Loading...
HomeMy WebLinkAbout06-28-16 Planning and Development Board Meeting Agenda PLANNING &DEVELOPMENT BOARD AGENDA The regular meeting of the PLANNING &DEVELOPMENT BOARD will be held at 6:00 p.m.on JUNE 28TH,2016 in COMMON COUNCIL CHAMBERS,City Hall,108 E.Green Street,Ithaca,NY. AGENDA ITEM Approx.Start Time 1.Agenda Review 6:00 2.Special Order of Business: Ithaca Landmarks Preservation Commission (ILPC)DeWitt House Update —B.McCracken, Historic Preservation Planner Brindley Street Bridge —Review of Revised FEAF &Comments to Lead Agency 6:01 3.Privilege of the Floor (3 minute maximum per person if you will be speaking about a project with a scheduled PUBLIC HEARING below ,you are highly encouraged to speak at that time) 6:30 4.Subdivision Review A.Project:Minor Subdivision 6:45 Location:312 314 W.Spencer St. Applicant:Charlie O’Connor,Modern Living Rentals Actions:Consideration of Preliminary &Final Subdivision Approval Project Description:The applicant proposes to consolidate,then subdivide,three tax parcels:#105.7 1.1 and #116. 1 1,with a combined area of approximately 0.212 acres (9,234 SF),and containing an existing single family house; and #116.1 2,measuring approximately 0.395 acres (17,206 SF)and containing an existing single family house.The new proposed parcels will be:Lot 1,measuring 8,571 SF with approximately 166.78’of frontage on Old Elmira Road; Lot 2,measuring 5,600 SF with approximately 45’of frontage on Old Elmira Road;and Lot 3,measuring 12,260 SF with approximately 191’of frontage on Spencer Road and containing the two existing houses.The proposed Lot 3 requires and Area Variance for a deficient front yard setback.This is an Unlisted Action under the City of Ithaca Environmental Quality Review Ordinance (“CEQRO”)and the State Environmental Quality Review Act (“SEQRA”)for which the Planning Board,acting as Lead Agency made a Negative Declaration of Environmental Significance on May 24,2016. CITY OF ITHACA 108 E. Green St. — 3rd Floor Ithaca, NY 14850-5690 DEPARTMENT OF PLANNING, BUILDING, ZONING, & ECONOMIC DEVELOPMENT Telephone: Planning & Development – 607-274-6550 Community Development/IURA – 607-274-6559 Email: dgrunder@cityofithaca.org Email: iura@cityofithaca.org Fax: 607-274-6558 Fax: 607-274-6558 APPLICANT OVERHEAD PROJECTOR NOTE: The City only has a VGA plug/cable available to connect to our overhead projector.If you need to connect another way,you will need to provide your own ADAPTOR.(Macs &many newer,lighter laptops may not have a VGA port.) If you have a disability &would like specific accommodation to participate, please contact City Clerk at 274 6570 by 12:00 p.m.,the day before the meeting. Start Times:Start times are approximate only —APPLICANTS are responsible for being available at whatever time(s)their agenda item(s)is actually discussed. “An Equal Opportunity Employer with a commitment to workforce diversification.” 2 5.Site Plan Review A.Project:Two Duplexes 7:00 Location:312 314 W.Spencer St. Applicant:Charlie O’Connor,Modern Living Rentals Actions:PUBLIC HEARING Consideration of Preliminary &Final Site Plan Approval Project Description:The applicant proposes to construct two new 2 story duplexes.The new houses will each have a footprint of 1,133 SF and contain a 3 bedroom unit on each floor,for a total of 4 new units.Site improvements will include:gravel parking areas for a total of 7 spaces;walkways;landscaping;one new curb cut;street trees;and construction of a public sidewalk along the property’s frontage on Old Elmira Road.The project is in the B 5 and R 2a Zoning Districts and has received required Area Variance This is a Type 2 Action under the City of Ithaca Environmental Quality Review Ordinance (“CEQRO”),§175 C (8),and State Environmental Quality Review Act (“SEQRA”),§617.5 C.(9),and is not subject to Environmental Review. B.Project:Apartment Building 7:15 Location:201 College Ave. Applicant:Noah Demarest,STREAM Collaborative,for Visum Development Group Actions:PUBLIC HEARING Consideration of Preliminary Site Plan Approval Project Description:The applicant proposes to build a 5 story apartment building on a 0.173 acre lot at the corner of College Avenue and Bool Street.The building will contain 44 dwelling units with approximately 76 bedrooms. The basement level will have a trash room,a fitness room with windows looking out to the street,and a bicycle garage for approximately 20 bikes with ramp access from a doorway on Bool Street.Other proposed amenities include landscaping,lighting,4 outdoor bike racks,and street trees.The site has a 17’difference in elevation from the southwest corner to the northeast corner,rising from 690.00 to 707.00.Site development requires removal of the existing 2 story wood framed house containing 1 apartment with 12 bedrooms,gravel parking area,and five trees.The project is proposing a curb bump out that will require approval form the Board of Public Works.The project is in the MU 1 Collegetown Area Form District (CAFD).The project has been revised so that it no longer requires an Area Variance.This is a Type 1 Action under the City of Ithaca Environmental Quality Review Ordinance (“CEQRO”),§176 4 B(1)(k)&(h)[4],and the State Environmental Quality Review Act (“SEQRA”),§617.4(b)(11),for which the Planning Board made a negative declaration of Environmental significance on May 24,2016. C.Project:Elmira Savings Bank 7:55 Location:602 W.State St./M.L.K.,Jr.St. Applicant:Kim Michaels,Trowbridge Wolf Michaels Landscape Architects,LLP Actions:Consideration of Preliminary &Final Site Plan Approval Project Description:Applicant proposes to renovate existing two story brick building at corner of West State and Meadow Streets for branch bank functions on first and second floor.Basement will be used for mechanical equipment/tenant storage;also proposed is small 700 SF two story addition,necessary for vertical circulation (stair/elevator).Site ingress/egress is provided from existing curb cuts on Meadow Street and West State Street (egress only).Two drive through lanes will be provided for bank transactions,one of which will serve as island station with pneumatic tube connection to remote teller,the second providing access to night deposit and ATM station at building’s west exterior wall.17 parking spaces are proposed.Applicant also proposes to remove 2 on street parking spaces on State St.to expand sidewalks and add street trees.Other site improvements include landscaping,signage,and lighting.Project site consists of 3 tax parcels:72.2 13,which contains existing two story brick building;72.2 11,which contains existing asphalt parking area and curb cut to N.Meadow St.;and 72.2 10, which contains two houses.Project development requires consolidation of tax parcels and demolition of two homes.Project is in WEDZ 1a Zoning District and has received the required Area Variance to allow for addition of one story canopy on west side of building over drive through lanes.Project also requires approval for removal of parking and curb bump out.This is an Unlisted Action under City of Ithaca Environmental Quality Review Ordinance (“CEQRO”)and State Environmental Quality Review Act (“SEQRA”),for which the Planning Board,acting as Lead Agency made a Negative Declaration of Environmental Significance on May 24,2016. “An Equal Opportunity Employer with a commitment to workforce diversification.” 3 D.Project:Nine Unit Apartment Building 8:10 Location:107 S.Albany St. Applicant:Nick Stavropoulos Actions:Declaration of Lead Agency PUBLIC HEARING Determination of Environmental Significance Consideration of Preliminary &Final Site Plan Approval Project Description:The applicant proposes to construct a three story,plus basement,9 unit apartment building in back of (and attached to)the existing two story building.The project will involve the removal of the rear 8 feet of the existing structure and interior renovations for conversion to residential use (three units).Site improvements will include removal of existing carport and asphalt drive,installation of landscaping,a concrete walk,and other site amenities.The project is in the CDB 60 Zoning District and has received Design Review.This is a Type 1 Action under the City of Ithaca Environmental Quality Review Ordinance (“CEQRO”)§176 1 B.(h)[4],and the State Environmental Quality Review Act (“SEQRA”)§617.4(b)(11),and is subject to Environmental Review. E.Project:Maplewood Graduate &Professional Student Housing Redevelopment Project 8:35 Location:Veteran’s Ave.(between Maple Ave.