impact anticipated. IMPACT ON TRANSPORTATION The project proposes to remove one ADA street parking space in front of 119 E.Seneca Street,shift the ADA designation to a parking space to the west,and add 4 parking spaces in front of 113 E. Seneca Street.The proposed north property site plan includes 28 bicycle parking spaces.City Page 6 of 7 bicycle parking standards require 27 bicycle spaces for the 64,095 nsf building (1 space per 2,500 nsf).In addition,there are 2 bicycle parking spaces on the south property site plan. The project consolidates the company’s scattered downtown employees,while also allowing room for future expansion.The new building will be the central office for all [NUMBER]downtown employees and an additional 20 new employees currently housed in East Hill.The project sponsor estimates 77 new employees will be added over the next 10 years. Description of current transportation and parking situation.The project is in close proximity to public transportation and is walkable from many points within the City.As an amenity to current and future employees,the project sponsor should develop and implement a Transportation Demand Management strategy to reduce singleoccupancy vehicle trips,like providing incentives for the following: Vanpooling Carpooling Remote parking Flexible work schedules and telecommuting options Public transportation The applicant has met with Tim Logue,City Transportation Engineer,and Frank Nagy,City Director of Parking,to discuss the traffic and street parking impacts of the project.The applicant has submitted a letter dated June 8,2015 from Amy Drake,Senior Traffic Engineer at SRF Associates,in response to Logue’s request for a Trip Generation Report.The letter and other project information is currently under review by the City Transportation Engineer. NYS DOT initially raised concerns about dual exit lanes proposed for the drive through;however,in a letter dated May 12,2015 from Mark Frechette,DOT Director,Planning &Program Management Group,it was stated that:“After reviewing the project in closer detail,we will allow the dual exit lanes onto East Seneca Street.” The Lead Agency has requested the width of the sidewalk in front of the building be a minimum of 12 feet from curb to building face with an unobstructed pedestrian zone of at least 9’.The applicant has responded that “[...]we will do our best to provide a (9’)functional sidewalk width between street tree planters and the building face and (12’)between the building face and the street curb as requested by the planning board.However,it may not be feasible to fit the necessary building program with these limitations.”Is this acceptable to the Lead Agency? Construction access to the site will primarily be from Seneca Street.The applicant anticipates the parking lane directly in front of the 118 E.Seneca Street site will be closed for material deliveries for the duration of the project.A self erecting crane is anticipated to be installed within the elevator shaft,central to the building,for the erection of steel and other building materials.Contractor staging areas will be contained completely onsite,as well as the jobsite offices of the contractor. Deliveries and materials are expected to arrive from Route 79 and Route 13. There will be no onsite parking available for contractors during construction.The project sponsor intends to require contractors to use public parking for the duration of construction.Does the Lead Agency want to require the applicant to explore remote parking options? Page 7 of 7 The project sponsor has agreed to maintain safe public sidewalk routes during construction.Two lanes of traffic will remain open during construction as well.It is anticipated concrete traffic barriers will be used to separate pedestrians from street traffic,when the pedestrian routes are shifted into the adjacent street.See attached diagram FIG01 showing the possible pedestrian circulation rerouting scenarios.A Street Permit will be required for any work in the City rightof way. IMPACT ON ENERGY No impact anticipated. IMPACT ON NOISE &ODORS Construction impacts See Impacts to Land. IMPACT ON PUBLIC HEALTH Additional Information needed:Phase 1 ESA or equivalent No impact anticipated. IMPACT ON GROWTH &CHARACTER OF COMMUNITY OR NEIGHBORHOOD The applicant’s preferred option for gas service for the new building:the best solution is to extend a service line from NYSEG's mediumpressure main on East Buffalo Street.Since the project lands do not extend to East Buffalo Street,an easement would need to be obtained from one of the adjacent neighboring properties to the north.If the project is not able to obtain the necessary easement, alternative solutions would include the following: 1. Service from NYSEG's lowpressure main on East Seneca Street,albeit at a reduced level of service. 