Loading...
HomeMy WebLinkAbout12-16-14 Planning and Development Board Special Meeting AgendaCITY OF ITHACA 108 E. Green St. — 3rd Floor Ithaca, NY 14850-5690 DEPARTMENT OF PLANNING, BUILDING, ZONING & ECONOMIC DEVELOPMENT Division of Planning & Economic Development JOANN CORNISH, DIRECTOR OF PLANNING & DEVELOPMENT PHYLLISA A. DeSARNO, DEPUTY DIRECTOR FOR ECONOMIC DEVELOPMENT Telephone: Planning Division – 607-274-6550 Community Development/IURA – 607-274-6559 Email: dgrunder@cityofithaca.org Email: iura@cityofithaca.org Fax: 607-274-6558 Fax: 607-274-6558   If you have a disability & would like specific accommodation  to participate, please contact the City Clerk at 274‐6570 by  12:00 p.m., the day before the meeting.          NOTICE OF MEETING    The regular meeting of the PLANNING & DEVELOPMENT BOARD will be held at 6:00 p.m. on DECEMBER 16TH, 2014 in COMMON  COUNCIL CHAMBERS, City Hall, 108 E. Green Street, Ithaca, NY.      AGENDA ITEM  Start Time     1. Agenda Review  6:00   2. Privilege of the Floor (3‐minute maximum per person) 6:01   3. Site Plan Review          A. Project: TC3 Culinary Center ― Coltivare 6:13   Location: 235 S. Cayuga St.     Applicant: Tompkins Cortland Community College (TC3)      Actions: ˆ Conditions of Final Approval & Screening for Vents         B. Project: Downtown Marriott 6:30   Location: 120 S. Aurora St.    Applicant: Matt Jalazo for Urgo Hotels     Actions: ˆ Signage Review/Sign Variance Review        C. Project: 3‐Story Apartment Building 7:00   Location: 114 Catherine St.     Applicant: Jagat Sharma for Nick Lambrou     Actions: ˆ Consideration of Approval of Transportation Demand Management Plan [UNDER SEPARATE COVER]   ˆ Consideration of Final Site Plan Approval       The applicant proposes to construct a 3‐story apartment building, with a footprint of 1,974 SF and containing  one 5‐bedroom and two 6‐bedroom units.  The project site contains an existing apartment building and a 13‐ space parking lot with 7 spaces in the back yard (to remain) and 6 spaces in the front yard (to be replaced by  the new building).  The project also includes removal of one curb‐cut.  The project is in the CR‐4 Zoning District,  which requires either: (1) off‐street parking in accordance with §325‐45.5 F; or (2) full compliance with the NYS  Building Code or Residential Code for new construction and a Transportation Management Plan (TDMP)  approved by the Planning Board.  The project received Design Review.  APPLICANT OVERHEAD PROJECTOR NOTE::   The City only has a VGA plug/cable  available to connect to our overhead  projector.  If you need to connect another  way, you will need to provide your own  ADAPTOR.  (Macs & many newer, lighter  laptops may not have a VGA port.)  AGENDA ITEM  Start Time     D. Project: 15,700‐SF Retail Building 7:30   Location: 500 S. Meadow St.     Applicant: Wegmans Food Markets, Inc.     Actions: ˆ Determination of Environmental Significance  ˆ Consideration of Preliminary &  Final Approval       The applicant proposes to construct a 15,700‐SF retail building.  The project site is a 17.7‐acre parcel that  contains an existing 115,000‐SF retail building (Wegmans), associated parking, and an access road from  Meadow Street.  The new building will be located on an existing 201‐space parking area.  Project development  will include parking for 77 cars, sidewalk along access road, crosswalk striping, lighting, and landscaping,  including six tree islands in the parking lot.  The project is in the SW‐2 Zoning District.  This is a Type I Action  under the City of Ithaca Environmental Quality Review Ordinance, §176‐4 B. (1) (i), and an Unlisted the State  Environmental Quality Review Act and is subject to environmental review.       E. Project:   Chain Works District GEIS ― Update & Schedule  8:00   4. Zoning Appeals  8:25 ƒ #2967, Area Variance, 114 Heights Ct.  [summary under separate cover]   ƒ #2968, Area Variance, 424 Dryden Rd.  [summary under separate cover]   ƒ #2970, Area Variance, 742‐744 S. Meadow St.  [summary & worksheet under separate cover]      5. Old/New Business (if any) 8:40   6. Reports    A. Planning Board Chair (verbal) 8:50     B. Director of Planning & Development (verbal) 9:00     C. Board of Public Works Liaison (verbal) 9:10    7. Approval of Minutes: 10/28/14 9:20    8. Adjournment 9:25   Site Plan Review & Subdivision Applications (and Related Documents)  Site Plan Review application documents are accessible electronically via the “Document Center” on the City web site  (www.cityofithaca.org/DocumentCenter), under “Planning & Development” > “Site Plan Review Project Applications,” and in the relevant year/month  folder.  Subdivision application materials can be similarly located, but in the “Subdivision Applications” folder.    Zoning Appeal Materials are also accessible electronically via the “Document Center” portion of the City web site, under “Planning & Development” >  “Planning & Development Board” > “Zoning Appeals,” and in the relevant year/month folder.    ACCESSING MEETING MATERIALS ONLINE  “An Equal Opportunity Employer with a commitment to workforce diversification.” 2 1110DA3.3 1 E3A5.4 2 A5 . 4 8' - 1 1 " FI E L D V E R I F Y 8' - 0" RE T A I N I N G W A L L 28 ' - 0 " RETAINING WALL 12' - 7 15/16" 10" 10 " 2' - 0 " 2' - 0" 7' - 10" 18 ' - 1 " 10 " 10 " 10" A5 . 4 4 ED G E O F G R A D E BE A M B E L O W EX I S T I N G P I E R ED G E O F M A T FO O T I N G B E L O W STAIR WIDTH 4' - 0" CONCRETE STAIR 8' - 0" 8' - 3 " LA N D I N G 6' - 2 " LA N D I N G 6' - 2 " 1' - 0" St a i r R u n 9' - 0 " Ty p T r e a d 1' - 0 " DR A I N GU A R D R A I L GU A R D R A I L GU A R D R A I L GU A R D R A I L 9.8 9. 2 LINE OF SCREEN ABOVEEXISTING PLANTER NEW AREA FOR EXISTING PLANTER TO BE EXPANEDREMOVE AND REUSE AS MUCH OF EXISTING CURBING AS POSSIBLE VIF =/- 6' - 8"VIF+/- 24' - 2"NOTE: THE INTENT OF THE PLAN BELOW IS TO EXTEND THE EXISITNG PLANTING AREA TOWARD THE EXISTING BUILDING WITHOUT ADVERSILY EFFECTING THE EXISTING PLANTINGS THAT ARE EXISTING. THE CONTRACTOR WILL FIELD VERIFY ALL DIMS AND NOTIFY GC OF EXACT FIELD CONDITIONS NEW/REUSED CURBING STOPS SHORT OF THE EXITING BUILDING TO MAINTAIN SURFACE RUN OFF OF RAIN/SNOW MELT TO CONTINUE TO FLOW TO STORM SYSTEM LOCATED ON CLINTON STREET 2' - 2"MTL RAIL 2' - 6 1/2"MTL RAIL 2' - 6 1/2"4"4"NEW RAILING MATCHING GUARD RAIL AT NEW EXTERIOR EXITNEW RAILING MATCHING GUARD RAIL AT NEW EXTERIOR EXIT Fi r s t F l o o r P l a n 40 5 ' - 5 " Le v e l 2 42 1 ' - 5 " D Le v e l 3 43 2 ' - 9 " Le v e l 4 44 3 ' - 5 " Le v e l 5 45 4 ' - 1 " Le v e l 6 46 4 ' - 9 " Le v e l 7 47 5 ' - 5 " Le v e l 8 48 6 ' - 1 " E 3 A5 . 4 3' - 6" CO N C R E T E RE T A I N I N G W A L L CO N C R E T E S T A I R CO N C R E T E S L A B Fi r s t F l o o r P l a n 40 5 ' - 5 " Le v e l 2 42 1 ' - 5 " 10 9 Le v e l 3 43 2 ' - 9 " Le v e l 4 44 3 ' - 5 " Le v e l 5 45 4 ' - 1 " Le v e l 6 46 4 ' - 9 " Le v e l 7 47 5 ' - 5 " Le v e l 8 48 6 ' - 1 " 2 A5 . 4 VIF +/- 9' - 10" 3' - 6" GU A R D R A I L CA S T I N P L A C E C O N C R E T E ST A I R S A N D R E T A I N I N G WA L L S & F O O T I N G S CO M P A C T E D F I L L SL A B O N G R A D E 8. 7 9. 8 9. 2 Fi r s t F l o o r P l a n 40 5 ' - 5 " First Floor Plan 405' - 5" Le v e l 2 42 1 ' - 5 " Level 2 421' - 5" 10 Le v e l 3 43 2 ' - 9 " Level 3 432' - 9" Le v e l 4 44 3 ' - 5 " Level 4 443' - 5"2 A5.4 STEEL TUBE GUARD RAIL2"x2" MESH STEEL TUBE FRAMESEE STRUCTURAL DRAWINGS FOR FOUNDATION DETAILS 4" MIN ABOVE EXISTING GRADE WALL HEIGHT FINISHES 2" 3' - 9 " 2" 3' - 9"2"3' - 9"2"3' - 9"2"3' - 9"2"3' - 9"2"3' - 9"2"FINISH MATCHES EXISTING EXIT STAIR HAND RAILS8.7 9. 