HomeMy WebLinkAbout10-18-16 P&D Board - Project Review Committee Meeting Agenda1
12118C104LAYOUTPLAN
12118GRADING ANDDRAINAGEPLAN
12118UTILITYPLAN
12118DETAILS
1.00
A
B
C
D
1.01
1.02
EXTENT OF DISTURBANCE
REMOVE TREE
REMOVE CARPORT
AND CONC. SIDEWALK
EXCAVATION FOR NEW PAVING EXCAVATION FOR NEW PAVINGREMOVE HEDG
E
R
O
W
FOUNDATION TYPE FOR NEW CONSTRUCTION:
BLDG A, B, C & D: 2’-6” x 1’-0” SPREAD FOOTER W/ CONC. FND WALL
APPROX. AMOUNT OF EXCAVATION:
BLDG A: 110 CU. YD.
BLDG B: 136 CU. YD.
BLDG C: 142 CU. YD.
BLDG D: 142 CU. YD.
NEW SIDEWALKS: 52 CU. YD.
NEW PAVING: 445 CU. YD.
TOTAL EXCAVATION: 1,027 CU. YD.
1.03
8 6EXISTING SIDEWALKNEW SIDEWALKCONC. SIDEWALK
1.04
CHAIN LINK FENCEEXISTING SIDEWALKNEW SIDEWALKDUMPSTER W/ CONC. PAD &
WOOD FENCE BUFFER
WWWWWW
1.05
1.06
GRANITE CURB DETAIL1NTS
0
0SIDEWALK DETAIL3NTS
ASPHALT DETAIL2NTS
BIKE RACK DETAIL4NTS
DUMPSTER BUFFER5NTS
2.01
SCHEMATIC DESIGN BY
STREAM COLLABORATIVE
2.02
SCHEMATIC DESIGN BY
STREAM COLLABORATIVE