&Mitchell St.) Applicant:Scott Whitham,Whitham Planning &Design,LLC,for Cornell University Actions:Comments of Draft Scope for Environmental Impact Statement (EIS) Project Description:The applicant proposes to redevelop the existing 170 unit and 372 bedroom Maplewood housing complex into a new project with 500 600 units and up to 975 bedrooms.The units are to be a mixture of townhomes,stacked flats,and multi family apartment buildings.The project will include a community center,some neighborhood scaled retail,and internal circulation network,including connections to adjacent East Hill Recreation Way,landscaping,lighting,and other amenities.The project site is approximately 17 acres —0.75 of which is in the City of Ithaca and is proposed to contain an apartment building.The applicant intends to develop the Town portion of the site as a Planned Development Zone (PDZ),while the City portion will comply with current R 3b Zoning District regulations.This is a Type 1 Action under the City of Ithaca Environmental Quality Review Ordinance (“CEQRO”), §176 4 B(1)(k)&(i),and the State Environmental Quality Review Act (“SEQRA”),§617.4(b)(11),and is subject to Environmental Review.The Town of Ithaca,acting as Lead Agency for the Environmental Review of the project, issued a Positive Declaration of Environmental Significance at its May 2016 meeting and directed the applicant to prepare an EIS.The comment period for the Draft Scope for the EIS ends on July 7,2016. F.SKETCH PLAN:301 E.State St.—Mixed Use Retail/Residential 8:55 6.Zoning Appeals 9:15 #3034,Area Variance,201½Wyckoff Ave. #3035,Special Permit,202 Brookfield Rd. #3036,Area Variance,605 N.Aurora St. 7.Old/New Business A. Chain Works District DGEIS —Updated Schedule &Special Meeting Schedule B. Collegetown Area Form Districts (CAFD)—Amendments to Allow Planning Board Discretion on Certain Design Elements C. Review of Annual Cornell U 1 Zone Parking Report 9:25 8.Reports A.Planning Board Chair (verbal) 9:35 B.Director of Planning &Development (verbal) C.Board of Public Works Liaison (verbal) “An Equal Opportunity Employer with a commitment to workforce diversification.” 4 9.Approval of Minutes:July 28,2015,September 22,2015,March 22,2016,April 24,2016,& May 24,2016 (time permitting) 9:45 10.Adjournment 9:46 ACCESSING MEETING MATERIALS ONLINE Site Plan Review &Subdivision Applications (and Related Documents) Site Plan Review application documents are accessible electronically via the “Document Center”on the City web site (www.cityofithaca.org/DocumentCenter),under “Planning &Development”>“Site Plan Review Project Applications,”and in the relevant year/month folder.Subdivision application materials can be similarly located, but in the “Subdivision Applications”folder.Zoning Appeal Materials are also accessible electronically via the “Document Center”on the City web site,under “Board of Zoning Appeals." Agenda You may access this agenda (including attachments)by going to the “Agenda Center”on the City web site (www.cityofithaca.org/agendacenter),under “Planning & Development Board.”For ease of access,a link to the most recent Planning Board agenda is always accessible on the Planning Board home page: http://www.cityofithaca.org/354/Planning Development Board. “An Equal Opportunity Employer with a commitment to workforce diversification.” City of Ithaca Sidewalks To: Lisa Nicholas, Senior Planner From: Johnathan Licitra, Sidewalk Program Manager Re: Site Plan Review: Project: 107 S. Albany St. Date: 20 June 2016 According to the submitted plans, L1-Planting Plan (14 June 2016); this project will leave the existing sidewalk on South Albany Street in-tact. The plans state that a new concrete walk will be constructed. There is one sidewalk square (5’ x 5’) that is cracked located in the asphalt driveway, and should be replaced with this project. Replacing this one broken sidewalk will improve the sidewalk infrastructure in sidewalk district 3. The proposed sidewalk should comply with the Americans with Disabilities Act (ADA) standards (i.e. 2% cross-slope, 5 feet wide, etc.). “An Equal Opportunity Employer with a commitment to workforce diversification.” City of Ithaca Sidewalks To: Lisa Nicholas, Senior Planner From: Johnathan Licitra, Sidewalk Program Manager Re: Site Plan Review: Project: 312 -314 W. Spencer Rd Date: 20 June 2016 According to the submitted plans, L101-Site Layout & Utility Plan (3 June 2016); this project will connect to the existing sidewalk on Old Elmira Road. This will improve the sidewalk infrastructure in sidewalk district 4. Although there is a parcel connection to W. Spencer St., there appears to be no driveway access or sidewalk proposed on W. Spencer St. The proposed sidewalk on Old Elmira Road must comply with the Americans with Disabilities Act (ADA) standards (i.e. 2% cross-slope, 5 feet wide, etc.) “An Equal Opportunity Employer with a commitment to workforce diversification.” City of Ithaca Sidewalks To: Lisa Nicholas, Senior Planner From: Johnathan Licitra, Sidewalk Program Manager Re: Site Plan Review: Project: 602 W. State St. Date: 20 June 2016 According to the submitted plans, L201-Layout Plan (14 June 2016); this project will saw-cut and replace the existing sidewalk on North Meadow Street and West State Street. This will improve the sidewalk infrastructure in sidewalk district 5. The proposed sidewalk is specified on the plans to comply with the Americans with Disabilities Act (ADA) standards (i.e. 2% cross-slope, 5 feet wide, etc.). June 17, 2016 Mr. Charles O’Connor Modern Living Rentals Email address: cwoconnor@gmail.com RE: Wetlands Investigation 312-314 West Spencer Street Ithaca, New York EDR Project No. 16072 Dear Mr. O’Connor: As per your request, Environmental Design and Research, Landscape Architecture, Engineering & Environmental Services, D.P.C. (EDR) investigated the above-referenced site to determine if any federal jurisdictional wetlands or streams are present. As you had mentioned, in preparing the Environmental Assessment Form (EAF), the EAF Mapper indicated that there were federal wetlands on the site. However, EDR’s review of the National Wetland Inventory (NWI) map for this area did not show any federal wetlands occurring on site. On June 14, 2016 EDR staff Ecologist Russell Farchione conducted a site visit to evaluate actual on-site conditions. The site visit revealed that the property consists primarily of maintained lawn with some trees, shrubs and a roadside ditch that runs parallel to the road on the western edge of the site. The ditch appears to have intermittent flow, with an off-site discharge into the Cayuga Inlet approximately 250 feet to the south, on the opposite side of the road. Vegetation within the ditch consists of 95% upland vegetation (primarily Japanese knotweed [Fallopia japonica] and brambles [Rubus sp.]) with a small patch of cattails (Typha sp.) at the southern end. Soils within the ditch consist primarily of gravel/rock deposits with clay-loam near the southern end. The ditch did not have any evidence of an Ordinary Highwater Mark, only drained upland areas (road surface runoff and uplands north of the site), and appeared to have been excavated wholly within uplands. According to the U.S. Army Corps of Engineers (USACE) Jurisdictional Guidebook (USACE, 2007), “Ditches (including roadside ditches) excavated wholly in and draining only uplands and that do not carry a relatively permanent flow of water generally are not jurisdictional under the CWA [Clean Water Act], because they are not tributaries or they do not have a significant nexus to TNWs [Traditional Navigable Waters]. If a ditch has relatively permanent flow into waters of the U.S. or between two (or more) waters of the U.S., the ditch is jurisdictional under the CWA. Even when not themselves waters of the United States, ditches may still contribute to a surface hydrologic connection between an adjacent wetland and a TNW.” Based on EDR’s field review, it appears that the ditch on the project site would likely not be considered jurisdictional by the USACE due to its intermittent flow of water, dominance of upland vegetation, lack of ordinary highwater mark, and drainage of only upland areas. This being the case, filling/culverting the ditch should not require a Section 404 (wetland) permit from the USACE. Mr. Charles O’Connor June 17, 2016 Page | 2 Please contact me if you have any questions or require additional information. Sincerely, John D. Hecklau Principal Literature Cited: United States Army Corps of Engineers (USACE). 2007. U.S. Army Corps of Engineers Jurisdictional Determination Form Instructional Guidebook. Available at: http://www.usace.army.mil/Portals/2/docs/civilworks/regulatory/cwa_guide/jd_guidebook_051207final.pdf. (Accessed June 17, 2016). PROPOSED RESOLUTION Minor Subdivision Preliminary & Final Approval City of Ithaca Tax Parcels 105.-7-1.1, 116.-1-1, & 116.-1-2 312-314 W. Spencer St. City of Ithaca Planning & Development Board June 28, 2016 WHEREAS: an application has been submitted for review and approval by the City of Ithaca Planning and Development Board for a Minor Subdivision (preceded by consolidation) of City of Ithaca Tax Parcels 105.-7-1.1, 116.-1-1, and 116.-1-2, located at 312-314 W. Spencer Street by Charlie O’Connor for Modern Living Rentals, and WHEREAS:the applicant proposes to consolidate, then subdivide, three tax parcels: #105.-7-1.1 and #116.