8 9.2 6 A3.5 6 A5 . 5 NE W R A I L I N G T O MA T C H R A I L A T N E W EX T E R I O R E X I T 3' - 3" 3" DATE:SCALE:PROJ#:DRAWN BY:REVISIONSTHE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AT THE SITE AND PROMPTLY NOTIFY THE ARCHITECT IN WRITING OF ANY DISCREPANCIES.ALL DRAWINGS AND SPECIFICATIONS ARE THE PROPERTY OF THE ARCHITECT AND SHALL BE USED ONLY ON THE JOB DESIGNATED.COPYRIGHT PART 69.5(b) OF TITLE VIII OF THE EDUCATION LAW OF NEW YORK PROHIBITS ANY AND ALL ALTERATIONS TO THIS DRAWING OR DOCUMENT BY ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED ARCHITECT. ANY SUCH ALTERATIONS SHALL BE NOTED, SEALED, AND SIGNED BY THE ALTERING ARCHITECT IN ACCORDANCE WITH THE REQUIREMENTS OF PART 69.5(b).10/27/2014 11:59:32 AMAs indicatedExterior Details A5.422 OCT 20141312cpkProgressPrint09/22/14 SC A L E : 1 / 4 " = 1 ' - 0 " A5 . 4 1 En l a r g e d P l a n E x t e r i o r S t a i r & R e t a i n i n g W a l l N TR U E PR O J E C T N SC A L E : 1 / 8 " = 1 ' - 0 " A5 . 42 Ea s t S i d e E x i t B u i l d i n g S e c t i o n N o r t h - S o u t h SC A L E : 1 / 8 " = 1 ' - 0 " A5 . 43 Ea s t S i d e E x i t B u i l d i n g S e c t i o n E a s t - W e s t SC A L E : 1 / 4 " = 1 ' - 0 " A5 . 44 Ea s t E x i t P a r t i a l E l e v a t i o n #DESCRIPTIONDATE 6Revision 605/30/14 7Revision 706/09/14 15Revision 159/22/14 15 15 Fi r s t F l o o r P l a n 40 5 ' - 5 " Le v e l 2 42 1 ' - 5 " 11 10 9 8 7 6 54 Le v e l 3 43 2 ' - 9 " Le v e l 4 44 3 ' - 5 " Le v e l 5 45 4 ' - 1 " Le v e l 6 46 4 ' - 9 " Le v e l 7 47 5 ' - 5 " Le v e l 8 48 6 ' - 1 " LI N E A R L E D L I G H T I N G 30 ' - 0 " EX T E R I O R L E D L I N E A R BU I L D I N G A C C E N T L I G H T I N G SE A S O N A L G R A P H I C BA N N E R S 4' - 6 " 3' - 0" EX T E R I O R D U C T W O R K F O R MA K E U P A I R - S E E H V A C DR A W I N G S ZO N E O F E X T E R I O R D U C T WO R K F O R M A K E U P A I R - SE E H V A C D R A W I N G S 8. 7 9. 8 9. 2 DU C T W O R K S C R E E N S T E E L TU B E A N D 2 X 2 W I R E M E S H MA T C H E X I S T I N G F I N I S H O F EX I S T I N G S C R E E N I N G EL E M E N T S RE M O V E P O R T I O N O F E X I S T I N G SC R E E N I N G T O A L L O W RE Q U I R E D E X I T - R E S T O F SC R E E N A N D V I N E S T O R E M A I N A3 . 33 Fi r s t F l o o r P l a n 40 5 ' - 5 " First Floor Plan 405' - 5" Le v e l 2 42 1 ' - 5 " Level 2 421' - 5"10 9 2 A4.4 2 A5 . 4 8. 7 9.89.2 6 A3.5 7' - 4" STL BeamEQSTL BeamEQSTL BeamEQSTL BeamEQ ST L B e a m EQ ST L B e a m EQ ST L B e a m EQ Cooler / Freezer Walk-in Box 7' - 4" MAX 1 1/2" 6 A5.5 16' - 0" 16 ' - 0 " 18' - 0"34' - 0" 6" M T L S T U D W I T H 5 / 8 " GW B A N D A C C E S S PA N E L T O B E LO C A T E D B Y T H E CO N T R A C T O R MT L L O C K E R S FR E E Z E R / C O O L E R PA N E L LE N G T H W A L K I N F R E E Z E R / C O O L E R +/ - 3 3 ' - 1 0 1 / 4 " 4" 4" 4" 4" ST E E L B E A M S E E ST R U C T U R A L ST E E L T U B E S E E ST R U C T U R A L TU B E S T E E L C O L U M N (T Y P ) S E E S T R U C T U R A L 1 1 / 2 " S T E E L GR A T I N G SE E S T R U C T U R A L PC U - 5 PCU-1PCU-2 PC U - 4 3 5/8"SPRAY ACOUSTIC INSULATION 10" 4" C O N C R E T E S L A B 2" R I G I D I N S U L A T I O N 4" C O N C R E T E S L A B 7' - 0" 7' - 4" Le v e l 2 42 1 ' - 5 " 11 EX T E R I O R D U C T W O R K F O R MA K E U P A I R - S E E H V A C DR A W I N G S ZO N E O F E X T E R I O R D U C T WO R K F O R M A K E U P A I R - SE E H V A C D R A W I N G S DU C T W O R K S C R E E N S T E E L TU B E A N D 2 X 2 W I R E M E S H MA T C H E X I S T I N G F I N I S H O F EX I S T I N G S C R E E N I N G EL E M E N T S 2" X 2 " M E S H ST E E L T U B E G U A R D R A I L FI N I S H M A T C H E S E X I S T I N G EX I T S T A I R H A N D R A I L S 2" 3' - 9 " 2" 3' - 9 " 2" 3' - 9 " 2" 3' - 9 " 2" 3' - 9 " 2" 3' - 9 " 2" 