HomeMy WebLinkAbout10-18-16 P&D Board - Project Review Committee Meeting Agenda1 12118C104LAYOUTPLAN 12118GRADING ANDDRAINAGEPLAN 12118UTILITYPLAN 12118DETAILS 1.00 A B C D 1.01 1.02 EXTENT OF DISTURBANCE REMOVE TREE REMOVE CARPORT AND CONC. SIDEWALK EXCAVATION FOR NEW PAVING EXCAVATION FOR NEW PAVINGREMOVE HEDG E R O W FOUNDATION TYPE FOR NEW CONSTRUCTION: BLDG A, B, C & D: 2’-6” x 1’-0” SPREAD FOOTER W/ CONC. FND WALL APPROX. AMOUNT OF EXCAVATION: BLDG A: 110 CU. YD. BLDG B: 136 CU. YD. BLDG C: 142 CU. YD. BLDG D: 142 CU. YD. NEW SIDEWALKS: 52 CU. YD. NEW PAVING: 445 CU. YD. TOTAL EXCAVATION: 1,027 CU. YD. 1.03 8 6EXISTING SIDEWALKNEW SIDEWALKCONC. SIDEWALK 1.04 CHAIN LINK FENCEEXISTING SIDEWALKNEW SIDEWALKDUMPSTER W/ CONC. PAD & WOOD FENCE BUFFER WWWWWW 1.05 1.06 GRANITE CURB DETAIL1NTS 0 0SIDEWALK DETAIL3NTS ASPHALT DETAIL2NTS BIKE RACK DETAIL4NTS DUMPSTER BUFFER5NTS 2.01 SCHEMATIC DESIGN BY STREAM COLLABORATIVE 2.02 SCHEMATIC DESIGN BY STREAM COLLABORATIVE