-1-1, with a combined area of approximately 0.212 acres (9,234 SF), and containing an existing single-family house; and #116.-1-2, measuring approximately 0.395 acres (17,206 SF) and containing an existing single-family house. The new proposed parcels will be: Lot 1, measuring 8,571 SF with approximately 166.78’ of frontage on Old Elmira Road; Lot 2, measuring 5,600 SF with approximately 45’ of frontage on Old Elmira Road; and Lot 3, measuring 12,260 SF with approximately 191’ of frontage on Spencer Street and containing the two existing houses. The project is in the R-2a and B-5 Zoning Districts. The proposed Lot 3, in the R-2a District, requires an Area Variance for a deficient front yard setback, and WHEREAS: this is an Unlisted Action under the City of Ithaca Environmental Quality Review Ordinance and the State Environmental Quality Review Act, both of which require Environmental Review, and WHEREAS: this is considered a Minor Subdivision in accordance with the City of Ithaca Code, Chapter 290, Article 1, §290-1, Minor Subdivision – Any subdivision of land resulting in creation of a maximum of one additional buildable lot, and WHEREAS: the Planning Board, being the local agency which has primary responsibility for approving, funding, or carrying out the action, did on April 26, 2016 declare itself the Lead Agency for the project, and WHEREAS: this Board, acting as Lead Agency in Environmental Review, did on May 24, 2016 review and accept as adequate: a Short Environmental Assessment Form (SEAF), Part 1, submitted by the applicant, and Part 2, prepared by Planning staff; a draft Subdivision plat entitled “Subdivision Plan 312-314 Spender Rd (L101),” [sic] dated 3/17/16 and prepared by STREAM Collaborative; and other application materials, and WHEREAS: the Planning and Development Board did on May 24, 2016 determine the proposed Subdivision will result in no significant impact on the environment and issued a Negative Declaration, and WHEREAS: the City of Ithaca Conservation Advisory Council, Tompkins County Planning Department, and other interested parties have been given the opportunity to comment on the proposed project and any comments received have been considered, and WHEREAS: in a letter dated June 21, 2016 to Lisa Nicholas, Senior Planner from Edward Marx, Tompkins County Commissioner of Planning, the County recommended the following: “As this proposal falls within the 100- year floodplain and is adjacent to an intermittent stream we understand that the project will need to comply with the City's Flood Damage Prevention Law (Chapter 186). The Tompkins County Hazard Mitigation Plan: 2013 Update, which the City of Ithaca helped develop and adopted, includes actions to "develop regulations to prohibit future building in flood-prone areas as well as create incentives to encourage property owners to protect and improve streams and buffers." We recommend that the site plan include a 50-foot pervious, vegetated buffer to the north of the intermittent stream to help reduce flood risk and improve water quality,” and WHEREAS: the Planning Board recognizes that the small portion of the project site that is within the 100-year floodplain is not slated for any development and, furthermore, the City has long planned to culvertize the drainage ditch (referred to as an intermittent stream in the above-referenced letter) to allow for the installation of a sidewalk that will fill an important gap in the city’s sidewalk system connecting downtown neighborhoods to the Southwest Commercial District, and which the applicant will install on the subject property, and WHEREAS: the applicant has submitted a letter dated June 17, 2016 from John D. Hecklau, Principal of Environmental Design and Research, to Charlie O’Connor, project sponsor, stating that, based on a field survey on June 14, 2916, the drainage ditch on the site would not likely to be considered jurisdictional by the U.S. Army Corps of Engineers (ACOE), and WHEREAS: should further investigation determine that the ACOE has any jurisdiction over the drainage ditch, the applicant will be obligated to seek any necessary permits form the ACOE, and WHEREAS: the Planning and Development Board recognizes that information received and reviewed for this Subdivision indicates one of the resultant parcels requires an Area Variance for relief from area requirements in the R-2a Zoning District, and that such area variance was granted by the BZA on June 7, 2016, now, therefore, be it RESOLVED: that the City of Ithaca Planning and Development Board does hereby grant Preliminary and Final Subdivision Approval to the proposed Minor Subdivision of City of Ithaca Tax Parcels Tax Parcels 105.-7-1.1, 116.-1-1, & 116.-1-2, located at 312-14 W. Spencer St., subject to the submission of three (3) paper copies of the final approved plat, all having a raised seal and signature of a registered licensed surveyor. Moved by: Seconded by: In favor: Against: Abstain: Absent: Elliott Vacancies: 0 PROPOSED RESOLUTION Two Duplexes Preliminary & Final Approval 312-314 W. Spencer St. Site Plan Review City of Ithaca Planning & Development Board June 28, 2016 WHEREAS: an application has been submitted for review and approval by the City of Ithaca Planning and Development Board for to duplexes to be located at 312-314 W. Spencer St., by Charlie O’Connor, and WHEREAS: the applicant proposes to construct two new 2-story duplexes. The new houses will each have a footprint of 1,133 SF and contain a 3-bedroom unit on each floor, for a total of 6 new units. Site improvements will include: gravel parking areas for a total of 7 spaces; walkways; landscaping; one new curb-cut; street trees; and construction of a public sidewalk along the property’s frontage on Old Elmira Road. The project is in the B-5 and R-2a Zoning Districts and has received the required Area Variance WHEREAS: this is a Type 2 Action under the City of Ithaca Environmental Quality Review Ordinance (“CEQRO”), §175-C (8), and State Environmental Quality Review Act (“SEQRA”), §617.5 C. (9), and is not subject to Environmental Review, and WHEREAS: legal notice was published and property posted in accordance with Chapters 276-6 (B) (4) and 176-12 (A) (2) (c) of the City of Ithaca Code, and WHEREAS: the Planning and Development Board held the required Public Hearing on June 28, 2016, and WHEREAS: this Board, has on June 28, 2016 reviewed and accepted as adequate: drawings titled “Existing Site (L100),” “Site Layout & Utility Plan (L101),” “Grading and Planting Plans (L102),” and “Elevations (A202),” all dated 6/3/16 and prepared by STREAM Collaborative; and other application materials, and WHEREAS: the Tompkins County Planning Department, and other interested parties have been given the opportunity to comment on the proposed project and any received comments have been considered, and WHEREAS: in a letter dated June 21, 2016 to Lisa Nicholas, Senior Planner from Edward Marx, Tompkins County Commissioner of Planning, the County recommended the following: “As this proposal falls within the 100-year floodplain and is adjacent to an intermittent stream we understand that the project will need to comply with the City's Flood Damage Prevention Law (Chapter 186). The Tompkins County Hazard Mitigation Plan: 2013 Update, which the City of Ithaca helped develop and adopted, includes actions to "develop regulations to prohibit future building in flood-prone areas as well as create incentives to encourage property owners to protect and improve streams and buffers." We recommend that the site plan include a 50-foot pervious, vegetated buffer to the north of the intermittent stream to help reduce flood risk and improve water quality,” and WHEREAS: the Planning Board recognizes that the small portion of the project site that is within the 100- year floodplain is not slated for any development and, furthermore, the City has long planned to culvertize the drainage ditch (referred to as an intermittent stream in the above-referenced letter) to allow for the installation of a sidewalk that will fill an important gap in the city’s sidewalk system connecting downtown neighborhoods to the Southwest Commercial District, and which the applicant will install on the subject property, and WHEREAS: the applicant has submitted a letter dated June 17, 2016 from John D. Hecklau, Principal of Environmental Design and Research, to Charlie O’Connor, project sponsor, stating that, based on a field survey on June 14, 2916, the drainage ditch on the site would not likely to be considered jurisdictional by the U.S. Army Corps of Engineers, and WHEREAS: should further investigation determine that the ACOE has any jurisdiction over the drainage ditch, the applicant will be obligated to seek any necessary permits from the ACOE, now, therefore, be it RESOLVED: that the Planning Board does hereby grant Preliminary and Final Site Plan Approval to the project, subject to the following conditions: i. Submission of