3' - 0" BU I L D U P C U R B A S NE E D E D F O R S L O P E I N GR A D E DATE:SCALE:PROJ#:DRAWN BY:REVISIONSTHE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AT THE SITE AND PROMPTLY NOTIFY THE ARCHITECT IN WRITING OF ANY DISCREPANCIES.ALL DRAWINGS AND SPECIFICATIONS ARE THE PROPERTY OF THE ARCHITECT AND SHALL BE USED ONLY ON THE JOB DESIGNATED.COPYRIGHT PART 69.5(b) OF TITLE VIII OF THE EDUCATION LAW OF NEW YORK PROHIBITS ANY AND ALL ALTERATIONS TO THIS DRAWING OR DOCUMENT BY ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED ARCHITECT. ANY SUCH ALTERATIONS SHALL BE NOTED, SEALED, AND SIGNED BY THE ALTERING ARCHITECT IN ACCORDANCE WITH THE REQUIREMENTS OF PART 69.5(b).9/22/2014 10:22:25 AMAs indicatedExterior Elevations A3.312 SEPT 20141312CPKCOLTIVARE102 East Clinton Street, Ithaca, New York 14850 TOMPKINS CORTLAND COMMUNITY COLLEGEProgress Print 09/22/14 #DESCRIPTIONDATE 1Revision 104/04/14 7Revision 706/09/14 15Revision 159/22/14 SC A L E : 1 / 8 " = 1 ' - 0 " A3 . 3 1 Ea s t E l e v a t i o n SC A L E : 1 / 4 " = 1 ' - 0 " A3 . 32 Se c t i o n a t W a l k - I n F r e e z e r & C o o l e r s SC A L E : 1 / 4 " = 1 ' - 0 " A3 . 33 En l a r g e d E a s t E l e v a t i o n 15 PROPOSED RESOLUTION Site Plan Review Approval of TDMP City of Ithaca Planning and Development Board 114 Catherine St. December 16, 2014 WHEREAS: the City of Ithaca Planning and Development Board has one pending application for Site Plan Review for an apartment project proposed by Jagat Sharma for owner Nick Lambrou, and WHEREAS: applicant proposes to construct a 3-story apartment building, with a footprint of 1,974 SF and containing one 5-bedroom and two 6-bedroom units. The project site contains an existing apartment building and a 13-space parking lot with 7 spaces in the back yard (to remain) and 6 spaces in the front yard (to be replaced by the new building). The project also includes removal of one curb- cut. The project received Design Review, and WHEREAS: this is an Unlisted Action under the City of Ithaca Environmental Quality Review Ordinance and the State Environmental Quality Review Act for which the Planning Board, acting as Lead Agency in Environmental Review made a negative determination of environmental significance on November 25, 2014, and WHEREAS: the applicant is proposing seven parking spaces on the project site. Total occupancy on the project site will be 30 residents with a parking requirement of 17 spaces, and WHEREAS: in accordance with district regulations in the CR-4 Zoning District the applicant will achieve full compliance with the NYS Building Code or Residential Code for new construction and a Transportation Demand Management Plan (TDMP) approved by the Planning Board, and WHEREAS: the Board has on December 16, 2014 reviewed and accepted as adequate a Transportation Demand Management Plan (TDMP) titled and dated: “FINAL 3- Story Apartment Building 114 Catherine Street Traffic Demand Management Plan As amended by the Planning and Development Board on December 16, 2014 ” now, therefore, be it RESOLVED: that the Planning Board does hereby approve the aforementioned TDMP for the apartment project on 114 Catherine Street. Moved by: Seconded by: In Favor: Against: Abstain: Absent: Vacancies: 0 PROPOSED RESOLUTION Site Plan Review Final Site Plan Approval 114 Catherine St. Apartments City of Ithaca Planning and Development Board December 16, 2014 WHEREAS: an application has been submitted for review and approval by the City of Ithaca Planning and Development Board for an apartment building to be located at 114 Catherine Street in the City of Ithaca, from Jagat Sharma, applicant for Nick Lambrou, owner, and WHEREAS: the applicant proposes to construct a 3-story apartment building, with a footprint of 1,974 SF and containing one 5-bedroom and