Loading...
HomeMy WebLinkAbout05-24-16 Planning and Development Board Meeting Agenda PLANNING &DEVELOPMENT BOARD AGENDA The regular meeting of the PLANNING &DEVELOPMENT BOARD will be held at 6:00 p.m.on MAY 24TH,2016 in COMMON COUNCIL CHAMBERS,City Hall,108 E.Green Street,Ithaca,NY. AGENDA ITEM Approx.Start Time 1.Agenda Review 6:00 2.Privilege of the Floor (3minute maximum per person if you will be speaking about a project with a scheduled PUBLIC HEARING below ,you are highly encouraged to speak at that time) 6:02 3.Special Order of Business:Incentive Zoning &Site Plan Review Discussion (Lynn Truame)6:10 4.Subdivision Review A.Project:Minor Subdivision 6:30 Location:312314 Spencer Rd. Applicant:Charlie O’Connor,Modern Living Rentals Actions:Determination of Environmental Significance Recommendation to BZA Project Description:The applicant proposes to consolidate,then subdivide,three tax parcels:#105.7 1.1 and #116.1 1,with a combined area of approximately 0.212 acres (9,234 SF),and containing an existing singlefamily house;and #116.1 2,measuring approximately 0.395 acres (17,206 SF)and containing an existing singlefamily house.The new proposed parcels will be:Lot 1,measuring 8,571 SF with approximately 166.78’of frontage on Old Elmira Road;Lot 2,measuring 5,600 SF with approximately 45’of frontage on Old Elmira Road;and Lot 3, measuring 12,260 SF with approximately 191’of frontage on Spencer Road and containing the two existing houses.The proposed Lot 3 requires and Area Variance for a deficient front yard setback.This is an Unlisted Action under the City of Ithaca Environmental Quality Review Ordinance (“CEQRO”)and the State Environmental Quality Review Act (“SEQRA”)and requires Environmental Review. 5.Site Plan Review A.SKETCH PLAN:Two Duplexes at 312314 Spencer Rd.6:45 CITY OF ITHACA 108 E. Green St. — 3rd Floor Ithaca, NY 14850-5690 DEPARTMENT OF PLANNING, BUILDING, ZONING, & ECONOMIC DEVELOPMENT Telephone: Planning & Development – 607-274-6550 Community Development/IURA – 607-274-6559 Email: dgrunder@cityofithaca.org Email: iura@cityofithaca.org Fax: 607-274-6558 Fax: 607-274-6558 APPLICANTOVERHEAD PROJECTOR NOTE: The City only has a VGA plug/cable available to connect to our overhead projector.If you need to connect another way,you will need to provide your own ADAPTOR.(Macs &many newer,lighter laptopsmay not have a VGA port.) If you have a disability &would like specific accommodation to participate, please contact the City Clerk at 274 6570 by 12:00 p.m.,the day before the meeting. Start Times:Start times are approximate only —APPLICANTS are responsible for being available at whatever time(s)their agenda item(s)is actually discussed. “An Equal Opportunity Employer with a commitment to workforce diversification.” 2 B.Project:Apartment Building 7:05 Location:201 College Ave. Applicant:Noah Demarest,STREAM Collaborative,for Visum Development Group Actions:Declaration of Lead Agency PUBLIC HEARING Determination of Environmental Significance Recommendation to BZA Project Description:The applicant proposes to build a 5story apartment building on a 0.173 acre lot at the corner of College Avenue and Bool Street.The building will contain 44 dwelling units with approximately 76 bedrooms.The basement level will have a trash room,a fitness room with windows looking out to the street, and a bicycle garage for approximately 20 bikes with ramp access from a doorway on Bool Street.Other proposed amenities include landscaping,lighting,4 outdoor bike racks,and street trees.The project is proposing a curb bumpout that will require approval form the Board of Public Works.The site has a 17’difference in elevation from the southwest corner to the northeast corner,rising from 690.00 to 707.00.Site development will require the removal of the existing 2story woodframed house containing 1 apartment with 12 bedrooms, gravel parking area,and five trees.The project is in the MU1 Collegetown Area Form District (CAFD)and requires Area Variances.This is a Type 1 Action under the City of Ithaca Environmental Quality Review Ordinance (“CEQRO”),§1764 B(1)(k)&(h)[4],and the State Environmental Quality Review Act (“SEQRA”), §617.4(b)(11),and is subject to Environmental Review. C.Project:Elmira Savings Bank 7:35 Location:602 W.State St./M.L.K.,Jr.St. Applicant:Kim Michaels,Trowbridge Wolf Michaels Landscape Architects,LLP Actions:Declaration of Lead Agency PUBLIC HEARING Potential Determination of Environmental Significance Recommendation to BZA Project Description:Applicant proposes to renovate existing twostory brick building at corner of West State and Meadow Streets for branch bank functions on first and second floor.Basement will be used for mechanical equipment and tenant storage;also proposed is mall 700SF twostory addition,necessary for vertical circulation (stair and elevator).Site ingress/egress is provided from existing curbcuts on Meadow Street and West State Street (egress only).Two drivethrough lanes will be provided for bank transactions,one of which will serve as island station with pneumatictube connection to remote teller.The second will provide access to night deposit and ATM station at building’s west exterior wall.17 parking spaces are proposed.Applicant also proposes to remove 2 onstreet parking spaces on State St.to expand the sidewalks and add street trees.Other site improvements include landscaping,signage,and lighting.Project site consists of 3 tax parcels:72.2 13,which contains existing twostory brick building;72.2 11,which contains existing asphalt parking area and curbcut to N.Meadow St.;and 72.2 10,which contains two houses.Project development will require consolidation of tax parcels and demolition of two homes.Project is in WEDZ1a Zoning District and requires an Area Variance to allow for addition of onestory canopy on west side of building over drivethrough lanes.Project also requires approval for removal of parking and curb bumpout.This is an Unlisted Action under City of Ithaca Environmental Quality Review Ordinance (“CEQRO”)and State Environmental Quality Review Act (“SEQRA”),and requires Environmental Review. D.Project:Brindley Street Bridge 8:00 Location:W.State St.at Cayuga Inlet Applicant:City of Ithaca Actions:Review of Revised FEAF,Parts 2 &3 Comments to Lead Agency (BPW) Project Description:The project will relocate current Brindley Street Bridge to align with W.State St./Taughannock Blvd.intersection through the construction of a new single span extending Taughannock Blvd. over the Cayuga Inlet to Taber Street.The project will retain existing Brindley Street Bridge and south approach road for pedestrian and bike use. “An Equal Opportunity Employer with a commitment to workforce diversification.” 3 6.Zoning Appeals 8:25 #3024,Area Variance,312314 Spencer Rd. #3025,Area Variance,201 College Ave. #3026,Area Variance,125 Farm St. #3027,Area Variance,220 Cobb St. #3028,Special Permit/Area Variance,339 Center St. #3029,Area Variance,207 Grandview Ave. #3030,Area Variance,602 W.State St. #3032,Area Variance,121 W.Court St. #3033,Sign Variance,120 S.Aurora St. 7.Old/New Business A.Chain Works District DGEIS —Updated Schedule &Special Meeting Schedule 8:35 8.Reports A.Planning Board Chair (verbal) 8:40 B.Director of Planning &Development (verbal) C.Board of Public Works Liaison (verbal) 9.Approval of Minutes:July 28,2015,September 22,2015,January 26,2016,March 22,2016, &April 24,2016 (time permitting) 8:50 10.Adjournment 8:51 ACCESSING MEETING MATERIALS ONLINE SitePlan Review &Subdivision Applications(and Related Documents) SitePlan Review applicationdocumentsare accessible electronically via the “Document Center”on the City web site (www.cityofithaca.org/DocumentCenter),under “Planning&Development”>“Site Plan Review Project Applications,”andin the relevant year/month folder.Subdivision applicationmaterialscan be similarly located, butin the “Subdivision Applications”folder.Zoning Appeal Materialsare alsoaccessible electronically via the “Document Center”on the City web site,under “Board of ZoningAppeals." Agenda You may access this agenda (including attachments)by going to the “Agenda Center”on the City web site (www.cityofithaca.org/agendacenter),under “Planning & Development Board.”For ease of access,a link to the most recent Planning Board agenda is always accessible on the Planning Board home page: http://www.cityofithaca.org/354/Planning Development Board. PROPOSED RESOLUTION Minor Subdivision CEQR Negative Declaration City of Ithaca Tax Parcels 105.-7-1.1, 116.-1-1, & 116.-1-2 312-14 Spencer Rd. City of Ithaca Planning & Development Board May 24, 2016 WHEREAS: an application has been submitted for review and approval by the City of Ithaca Planning and Development Board for a Minor Subdivision (preceded by consolidation) of City of Ithaca Tax Parcels 105.-7-1.1, 116.-1-1, and 116.-1-2, located at 312-314 Spencer Road by Charlie O’Connor for Modern Living Rentals, and WHEREAS:the applicant proposes to consolidate, then subdivide, three tax parcels: #105.-7-1.1 and #116.-1-1, with a combined area of approximately 0.212 acres (9,234 SF), and containing an existing single-family house; and #116.