colored building elevations keyed to building materials, and ii. Submission of building materials, and iii. Bike racks, and iv. All work in the City Right of Way will require a Street Permit, and v. Submission of information documenting that endangered species are not present on the project site, and vi. Bike racks to be installed before a Certificate of Occupancy is issued, and vii. Written approval by the City Fire Department that all life safety access requirements have been met. Moved by: Seconded by: In favor: Against: Abstain: Absent: Elliott Vacancies: 0 To: The Planning and Development Board From: Neil H. Golder Re: 201 College Avenue project Date: June 20, 2016 A big building can still be a good building The Collegetown Area Form Districts (CAFD 325-45) is “intended to implement the 2009 Collegetown Urban Plan and Conceptual Design Guidelines, endorsed by the Common Council on August 5, 2009” (325-45.1.B). The Collegetown Plan designates most of the 200 block of College Avenue as a “character area” called “village residential,” with specific recommendations to building use, height, site design, materials, architectural design, and streetscape. I have attached copies of the relevant pages (6.14 through 6.19). These recommendations attempt to maintain and create a vibrant neighborhood. For example, “Site elements, orientation and setbacks should enable new, higher density housing types to relate to the existing vernacular architecture and become and active part of the streetscape.” (6.16) Also, “While the ideal housing type for the village residential area is larger in scale than the single-family houses or rooming houses that currently sit on the street, every effort should be made to assure that new housing relates directly to the vernacular housing that gives such a wonderful character to the neighborhoods surrounding the area.” (6.17) Examples One doesn't need to be an architect to know if a building gives life to a neighborhood or takes life away from it. I think most people know this or at least feel it unconsciously. The Egan building and 312 College Avenue are two in the latter category. The Snaith House and the Grandview are obviously in the former. But even a newer, modern building can be a positive addition to a neighborhood. I have given as an example 211 Linden Avenue, a building which is not exceptionally beautiful but which—with its visual interest, its setback similar to that of surrounding houses, and its extensive trees and shrubbery out front— fits in and is not unpleasant to walk by. Another example of a building which is large and yet promotes life in the neighborhood is Josh Lower's at 307 College Avenue. The building in this case is big and boxy, but is similar to buildings around it in the Collegetown core. More importantly, it not only has a residential component: it also contributes to transportation, pedestrian comfort and shopping: it will have the Greenstar Co-op grocery store, a TCAT bus stop, and a pedestrian walkway between College and Linden Avenues. It is a truly “mixed use” building. We can imagine a lively street scene there: not only people living in the floors above, but people shopping for food, people getting on and off the bus, people walking by and through the walkway chatting and socializing... Wise Density and a vision Certainly the 201 project increases density in the area. It provides more housing for Ithaca and more student housing in Collegetown. I have supported and still support increased density in Ithaca. But not at any cost. Not long ago, we used to talk about Smart Growth. Maybe now we should talk about Wise Density. Could the developers of 201 College Avenue offer something similar? Thinking outside the box, what about a cafe with tables out front? Or a neighborhood laundromat? A restaurant, an ice cream parlor? Affordable housing for low income people? If this building is to be part of a future more urbanized Collegetown, why not give us some of the benefits of living in an urban area, where people can work, study, eat, play and live in the same place. Let it be a place that students will enjoy and that will offer pleasure to people from all over the city. Let it be a building that really lives and that enhances the life of the neighborhood and the city. PROPOSED RESOLUTION Apartment Building Preliminary Approval 201 College Ave. Site Plan Review City of Ithaca Planning & Development Board June 28, 2016 WHEREAS: an application has been submitted for review and approval by the City of Ithaca Planning and Development Board for an apartment building to be located at 201 College Avenue, by Noah Demarest for Visum Development Group, and WHEREAS:the applicant proposes to build a 5-story apartment building on a 0.173-acre lot at the corner of College Avenue and Bool Street. The building will contain 44 dwelling units with approximately 76 bedrooms. The basement level will have a trash room, a fitness room with windows looking out to the street, and a bicycle garage for approximately 20 bikes with ramp access from a doorway on Bool Street. Other proposed amenities include landscaping, lighting, 4 outdoor bike racks, and street trees. The site has a 17’ difference in elevation from the southwest corner to the northeast corner, rising from 690.00 to 707.00. Site development will require removal of the existing 2 story wood-framed house containing 1 apartment with 12 bedrooms, gravel parking area, and five trees. The project is in the MU 1 Collegetown Area Form District (CAFD). The originally proposed project required an Area Variance for rear yard setback, and WHEREAS: this is a Type 1 Action under the City of Ithaca Environmental Quality Review Ordinance (“CEQRO”), §176-4 B(1)(k) & (h)[4], and the State Environmental Quality Review Act (“SEQRA”), §617.4(b)(11), and is subject to Environmental Review, and WHEREAS: the City of Ithaca Planning and Development Board did, on May 24, 2016 declare itself Lead Agency in Environmental Review for the proposed project, and WHEREAS: this Board, acting as Lead Agency in Environmental Review, did on May 24, 2016 review and accept as adequate: a Full Environmental Assessment Form (FEAF), Part 1, submitted by the applicant, and Parts 2 and 3, prepared by Planning staff; drawings titled “Demo and Layout Plan,” “Grading and Planting Plans,” “Level 1,” “Basement,” and “Levels 3-5,” dated 3/29/16; and “Southwest Corner Perspective,” “West Elevation,” “East Elevation,” “South Elevation - Bool St. Façade,” and “North Elevation,” dated 4/13/16; and “North to South Site Section,” and “East to West Site Section,” dated 5/11/16 and prepared by STREAM Collaborative; and other application materials, and WHEREAS: the City of Ithaca Conservation Advisory Council, Tompkins County Planning Department, and other interested parties have been given the opportunity to comment on the proposed project and any comments received have been considered, WHEREAS: the City of Ithaca Planning and Development Board determined that the proposed project will result in no significant impact on the environment and issued Negative Declaration of Environmental Significance on May 24, 2016, and, WHEREAS: the project met with the Design Review Committee on June 7, 2016, and WHEREAS: this Board did on June 28, 2016 review and accept as adequate: new and revised drawings titled “Exterior Building Materials,” “Site Materials,” “Basement Plan,” “1st and 2nd Floor Plans,” “3rd and 4th Floor Plans,” “3rd and 4th Mezzanine Plans,” “5th Floor Plans,” “5th Floor Mezzanine Plan,” and ”Roof Plan,” dated June 14, 2016; and “Demo and Layout Plan,” “Grading and Planting Plans,” “East and West Elevations,” “South Elevation,” “North Elevations,” “Existing Context,” “Future Context,” “Sheet Showing Northeast, Northwest, Southwest, and Southeast Views,” “Looking North – Existing,” “Looking North – Proposed,” “Looking South – Existing,” “Looking South – Proposed,” “Looking West – Existing,” “Looking West – Proposed,” “Looking East – Existing,” “Looking East – Proposed,” “Façade Details,” and an untitled drawing showing a street-level view of the building at the corner of Bool Street and College Avenue, all dated June 21, 2016 and prepared by STREAM Collaborative; and other application materials, and WHEREAS: the revised drawings listed above show the following changes from plans reviewed and accepted during the Environmental Review: the repositioning of the building on the site to meet the rear yard setback requirement of 10’; the addition of two functional entries along Bool Street to meet CAFD requirements, the addition of a curb-cut and concrete driveway at the rear of the building, and the incorporation of architectural details and further design development in response to Design Review Committee comments, and WHEREAS: this Board did on June 28, 2016 determine the proposed project changes are consistent with the environmental review and that no amendment to the Negative Declaration is required, now, therefore, be it RESOLVED: that the Planning and Development Board does hereby grant Preliminary Site Plan Approval to the project subject to the following conditions: i. Submission to the Planning Board of all site details including, lighting, signage, paving, retaining walls, fencing bike racks, site furnishings and other site amenities, and ii. Submission of cut-sheet for metal paneling materials demonstrating that the installation provides for reveals between panels, and iii. Screening for rooftop mechanicals will be changed from white to gray, and iv. Submission to the Planning Board of a location and plan for remote construction parking, and v. Hours of noise-producing construction activities will be limited to 7:30 a.m.-6:00 p.m., Monday-Friday, and vi. Any work in the City Right of Way will require a Street Permit, and vii. Before a Certificate of Occupancy is issued, there must be a fully executed permanent easement for access, use, and maintenance of public sidewalk on private property. Moved by: Seconded by: In favor: Against: Abstain: Absent: Elliott Vacancies: Direct-View LED Traffic Controller TCL734GG-115 PRODUCT ID 12474 DIMENSIONS 7" H x 34" W x 2.5" D CONSTRUCTION Cabinet: 1-piece, corrosion resistant, extruded aluminum frame, 2.5" deep. Cabinet Finish: Duranodic Bronze Face Material: 1/8" thick, impact resistant, smoke-tinted polycarbonate (5109) Faces: Single faced sign ELECTRICAL UL/cUL Listed: Listed for wet locations Voltage: 120 VAC MESSAGE Illumination: Super bright direct view LEDs. Message blanks out when off. LED Viewing Angle: Wide Angle NOTE: Other colors, voltages, cabinet sizes, cabinet styles and paint finishes are available upon request. MESSAGE COLOR HEIGHT AMPS ATM Green Wide Angle 3.5"0.029 OPEN Green Wide Angle 3.5"0.040 Product View NOTE: Sign image may not exactly represent the finished product. For illustration purposes only. REV 0 | 01302015 | AV 7" 34"2.5" iSigns 7625 Birkmire Drive Fairview, PA 16415 Version 1 (2015-01-30 14:22:20) Proudly Made in the USA Direct-View LED Traffic ControllerTCL734GR-100 PRODUCT ID6083 DIMENSIONS7" H x 34" W x 2.5" D CONSTRUCTIONCabinet: 1-piece, corrosion resistant, extruded aluminum frame, 2.5" deep.Cabinet Finish: Duranodic BronzeFace Material: 1/8" thick, impact resistant, smoke-tinted polycarbonate(5109)Faces: Single faced sign ELECTRICALUL/cUL Listed: Listed for wet locationsVoltage: 120 VAC MESSAGEIllumination: Super bright direct view LEDs. Message blanks out when off.LED Viewing Angle: Wide Angle NOTE: Other colors, voltages, cabinet sizes, cabinet styles and paintfinishes are available upon request. MESSAGE LED/COLOR HEIGHT AMPS OPEN Green Wide Angle 3.5"0.041CLOSEDRed Wide Angle 3.5"0.031 Product View NOTE: Sign image may not exactly represent the finished product. For illustration purposes only. REV 0 | 02032015 | AV 7" 34"2.5" iSigns 7625 Birkmire Drive Fairview, PA 16415 Version 2 (2015-02-03 10:52:05) Proudly Made in the USA PROPOSED RESOLUTION Building Expansion &Renovations Preliminary & Final Approval 602 W. State St. (Elmira Savings Bank) Site Plan Review City of Ithaca Planning & Development Board June 28, 2016 WHEREAS: an application has been submitted for review and approval by the City of Ithaca Planning and Development Board for building renovations, expansion, and site improvements to be located at 602 W. State Street by Trowbridge Wolf Michaels Landscape Architects, LLP, and WHEREAS:the applicant proposes to renovate existing two-story brick building at the corner of West State and Meadow Streets for branch bank functions on the first and second floor. Basement will be used for mechanical equipment and tenant storage; also proposed is a small 700-SF two-story addition, necessary for vertical circulation (stair and elevator). Site ingress/egress is provided from existing curb-cuts on Meadow Street and West State Street (egress only). Two drive-through lanes will be provided for bank transactions, one of which will serve as an island station with pneumatic-tube connection to remote teller. The second will provide access to a night deposit and ATM station at the building’s west exterior wall. 17 parking spaces are proposed. Applicant also proposes to remove 2 on- street parking spaces on State St. to expand the sidewalks and add street trees. Other site improvements include landscaping, signage, and lighting. Project site consists of 3 tax parcels: 72.-2-13, which contains existing two-story brick building; 72.-2-11, which contains existing asphalt parking area and curb-cut to N. Meadow St.; and 72.-2-10, which contains two houses. Project development will require consolidation of tax parcels and demolition of two homes. Project is in the WEDZ-1a Zoning District and has received the required Area Variance to allow for the addition of one-story canopy on west side of building over the drive-through lanes, and WHEREAS: this is an Unlisted Action under City of Ithaca Environmental Quality Review Ordinance (“CEQRO”) and State Environmental Quality Review Act (“SEQRA”), and requires Environmental Review, and WHEREAS: the City of Ithaca Planning and Development Board, being the local agency which has primary responsibility for approving and funding or carrying out the action, did on May 24, 2016 declare itself Lead Agency in Environmental Review for the proposed project, and WHEREAS: legal notice was published and property posted in accordance with Chapters 276-6 B. (4) and 176-12 A. (2) (c) of the City of Ithaca Code, and WHEREAS: the Planning and Development Board held the required Public Hearing on May 24, 2016, and WHEREAS: this Board, acting as Lead Agency in Environmental Review, did on May 24, 2016 review and accept as adequate: a Full Environmental Assessment Form (FEAF), Part 1, submitted by the applicant, and Part 2, prepared by Planning staff; drawings titled “Erosion, Sediment Control and Demolition Plan (C101),” “Utility Plan and Details (C102),” “Demo Plan (L101),” “Layout Plan (L201),” “Grading Plan (L301),” “Planting Plan (L401),” “Site Details (L501 & L502),” “First Floor Plan (A1.1),” “Second Floor Plan (A1.2),” “East Elevation (A2.1),” “North Elevation (A2.2),” “South Elevation (A2.3),” “West Elevation (A2.4),” and “Perspectives (A3.1 & A3.2),” all dated April 15, 2016, and prepared by HOLT Architects; and other application materials, and WHEREAS: the City of Ithaca Conservation Advisory Council, and other interested parties have been given the opportunity to comment on the proposed project and any comments received have been considered, and WHEREAS: the City of Ithaca Planning and Development Board did on May 24, 2016 determine the proposed project would result in no significant impact on the environment and issued a Negative Declaration of Environmental Significance, and WHEREAS: the Board has on June 28, 2016 reviewed and accepted as adequate the following new and revised drawings titled: “Layout Plan (L201),” “Planting Plan (L410),” “East Elevation (A2.1),” “North Elevation (A2.2),” “South Elevation (A2.3),” “West Elevation (A2.4),” “Perspectives (A3.1 & A3.2),” and “Exterior Lighting Photometrics,” all dated June 15, 2016; and “Signage (A4-1),” dated June 14, 2016, and all prepared by HOLT Architects; and other application materials, now, therefore, be it RESOLVED: that the Planning Board does hereby grant Preliminary and Final Site Plan Approval to the project subject to the following conditions: i. Submission in writing that concern of City Transportation Engineer regarding the State Street ingress/egress have been satisfied, and ii. Subject to City approval, street trees should be added to the State Street side of the project, such that their location and shape do not impede vehicular lines of sight, and iii. Submission of a corrected sheet “A3.2,” and iv. Submission of revised west and north elevations to show utility boxes, and v. Any work in the City Right of Way will require a Street Permit, and vi. Before a Certificate of Occupancy is issued, there must be a fully executed permanent easement for access, use, and maintenance of public sidewalk on private property. Moved by: Seconded by: In favor: Against: Abstain: Absent: Elliott Vacancies: 0 PROPOSED RESOLUTION Nine-Unit Apartment Building Declaration of Lead Agency 107 S. Albany St. Site Plan Review City of Ithaca Planning & Development Board June 28, 2016 WHEREAS: 6 NYCRR, Part 617, of the State Environmental Quality Review Law and Chapter 176.6 of the City Code, Environmental Quality Review, require that a Lead Agency be established for conducting Environmental Review of projects in accordance with local and state environmental law, and WHEREAS: State Law specifies that, for actions governed by local environmental review, the Lead Agency shall be that local agency which has primary responsibility for approving and funding or carrying out the action, and WHEREAS: an application has been submitted for review and approval by the City of Ithaca Planning and Development Board for a nine-unit apartment building/addition to be located at 107 S. Albany Street, by Nick Stavropoulos, and WHEREAS: the applicant proposes to construct a three-story, plus basement, nine-unit apartment building in back of (and attached to) the existing two-story building. The project will involve the removal of the rear 8 feet of the existing structure and interior renovations for conversion to residential use (three units). Site improvements will include removal of existing carport and asphalt drive, installation of landscaping, a concrete walk, and other site amenities. The project is in the CDB-60 Zoning District and has received Design Review, and WHEREAS: this is a Type 1 Action under the City of Ithaca Environmental Quality Review Ordinance (“CEQRO”), §176-1 B. (h)[4], and the State Environmental Quality Review Act (“SEQRA”), §617.4(b)(11), and is subject to Environmental Review, now, therefore, be it WHEREAS: the Planning Board, being the local agency which has primary responsibility for approving and funding or carrying out the action, is by way of this resolution declaring itself Lead Agency in Environmental Review for the proposed project. Moved by: Seconded by: In favor: Against: Abstain: Absent: Elliott Vacancies: 0 PROPOSED RESOLUTION Nine-Unit Apartment Building CEQR Negative Declaration 107 S. Albany St. Site Plan Review City of Ithaca Planning & Development Board June 28, 2016 WHEREAS: an application has been submitted for review and approval by the City of Ithaca Planning and Development Board for a nine-unit apartment building/addition to be located at 107 S. Albany Street, by Nick Stavropoulos, and WHEREAS: the applicant proposes to construct a three-story, plus basement, nine-unit apartment building in back of (and attached to) the existing two-story building. The project will involve the removal of the rear 8 feet of the existing structure and interior renovations for conversion to residential use (three units). Site improvements will include removal of existing carport and asphalt drive, installation of landscaping, a concrete walk, and other site amenities. The project is in the CDB-60 Zoning District and has received Design Review, and WHEREAS: this is a Type 1 Action under the City of Ithaca Environmental Quality Review Ordinance (“CEQRO”), §176-1 B. (h)[4], and the State Environmental Quality Review Act (“SEQRA”), §617.4(b)(11), and is subject to Environmental Review, and WHEREAS: the Planning Board, being the local agency which has primary responsibility for approving and funding or carrying out the action, did on June 28, 2016 declare itself Lead Agency in Environmental Review for the proposed project, and WHEREAS: this Board, acting as Lead Agency in Environmental Review, has on June 28, 2016 reviewed and accepted as adequate: a Full Environmental Assessment Form (FEAF), Part 1, submitted by the applicant, and Parts 2 and 3 prepared by Planning staff; drawings titled “Survey Map No. 107 South Albany Street, City of Ithaca, Tompkins County, New York,” prepared by T.G. Miller, P.C. and dated 3/3/11; and “Site Plat Plan, E&S, Demo and Excavation” [undated and drawn on Site Plan dated 3/21/16] and “Demolition Plan,” dated 5/31/16, and “Site and Partial Landscape Plan,” dated 6/2/16; and “ Basement Plan (A-100),” “First Floor Plan (A-101),” “Second Floor Plan (A-102),” and “Third Floor Plan (A-103),” dated 3/21/16; and “Elevations (A-201 & A- 202),” and “Renderings (A-203 & A-204),” with a last revision date of 6/13/16, and all prepared by Lawrence P. Fabbroni PE, LC; and “Planting Plan (L-1),” dated 6/14/16 and prepared by Empire Landscape Architecture; and other application materials, and WHEREAS: the City of Ithaca Conservation Advisory Council, Tompkins County Planning Department, and other interested parties have been given the opportunity to comment on the proposed project and any received comments have been considered, and WHEREAS: as more fully documented in the FEAF, Part 3, the applicant has incorporated architectural elements to make the building more compatible with both the existing building, as well as the adjacent Historic District, now, therefore, be it RESOLVED: that the City of Ithaca Planning and Development Board determines the proposed project will result in no significant impact on the environment and that a Negative Declaration for purposes of Article 8 of the Environmental Conservation Law be filed in accordance with the provisions of Part 617 of the State Environmental Quality Review Act. Moved by: Seconded by: In favor: Against: Abstain: Absent: Elliott Vacancies: 0 PROPOSED RESOLUTION Nine-Unit Apartment Building Preliminary & Final Approval 107 S. Albany St. Site Plan Review City of Ithaca Planning & Development Board June 28, 2016 WHEREAS: an application has been submitted for review and approval by the City of Ithaca Planning and Development Board for a nine-unit apartment building/addition to be located at 107 S. Albany Street, by Nick Stavropoulos, and WHEREAS: the applicant proposes to construct a three-story, plus basement, nine-unit apartment building in back of (and attached to) the existing two-story building. The project will involve the removal of the rear 8 feet of the existing structure and interior renovations for conversion to residential use (three units). Site improvements will include removal of existing carport and asphalt drive, installation of landscaping, a concrete walk, and other site amenities. The project is in the CDB-60 Zoning District and has received Design Review, and WHEREAS: this is a Type 1 Action under the City of Ithaca Environmental Quality Review Ordinance (“CEQRO”), §176-1 B. (h)[4], and the State Environmental Quality Review Act (“SEQRA”), §617.4(b)(11), and is subject to Environmental Review, and WHEREAS: the Planning Board, being the local agency which has primary responsibility for approving and funding or carrying out the action, did on June 28, 2016 declare itself Lead Agency in Environmental Review for the proposed project, and WHEREAS: legal notice was published and property posted in accordance with Chapters 276-6 (B) (4) and 176-12 (A) (2) (c) of the City of Ithaca Code, and WHEREAS: the Planning and Development Board held the required Public Hearing on June 28, 2016, and WHEREAS: this Board, acting as Lead Agency in Environmental Review, has on June 28, 2016 reviewed and accepted as adequate: a Full Environmental Assessment Form (FEAF), Part 1, submitted by the applicant, and Parts 2 and 3 prepared by Planning staff; drawings titled “Survey Map No. 107 South Albany Street, City of Ithaca, Tompkins County, New York,” prepared by T.G. Miller, P.C. and dated 3/3/11; and “Site Plat Plan, E&S, Demo and Excavation,” [undated and drawn on Site Plan dated 3/21/16]; and “Demolition Plan,” dated 5/31/16; and “Site and Partial Landscape Plan,” dated 6/2/16; and “Basement Plan (A-100),” “First Floor Plan (A-101),” “Second Floor Plan (A-102),” and “Third Floor Plan (A-103),” dated 3/21/16; and “Elevations (A-201 & A-202),” and “Renderings (A-203 & A-204),” with a last revision date of 6/13/16, and all prepared by Lawrence P. Fabbroni, PE, LC; and “Planting Plan (L-1),” dated 6/14/16 and prepared by Empire Landscape Architecture; and other application materials, and WHEREAS: the City of Ithaca Conservation Advisory Council, Tompkins County Planning Department, and other interested parties have been given the opportunity to comment on the proposed project and any received comments have been considered, and WHEREAS: as more fully documented in the FEAF, Part 3, the applicant has incorporated architectural elements to make the building more compatible with both the existing building, as well as the adjacent Historic District, and WHEREAS: the City of Ithaca Planning and Development Board did on June 28, 2016 determine the proposed project will result in no significant impact on the environment and issued a that a Negative Declaration, now, therefore, be it RESOLVED: that the Planning Board does hereby grant Preliminary and Final Site Plan Approval to the project subject to the following conditions: i. Submission of detail showing window assembly with sill added, and ii. That the large sign currently on the existing building will be removed, and iii. All work in the City Right of Way will require a Street Permit, and iv. Tree planting in the City Right of Way will require approval from the City Forester, and v. Bike racks to be installed before a Certificate of Occupancy is issued, and vi. Written approval by the City Fire Department that all life safety access requirements have been met. Moved by: Seconded by: In favor: Against: Abstain: Absent: Elliott Vacancies: 0 ZONING APPEAL SUMMARIES, WORKSHEETS, & SUPPLEMENTARY MATERIALS NOT PROVIDED EARLIER 1 ZONING APPEAL #3034 201½ WYCKOFF AVENUE (PETRU PETRINA) Appeal of Petru Petrina for Area Variances from Section 325-8, Column 6, Lot Area, Column 7, Lot Width at Street, Column 10, Lot Coverage, Column 11, Front Yard, Column 12, Side Yard, and Column 13, Other Side Yard, requirements of the Zoning Ordinance. The applicant is proposing to use the existing dwelling located at 201½ Wyckoff Avenue as a two-family dwelling. This property received variances to add various additions to the single-family home. Zoning Appeal #1426 was granted on April 5, 1982 to previous owner, Mary Boynton. This variance was for raising the roof over the existing garage and creating a bedroom, study, and bathroom in the second-floor addition. Subsequently, a permit was issued on March 20, 1987 to the current owner to add a kitchen to the garage addition, creating a live-in space with access from the main dwelling. Then, in June 1996, Mr. Petrina was granted a variance to construct a two-story addition on the west and south sides of the home to further improve the property. Not until 2005 was it discovered a separation was installed, separating the owner-occupied portion of the home from the live-in portion, which created a second unit. The owner would like to maintain the current configuration as two units. The property has existing deficiencies in lot area, lot width at street, lot coverage, front yard, and both side yards that will not be exacerbated by the proposal. 201½ Wyckoff Avenue is located in an R-2a residential use district in which the proposed use is permitted. However, Section 325-39 requires a variance be granted before a Certificate of Compliance is issued. CITY OF ITHACA Board of Zoning Appeals – Notice of Appeal City of Ithaca Board of Zoning Appeals WorksheetAppeal NumberBZA-3034Address201½ Wyckoff AvenueUse DistrictR-2aDate7/5/2016ApplicantPetru PetrinaOwnerPetru PetrinaApplication Type:Area VarianceColumn Number234567891011121314/1516Column Title UseAccessory UseOff-Street ParkingOff-Street LoadingLot Area (Sq. Feet)Lot Width (Feet)Number of StoriesHeight in Feet% of Lot CoverageFront Yard Side YardOther Side YardRear yard: % of depth or number of feet, whichever is lessMinimum Building HeightExisting Condition and Use1 Family w/4BR3 3354.12 6' 3 28+48.56% 2.5' 4' .3' 33.5' or 35%District Regulations for ExistingOne and Two Family Zone2None Required5000 45 3 35 30% 25 10 1025% or 50' but not less than 20'NoneNote Non-Conforming Conditions* Def. OK N/A Def. Def. OK OK Def. Def. Def. Def. OK N/AProposed Condition and/or Use2 Family 3 3354.12 6' 3 28+48.56% 2.5' 4' .3' 33.5' or 35%District Regulation for ProposedOne and Two Family Zone2None Required5000 45 3 35 30% 25 10 1025% or 50' but not less than 20'NoneNote Non-Conforming Conditions for ProposalVariance RequiredN/A OK N/A Def. Def. OK OK Def. Def. Def. Def. OK N/ANotes: This property has had five variances that were proposed. BZA-1426, the variance was granted and the work was performed.BZA-1862, this variance was denied.BZA-1867, the variance was granted, but the work was never performed.BZA-1935, applicant withdrew the appeal at the meeting.BZA-2297, initial proposal included an addition to the rear of the building, final approval was limited to the north and west side of the building. 1 ZONING APPEAL #3035 202 BROOKFIELD ROAD (MICHAEL THORNE) Appeal of Michael and Pamela Thorne for an Accessory Apartment Special Permit from Section 325- 10, Accessory Apartments, requirements of the Zoning Ordinance. The applicant proposes to construct an accessory apartment at the property located at 202 Brookfield Road. The applicant proposes to rent the apartment to help with monthly mortgage payments and eventually use the space for an elderly parent. The accessory apartment will have a separate entrance and be located in the basement level of the existing home. The apartment will contains kitchen, bathroom, and have approximately 196 SF of habitable living space. Section 325-10 D. (4) requires accessory apartments not exceed 33 % of the total habitable floor area within the primary dwelling. The apartment will be 8.22%, meeting the requirement of the Zoning Ordinance. The 202 Brookfield Road property is in an R-1a Zoning District where the installation of an accessory apartment is permitted. However, Section 325-10 requires the Board of Zoning Appeals grant a Special Temporary Permit for the accessory use prior to issuance of a Building Permit. CITY OF ITHACA Board of Zoning Appeals – Notice of Appeal City of Ithaca Board of Zoning Appeals WorksheetAppeal NumberBZA-3035Address202 Brookfield RoadUse DistrictR-1aDate7/5/2016ApplicantMichael & Pamela ThorneOwnerMichael & Pamela ThorneApplication Type:Special PermitColumn Number23 4567891011121314/1516Column Title UseAccessory UseOff-Street ParkingOff-Street LoadingLot Area (Sq. Feet)Lot Width (Feet)Number of StoriesHeight in Feet% of Lot CoverageFront Yard Side YardOther Side YardRear yard: % of depth or number of feet, whichever is lessMinimum Building HeightExisting Condition and UseOne Family Dwelling3 45302 181.55' 1 14' 0.06% 32.5' 118' 34.4' 100' or 41%District Regulations for ExistingOne Family Zone2None Required10,000 75 3 35 20% 25 10 1025% or 50' but not less than 20'NoneNote Non-Conforming ConditionsOK OK N/A OK OK OK OK OK OK OK OK OKProposed Condition and/or UseOne Family DwellingAccessory Apt.3 45302 181.55' 1 14' 0.06% 32.5' 118' 34.4' 100' or 41%District Regulation for ProposedOne Family ZonePermitted 3None Required10,000 75 3 35 20% 25 10 1025% or 50' but not less than 20'NoneNote Non-Conforming Conditions for ProposalOKSpecial Permit RequiredOK N/A OK OK OK OK OK OK OK OK OK N/ANotes: 1 ZONING APPEAL #3036 605 NORTH AURORA STREET (SHELLEY KNICKERBOCKER) Appeal of Shelley Knickerbocker of Access to Independence on behalf of owners Paul and Jen Mutolo for an Area Variance from Section 325-8, Column 11, Front Yard, Column 12, Side Yard, and Column 13, Other Side Yard dimensions, of the Zoning Ordinance. The applicant proposes to construct an accessible ramp on the property located at 605 N. Aurora Street. The ramp is designed to assist the owner’s son to access the bus from the front of the home and will extend to the garage entry door in the rear of the property. Due to the rise and run requirements of the NYS Residential Code, the ramp will extend from the front yard to the rear yard, incorporating a series of ramps and level landings on the north side of the property. In the front yard, the ramp will be set back 11’ from the front property line and positioned approximately 4’ from the property line. In the rear yard, the ramp will be positioned approximately 6” from the side lot line. The ordinance requires the side yard to be 10’. The property has existing deficiencies in the front yard and other side yard that will not be exacerbated by the proposal. The property is located in an R-2b residential use district in which the proposed use is permitted. However, Section 325-38 requires that a variance be granted before a Building Permit is issued. CITY OF ITHACA Board of Zoning Appeals – Notice of Appeal City of Ithaca Board of Zoning Appeals WorksheetAppeal NumberBZA-3036Address605 N. Aurora StreetUse DistrictR-2bDate07/05/16ApplicantPaul & Jen MutoloOwnerPaul MutoloApplication Type:Area VarianceColumn Number234567891011121314/1516Column Title UseAccessory UseOff-Street ParkingOff-Street LoadingLot Area (Sq. Feet)Lot Width (Feet)Number of StoriesHeight in Feet% of Lot CoverageFront Yard Side YardOther Side YardRear yard: % of depth or number of feet, whichever is lessMinimum Building HeightExisting Condition and UseTwo Family Dwelling2 5,199.70 40.75' 2 27'+33.90% 8' 9.5' 1.08' 59.5' or 46.6%District Regulations for ExistingTwo Family Zone2None Required3,000 35 3 35 35% 10 10 525% or 50' but not less than 20'NoneNote Non-Conforming ConditionsOK N/AOK N/A OK OK OK OK OK Def. Def. Def. OK N/AProposed Condition and/or UseTwo Family Dwelling2 5,199.70 40.75' 2 27'+41.30% 8' 6" 1.05' 59.5' or 46.6%District Regulation for ProposedTwo Family Zone2None Required3,000 35 3 35 35% 10 10 525% or 50' but not less than 20'NoneNote Non-Conforming Conditions for ProposalOK N/AOK N/A OK OK OK OK OK *Def. Def. Def. OK N/ANotes:The beginning of the ramp in the front yard will be located approximately 11' from the property line. 2 The revision took into account that students,employees,and visitors going to Cornell Campus who use the bus or other ride share program,instead of their car,should be excluded from the total number of parking spaces Cornell needs to provide on campus. Determining Number of Parking Spaces Needed on Main Campus The number of parking spaces required under the U 1 Ordinance on main campus is based on the results of a survey conducted by the Travers Association in 1998.This survey derived a correlation between full time undergraduates,graduates,and employees and a specified ratio of parking spaces that should be provided for each.Travers’parking ratios are: (1)one parking space per every seven full time undergraduates; (2)one parking space for every two full time