two 6-bedroom units. The project site contains an existing apartment building and a 13-space parking lot with 7 spaces in the back yard (to remain) and 6 spaces in the front yard (to be replaced by the new building). The project also includes removal of one curb-cut. The project is in the CR-4 Zoning District, which requires either: (1) off- street parking in accordance with §325-45.5 F; or (2) full compliance with the NYS Building Code or Residential Code for new construction and a Transportation Management Plan (TDMP) approved by the Planning Board. The project received Design Review, and WHEREAS: this an Unlisted Action under the City of Ithaca Environmental Quality Review Ordinance and the State Environmental Quality Review Act, and is subject to environmental review, and WHEREAS: the Planning Board, being that local agency which has primary responsibility for approving and funding or carrying out the action, did on October 28, 2014 declare itself Lead Agency for the environmental review, and WHEREAS: legal notice was published and property posted in accordance with Chapters 276-6 B. (4) and 176-12 A. (2) (c) of the City of Ithaca Code, and WHEREAS: the Planning and Development Board held the required Public Hearing on November 25, 2014, and WHEREAS: the City of Ithaca Conservation Advisory Council, Tompkins County Planning Department, and other interested parties have been given the opportunity to comment on the proposed project and any received comments have been considered, and WHEREAS: the Planning Board, acting as Lead Agency in environmental review, did on November 25, 2014 review and accept as adequate: a Full Environmental Assessment Form (FEAF), Part 1, submitted by the applicant, and Parts 2 and 3, prepared by Planning staff; and the following drawings: “Rendering-Catherine Street (R.01),” “Location Plan, Site Photos, Survey (1.01),” “’Demo Plan, Disturbance Plan, Utility Plan (1.02),” “Parking Plan, Project Data, Site Plan, Details (1.03)” (version with plantings labeled and “Planting List” added), “First Floor Plan, Typical Floor Plan (2.01),” “South Elevation (3.01),” and “East and West Elevations (3.02),” with a latest revision date of 11/4/14; “Site Plan (1.03A),” dated 11/17/14; and “Materials Samples,” dated 11/20/14; and all prepared by Jagat P. Sharma; and other application materials, and WHEREAS: the City of Ithaca Planning and Development Board, acting as Lead Agency in environmental review, did on November 25, 2014 make a Negative Determination of Environmental Significance, and WHEREAS: the Planning Board did on November 25, 2014 review a Transportation Demand Management Plan (TDMP), prepared by Jagat P. Sharma and dated 11/24/14, and agreed in principle on a strengthened TDMP to be formally approved on 12/16/14, and, WHEREAS: the Planning Board did on November 25, 2014 grant Preliminary Site Plan Approval for the project, subject to the following conditions: i. Written approval from the Fire Department, and ii. Submission of a revised site plan indicating restoration of curb, and repair of sidewalk to original condition, if damaged during construction, and iii. Submission of revised elevations noting integrally-tinted colored concrete foundation, and of revised “Material Samples” sheet, adding sample of aforementioned tinted concrete foundation, and iv. Submission of project details, including building materials, lighting, paving, signage, stairs, railing, etc., and WHEREAS: the Planning Board, did on December 16, 2014 review and accept as adequate: revised drawings titled “Site Plan (1.04A),” “South Elevation (3.01),” and “East and West Elevations (3.02),” with a latest revision date of 12/4/14; and a revised Transportation Demand Management Plan (TDMP), dated 12/X/14, prepared by Jagat P. Sharma, and WHEREAS: the Board