-1-2, measuring approximately 0.395 acres (17,206 SF) and containing an existing single-family house. The new proposed parcels will be: Lot 1, measuring 8,571 SF with approximately 166.78’ of frontage on Old Elmira Road; Lot 2, measuring 5,600 SF with approximately 45’ of frontage on Old Elmira Road; and Lot 3, measuring 12,260 SF with approximately 191’ of frontage on Spencer Road and containing the two existing houses. The project is in the R-2a and B-5 Zoning Districts. The proposed Lot 3, in the R-2a District, requires and Area Variance for a deficient front yard setback, and WHEREAS: this is an Unlisted Action under the City of Ithaca Environmental Quality Review Ordinance and the State Environmental Quality Review Act, both of which require Environmental Review, and WHEREAS: this is considered a Minor Subdivision in accordance with the City of Ithaca Code, Chapter 290, Article 1, §290-1, Minor Subdivision – Any subdivision of land resulting in creation of a maximum of one additional buildable lot, and WHEREAS: the Planning Board, being the local agency which has primary responsibility for approving, funding or carrying out the action, did on April 26, 2016 declare itself the Lead Agency for the project, and WHEREAS: this Board, acting as Lead Agency in Environmental Review, did on May 24, 2016 review and accept as adequate: a Short Environmental Assessment Form (SEAF), Part 1, submitted by the applicant, and Part 2, prepared by Planning staff; a draft Subdivision plat entitled “Subdivision Plan 312-314 Spender Road (L101),” dated 3/17/16 and prepared by STREAM Collaborative; and other application materials, and WHEREAS: the City of Ithaca Conservation Advisory Council, Tompkins County Planning Department, and other interested parties have been given the opportunity to comment on the proposed project and any comments received have been considered, and WHEREAS: the Planning and Development Board recognizes that information received and reviewed for this Subdivision indicates one of the resultant parcels requires an Area Variance for relief from area requirements in the R-2a Zoning District, now, therefore, be it RESOLVED: that the City of Ithaca Planning and Development Board determines the proposed Subdivision will result in no significant impact on the environment and a Negative Declaration for purposes of Article 8 of the Environmental Conservation Law be filed in accordance with the provisions of Part 617 of the State Environmental Quality Review Act. Moved by: Seconded by: In favor: Against: Abstain: Absent: Vacancies: 0 May 16, 2016 To members of the Planning & Development Board: Since commenting to the Planning & Development Board last month regarding the large evergreen trees currently on the property at 201 College Avenue, I happened to see in my files a sketch envisioning that site developed but with the trees apparently intact. That sketch came from Part II (pp. 5.18-19, to be provided) of the “2009 Collegetown Urban Plan & Conceptual Design Guidelines” endorsed by the Common Council in August 2009. Like the form-based Collegetown zoning enacted in 2014, the 2009 plan proposed that development be concentrated in the core of the area while protecting surrounding neighborhoods; the specifics of its suggested zoning differed from that enacted, however, permitting taller structures at the center with buildings of lesser height envisioned for a number of College Avenue properties north of Bool Street, more akin to those along the west side of Linden Avenue. The sketch on p. 5.19 actually refers to development on the two combined sites immediately north of Bool Street, with a footprint that seemed to preserve the trees of note, and quite possibly (judging from the site plan on p. 5.18) the equally important trees on the Linden Avenue site. I understand that the property in question here is solely that at 201 College Avenue, with its current zoning permitting a greater building envelope, and I would not want to see a proposal that would combine more than two properties, or one that would seek to increase, by variance, the enacted zoning’s reduced heights along Linden Avenue. Those points having been made, I offer this material for your consideration. With apologies for the somewhat erratic presentation from a relatively unfamiliar computer. Thank you, Mary Tomlan [attachments] PROPOSED RESOLUTION Apartment Building Declaration of Lead Agency 201 College Ave. Site Plan Review City of Ithaca Planning & Development Board May 24, 2016 WHEREAS: 6 NYCRR, Part 617, of the State Environmental Quality Review Law and Chapter 176.6 of the City Code, Environmental Quality Review require that a Lead Agency be established for conducting Environmental Review of projects in accordance with local and state environmental law, and WHEREAS: State Law specifies that, for actions governed by local environmental review, the Lead Agency shall be that local agency which has primary responsibility for approving and funding or carrying out the action, and WHEREAS: an application has been submitted for review and approval by the City of Ithaca Planning and Development Board for an apartment building to be located at 201 College Avenue, by Noah Demarest for Visum Development Group, and WHEREAS:the applicant proposes to build a 5-story apartment building on a 0.173-acre lot at the corner of College Avenue and Bool Street. The building will contain 44 dwelling units with approximately 76 bedrooms. The basement level will have a trash room, a fitness room with windows looking out to the street, and a bicycle garage for approximately 20 bikes with ramp access from a doorway on Bool Street. Other proposed amenities include landscaping, lighting, 4 outdoor bike racks, and street trees. The project is proposing a curb bump-out that will require approval form the Board of Public Works. The site has a 17’ difference in elevation from the southwest corner to the northeast corner, rising from 690.00 to 707.00. Site development will require removal of the existing 2 story wood-framed house containing 1 apartment with 12 bedrooms, gravel parking area, and five trees. The project is in the MU 1 Collegetown Area Form District (CAFD) and requires an Area Variance for rear yard setback, and WHEREAS: this is a Type 1 Action under the City of Ithaca Environmental Quality Review Ordinance (“CEQRO”), §176-4 B(1)(k) & (h)[4], and the State Environmental Quality Review Act (“SEQRA”), §617.4(b)(11), and is subject to Environmental Review, and WHEREAS: the Board of Public Works has consented to the City of Ithaca Planning and Development Board’s being Lead Agency for this project, now, therefore, be it RESOLVED: that the City of Ithaca Planning and Development Board is by way of this resolution declaring itself Lead Agency in Environmental Review for the proposed project. Moved by: Seconded by: In favor: Against: Abstain: Absent: Vacancies: 0 Page 1 of 5 City of Ithaca FULL ENVIRONMENTAL ASSESSMENT FORM —Part III Project Name:Student Housing —201 College Ave. Date Created:4/13/16 Updated:5/5/16 &5/17/16 The document has been updated to include relevant portions of applicant’s responses to the 5/5/16 version of the document,as well as information discussed in the Project Review Committee on 5/17/16.New text is underlined. PROJECT DESCRIPTION The applicant proposes to build a 5 story apartment building on a 0.173 acre lot at the corner of College Avenue and Bool Street.The building will contain 44 dwelling units with approximately 76 bedrooms.The basement level will have a trash room,a fitness room with windows looking out to the street,and a bicycle garage for approximately 20 bikes with ramp access from a doorway on Bool Street.Other proposed amenities include landscaping,lighting,4 outdoor bike racks,and street trees.The project is proposing a curb bump out that will require approval form the Board of Public Works.The site has a 17’difference in elevation from the southwest corner to the northeast corner,rising from 690.00 to 707.00.Site development will require the removal of the existing 2 story wood framed house containing 1 apartment with 12 bedrooms,gravel parking area,and five trees.The project is in the MU 1 Collegetown Area Form District (CAFD)and requires Area Variances.This is a Type 1 Action under the City of Ithaca Environmental Quality Review Ordinance (“CEQRO”),§176 4 B(1)(k)&(h)[4],and the State Environmental Quality Review Act (“SEQRA”), §617.4(b)(11),and is subject to Environmental Review. IMPACT ON LAND Approximately 4,300 CY of material will be removed from the site.The building foundation will consist of standard shallow foundations with perimeter strip footings and spread footings,with 10" and 8"Concrete Masonry Unit walls.Temporary shoring will be installed as required on the north and east sides of the lot in order to protect adjacent properties. Approximately 20,000 CY of material will be removed from the site.More information is needed about foundation construction. IMPACT ON WATER No impact anticipated. IMPACT ON DRAINAGE No impact anticipated. IMPACT ON AIR Construction Impacts: Construction will last approximately 13 months.The project is in a densely developed area in close proximity to residential and commercial development.Due to the slope of the site,foundation work will require excavation of approximately 20,000 CY of material.This will generate approximately 1,660 truck trips (assuming a 10 wheeler truck).More information is needed regarding duration of excavation and hauling route. Page 2 of 5 How will dust impacts be handled during the construction period? Due to the slope of the site,foundation work will require excavation of approximately 4,300 CY of materials.This will generate approximately 36 truck trips (assuming a 10 wheeler truck),with the material being hauled to a local dump site.The location of the dump site will be determined by the excavation contractor.The applicant anticipates the trucks will leave the site,head south on College Ave.to Mitchell Street,then to Route 79 heading east. No hazardous materials are present.Excavation work should last three to four weeks.The site is too small to allow for any stockpiling of earth;and the eventual subgrade is rock,so there should be a minimal amount of dust or debris to contend with.If,during construction,dust becomes an issue, the contractor will use water to mitigate. IMPACT ON PLANTS AND ANIMALS Site development includes removal of 6 8 large/mature white pines.The Lead Agency has received several comments from nearby residents regarding impacts due to the loss of these trees. IMPACT ON AESTHETIC RESOURCES See Impacts to Historic Resources. IMPACT ON HISTORIC RESOURCES The project site is in close proximity to two local landmarks:the John Snaith House is directly across the street and the Grand View House is within the same block on the east side of College Ave. While acknowledging the goals of the CAFD,the Lead Agency has concerns about the size,shape, and height of the building in relation to its immediate context.The Lead Agency has stated the following concerns and requested the following additional information: Concern that the building appears too ‘boxy’ The sidewalk on College Avenue should meet American Society of Civil Engineers standards for unobstructed sidewalk width in urban areas The pedestrian level experience of the building The Planning Board intends to continue to work with the applicant during Site Plan Review to further develop the façade details,building materials,and other design aspects that will address these issues. The Lead Agency has requested,and the applicant has agreed,to push the proposed planters back two feet to further increase the width of the sidewalk on College Ave.and to allow for expansion of the tree pits,which —as proposed —do not conform to the City standard for size. IMPACT ON OPEN SPACE AREA No impact is anticipated. Page 3 of 5 IMPACT ON TRANSPORTATION Construction Impacts: Construction will last approximately 13 months.The project is in a densely developed area in close proximity to residential and commercial development.Due to the slope of the site,foundation work will require excavation of approximately 4,300 CY of material.This will generate approximately 360 truck trips (assuming a 10 wheeler truck),with the material being hauled to a local dump site.The location of the dump site will be determined by the excavation contractor.The applicant anticipates the trucks will leave the site,head south on College Ave.to Mitchell Street,then to Route 79 and head east on Route 79.No hazardous materials are present.Excavation work should last three to four weeks.The site is too small to allow any stockpiling of earth;and the eventual subgrade is rock,so a minimal amount of dust or debris is anticipated.If,during construction,dust becomes an issue,the contractor will use water to mitigate.A stone construction entrance will be built to minimize tracking of dirt and debris onto College Ave.and a sweeper will be brought in as needed.Due to the slope of the site,foundation work will require excavation of approximately 20,000 CY of material.This will generate approximately 1,660 truck trips (assuming a 10 wheeler truck).More information is needed regarding duration of excavation and hauling route. There is little room on the property for construction support.Construction activities,particularly staging and deliveries,will temporarily but significantly impact vehicular,bike,and pedestrian movements.It is anticipated the project may require periodic road closure,potential removal of parking,as well as sidewalk closure during the construction period.The applicant presented these issues to the Board of Public Works on 5/9/16 and was informed all street work and closures will be coordinated directly with the Engineering Division.The applicant is currently working with Engineering staff to coordinate these activities. The applicant should provide more information regarding the intended plan for these activities. There is a potential for cumulative negative impacts of several simultaneously occurring construction projects in Collegetown in the 2016 and 2017 construction seasons. City sidewalks,curbing,and other improvements,disturbed during construction,will be restored per City regulations at the end of the project construction. Project Impacts: The project site is a corner property.Currently,the property has a sidewalk on both sides,as well as a narrow grass strip between the sidewalk and curb.The new building will be set back approximately 9 feet from the property line on College Ave.and will have 4 foot wide planters on both street facing façades.The applicant is proposing to remove existing sidewalks and grass strip to be replaced by a wider sidewalk with tree pits (3 on Bool St.and 2 on College Ave.).The Lead Agency has requested,and the applicant has agreed,to move the building back farther from the property line to create a more open feeling on the street.As the applicant did not reduce the size of the building —to accomplish the push back —the resulting footprint requires an Area Variance from the Board of Zoning Appeals. Due to the proximity of the overhead power lines to the location of the building,the applicant originally proposed to bump out the curb at the corner and relocate the utility pole farther away from the building and within the proposed bump out.The proposed new location of the pole as shown on the drawing titled “Demo and Layout Plan,”dated 3/29/16 appears to be in conflict with Page 4 of 5 pedestrian movements and should be reconsidered.The bump out would have removed one on street parking space.Due to the proposed building push back,the utility pole on College Ave.no longer needs to be relocated and,therefore,a bump out is no longer proposed.Utility poles on Bool Street will be relocated to the south side of Bool Street. More information is needed about deliveries and accommodation for trash removal. There is no parking requirement in the M U1 CAFD Zone and no on site parking is proposed.The site is well served by TCAT,offering access to Cornell University,downtown,and other prime destinations.The building will have an internal ramp accessed bike garage (20 spaces)for residents, and outdoor bike parking (4 spaces)for visitors,in compliance with Site Plan Review requirements. New +/8’8”to +/12’wide sidewalks will be installed along both streets,including a new accessibility sidewalk ramp at the corner,consistent with current City standards. IMPACT ON ENERGY No impact is anticipated. IMPACT ON NOISE &ODORS Construction is anticipated to last 13 months.The project is in a densely developed area in close proximity to residential and commercial development.Construction activities,including foundation work,will temporarily produce noise that will affect residents and businesses in the immediate area. IMPACT ON PUBLIC HEALTH The applicant has submitted a Phase 1 Environmental Site Assessment prepared by GeoLogic,Inc., and dated April 2016.The report evaluated the basement and exterior of the property.The 1st floor,2nd floor,and attic were excluded from the assessment.The report found no evidence of recognized environmental conditions in relation to the property. The existing building to be demolished may contain asbestos or other hazardous substances that could potentially be released during construction/demolition.Any hazardous materials in the existing buildings should be removed by appropriately licensed contractors. IMPACT ON GROWTH &CHARACTER OF COMMUNITY OR NEIGHBORHOOD The project site is in a densely developed area near the central core of Collegetown.The immediate area is primarily residential,characterized by a large variety of predominantly older multi family student residences. The project site is in the Mixed Use 1 CAFD (MU 1)Zoning District.These districts were created to produce a dynamic urban environment in which uses reinforce each other and promote an attractive,walkable neighborhood.Enacted by Common Council in January 2014,CAFD describes the MU districts as follows: Located in central Collegetown,the Mixed Use districts allow the highest density within the Collegetown Area Form Districts.Redevelopment is anticipated and encouraged (with the exception of designated local landmarks),and the intent is to concentrate the majority of additional development within these districts. Page 5 of 5 The Mixed Use district regulations have been designed to encourage exceptional urban design and high quality construction.The Mixed Use 1 district permits buildings of up to 5 stories and 70 feet in height while the Mixed Use 2 district allows buildings of up to 6 stories and 80 feet in height.A building cannot exceed either requirement.While it may be feasible to design a building with a greater number of stories within the maximum allowed height in feet,the intent of the district regulations is to meet both requirements.The additional building height in feet has been allowed for the purpose of providing adequate space for mechanicals and accommodating high quality design features and finishes. The project site is at the edge of the MU 1 CAFD Zoning District where the district transitions to CR 4,the residential district that allows the highest density.The applicant has proposed a step down at the corners the 5th floor facing College Avenue. While acknowledging the goals of CAFD,the Lead Agency has concerns about the size,shape,and height of the building in relation to its immediate context.The Lead Agency has stated the following concerns and requested the following additional information: Submission of a shadow study Consideration of mounting solar panels on the building for use by the adjacent property owner to the north,whose roof mounted solar panels will presumably be shaded by the project Concern that the building appears too ‘boxy’ The sidewalk on College Avenue should meet American Society of Civil Engineers standards for unobstructed sidewalk width in urban areas The pedestrian level experience of the building The Planning Board intends to continue to work with the applicant during Site Plan Review to further develop the façade details,building materials,and other design aspects that will address these issues. The Lead Agency has requested,and the applicant has agreed,to push the proposed planters back two feet to further increase the width of the sidewalk on College Ave.and to allow for expansion of the tree pits,which —as proposed —do not conform to the City standard for size. Prepared by:Lisa Nicholas,AICP PROPOSED RESOLUTION Apartment Building CEQR Negative Declaration 201 College Ave. Site Plan Review City of Ithaca Planning & Development Board May 24, 2016 WHEREAS: an application has been submitted for review and approval by the City of Ithaca Planning and Development Board for an apartment building to be located at 201 College Avenue, by Noah Demarest for Visum Development Group, and WHEREAS:the applicant proposes to build a 5-story apartment building on a 0.173-acre lot at the corner of College Avenue and Bool Street. The building will contain 44 dwelling units with approximately 76 bedrooms. The basement level will have a trash room, a fitness room with windows looking out to the street, and a bicycle garage for approximately 20 bikes with ramp access from a doorway on Bool Street. Other proposed amenities include landscaping, lighting, 4 outdoor bike racks, and street trees. The project is proposing a curb bump-out that will require approval form the Board of Public Works. The site has a 17’ difference in elevation from the southwest corner to the northeast corner, rising from 690.00 to 707.00. Site development will require removal of the existing 2 story wood-framed house containing 1 apartment with 12 bedrooms, gravel parking area, and five trees. The project is in the MU 1 Collegetown Area Form District (CAFD) and requires an Area Variance for rear yard setback, and WHEREAS: this is a Type 1 Action under the City of Ithaca Environmental Quality Review Ordinance (“CEQRO”), §176-4 B(1)(k) & (h)[4], and the State Environmental Quality Review Act (“SEQRA”), §617.4(b)(11), and is subject to Environmental Review, and WHEREAS: the City of Ithaca Planning and Development Board did, on May 24, 2016 declarr itself Lead Agency in Environmental Review for the proposed project, and WHEREAS: this Board, acting as Lead Agency in Environmental Review, did on May 24, 2016 review and accept as adequate: a Full Environmental Assessment Form (FEAF), Part 1, submitted by the applicant, and Parts 2 and 3 prepared by Planning staff; drawings titled “ Demo and Layout Plan,” “Grading and Planting Plans,” “Level 1,” “Basement,” and “Levels 3-5,” dated 3/29/16; and “Southwest Corner Perspective,” “West Elevation,” “East Elevation,” “South Elevation - Bool St. Façade,” and “North Elevation,” dated 4/13/16; and “North to South Site Section,” and “East to West Site Section,” dated 5/11/16 and prepared by STREAM Collaborative; and other application materials, and WHEREAS: the City of Ithaca Conservation Advisory Council, Tompkins County Planning Department, and other interested parties have been given the opportunity to comment on the proposed project and any comments received have been considered, now, therefore, be it RESOLVED: that the City of Ithaca Planning and Development Board determines the proposed project will result in no significant impact on the environment and that a Negative Declaration for purposes of Article 8 of the Environmental Conservation Law be filed in accordance with the provisions of Part 617 of the State Environmental Quality Review Act. Moved by: Seconded by: In favor: Against: Abstain: Absent: Vacancies: 0 From:Jeanne Grace Sent:Wednesday,May 18,2016 11:24 AM To:Charles Pyott Subject:[Elmira Savings Bank] Elmira Savings Bank Project. I am concerned with visibility with trees being planted on either side of the exit on State St side.We have gone to planting trees 10 from driveways to reduce likelihood the trees will impede driver visibility up and down the street when exiting. I am concerned about soil volume for the new trees.I suggest sharing our proposed site plan requirements to ensure there is enough soil volume for the street trees.Expanding the amount of porous surfacing around the trees and adding structural soil would be a good start. I also know that the County Beautification brigade was interested in getting more space for gardens at this intersection.Could suggest to developers to reach out to them to see if creating a garden bed for them to maintain could be possible rather than just brick on the State St side of the building. I was also contacted by the neighbor of 201 College Ave project.I have yet to go take a look at the spruce trees he was concerned about but I hope to do that this afternoon and I share with the board my opinion on that. thanks, Jeanne Grace City Forester PROPOSED RESOLUTION Building Expansion &Renovations Declaration of Lead Agency 602 W. State Street (Elmira Savings Bank) Site Plan Review City of Ithaca Planning & Development Board May 24, 2016 WHEREAS: 6 NYCRR, Part 617, of the State Environmental Quality Review Law and Chapter 176.6 of the City Code, Environmental Quality Review require that a Lead Agency be established for conducting Environmental Review of projects in accordance with local and state environmental law, and WHEREAS: State Law specifies that, for actions governed by local environmental review, the Lead Agency shall be that local agency which has primary responsibility for approving and funding or carrying out the action, and WHEREAS: an application has been submitted for review and approval by the City of Ithaca Planning and Development Board for building renovations, expansion, and site improvements to be located at 602 W. State Street by Trowbridge Wolf Michaels Landscape Architects, LLP, and WHEREAS:the applicant proposes to renovate existing two-story brick building at corner of West State and Meadow Streets for branch bank functions on first and second floor. Basement will be used for mechanical equipment and tenant storage; also proposed is a small 700-SF two-story addition, necessary for vertical circulation (stair and elevator). Site ingress/egress is provided from existing curb-cuts on Meadow Street and West State Street (egress only). Two drive-through lanes will be provided for bank transactions, one of which will serve as an island station with pneumatic-tube connection to remote teller. The second will provide access to a night deposit and ATM station at building’s west exterior wall. 17 parking spaces are proposed. Applicant also proposes to remove 2 on-street parking spaces on State St. to expand the sidewalks and add street trees. Other site improvements include landscaping, signage, and lighting. Project site consists of 3 tax parcels: 72.-2-13, which contains existing two-story brick building; 72.-2-11, which contains existing asphalt parking area and curb-cut to N. Meadow St.; and 72.-2-10, which contains two houses. Project development will require consolidation of tax parcels and demolition of two homes. Project is in the WEDZ-1a Zoning District and requires an Area Variance to allow for addition of one-story canopy on west side of building over drive-through lanes. Project also requires approval for removal of parking and curb bump-out, and WHEREAS: this is an Unlisted Action under City of Ithaca Environmental Quality Review Ordinance (“CEQRO”) and State Environmental Quality Review Act (“SEQRA”), and requires Environmental Review, now, therefore, be it RESOLVED: that the City of Ithaca Planning and Development Board does hereby declare itself Lead Agency for the Environmental Review of the project. Moved by: Seconded by: In favor: Against: Abstain: Absent: Vacancies: 0 PROPOSED RESOLUTION Building Expansion &Renovations CEQR Negative Declaration 602 W. State St. (Elmira Savings Bank) Site Plan Review City of Ithaca Planning & Development Board May 24, 2016 WHEREAS: an application has been submitted for review and approval by the City of Ithaca Planning and Development Board for building renovations, expansion, and site improvements to be located at 602 W State Street by Trowbridge Wolf Michaels Landscape Architects, LLP, and WHEREAS:the applicant proposes to renovate existing two-story brick building at the corner of West State and Meadow Streets for branch bank functions on the first and second floor. Basement will be used for mechanical equipment and tenant storage; also proposed is a small 700-SF two-story addition, necessary for vertical circulation (stair and elevator). Site ingress/egress is provided from existing curb-cuts on Meadow Street and West State Street (egress only). Two drive-through lanes will be provided for bank transactions, one of which will serve as an island station with pneumatic-tube connection to remote teller. The second will provide access to a night deposit and ATM station at the building’s west exterior wall. 17 parking spaces are proposed. Applicant also proposes to remove 2 on- street parking spaces on State St. to expand the sidewalks and add street trees. Other site improvements include landscaping, signage, and lighting. Project site consists of 3 tax parcels: 72.-2-13, which contains existing two-story brick building; 72.-2-11, which contains existing asphalt parking area and curb-cut to N. Meadow St.; and 72.-2-10, which contains two houses. Project development will require consolidation of tax parcels and demolition of two homes. Project is in the WEDZ-1a Zoning District and requires an Area Variance to allow for addition of one-story canopy on west side of building over drive-through lanes. The project also requires approval for removal of parking and curb bump-out, and WHEREAS: this is an Unlisted Action under City of Ithaca Environmental Quality Review Ordinance (“CEQRO”) and State Environmental Quality Review Act (“SEQRA”), and requires Environmental Review, and WHEREAS: the City of Ithaca Planning and Development Board, being the local agency which has primary responsibility for approving and funding or carrying out the action did on May 24, 2016 declare itself Lead Agency in Environmental Review for the proposed project, and WHEREAS: this Board, acting as Lead Agency in Environmental Review, did on May 24, 2016 review and accept as adequate: a Full Environmental Assessment Form (FEAF), Part 1, submitted by the applicant, and Part 2, prepared by Planning staff; drawings titled “Erosion, Sediment Control and Demolition Plan (C101),” “Utility Plan and Details (C102),” “Demo Plan (L101),” “Layout Plan (L201),” “Grading Plan (L301),” “Planting Plan (L401),” “Site Details (L501 & L502),” “First Floor Plan (A1.1),” “Second Floor Plan (A1.2),” “East Elevation (A2.1),” “North Elevation (A2.2),” “South Elevation (A2.3),” “West Elevation (A2.4),” and “Perspectives (A3.1 & A3.2),” all dated April 15, 2016 and prepared by HOLT Architects; and other application materials, and WHEREAS: the City of Ithaca Conservation Advisory Council, and other interested parties have been given the opportunity to comment on the proposed project and any comments received have been considered, now, therefore, be it RESOLVED: that the City of Ithaca Planning and Development Board determines the proposed project will result in no significant impact on the environment and that a Negative Declaration for purposes of Article 8 of the Environmental Conservation Law be filed in accordance with the provisions of Part 617 of the State Environmental Quality Review Act. Moved by: Seconded by: In favor: Against: Abstain: Absent: Vacancies: 0 ELEVATION LOOKING WEST CAYUGA INLET BRINDLEY STREET OVER ALTERNATIVE 2 5/16/2016 STREAMBED CAYUGA INLET A Conditioned Negative Declaration is only valid for Unlisted Actions Please complete each question (indicate N/A, if not applicable) Chosen units apply to following section also Units in Question 2 apply to this section City of Ithaca Full Environmental Assessment Form (FEAF) Part 2 Project Impacts Project Name: Replacement of Brindley Street Bridge Date Created: 3/28/2016 1 of 11 5/16/2016 Small-to- Moderate Impact Potential Large Impact Can Impact Be Reduced by Project Change? IMPACT ON LAND 1. Will there be an effect as a result of a physical change to project site? Yes No Any construction on slopes of 15% or greater (15-foot rise per 100 feet of length) or where general slope in the project exceeds 10%. (Bridge abutment and wingwall construction) Yes No Construction on land where depth to the water table is less than 3 feet. (Roadway embankment construction) Yes No Construction of parking facility/area for 50 or more vehicles. Yes No Construction on land where bedrock is exposed or generally within 3 feet of existing ground surface. Yes No Construction that will continue for more than 1 year or involve more than one phase or stage. Yes No Evacuation for mining purposes that would remove more than 1,000 tons of natural material (i.e., rock or soil) per year. Yes No Construction of any new sanitary landfill. Yes No Construction in designated floodway. Yes No Other impacts (if any): Yes No 2. Will there be an effect on any unique land forms found on the site (i.e., cliffs, gorges, geological formations, etc.)? Yes No Specific land forms (if any): Yes No City of Ithaca Full Environmental Assessment Form (FEAF) Part 2 Project Impacts Project Name: Replacement of Brindley Street Bridge Date Created: 3/28/2016 2 of 11 5/16/2016 Small-to- Moderate Impact Potential Large Impact Can Impact Be Reduced by Project Change? IMPACT ON WATER 3. Will project affect any water body designated as protected (under article 15 or 24 of Environmental Conservation Law, E.C.L.)? Yes No Developable area of site contains protected water body. Yes No Dredging more than 100 cubic yards of material from channel of protected stream. Yes No Extension of utility distribution facilities through protected water body. Yes No Construction in designated freshwater wetland. Yes No Other impacts (if any): Discharge of Fill below OHWM and Bed / Bank Disturbance (Scour protection and roadway embankment construction) Yes No 4. Will project affect any non-protected existing or new body of water? Yes No A 10% increase or decrease in surface area of any body of water or more than 10,000 sq. ft. of surface area. Yes No Construction, alteration, or conversion of body of water that exceeds 10,000 sq. ft. of surface area. Yes No Fall Creek, Six Mile Creek, Cascadilla Creek, Silver Creek, Cayuga Lake, or Cayuga Inlet? (Cayuga Inlet) Yes No Other impacts (if any): Yes No City of Ithaca Full Environmental Assessment Form (FEAF) Part 2 Project Impacts Project Name: Replacement of Brindley Street Bridge Date Created: 3/28/2016 3 of 11 5/16/2016 Small-to- Moderate Impact Potential Large Impact Can Impact Be Reduced by Project Change? IMPACT ON WATER (cont.) 5. Will project affect surface or groundwater quality? Yes No Project will require discharge permit. Yes No Project requires use of source of water that does not have approval to serve proposed project. Yes No Construction or operation causing any contamination of a public water supply system. Yes No Project will adversely affect groundwater. Yes No Liquid effluent will be conveyed off the site to facilities which do not currently exist or that have inadequate capacity. Yes No Project requiring a facility that would use water in excess of 20,000 gallons per day or 500 gallons per minute. Yes No Project will likely cause siltation or other discharge into an existing body of water to the extent that there will be an obvious visual contrast to natural conditions. (Water siltation from excavation will be contained within turbidity curtain installed around work area) Yes No Proposed action will require storage of petroleum or chemical products greater than 1,100 gallons. Yes No Other impacts (if any): Yes No City of Ithaca Full Environmental Assessment Form (FEAF) Part 2 Project Impacts Project Name: Replacement of Brindley Street Bridge Date Created: 3/28/2016 4 of 11 5/16/2016 Small-to- Moderate Impact Potential Large Impact Can Impact Be Reduced by Project Change? IMPACT ON WATER (cont.) 6. Will project alter drainage flow, drainage patterns, or surface water runoff? Yes No Project would impede floodwater flows. Yes No Project is likely to cause substantial erosion. Yes No Project is incompatible with existing drainage patterns. Yes No Other impacts (if any New drainage pattern via closed drainage system on relocated Brindley Street. Yes No IMPACT ON AIR 7. Will project affect air quality? Yes No Project will induce 500 or more vehicle trips in any 8-hour period per day. Yes No Project will result in the incineration of more than 2.5 tons of refuse per 24-hour day. Yes No Project emission rate of all contaminants will exceed 5 lbs. per hour or a heat source producing more than 10 million BTUs per hour. Yes No Other impacts (if any): Yes No City of Ithaca Full Environmental Assessment Form (FEAF) Part 2 Project Impacts Project Name: Replacement of Brindley Street Bridge Date Created: 3/28/2016 5 of 11 5/16/2016 Small-to- Moderate Impact Potential Large Impact Can Impact Be Reduced by Project Change? IMPACTS ON PLANTS AND ANIMALS 8. Will project affect any threatened or endangered species? Yes No Reduction of any species, listed on New York or Federal list, using the site, found over, on, or near site. Yes No Removal of any portion of a critical or significant wildlife habitat. Yes No Application of pesticide or herbicide more than twice a year other than for agricultural purposes. Yes No Other impacts (if any): Yes No 9. Will proposed action substantially affect non-threatened or non-endangered species? Yes No Proposed action would substantially interfere with any resident or migratory fish, or wildlife species. Yes No Proposed action requires removal or more than ½ acre of mature woods or other locally important vegetation. Yes No Other impacts (if any): Approximately ¼ acre of wooded area to be removed on south bridge approach. Yes No City of Ithaca Full Environmental Assessment Form (FEAF) Part 2 Project Impacts Project Name: Replacement of Brindley Street Bridge Date Created: 3/28/2016 6 of 11 5/16/2016 Small-to- Moderate Impact Potential Large Impact Can Impact Be Reduced by Project Change? IMPACT ON AESTHETIC RESOURCES 10. Will proposed action affect views, vistas, or visual character of the neighborhood or community? Yes No Proposed land uses or proposed action components obviously different from, or in sharp contrast to, current surrounding land use patterns, whether man-made or natural. Yes No Proposed land uses or proposed action components visible to users of aesthetic resources which will eliminate or significantly reduce their enjoyment of aesthetic qualities of that resource. Yes No Proposed action will result in elimination or major screening of scenic views known to be important to the area. Yes No Other impacts (if any): Wooded/brush area between railroad bed and relief channel will be largely replaced with new bridge and approach roadway. Yes No IMPACT ON HISTORIC AND ARCHAEOLOGICAL RESOURCES 11. Will proposed action impact any site or structure of historic, prehistoric, or paleontological importance? Yes No Proposed action occurring wholly or partially within, or contiguous to, any facility or site listed on or eligible for the National or State Register of Historic Places. Yes No Any impact to an archaeological site or fossil bed located within the project site. Yes No Proposed action occurring wholly or partially within, or contiguous to, any site designated as a local landmark or in a landmark district. Yes No Other impacts (if any): Yes No City of Ithaca Full Environmental Assessment Form (FEAF) Part 2 Project Impacts Project Name: Replacement of Brindley Street Bridge Date Created: 3/28/2016 7 of 11 5/16/2016 Small-to- Moderate Impact Potential Large Impact Can Impact Be Reduced by Project Change? IMPACT ON OPEN SPACE AND RECREATION 12. Will the proposed action affect the quantity or quality of existing or future open spaces, or recreational opportunities? Yes No The permanent foreclosure of a future recreational opportunity. Yes No A major reduction of an open space important to the community. Yes No Other impacts (if any): Yes No IMPACT ON UNIQUE NATURAL AREAS OR CRITICAL ENVIRONMENTAL AREAS 13. Will proposed action impact the exceptional or unique characteristics of a site designated as a unique natural area (UNA) or a critical environmental area (CEA) by a local or state agency? Yes No Proposed action to locate within a UNA or CEA? Yes No Proposed action will result in reduction in the quality of the resource. Yes No Proposed action will impact use, function, or enjoyment of the resource. Yes No Other impacts (if any): Yes No City of Ithaca Full Environmental Assessment Form (FEAF) Part 2 Project Impacts Project Name: Replacement of Brindley Street Bridge Date Created: 3/28/2016 8 of 11 5/16/2016 Small-to- Moderate Impact Potential Large Impact Can Impact Be Reduced by Project Change? IMPACT ON TRANSPORTATION 14. Will there be an effect to existing transportation systems? Yes No Alteration of present patterns of movement of people and/or goods. (Relocated roadway) Yes No Proposed action will result in major traffic problems. Yes No Other impacts: Yes No IMPACT ON ENERGY 15. Will proposed action affect community's sources of fuel or energy supply? Yes No Proposed action causing greater than 5% increase in any form of energy used in municipality. Yes No Proposed action requiring creation or extension of an energy transmission or supply system to serve more than 50 single- or two-family residences. Yes No Other impacts (if any): Yes No City of Ithaca Full Environmental Assessment Form (FEAF) Part 2 Project Impacts Project Name: Replacement of Brindley Street Bridge Date Created: 3/28/2016 9 of 11 5/16/2016 Small-to- Moderate Impact Potential Large Impact Can Impact Be Reduced by Project Change? IMPACT ON NOISE AND ODORS 16. Will there be objectionable odors, noise, glare, vibration, or electrical disturbance during construction of, or after completion of, this proposed action? Yes No Blasting within 1,500 feet of a hospital, school, or other sensitive facility? Yes No Odors will occur routinely (more than one hour per day). Yes No Proposed action will produce operating noise exceeding local ambient noise levels for noise outside of structure. (daytime construction noise) Yes No Proposed action will remove natural barriers that would act as noise screen. (existing tree removals) Yes No Other impacts (if any): Yes No IMPACT ON PUBLIC HEALTH 17. Will proposed action affect public health and safety? Yes No Proposed action will cause risk of explosion or release of hazardous substances (i.e., oil, pesticides, chemicals, radiation, etc.) in the event of accident or upset conditions, or there will be chronic low-level discharge or emission. Yes No Proposed action may result in burial of “hazardous wastes” in any form (i.e., toxic, poisonous, highly reactive, radioactive, irritating, infectious, etc.) Yes No Proposed action may result in excavation or other disturbance within 2,000 feet of a site used for the disposal of solid or hazardous wastes. Yes No Proposed action will result in handling or disposal or hazardous wastes (i.e., toxic, poisonous, highly reactive, radioactive, irritating, infectious, etc., including wastes that are solid, semi-solid, liquid, or contain gases). Yes No City of Ithaca Full Environmental Assessment Form (FEAF) Part 2 Project Impacts Project Name: Replacement of Brindley Street Bridge Date Created: 3/28/2016 10 of 11 5/16/2016 Small-to- Moderate Impact Potential Large Impact Can Impact Be Reduced by Project Change? IMPACT ON PUBLIC HEALTH (cont.) Storage facilities for 50,000 or more gallons of any liquid fuel. Yes No Use of any chemical for de-icing, soil stabilization, or control of vegetation, insects, or animal life on the premises of any residential, commercial, or industrial property in excess of 30,000 square feet. Yes No Other impacts (if any): Yes No IMPACT ON GROWTH AND CHARACTER OF COMMUNITY OR NEIGHBORHOOD 18. Will proposed action affect the character of the existing community? Yes No The population of the city in which the proposed action is located is likely to grow by more than 5% of resident human population. Yes No The municipal budgets for capital expenditures or operating services will increase by more than 5% per year as a result of this proposed action. Yes No Proposed action will conflict with officially adopted plans or goals. Yes No Proposed action will cause a change in the density of land use. Yes No Proposed action will replace or eliminate existing facilities, structures, or areas of historic importance to the community. Yes No Development will create demand for additional community services (e.g., schools, police, and fire, etc.) Yes No Proposed action will set an important precedent for future actions. Yes No Proposed action will relocate 15 or more employees in one or more businesses. Yes No City of Ithaca Full Environmental Assessment Form (FEAF) Part 2 Project Impacts Project Name: Replacement of Brindley Street Bridge Date Created: 3/28/2016 11 of 11 5/16/2016 Small-to- Moderate Impact Potential Large Impact Can Impact Be Reduced by Project Change? IMPACT ON GROWTH AND CHARACTER OF COMMUNITY OR NEIGHBORHOOD (cont.) Other impacts (if any): Yes No 19. Is there public controversy concerning the proposed action? Yes No Unknown — If any action in Part 2 is identified as a potential large impact, or if you cannot determine the magnitude of impact, proceed to Part 3 — Page 1 of 3 City of Ithaca FULL ENVIRONMENTAL ASSESSMENT FORM - Part III Project Name: Replacement of Brindley Street Bridge Date Created: 3/28/2016 Updated: 5/14/2016 PROJECT DESCRIPTION: This project will relocate Brindley Street to align with the West State Street/Taughannock Boulevard intersection through construction of a new single span bridge carrying Brindley Street over Cayuga Inlet. The existing structure and south approach will be converted for non-motorized use by pedestrians and bicyclists. IMPACT ON LAND The proposed project includes bridge relocation; full depth roadway reconstruction; major approach roadway realignment; new sidewalks, and new drainage along Brindley Street. The proposed roadway realignment will provide a tree lawn / snow storage area between the curb and the sidewalk on the west side of the roadway. The roadway re-alignment will increase vehicle safety along Brindley Street by eliminating the existing one lane bridge. Construction of the proposed bridge abutments, superstructure, and placement of stone fill protection will not impact the existing water surface elevations. It is anticipated that the project will be constructed in one (1) construction seasons beginning in early spring of 2017. It is anticipated that the project will substantially complete (open to full traffic) by November of 2017. IMPACT ON WATER Installation of the new bridge abutments and placement of stone fill protection will require construction within Cayuga Inlet. Proper soil erosion and sediment control measures (cofferdams, stabilized construction entrances, silt fence, turbidity curtains, etc) will be implemented to minimize impacts to the waterway. A NYSDEC Protection of Waters Permit, NYSDEC State Pollution Discharge Elimination System (SPDES) General Permit, NYSDEC Section 401 Water Quality Certification and USACOE Nationwide Permit 14 will be obtained prior to construction. The relocated Brindley Street will require a new closed storm water drainage system to convey storm water off of the roadway. IMPACT ON AIR No significant impacts are anticipated. Page 2 of 3 IMPACT ON PLANTS AND ANIMALS Approximately ¼ acre of wooded land south of Cayuga Inlet between the old railroad bed and the relief channel will be impacted by the proposed construction. Approximately 40 trees 3” or greater diameter at breast height (DBH) will be removed in this area. In addition, approximately 30 trees 3” or greater DBH will be removed along the north bank of Cayuga Inlet adjacent to the existing City parking lot. New trees are proposed on the south side of the inlet on both sides of relocated Brindley Street as mitigation for the lost forest area and as a traffic calming measure. Consultation will be made with the City forester for species selection and density. IMPACT ON AESTHETIC RESOURCES The new bridge location and relocated portion of Brindley Street will provide for a new visual appearance to the existing natural/wooded area. The new structure will provide Texas aesthetic railing and period lighting consistent with other bridges in the City. IMPACT ON HISTORIC RESOURCES A Phase 1 Cultural Resource Study was performed in April 2016. Testing did not locate prehistoric or historic sites within the project area, and no further work is recommended. A Phase 1 Architectural Survey was also performed. No buildings or structures within the architectural project area were identified as eligible for the Historic Register. The results are subject to concurrence from the NYSDOT Regional Cultural Resource Coordinator and the NYS Office of Parks, Recreation and Historic Preservation. IMPACT ON UNIQUE NATURAL AREAS OR CRITICAL ENVIRONMENTAL AREAS No significant impacts are anticipated. IMPACT ON TRANSPORTATION The existing transportation system will be impacted during construction of the project due to the required tie-in of the new Brindley Street alignment and existing West State Street and Tabor Street. The completed project will improve both pedestrian and vehicle mobility and safety through the project area. IMPACT ON ENERGY No significant impacts are anticipated. IMPACT ON NOISE AND ODORS Removal of existing trees through the proposed Brindley Street re-alignment corridor is required. These trees currently help to provide a natural sound barrier between the existing buildings and the Page 3 of 3 roadway. As part of this project, new trees will be planted but it will take time until they become effective natural sound barrier. Typical odors and noise consistent with construction projects will likely occur during day time hours only. IMPACT ON PUBLIC HEALTH No significant impacts are anticipated. IMPACT ON GROWTH AND CHARACTER OF COMMUNITY OR NEIGHBORHOOD This project is essentially an extension of Taughannock Boulevard, which has been identified as an element of the City’s Six Point Traffic Plan Evaluation report. The project will provide improved access to the Southwest Development Area. Prepared by: David L. Kennicutt, PE, Sr. Project Manager, Delta Engineers, Architects, & Land Surveyors, P.C. “An Equal Opportunity Employer with a commitment to workforce diversification.” 1 of 4 TO:Board of Zoning Appeals FROM:Planning &Development Board DATE:May 25,2016 SUBJECT:Comments for Zoning Appeals 3024,3025,3026,3027,3028,3029,3030,3032,&3033 On May 24th,2016,members of the Planning and Development Board discussed the above listed Zoning Appeals and agreed to forward the following recommendations: APPEAL #3033 120 SOUTH AURORA STREET (ITHACA MARRIOTT) Area Variance —Signage Appeal of Matt Jalazo for Hotel Ithaca,LLC,owners of 120 South Aurora Street for variance from Sign Ordinance, Section 272 6 B.(2),which allows a maximum of two wall signs per business in the commercial zoning district and limits the size of each sign to a maximum 50 SF. Hotel Ithaca is currently constructing a multi story Marriott Hotel at 120 South Aurora Street at the east end of Ithaca Commons.On November 4,2014,Hotel Ithaca was granted Sign Variances from Section 272 6 B.(2), which provides that each business in a commercial district is limited to two building (wall)signs and each sign cannot be larger than 50 SF.In 2014,Hotel Ithaca requested the Board grant variances to erect six wall signs. The Board approved four of the six signs.Two of the approved signs are directional signs to be located on west side of the hotel.The third approved sign advertises the hotel’s restaurant.The fourth approved sign was a combination address and “name”sign at front entrance facing Aurora Street.On March 1,2016,the Board approved one additional sign to be located on the third floor level,facing the Commons. Hotel Ithaca’s current appeal to the Board is a request for one additional sign for the hotel at 120 South Aurora Street.The proposed sign is a wall sign with the “Marriott”name,to be located on exterior of the 10th floor level and facing East Green Street.This proposed sign will be 76 SF,which also exceeds the 50 SF Sign Ordinance maximum size threshold.Hotel Ithaca believes the size and lighting scheme of the requested sign are appropriate for the hotels’massing and location. The 120 South Aurora Street property is in a CBD 140 Zoning District where wall signs are permitted;however, Section 272 18 requires the applicant receive variances for the number and size of the additional signs requested,before a Sign Permit can be issued. The Board previously approved the size and location of this signage and does not have any further issues with this appeal. APPEAL #3032 121 WEST COURT STREET Area Variance —Parking Appeal of Christopher Anagnost on behalf of owner Tompkins County Senior Citizens Council for Area Variance from Section 325 8,Column 4,Off Street Parking and Column 13,Other Side Yard Dimension,requirements of the Zoning Ordinance.The building located at 121 W.Court Street consists of an office space on the first floor and a three bedroom apartment on the second floor.The two uses require a total of 11 parking spaces.The CITY OF ITHACA 108 E.Green Street —3rd Floor Ithaca,NY 14850 5690 DEPARTMENT OF PLANNING,BUILDING,ZONING,&ECONOMIC DEVELOPMENT JOANN CORNISH,DIRECTOR OF PLANNING &DEVELOPMENT PHYLLISA A.DeSARNO,DEPUTY DIRECTOR FOR ECONOMIC DEVELOPMENT Telephone:Planning &Development –607 274 6550 Community Development/IURA –607 274 6559 Email:dgrunder@cityofithaca.org Email:iura@cityofithaca.org Fax:607 274 6558 Fax:607 274 6558 “An Equal Opportunity Employer with a commitment to workforce diversification.” 2 of 4 tenants of this property were utilizing the neighboring parking lot at 119 W.Court Street,which is owned by the same owner.But the owner now intends to sell the property located at 121 W.Court Street,which has no parking on site.The applicant is proposing to adjust the lot line to the east approximately 10’9”to make room for 5 new parking spaces of the 11 spaces required by the Ordinance.The property has an existing side yard deficiency,having 2’of the 5’required by the Ordinance,which will not be exacerbated by the proposal. The property at 121 W.Court Street is located in a B 1a business use district in which the proposed use is permitted;however,Section 325 38 requires a variance be granted before a Building Permit is issued. The Planning Board does not identify any long term planning issues in this appeal. APPEAL #3030 602 WEST STATE STREET Area Variance —Minimum Stories Appeal of HOLT Architects on behalf of owner Elmira Savings Bank for Area Variance from Section 325 16 F.(1), Number of Stories,requirement of the Zoning Ordinance.The applicant proposes to convert existing vacant building located at 602 W.State Street to the Elmira Savings Bank.As part of the project,a canopy structure will be added to west side of the building to cover 2 drive through pneumatic tube stations.Property is located in the WEDZ 1a zone where there is a minimum 2 story or 24’height requirement.The new canopy will be a one story structure,approximately 12 feet in height. The property is located in the WEDZ 1a,West End Development Zone,in which the proposed use is permitted. However,Section 325 38 requires a variance be granted before a Building Permit is issued. The Planning Board does not identify any long term planning issues in this appeal.The Board suggest the Zoning Code be revised to exclude canopies from minimum story requirements. APPEAL #3029 207 GRANDVIEW AVENUE Area Variance Appeal of Michael Perehinec,Jr.Esq.,on behalf of owner Brent Campagni,for Area Variance from Section 325 8, Columns 12 and 13,Side Yard Dimensions,of the Zoning Ordinance.In 1972,a permit was issued to then owner Kenneth Fiero to install a deluxe modular home at the property located at 207 Grandview Avenue.The modular home was positioned on the property with one side yard having 5’and the other side yard having 15’5”;the Ordinance required side yards to be 10’and 10’respectively.Soon after project was completed in 1973,Mr. Fiero constructed a 12’x20’carport in the side yard without a permit.This reduced the compliant side yard dimension from 15’5”to 3’9”of the 10’required by the Ordinance.A Certificate of Occupancy was never issued and the building remained in non compliance with the Zoning Ordinance.Not until a recent housing inspection was it discovered that the issues with the carport permit or side yard deficiencies were never resolved.Current owner intends to sell the property and needs a Certificate of Compliance issued.The Building Division cannot issue the Certificate of Compliance without granting a variance for existing deficiencies. The property is located in an R 2a residential use district in which the proposed use is permitted.However, Section 325 39 requires a variance be granted before a Certificate of Compliance is issued. The Planning Board does not identify any long term planning issues in this appeal.The appeal is for an existing issue for which the current owner is not at fault. APPEAL #3028 339 CENTER STREET Special Permit “An Equal Opportunity Employer with a commitment to workforce diversification.” 3 of 4 Appeal of Meghan Prichard on behalf of Andrew Lunn for a service commercial facility Special Permit as required by Section 325 9 C.(1)(e),and a variance from Section 325 8,Column 4,Off Street Parking,Column 11,Front Yard,Column 12,Other Front Yard,and Column 14/15,Rear Yard,requirements of the Zoning Ordinance.The applicant proposes to re establish a home salon in basement area of property located at 339 Center Street. Between 1937 and 1978,a salon was operating in the basement by the original owner Lillian Morgan.Since that time,the salon equipment in the basement remained and is still fully operational.Resuming the business requires no new construction to re establish the home salon.The applicant resides in one of the apartments in the 2 family home and would like to utilize existing equipment to start a salon business. The property at 339 Center Street has two parking spaces on site and lacks one parking space for the business,as required by the Zoning Ordinance.There are existing area deficiencies in the front yard,other front yard,and rear yard that will not be exacerbated by this proposal.This property is located in an R 2b use district where a service commercial facility is permitted;however,Section 325 9 requires a Special Permit and Area Variance be granted before a Certificate of Occupancy is issued. The Planning Board does not identify any long term planning issues in this appeal. APPEAL #3027 220 COBB STREET Appeal of Sue Cosentini on behalf of the owner Daniel Barbash for an Area Variance from Section 325 8,Column 11,Front Yard Dimension,of the Zoning Ordinance.The applicant proposes to construct an addition on the building located at 220 Cobb Street.The addition will consist of a sunroom,storage space,and a mudroom that will be constructed on the south side of existing home.A portion of the addition will extend into the front yard. Existing dwelling has a front yard deficiency,having 17.5’of the 25’required by the Ordinance.The new addition will encroach into required front yard approximately 2’,leaving 23.1’of the 25’required by the Ordinance. The property is located in an R 1b residential use district,in which the proposed use is permitted.However, Section 325 38 requires a variance be granted before a Building Permit is issued. The Planning Board does not identify any long term planning issues in this appeal.However,it is not possible to determine any potential aesthetic impacts to the neighborhood,because the appellant did not provide elevations for the façade facing the public way. APPEAL #3026 125 FARM STREET Area Variance Appeal of Richard Ford on behalf of 125 Farm Street Land Trust for Area Variance from Section 325 8,Column 4, Parking,Column 10,Percentage of Coverage,Column 11,Front Yard,and Column 12/13,Side Yard, requirements of the Zoning Ordinance.The property located at 125 Farm Street is a two family dwelling consisting of a 3 bedroom apartment on the first floor and a 1 bedroom apartment on the second floor.The applicant proposes to reconfigure the interior of the two family dwelling and create two 3 bedroom apartments. The reconfiguration will increase the occupancy from 5 to 6 unrelated individuals for the building.The property has no on site parking and the interior changes will not exacerbate existing deficiencies in parking,percentage of lot coverage,front yard,or side yards. The property at 125 Farm Street is located in an R 2b residential zone district,in which the proposed use is permitted;however,Section 325 38 requires Zoning Variances be granted before a Building Permit can be issued. “An Equal Opportunity Employer with a commitment to workforce diversification.” 4 of 4 The Planning Board does not identify any long term planning issues in this appeal,as this is a minor request for a pre existing condition. APPEAL #3025 201 COLLEGE AVENUE Area Variance Appeal of Noah Demarest,STREAM Collaborative,on behalf of Visum Development Group for an Area Variance from Section 325 8,Column 14/15,Rear Yard,and 325 45.2 G.(1)(C),Functioning Entry Distance,requirements of the Zoning Ordinance.The applicant proposes to demolish existing building located at 201 College Avenue and construct a 5 story,44 unit apartment building.As part of the building design,the applicant proposes to increase sidewalk width from 8’to 12’along the pedestrian thoroughfare on College Avenue.The applicant would like to maintain proposed square footage of the building and move the building east toward the rear property line to accommodate the increase in sidewalk width.This will result in a rear yard reduction to 5’1”of the 10’required by the Ordinance. The proposed building is located on the corner of College Avenue and Bool Street.The building façade along Bool Street is required to have a maximum of 35’between functioning entries.The applicant proposes to install one main entry along Bool Street in a recessed courtyard,approximately 57’from the building corner.Due to the sloping topography of Bool Street,adding 2 additional entry points would require installing one elevated entry and steps,and one excavated entry to an already constrained site condition. The property at 201 College Avenue is located in a MU 1 Zoning District where the proposed apartment building is a permitted use;however,Section 325 38 requires variances to be granted before a Building Permit can be issued. The Planning Board does not identify any negative long term planning issues in this appeal.Moving the building footprint into the rear yard setback allows for wider sidewalks and street trees on College Avenue. APPEAL #3024 312 314 WEST SPENCER ROAD Area Variance Appeal of Noah Demarest,STREAM Collaborative,for the owner,Giuliano Lucatelli,Jr.,for an Area Variance from Section 325 8,Column 11,Front Yard,requirement of the Zoning Ordinance.The applicant proposes to consolidate two parcels located at 312 and 314 W.Spencer Road and re subdivide the lot into three new parcels. One parcel will contain existing buildings at 312 and 314 W.Spencer Rd.The other two parcels will be configured as two buildable lots.However,the building located at 314 W.Spencer Road has existing front yard deficiency,having 16.5 feet of the 25 foot front yard setback required by the Zoning Ordinance. The property at 314 W.Spencer Rd.is located in an R 2b Zoning District where the proposed use is permitted; however,General Municipal Law,Article 3,Section 33,states a subdivided plat must comply with a municipality’s Zoning Ordinance.Compliance can therefore only be achieved if the BZA grants this variance for front yard deficiency. The Planning Board does not identify any long term planning issues in this appeal,as this is a minor request for a pre existing condition.