graduate students; (3)three parking spaces for every four full time employees;and (4)one parking space for every 25 persons in the group of undergraduates,graduates,and employees. (This ratio,in part,accounts for visitors on campus.) When the parking ratio for each user group is multiplied by the yearly population of each group on campus,the number of parking spaces for each group can be derived.Adding the parking space requirements for all three groups together,plus one additional space for each 25 undergraduates, graduates,and employees,results in the number of campus parking spaces needed before credit is allocated for TDM participation. As stated earlier,this calculated number of parking spaces on campus is proportionately reduced by the number of people using Cornell’s TDM program.Credit for TDM transportation is calculated by applying the Travers’ratios for determining parking spaces to the specific population of students,employees,and visitors using the TDM program.The sum calculated for TDM program participation is subtracted from the original number of required parking spaces determined for Cornell’s entire population of students, employees,and visitors.With this reduction,Cornell not only benefits from the TDM program,because there are fewer vehicles on campus,but also the continued increase in TDM program participation may mean that land once required for parking spaces can be used for other purposes. Cornell’s Efforts to Increase TDM Participation Since the inception of the TDM ridership program,participation has led to the overall reduction of required parking spaces on Cornell’s main campus.Currently,Cornell continues to use an incentive program where all new students are provided a free one year bus pass.This program introduces new students to the convenience of the TDM program and leads to many continuing to participate in the program until graduation. Furthermore,the TDM program supports the car share program and has also helped implement a community van pool program,which uses two vans from independent contractors to transport various groups throughout Tompkins County.The car share,car pooling,and van pool programs help increase alternative ridership.All the issues listed above have had and will have some impact on the required number of parking spaces on Cornell’s main campus,listed in the reports dating from 2007 to present. If Cornell continues to draw participants into the TDM and rideshare program,then the likelihood is that Cornell will have sufficient parking on campus because of the parking credit rewarding the TDM program. In the 2015 2016 school year,participation in the TDM program increased among undergraduates, graduates,and in the total population categories.While the number of Cornell’s employees participating in the ridership program has declined over the past two school years,overall,there is no indication that interest in riding the bus to and from Cornell or participating in ridesharing is dwindling. 3 Required Annual Report In reviewing the statistics for the 2015 2016 school year that Cornell’s Campus Planning Office provided, Cornell shows in its timely submitted report that there are sufficient parking spaces on the main campus to meet the U 1 Zoning District parking requirements.As required in the City Zoning Ordinance,§325 20 J.,this report also provides an annual parking inventory spreadsheet,a summary of the parking changes that have occurred in the preceding year,and a report on whether more than 25 parking spaces have been removed from any parking lot. Requirements Under Part §325 20 J.(7) Section §325 20.J.(7)states that as of 2006,every 5 years,Cornell shall submit a new “Main Parking Inventory Map.”The map must provide the names of prominent buildings and roads for the sake of geographical reference,and must provide inventory control numbers for parking areas.Cornell submitted a new 24”x36”map in 2011.This map has the names of Cornell’s main buildings and inventory control numbers designating where parking is located.This year,as required,Cornell submitted a new updated 24”x36”inventory map.In addition,Cornell submitted an updated 8.5’x11”Main Parking Inventory Map showing the current location of parking areas on campus,which is ATTACHED for reference. Requirements Under Part §325 20 J.(10)(a) The requirements under Parking for the U 1 Zoning District also state under §325 20.J.(10)(a)that every year the Director of Zoning Administration will be provided with an updated “parking inventory spreadsheet and summary.”This control sheet is also ATTACHED to this report.The parking inventory spreadsheet provides parking lot identification numbers and the number of parking spaces available in each lot;and it provides the total number of parking spaces on campus. According to part §325 20 J.(8),this parking inventory must also provide a summary of parking changes. These changes list the number of spaces added back to the inventory,newly created spaces,temporarily removed spaces,permanently removed spaces,and inventory errors. Requirements Under Part §325 20 J.(11) This part states that whenever 25 parking spaces have been permanently deleted since the last report, Cornell must provide a report stating where the parking spaces were removed from and provide the total number of remaining parking spaces.This year,no parking lots have experienced a permanent loss of parking spaces.Seven parking lots have temporarily lost a total of 95 spaces,but these losses are due to construction projects.Parking will be restored to these lots once these construction projects are completed.Cornell’s parking report also shows 21 spaces were permanently added to lot #3055 and 39 spaces were permanently added to lot #4015.There are a total of 11,579 parking spaces this year on main campus —a decrease of 35 parking spaces from last year. Supplementary Chart Along with this memorandum,I have ATTACHED a supplementary chart entitled “Cornell Parking 2015 2016.”This chart provides a count of full time undergraduates,graduate students,and employees enrolled in the 2015 2016 school year,and a count of full time undergraduates,graduates,and employees participating in the TDM program.This information was provided by Cornell in accordance with part §325 20 J.(10)of the Zoning Ordinance.It is from this information that the required number of parking spaces on campus can be derived.The chart shows: (1)How many parking spaces are required without credit for TDM participation; (2)The number of parking spaces credited for participation in the TDM; (3)The total number of required parking spaces;and (4)The excess number of parking spaces on main campus. 4 Finally,using the information found in Cornell’s report and applying the regulations under §325 20 J.(2) (a)and (b),I have determined that not only does Cornell University comply with the U 1 Parking Ordinance requirements,but it has 3,938 parking spaces in excess of the overall on campus parking requirement. The University’s report and my review are required to be submitted to the Planning Board for its review and comment.The report must also be provided to the City of Ithaca Director of Planning and Development,the Town of Ithaca Zoning Officer,and the Village of Cayuga Heights. I hope this information regarding Cornell’s main campus parking spaces and TDM ridership is useful to the Planning Board. If you have any questions regarding Cornell’s parking report and my determination of compliance,please do not hesitate to contact me at 274 6550. cc:JoAnn Cornish,Director of Planning &Development Brent Cross,Zoning Officer,Village of Cayuga Heights Bruce Bates,Zoning Officer,Town of Ithaca Reed Huegerich,Senior Planner,Campus Planning Office,Cornell University Total Spaces on Campus:11,614 11,579 Required Spaces without TDM* Participation Undergraduates (14,282 ÷ 7 =) 2,041 (14,024 ÷ 7 =) 2,003 Graduates (7,397 ÷ 2 =) 3,699 (6,909 ÷ 2 =) 3,455 Employees (8,439 × 0.75 =) 6,330 (9,073 × 0.75 =) 6,805 Total Population (30,118 ÷ 25 =) 1,205 (30,006 ÷ 25 =) 1,200 13,275 13,463 TDM Participation for Parking Reduction Undergraduates (5,422 ÷ 7 =) 775 (5,641 ÷ 7 =) 806 Graduates (4,330 ÷ 2 =) 2,165 (4,353 ÷ 2 =) 2,177 Employees (3,265 × 0.75 =) 2,449 (3,086 × 0.75 =) 2,315 Total Population (13,017 ÷ 25 =) 521 (13,080 ÷ 25 =) 524 5,910 5,822 Parking Adjusted for TDM Participation Required Spaces —Unadjusted 13,275 13,463 Number of Spaces Deducted for TDM 5,910 5,822 Required Parking 7,365 7,641 Available Parking:11,614 11,579 Required Parking:7,365 7,641 Excess Parking:4,249 3,938 * Transportation Demand Management (TDM) Note: Fractions rounded up to the nearest whole number. Date: 6/21/14 Author: Phyllis Radke, Director of Zoning Administration Zoning Division Planning, Building, Zoning, & Economic Development Department City of Ithaca 2014 2015 Cornell University Annual Report —Compliance with Requirements of Zoning Ordinance,§325 20.J.,Parking for the U 1 Zoning District 2015-2016