determines that conditions i., ii., and iii. have been satisfied, and that condition iv. has been partially satisfied, now, therefore, be it RESOLVED: that the Planning Board does hereby grant Final Site Plan Approval for the project, subject to the following conditions: i. Submission to Planning staff of updated materials sheet, and ii. Submission of project details, including building materials, lighting, paving, signage, stairs, railing and covered bike storage, and Moved by: Seconded by: In Favor: Against: Abstain: Absent: Vacancies: 0 From:   Jeanne Grace  Sent:   Wednesday, December 10, 2014 8:24 AM  To:   Lisa Nicholas  Subject:  [Wegmans SPR]    Utility conflicts:  There are two existing maples on the West side of the site. Appears they will be in conflict with the proposed  UGE line. They will probably need to be removed to install the line. Perhaps the line could hug closer to the  building and the tree could remain.    South side of project has some storm sewer hook up points. They appear to be in the formally paved area so  should not impact the existing trees. Maybe some could verify that for us.    The UGT line enters the property in the NW corner. Appears to be running down the current Wegmans service  road. Will the line be new or does that already run down the road and the only new portion will be within the  new deveoplment. If it needs to be run down the entire service road, all the existing trees on that road will be  impacted. Many are in very poor condition already. Tree replacements (and soil improvements) should be  considered.    Plant list:  Viburnum trilobum is highly susceptible to Viburnum leaf beetle which kills the plant in 1‐2 yrs. Should be  switched to a different species.  Viburnum juddi, also in the plant list, is resistant to Viburnum leaf beetle.    Planting Specs:  For filling the tree island in the parking lot, the planting specs state "backfill with approved planting mix, see  specifications or landscape notes". The only language I found there relating to soil/fill is #14 which directs 4"  of top soil or 6" on berms. What is the approved spec for backfill?    The planting island will have approx 1000 cu ft of soil (actually less because I figured for a rectangle 35x10x3  and actual islands are round and mounded). The spec we are proposing require min 720cu ft for 1 large tree.  This project is proposing 2 large trees in 1000cu ft. The detail for "typical tree planting island in a parking lot  with Struc soil" in the appendix of our proposed revisions show how increased soil volume could be achieved.  Also included in that detail is a drain pipe to storm sewer. Which would be a good thing to recommend too.  Wegmans has replaced other islands in their current parking lot and I noticed that when excavated the  planting islands were full of water, so providing a drain would alleviate that problem for the new islands.  Without drainage the planting island can be saturated with water after a storm/flooding event which drowns  the tree roots.    These specs are not official yet so I don't know how much you feel the city can hold the developer to at this  point, but it would be a great opportunity to start improving parking lot plantings.    Jeanne  Jeanne Grace  City Forester  City of Ithaca  Department of Public Works  Division of Parks and Forestry    PROPOSED RESOLUTION Site Plan Review CEQR 500 S. Meadow St. Wegmans 15,700-SF Retail Building City of Ithaca Planning & Development Board December 16, 2014 WHEREAS: the City of Ithaca Planning and Development Board has one pending application for Site Plan Approval for a retail building, and WHEREAS: the applicant proposes to construct a 15,700-SF retail building. The project site is a 17.7-acre parcel that contains an existing 115,000-SF retail building (Wegmans), associated parking, and an access road from Meadow Street. The new building will be located on an existing 201-space parking area. Project development will include parking for 77 cars, internal sidewalks, crosswalk striping, lighting, and landscaping. The project is in the SW-2 Zoning District, and   WHEREAS: this is an Unlisted Action under the City of Ithaca Environmental Quality Review Ordinance and the State Environmental Quality Review Act, and is subject to environmental review, and WHEREAS: State Law specifies that, for actions governed by local environmental review, the Lead Agency shall be that local agency which has primary responsibility for approving and funding or carrying out the action, and WHEREAS the Planning Board, being the local agency which has primary responsibility for approving and funding or carrying out the action, did on October 28, 2014 declare itself Lead Agency for the environmental review of the project, and WHEREAS: the City of Ithaca Conservation Advisory Council, Tompkins County Planning Department, and other interested parties have been given the opportunity to comment on the proposed project and any received comments have been considered, and WHEREAS: in a letter dated 10/28/14 from Ed Marx, Tompkins County Commissioner of Planning to Lisa Nicholas, Senior Planner, Marx states: “To facilitate safe and convenient pedestrian travel from the sidewalk on South Meadow Street to the Wegman’s supermarket site, we recommend the City require that the landscaping proposed to the south of the parking lot and north to the existing tree lawn be replaced by a sidewalk connecting the currently proposed sidewalk heading west,” and WHEREAS: the Planning Board, in agreement with the Commissioner’s recommendations, requested that the applicant provide such a sidewalk, and WHEREAS: the Planning Board, acting as Lead Agency in environmental review, did on December 16, 2014 review and accept as adequate: a Full Environmental Assessment Form (FEAF), Part 1, submitted by the applicant, and Part 2 prepared by Planning staff; plans entitled “Topographic Survey for Wegmans Food Market, 500 South Meadow Street (Sheets 1 and 2),” prepared by C.T. Male Associates, P.C and dated 8/25/11; “Overall Master Site Plan (C-1),” “Demolition Plan (C-2),” “Site Plan (C-3),” “Utility Plan (C-4),” “Grading and Erosion Control Plan (C-5),” “Landscape Plan (C-6),” “Lighting Plan (C-7),” “Construction Phasing Plan (C-8),” and “Construction Details 1−5 (CD-1, CD-2, CD- 3, CD-4, & CD-5),” dated 2/1/14 and all prepared by T.Y. LIN International; and other application materials, now, therefore, be it RESOLVED: that the City of Ithaca Planning and Development Board determines the proposed project will result in no significant impact on the environment and a Negative Declaration for purposes of Article 8 of the Environmental Conservation Law be filed in accordance with the provisions of Part 617 of the State Environmental Quality Review Act. Moved by: Seconded by: In Favor: Against: Abstain: Absent: Vacancies: 0 PROPOSED RESOLUTION Site Plan Review Preliminary & Final Approval 500 S. Meadow St. Wegmans 15,700-SF Retail Building City of Ithaca Planning & Development Board December 16, 2014 WHEREAS: the City of Ithaca Planning and Development Board has one pending application for Site Plan Approval for a retail building, and WHEREAS: the applicant proposes to construct a 15,700-SF retail building. The project site is a 17.7-acre parcel that contains an existing 115,000-SF retail building (Wegmans), associated parking, and an access road from Meadow Street. The new building will be located on an existing 201-space parking area. Project development will include parking for 77 cars, internal sidewalks, crosswalk striping, lighting, and landscaping. The project is in the SW-2 Zoning District, and   WHEREAS: this is an Unlisted Action under the City of Ithaca Environmental Quality Review Ordinance and the State Environmental Quality Review Act, and is subject to environmental review, and WHEREAS: the Planning Board, being that local agency which has primary responsibility for approving and funding or carrying out the action, did on October 28, 2014 declare itself Lead Agency for the environmental review, and WHEREAS: legal notice was published and property posted in accordance with Chapters 276-6 B. (4) and 176- 12 A. (2) (c) of the City of Ithaca Code, and WHEREAS: the Planning and Development Board held the required Public Hearing on October 28, 2014, and WHEREAS: the City of Ithaca Conservation Advisory Council, Tompkins County Planning Department, and other interested parties have been given the opportunity to comment on the proposed project and any received comments have been considered, and WHEREAS: in a letter dated 10/28/14 from Ed Marx, Tompkins County Commissioner of Planning to Lisa Nicholas, Senior Planner, Marx states: “To facilitate safe and convenient pedestrian travel from the sidewalk on South Meadow Street to the Wegman’s supermarket site, we recommend the City require that the landscaping proposed to the south of the parking lot and north to the existing tree lawn be replaced by a sidewalk connecting the currently proposed sidewalk heading west,” and WHEREAS: the Planning Board, in agreement with the Commissioner’s recommendations, requested that the applicant provide such a sidewalk, and WHEREAS: the Planning Board, acting as Lead Agency in environmental review, did on December 16, 2014 review and accept as adequate: a Full Environmental Assessment Form (FEAF), Part 1, submitted by the applicant, and Part 2 prepared by Planning staff; plans entitled “Topographic Survey for Wegmans Food Market, 500 South Meadow Street (Sheets 1 and 2),” prepared by C.T. Male Associates, P.C and dated 8/25/11; “Overall Master Site Plan (C-1),” “Demolition Plan (C-2),” “Site Plan (C-3),” “Utility Plan (C-4),” “Grading and Erosion Control Plan (C-5),” “Landscape Plan (C-6),” “Lighting Plan (C-7),” “Construction Phasing Plan (C-8),” and “Construction Details 1−5 (CD-1, CD-2, CD-3, CD-4, & CD-5),” dated 2/1/14 and all prepared by T.Y. LIN International; and other application materials, and WHEREAS: the Planning Board did on December 16, 2014 make a Negative Determination of Environmental Significance, now, therefore, be it RESOLVED: that the City of Ithaca Planning and Development Board does hereby grant Preliminary and Final Site Plan approval to the project, subject to the following conditions: i. Submission of a revised landscape plan with tree protection and soil remediation specifications in accordance with recommendations of the City Forester, and ii. Submission of revised elevations and materials board replacing EIFS with fiber cement lap siding, and iii. Submission of revised site plan showing continuous sidewalk crossing curb-cut on access road, and iv. Applicant to investigate adding an entrance at or near the southwest corner of the building, and v. Installation of inverted U bike racks to be verified before Certificate of Occupancy is issued. Moved by: Seconded by: In Favor: Against: Abstain: Absent: Vacancies: 0 Chainworks District Scope Schedule as of 12-9-14 SCOPE TIMELINE December 9, 2014 - Work session of P&DB to discuss scoping document (6 pm) December 16, 2014 – Revised Scope due to staff December 18, 2014 – Work session with staff/consultant/project team 10 am December 22, 2014 –Recirculation of revised Draft Scope to distribution list January 5, 2015 – Comments on revised Scope due to Lisa January 6, 2015 – Comments on revised Scope distributed to LA January 13, 2015 - Issuance of Final Scope by P&DB