2. Extension of the mediumpressure system within the street rightsof way from East Buffalo Street to the site on East Seneca Street. The applicant is concerned that lack of gas service from the medium pressure system may also preclude the use of a natural gasfired backup generator for the project. No impact anticipated. Prepared by:Lisa Nicholas,AICP,Senior Planner FIRST FLOOR392' - 6"AVERAGE GRADE388' - 7 1/2"FLOOD PLAIN @ 391'-6"S.E. GRADE ELEVATION @ 389'-9"VARIANCEREQUESTVARIANCEREQUESTN.E. GRADE ELEVATION @ 388'-3"ELEVATOR OVERRUN1' - 0"3' - 10 1/2"40' - 0" ZONING ALLOWANCE6' - 6"40' - 0" ZONING ALLOWANCE6' - 6"1' - 0"3' - 10 1/2"FIRST FLOOR392' - 6"AVERAGE GRADE388' - 7 1/2"FLOOD PLAIN @ 391'-6"N.W. GRADE ELEVATION @ 387'-6"N.E. GRADE ELEVATION @ 388'-3"VARIANCEREQUESTVARIANCEREQUEST6' - 6"40' - 0" ZONING ALLOWANCE6' - 6"40' - 0" ZONING ALLOWANCE1' - 0"3' - 10 1/2"FIRST FLOOR392' - 6"AVERAGE GRADE388' - 7 1/2"1' - 0"FLOOD PLAIN @ 391'-6"S.E. GRADE ELEVATION @ 389'-9"S.W. GRADE ELEVATION @ 389'-0"3' - 10 1/2"6' - 6"40' - 0" ZONING ALLOWANCEVARIANCEREQUEST40' - 0" ZONING ALLOWANCE6' - 6"VARIANCEREQUESTBUS SHELTERFIRST FLOOR392' - 6"AVERAGE GRADE388' - 7 1/2"FLOOD PLAIN @ 391'-6"1' - 0" REQ.3' - 10 1/2"S.W. GRADE ELEVATION @ 389'-0"40' - 0" ZONING ALLOWANCE6' - 6"3' - 10 1/2"1' - 0"6' - 6"40' - 0" ZONING ALLOWANCEVARIANCEREQUESTVARIANCEREQUESTN.W. GRADE ELEVATION @ 387'-6"ELEVATOR OVERRUNABCDEFGABCDEFG1234567891012345678910WARNING: It is a violation ofNew York State Law for anyperson, unless acting under thedirection of a licensed Architect,to alter this document in any way.If a document bearing the seal ofan Architect is altered, thealtering Architect shall affix tosuch document his seal and thenotation "altered by" followed byhis signature, the date of suchalteration, and a specificdescription of the alteration.ArchitecturePlanningInterior Design217 North Aurora StreetIthaca NY 14850p 607.273.7600 f 607.273.0475DATE:PROJECT:OTHER:DRAWN BY:6/8/2015 8:54:51 AMAP110ZONINGVARIENCE -HEIGHT5/27/2015210 HANCOCK STREET, ITHACA NY 14850ITHACA NEIGHBORHOOD HOUSING SERVICESHANCOCK STREET REDEVELOPMENT2014055NBSCHEMATIC DESIGNREVISION SCHEDULENAME DATE 1/16" = 1'-0"F2OVERALL EAST ELEVATION - ZONING 1/16" = 1'-0"C2OVERALL NORTH ELEVATION - ZONING 1/16" = 1'-0"C6OVERALL SOUTH ELEVATION - ZONING 1/16" = 1'-0"A2OVERALL WEST ELEVATION - ZONING 1 APPEAL #2987 105-107 E. YORK STREET (JAMES SEMP) Appeal James Semp, owner of 105-107 East York Street, for a Use Variance from Section 325-32 C. (1) and Area Variances from Section 325-8, Columns 10, 11, 12, and 13, Percentage of Lot Coverage, Front Yard, Side Yard, and Other Side Yard, respectively, requirements of the Zoning Ordinance. The property at 105-107 East York Street is a non-conforming three-family dwelling unit. Apartment 105 occupies half the building and contains portions of both the first and second floors. The other side of the building contains two apartments. Apartment 105 is on the first floor and apartment 107 is on the second floor. To make two of the apartments more attractive to long-term tenants, the applicant wants to enlarge both apartments 105 and 107 by creating habitable space on the third floor of the building. The applicant proposes adding a 250 SF “bonus room” for apartment 107 on the third floor. He also proposes adding a 575 SF “bonus room” on the third floor for apartment 105. Section 325-32 C. (1) prohibits the extension or enlargement of a non-conforming use without a Use Variance. The applicant’s request to extend into the attic space is considered an enlargement. The property at 105-107 East York Street also has several existing area deficiencies. Column 10 limits lot coverage to 35%; the property has 41% lot coverage. Column 11 requires a 10-foot front yard; the property has a 6-foot front yard. Column 12 requires a 10-foot side yard; the property has a 5-foot side yard. Column 13 requires a five-foot other side yard; the property’s other side yard is 4 feet. 105-107 East York Street is in an R-2b Use District, where the multiple dwelling is considered a non- conforming use and Section 325-38 requires that variances be granted before a Building Permit is issued. CITY OF ITHACA Board of Zoning Appeals Notice of Appeal City of IthacaBoard of Zoning Appeals WorksheetAppeal NumberBZA-2987Address105-107 E. York StreetUse DistrictR-2bDate07/07/15ApplicantJames SempOwnerJames SempApplication Type:Use VarianceColumn Number234567891011121314/1516Column TitleUseAccessory UseOff-Street ParkingOff-Street LoadingLot Area (Sq. Feet)Lot Width (Feet)Number of StoriesHeight in Feet% of Lot CoverageFront YardSide YardOther Side YardRear yard: % of depth or number of feet, whichever is lessMinimum Building HeightExisting Condition and UseMultiple 3-Units24983.549.8'2 Occupied Stories30+41%6'5'4'32' or 32%District Regulations for ExistingTwo Family Zone3None Required4,0003533535%1010525% or 50' but not less than 20'NoneNote Non-Conforming ConditionsDef.Def.OKOKOKOKDef.Def.Def.Def.OKProposed Condition and/or UseMultiple 3-Units24983.549.8'3 Occupied Stories30+41%6'5'4'32' or 32%District Regulation for ProposedTwo Family Zone3None Required4,0003533535%1010525% or 50' but not less than 20'NoneNote Non-Conforming Conditions for ProposalDef.N/ADef.N/AOKOKOKOKDef.Def.Def.Def.OKN/ANotes: